GEORGE & JERZY CONTRACTING CORP

Similar documents
Proposal. Lexington, MA. Price Work Description

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Cheshire, CT. By: A.M. Napolitano, LLC. Project Manager: Carolyne Sakonchick Ext. 323

Delta Gamma Sorority Renovation Budget Scope 3/7/2018

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Davis Frame Co., Inc. Construction Budget Considerations

Cheshire, CT. by Sunrise Land Associates, LLC. Eight gracious homes set on 16 wooded acres, architecturally designed to become classics.

Kelly Village Apartments 3118 Green Houston, Texas 77020

REHABILITATION STANDARDS CHECKLIST

TABLE OF CONTENTS Public Safety Building

Interior Remodeling Proposal

Monteleone Homes, Inc Canfield Norridge, Illinois Lot #1 Lot Size: 72 x 100 feet

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications

Cheshire, CT. by Sunrise Land Associates, LLC. Eight gracious homes set on 16 wooded acres, architecturally designed to become classics.

Cheshire, CT. Project Managers: Pat O Neill & Marilyn Rock Ext. 309 & 307

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Appalachian Log Structures Construction Cost Estimating Guide

By YR Communities.

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

STANDARD CONSTRUCTION PACKAGE Addendum A REV SITE & EXCAVATION Layout of the foundation and septic system as approved by local and state author

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No. 1-AMP Christopher Christopher Repair

Newberry. Foundation Framing

Atlantic Builders Saratoga Woods Included Features Classic Series Single Family Homes Included Features - Bridgewater II, Griffin, Ashland, Chelsey

Standard Sample Building Specification Windy Hollow, Merrimack, NH * Revised April 1st, 2015

RB Homes, Inc. 152 Witherspoon St. Princeton, NJ P: (609) / F: (609)

Included Features for The Meadows at Slate Run Single Family Homes - Bridgewater, Chelsey, Ashland

RIVERSIDE TERRACE. For more information, contact: Maggie Houston, ,

Homes at Pine Ridge - NEW CONSTRUCTION SPECS

Estimate Form for Bathroom Design and Installation

Highland Park. Exceptional Interiors (cont.) Green Technology. Designer Kitchen Features. Distinctive Exterior Features

11/1/2016. Smoke detectors will be furnished by MHA and installed by contractor.

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

Welcome to Smithfield Crossing Condominiums

Columbia County Health Care Center Added Amenities

TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up

Home Features. ELECTRICAL COMPONENTS Copper wire electrical system Minimum 150-amp electrical panel with circuit breakers

TRIPLEX BUILDING 3 TOWNHOUSE UNITS

HC Homes at Tehaleh Standard Features

Water s Edge Parkview Collection Jill Delmastro

1634 W CATALPA 5 BED 3.1 BATH ANDERSONVILLE

Burlington Model at Country Hills Estates

ADDENDUM A CONSTRUCTION SPECIFICATIONS

I N C L U D E D F E AT U R E S Catherine s Cove Series

Single Family Units. Specification Sheet - 5/14/18. 9ft. lst floor ceilings/ nd floor. Exterior Sheathing ½ Zip wall system

Schedule C STANDARD Specifications

EDISON. One Story, 3 Bedrooms, 2 Baths, Den & 2 Car Garage ELEVATION C ELEVATION D DRHORTON.COM. artist s concept.

Lot 5. 7 Liam s Lane, Methuen, MA Price: $579,500 Lot: 22,651 SQ FT Home: 2,797 SQ FT

FLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE

Lot 2. 1 Liam s Lane, Methuen, MA Pre-Construction Price: $579,500 Lot: 17,613 SQ FT Home: 2,797 SQ FT

DURKEE FARM. Welcome to Durkee Farm Estates in Littleton, MA. Dennis M. Page & Company

Electrical & designer allowance

HC Homes at Tehaleh. Framing

Gramercy Place Condo Association, Inc.

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE

OLD GRACE HOUSING CO-OPERATIVE

Sams & Associates York Field Services

YOU LL LOVE LIFE IN A NEW PENTREX HOME! Lillian Ave. ~ Des Peres 63131

Exterior Features. Interior Features

J e w e l S e r i e s. Marquis Elevation A. Elevation B

Address: Contractor: Contractor Phone: Line Item Bid Parts/Labor Labor Only Bid Week Complete (Circle One)

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

Call for more information

I N C L U D E D F E A T U R E S St. James Plantation

Residential Outline Specifications

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

New Homes Forestbrook Road. Yes, it s INCLUDED!

Front Garage Plans (T3 Lots)

QUINN COMMONS. Quinn Ln. SOLD

Boyle. contemporary new homes with great curb appeal. boyle call or 3br/2.5bth, 1905sf

Kitchen Remodel Estimator. Contact Info: Project Summary: Design. Demo

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

Helms Builders, Inc.

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No

Steel Built Estate Home in West Atascadero

FABULOUS FLORIDA LIVING

Wallingford, CT. Project Manager: Karen Charest Ext. 233

Z & C Construction, Inc. Subdivision:

Some features shown in elevations and floorplans are optional upgrades. Please refer to standard features section to view standard features included

APPLICATION AND CERTIFICATE FOR PAYMENT

Mountainview Estates.

Schedule D. RTM Finished Home Specifications

The Inspector. Property Inspection Report

NAAHB Workgroup Index General Ledger Account

BuildingAdvisor.com Estimating Checklist

FILED: NEW YORK COUNTY CLERK 09/18/ :45 PM INDEX NO /2017 NYSCEF DOC. NO. 27 RECEIVED NYSCEF: 09/18/2017 EXHIBITC

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Windsor Gardens Association Modifications Submittal Package

Price, plans and specifications are subject to change without notice. Revised 01/2018

A. F. Sterling Custom Homes Division

Lancaster Condominiums CONSTRUCTION RULES AND GUIDELINES

PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C

--*6 S CONSTRUCTION GROUP, INC SW 87 Avenue Miami, FL Phone:

New Homes Starting at $124,900

1st Defense Home Inspections, LLC

Transcription:

FILED: NEW YORK COUNTY CLERK 05/07/2015 08:12 AM INDEX NO. 161276/2013 NYSCEF DOC. NO. 34 RECEIVED NYSCEF: 05/07/2015 GEORGE & JERZY CONTRACTING CORP 64-19 Central Ave Tel: (718) 386 4344 PROPOSAL Glendale, NY 11385 Fax: (718) 386 3092 License: 1204336 TO: George W. Sweeney Architect, LLC REF: The Wilson Residence 49 W 38 th St, 16 th Fl 1070 Park Ave, Apt 4D New York, NY. 10018 New York, NY 10128 DATE: March 14, 2013 revised April 9, 2013 Hereby George & Jerzy Contracting Corp submits the following proposal to provide labor, tools and materials to perform the following scope of work as per drawings dated February 28, 2013 provided by George W. Sweeney Architect, LLC; DESCRIPTION PROTECTION: $15,337.00 Furnish labor, material and tools to cover existing floors with paper; Install plastic dust barriers as necessary; Install sticky mats at entry door; Cover public hall with paper and masonite; Provide negative pressure machine and filters for the duration of the project; Install 1/2 sound board throughout the apartment as per alteration agreement; Vacuum public hallway daily during construction; DEMO: $40,278.00 Furnish labor, material and tools to remove all wall, floor and ceiling finishes as per demo plan A- 100.00 Removal of asbestos not included TBD; Dining Room, Living Room, Master Bedroom existing crown moulding to remain; CONSTRUCTION: $93,688.00 Furnish labor, material and tools to level existing walls in three (3) Bathrooms; Furnish labor, material and tools to build new drop ceiling in Kitchen, Hallways, Closets, Bathrooms, Guest Bedroom and Laundry as per drawing A-300.00; Furnish labor, material and tools to install Laticrete water proofing membranes in three (3) Bathrooms and Laundry, Kitchen TBD-existing kitchen floor tile to remain; Furnish labor, material and tools to build new partition walls as per plan A-200.00; Furnish labor, material and tools to install sound proofing membrane Drytek 100 or Eco Sound HD; WOODWORK: $254,918.00 LIVING ROOM: Furnish labor, material and tools to install picture rail moulding Saw # 7708 as per detail 6/A- 801.00; Furnish labor, material and tools to install base moulding as per detail 1/A-801.00; The Wilson Residence Proposal Page 1

Furnish labor, material and tools to install two (2) paint grade wall units with door and adjustable shelves as per elevation 2/A-500.00 and detail 3/A-602.00; Furnish labor, material and tools to fabricate and install fire place mantel as per elevation 2/A- 500.00 and detail 1/A-603.00; Furnish labor, material and tools to fabricate and install paint radiator enclosure as per elevation 4/A- 500.00 and detail 5/A-600.00 (grille included); Furnish labor, material and tools to fabricate and install paneling over doors as per elevation 5/A- 500.00 and detail 13/A-801.00; Existing plaster crown moulding to remain; HALL: Furnish labor, material and tools to fabricate and install crown moulding; Furnish labor, material and tools to fabricate and install beaded casing moulding for two (2) openings; MECHANICAL CLOSET: Furnish labor, material and tools to fabricate and install closet interiors; FOYER Furnish labor, material and tools to fabricate and install base moulding as per detail 1/A-801.00; Furnish labor, material and tools to fabricate and install crown moulding as per detail 11-12/A- 801.00; Furnish labor, material and tools to fabricate and install paneling over four (4) doors as per elevation 2,3,4/A-501.00 and detail 13/A-801.00; MASTER BEDROOM HALL: Furnish labor, material and tools to fabricate and install picture moulding as per detail 9/A-801.00; Furnish labor, material and tools to fabricate and install paneled opening at Entry Hall; South Wall Elevation: Furnish labor, material and tools to fabricate and install closet interior; Furnish labor, material and tools to fabricate and install closet interiors with adjustable shelves; Existing crown moulding to remain; DINING/FAMILY ROOM: Furnish labor, material and tools to install picture rail moulding; Furnish labor, material and tools to fabricate and install wall paneling moulding; Furnish labor, material and tools to fabricate and install chair rail moulding; Furnish labor, material and tools to fabricate and install paneling over doors as per elevation 2-4/A- 502.00 ; Furnish labor, material and tools to fabricate and install new radiator enclosure (grille included); Note: Existing crown moulding to remain; POWDER ROOM: Furnish labor, material and tools to install mahogany crown moulding; Furnish labor, material and tools to install mahogany base moulding; Furnish labor, material and tools to install mahogany wall paneling; Furnish labor, material and tools to install mahogany vanity cabinet; MASTER BATHROOM: Furnish labor, material and tools to install crown moulding; The Wilson Residence Proposal Page 2

Furnish labor, material and tools to install medicine cabinet; Furnish labor, material and tools to install vanity; GUEST BATHROOM: Furnish labor, material and tools to fabricate and install crown moulding; Furnish labor, material and tools to fabricate and install mahogany vanity and panel over bathtub; Furnish labor, material and tools to fabricate and install two (2) medicine cabinets; MASTER BEDROOM: Furnish labor, material and tools to install picture rail moulding; Furnish labor, material and tools to fabricate and install new radiator enclosure (grille included); Furnish labor, material and tools to fabricate and install closet interior; Furnish labor, material and tools to fabricate and install paneling over doors; MASTER BEDROOM W.I.C: Furnish labor, material and tools to fabricate and install paint grade closet interior as per elevation 2,3,4,5/A-507.00; GUEST BEDROOM: Furnish labor, material and tools to install crown moulding; Furnish labor, material and tools to install picture rail moulding; Furnish labor, material and tools to fabricate and install two (2) new radiator enclosures (grille included); Furnish labor, material and tools to fabricate and install closet as per elevation 5/A-505.00; GUEST W.I.C: Furnish labor, material and tools to fabricate and install paint grade closet interior as per drawing A- 507.00 elevation 6,7,8/A-507.00; KITCHEN: Furnish labor, material and tools to remove, refurbish and reinstall part of existing cabinets; Furnish labor, material and tools to fabricate and install crown moulding to match existing; Furnish labor, material and tools to fabricate and install new cabinets to match existing; LAUNDRY: Furnish labor, material and tools to fabricate and install new mahogany cabinets; DOORS: $47,383.00 Furnish labor, material and tools to fabricate and install door as per door schedule A-800.00 dated 12/01/2012; DOOR HARDWARE: ALLOWANCE$17,640.00 Supply door hardware as per door schedule A-800.00 dated 12/01/2012; PLUMBING: $42,298.00 As per drawing A-100.00 and P-100.00: Disconnect plumbing fixtures as required; Supply roughing from existing stack to new connections and installation of fixtures; Guest Bathroom: (1) one floor mount toilet, (1) one sink, (1) bath tub; Master Bathroom: (1) one floor mount toilet, (1) one sink, (1) one shower with lead pan; The Wilson Residence Proposal Page 3

Powder Room: (1) one floor mount toilet, (1) one sink; Kitchen: (1) one sink, (1) one dish washer, (1) one gas stove, instant hot with hot and cold water and faucet in chrome finish and filter; (2) Two funnel drain with trap primers, (1) one washing machine with drip pan and leak detector, (1) one dryer; Install (5) five radiators and line to raisers; Note: Radiators not included TBD, plumbing fixtures, bathroom accessories by others; APPLIANCES: Installation included BY OTHERS ELECTRICAL: $75,854.00 Supply and install wiring for 33 (thirty three) dedicated lines; Supply and install wiring for 2 (two) dedicated lines for floor heat mat; Supply and install wiring for 2 (two) dedicated lines for humidifier; Supply and install wiring for 2 (two) thermostats (thermostats are included); Supply and install 2 (two) floor heat mats; Supply and install wiring for 20 (twenty) duplex receptacles; Install wiring for 24 (twenty four) runs for low voltage with termination (AV wires HDMI provided by other for installation); Supply and install wiring for 32 (thirty two) half switched outlets; Supply and install wiring for 29 (twenty nine) switches; Supply and install wiring for 18 (eighteen) door switches; Supply and install 25 (twenty five) dimmer switches; Supply and install wiring for 4 (four) smoke detectors (detectors are included); Supply and install wiring for 20 (twenty) speakers; Install wiring for 7 (seven) room kit, rf gateway, sons player, main rack; Supply and install wiring for 82 (eighty two) light fixtures; Supply and install wiring for 2 (two) compressors; Supply and install wiring for 2 (two) air handlers; Supply and install wiring for 2 (two) a/c pumps; Supply and install wiring for 2 (two) thermostat; Supply and install wiring for 4 (four) disconnected switches for a/c; Supply and install 2 (two) electrical boxes; Light fixtures A, A, D are included; Remove unused existing wiring All work will be done as per NYC Electrical Code. Permits, expediting, filing fees are included HVAC: $80,978.00 Drawing M-100.00 Supply and install (2) two Aerosys condensing units (CU-1 and CU-2); Supply and install (1) one Carrier air handler (AHU-1); Supply and install (1) one First Company fan coil unit (AHU-2); The Wilson Residence Proposal Page 4

Supply and install (2) two Nortec steam humidifiers (H-1 and H-2); Supply and install sheet metal ductwork with insulation; Supply and install Kitchen exhaust ductwork to connect to existing wall cap; Supply refrigerant piping; Supply and install registers and grilles, and cable-operated dampers; Supply and install (2) two louvers; Supply and install (1) one condensate pump; Supply and install emergency drain pans with safety floats switches below air handler (AHU-1), fan coil (AHU-02) and humidifiers (H-1 and H-2); Supply and install vibration isolators; Supply and install (2) two programmable thermostats; Start up and check test of operation; Provide submittals and shop drawings; Provide certified testing and balancing; Provide masonry subcontractor to do the following: -rise (2) two window sills; -install (2) two condensing unit sleeves (1) one in the Kitchen and (1) in the Laundry as per building specifications; -rig from roof; -brick up (2) two air conditioning wall openings (1) one in Playroom and (1) one in the Dining Room; NOT INCLUDED: Sidewalk bridge and/or any violations resulting from no sidewalk bridge in place; Filing, Filing fees, Controlled Inspections, Special Inspections, Work Permit and/or Use Permit; Duct leakage testing and/or any progress inspections; Fire dampers/access doors; Temporary heating and/or air conditioning; Architectural wall/ceiling access doors; Seismic restraints and/or professional engineer s analysis/confirmations of seismic code appliance; Fire stopping; Pre-existing conditions; Any heating work; Custom registers and/or grilles; Bathrooms exhaust fans and/or ductwork; Creston thermostats and/or centralized controls, and/or connection or integration to any home and/or building automation or control system; Maintenance of new and/or existing systems; TILE/STONE: $71,340.00 KITCHEN: Fabricate and install countertops and backsplash; Install floor tile; POWDER ROOM: Fabricate and install stone vanity top, backsplash and window sill; Install floor tile; GUEST BATHROOM: The Wilson Residence Proposal Page 5

Install floor and wall marble tile; Fabricate and install vanity top, backsplash, tub deck, door saddle and base; MASTER BATHROOM: Install floor and wall marble tile; Fabricate and install stone vanity top, backsplash, shower curb, frame, window sill, door saddle and base; FIRE PLACE: Fabricate and install stone top and mantel MATERIALS: Stone slabs: Statuary White, Crema Marfil, Statuary tile, stone mosaic tile, ceramic tile 6 x 3 GLASS/MIRRORS: $18,378.00 MASTER HALLWAY: Furnish and install 3/16 medium mercury mirrors as specified on doors (12 x 60 ) 5 pc; MASTER BATH: Furnish and install shower enclosure 5 x 8 Neo angle, ½ starfire tempered glass door, two fixed panels and specified hardware; Furnish and install medicine cabinet mirrors 1/4 thick, polished, crystal clear 10 pc; Furnish and install glass shelves 3/8 starfire tempered glass 9 pc; Furnish and install 1/8 crystal clear mirror applied on plywood back; POWDER ROOM: Furnish and install 1/4 crystal clear mirror, polished 4 x4 1pc, 12 x 4 1pc; GUEST BATHROOM: Furnish and install crystal clear mirrors above vanity 4 x 2 2 pc; Furnish and install mirrors above tub 2 x 4-10 4pc Furnish and install glass shelves 3/8 starfire tempered glass; Furnish and install 1/8 clear on back; MASTER BEDROOM: Furnish and install door lites ¼ starfire tempered glass 12 x 5-6 4 pc; Furnish and install 1/4 crystal clear mirror 36 x 21 1pc; GUEST BEDROOM: Furnish and install 1/4 crystal clear polished mirror 3 x 1-5 1pc; KITCHEN CABINETS: Furnish and install door lites 1/8 clear tempered glass 100 pc; WINDOWS: Two windows as per drawing A-500.00 ALLOWANCE$9,800.00 FLOORING: $12,076.00 Supply and install 2-1/4 x ¾ x random length oak flooring to hallway areas as discussed; Flooring will be blind-nailed over a layer of felt paper into the sub floor; Sand all existing and new wood flooring, including closets in apartment using three (3) grades of paper; Screen to eliminate any sanding lines; Water pop floor to raise grain and apply one coat of stain; The Wilson Residence Proposal Page 6

Apply three coats of acrylic finish; Supply and install and finish new saddles as required; PAINTING: $105,262.00 FOYER: Walls: mash, tape, skim coat, sand, prime oil base and paint latex eggshell finish; Trim (crown molding, door frames, and baseboard): repair, sand, prime oil base and paint oil base satin brush finish. LIVING ROOM: Walls: mash, tape, skim coat, sand prime oil base and paint latex eggshell finish; Trim (crown molding, picture molding, door frame, window frame, cabinets, convector covers, fire place, and baseboard): repair, sand, prime oil base and paint oil base satin brush finish; BACK HALL: Walls: mash, tape, skim coat, sand, prime oil base and paint latex eggshell finish; Trim (crown molding, doors door frames, baseboard): repair, sand, prime oil base and paint oil base satin brush finish; GUEST BEDROOM: Walls: remove wallpaper, mash, tape, skim coat, sand, prime oil base and paint latex eggshell finish; Trim (crown molding, picture molding, doors door frames, window frame, cabinets doors only, convector covers, baseboard): repair, sand, prime oil base and paint oil base satin brush finish; GUEST BATHROOM: Ceiling: skim coat, sand, prime oil base and paint latex eggshell finish; Walls above the tiles: skim coat, sand, prime oil base and paint latex eggshell finish; Trim (crown molding, door, door frame): repair, sand, prime oil base and paint oil base satin brush finish; MASTER BEDROOM HALL; Walls: mash tape, skim coat, sand, prime oil base and paint latex eggshell finish; Trim (crown molding, doors, door frames, baseboard): repair, sand, prime oil base and paint oil base satin brush finish; MASTER BEDROOM: Walls: mash, tape, skim coat, sand, prime oil base and paint latex eggshell finish; Trim (crown molding, picture molding, doors, door frames, window frame, cabinets doors only, convector covers, baseboard): repair, sand, prime oil base and paint oil base satin brush finish; MASTER BATHROOM; Ceiling: skim coat, sand, prime oil base and paint latex eggshell finish; Walls: skim coat, sand, prime oil base and paint latex eggshell finish; Trim: crown molding, door door frame, baseboard, repair sand prime oil base and paint oil base satin brush finish. DINING ROOM: Ceiling: skim coat, sand prime oil base and paint latex flat finish. The Wilson Residence Proposal Page 7

Walls: remove wall paper, mash, tape, skim coat, sand prime oil base and paint latex eggshell finish. Trim (crown molding, picture molding, door frame, window frame, panel, convector covers, baseboard): repair, sand, prime oil base and paint oil base satin brush finish; KITCHEN: Wall: repair and prime; Trim (crown molding, door frames, window frame, bead board, cabinets, baseboard): repair, sand, prime oil base and paint oil base satin brush finish; LAUNDRY: Walls: skim coat, sand, prime oil base and paint latex eggshell finish; Trim: no work; POWDER ROOM; Walls: no work; Trim: no work; CLOSETS: Ceiling and walls: repair (no skim coat), sand, prime oil base and paint latex eggshell finish; Trim (door, door frame, no cabinetry or shelves): repair, sand, prime oil base and paint oil base satin brush finish; Note: All walls ceilings and trim will get one prime and two coats of paint finish. Price does not include any glaze, high gloss, wallpaper or decorative painting. PROPOSAL TOTAL: $885,230.00 Permits, permit fees, filing, and building management approvals by others, shop drawings not included; Asbestos removal not included. Any other items not specifically included in this proposal are not included. Initial deposit (30%) - upon approval of this proposal And prior to the commencement of work: $265,569.00 Progress payment (30%): $265,569.00 Progress payment (30%): $265,569.00 Final pay (10%)-after satisfactory completion of work specified: $88,523.00 Tax not included. Capital Improvement form ST-124 must be provided. Proposal is valid for 30(thirty) days. All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the contract. All agreements are contingent upon strikes, accidents or delays beyond our control. Owner is to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workman s Compensation Insurance. Acceptance of Proposal- The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to the work as specified. Payments will be made as shown above. Further progress payments will be applicable in accordance of work completed. Date of Acceptance: The Wilson Residence Proposal Page 8

Signature Customer Print: Customer Authorized Signature Date: Contractor George & Jerzy Contracting Corp appreciates your business. Sincerely, Jerzy Jurek You, the buyer may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction. See the attached notice of Cancelation form for an explanation of this right. TRANSACTION DATE: 04/09/2013 NOTICE OF CANCELATION You may cancel this transaction, without any penalty, or obligation, within (3) three business days from the above date. If you cancel, any property traded in, any payments made by you under the contract of sale, and any negotiable instrument executed by you will be returned within (10) ten business days following receipt by the seller of your cancellation notice, and any security interest arising out of the transaction will be canceled. If you cancel, you must make available to seller at your residence, in substantially as good conditions when received, any goods delivered to you under this contract or sale: or you may, if you wish, comply with the instructions of the seller regarding the return shipment of the goods at the seller s expense and risk. If you do make the goods available to the seller and the seller does not pick them up within (20) twenty days of the date of your notice of cancellation, you may retain or dispose of the goods without any further obligation. If you fail to make the good available to the seller, or if you agree to return the goods to the seller and fail to do so, then you remain liable for performance of all obligations under the contract. To cancel this transaction, mail or deliver a signed and dated copy of this cancelation notice or any other written notice, or send a telegram, to George & Jerzy Contracting Corp at 64-19 Central Ave, Glendale, NY 11385 not later than midnight of 04/12/2013 I HEREBY CANCEL THIS TRANSACTION. DATE: BUYER S SIGNATURE: PRINT BUYER S NAME: The Wilson Residence Proposal Page 9