Velma F Thomas Early Childhood Center

Similar documents
Charles H Wacker Elementary School

Frederic Chopin Elementary School

Louis A Agassiz Elementary School

Charles H Wacker Elementary School 9746 S Morgan St Chicago, IL 60643

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621

James E McDade Elementary Classical School 8801 S Indiana Ave Chicago, IL 60619

Stephen Decatur Classical Elementary School 7030 N Sacramento Ave Chicago, IL 60645

Walter Q Gresham Elementary School

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

Harold Washington Elementary School 9130 S University Ave Chicago, IL 60619

Perkins Bass Elementary School 1140 W 66th St Chicago, IL 60621

Henry R Clissold Elementary School 2350 W 110th Pl Chicago, IL 60643

Jane Addams Elementary School S Avenue H Chicago, IL 60617

Minnie Mars Jamieson Elementary School 5650 N Mozart St Chicago, IL 60659

Donald Morrill Math & Science Elementary School 6011 S Rockwell St Chicago, IL 60629

Walter S Christopher Elementary School 5042 S Artesian Ave Chicago, IL 60632

John D Shoop Math-Science Technical Academy ES S Bishop St Chicago, IL 60643

Inter-American Elementary Magnet School 851 W Waveland Ave Chicago, IL 60613

Edgar Allan Poe Elementary Classical School S Langley Ave Chicago, IL 60628

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630

George Armstrong International Studies ES 2110 W Greenleaf Ave Chicago, IL 60645

Thomas J Higgins Elementary Community Academy S Morgan St Chicago, IL 60643

Horace Greeley Elementary School 832 W Sheridan Rd Chicago, IL 60613

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630

Ole A Thorp Elementary Scholastic Academy 6024 W Warwick Ave Chicago, IL 60634

Eugene Field Elementary School 7019 N Ashland Ave Chicago, IL 60626

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Lake Highlands North Recreation Center Summary

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

COOLIDGE SENIOR HIGH SCHOOL

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

BALLOU SENIOR HIGH SCHOOL

POWELL ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

Appendix J - Custom Uniformat for EDU Migration

FACILITY COMPONENTS - MIDDLE SCHOOL

LASALLE - BACKUS EDUCATION CAMPUS

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Timberglen Recreation Center Summary

FACILITY COMPONENTS - ELEMENTARY SCHOOL

RAYMOND EDUCATION CAMPUS

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School

NALLE ELEMENTARY SCHOOL

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Beckley-Saner Recreation Center Summary

Reilly Elementary School Site Summary

CODE COMPLIANCE PLAN REVIEW PROCEDURES

FRAMING INSPECTION GENERAL

Mills Elementary School Site Summary

Delco Activity Center Site Summary

The Report: Priority 1 thru 5 $ 2,933,064 New Construction $ 6,797,031 Less Redlined Items $ 218,060

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

School Without Walls

Harry Stone Recreation Center Summary

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

GARFIELD ELEMENTARY SCHOOL

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

Administrative Offices

1065 N Canyon St, Ste. 8, Hildale, UT Cell: (435) S Pioneer

STUART-HOBSON MIDDLE SCHOOL

BVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014

DRAFT. Carruth Administration Center Site Summary. Address West 6 th Street Austin, TX Number of Permanent Campus Facilities 6

K.B. Polk Recreation Center Summary

KEY ELEMENTARY SCHOOL

Facilities Management Services & Funding Guide Centrally Funded and Recharge Services

SEATON ELEMENTARY SCHOOL

A/E Design Deliverable Checklist

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Exhibit A Library Shell Construction

Corsicana High School

Barrington Elementary School Site Summary

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

Asset Overview Report By Asset Name

NYC Department of Education

Alabama Home Inspections

Facility Assessment Report, Montgomery Independent School District

NYC Department of Education

Prepared by. Christopher La Follette. Fidelis Management, Inc.

Menchaca Elementary School Site Summary

DRAFT. Govalle Elementary School Site Summary Valley Hill Circle Austin, TX Number of Permanent Campus Facilities 2

BARNARD ELEMENTARY SCHOOL

0B MAGNOLIA HALL. Scale: 1:110. Date: Feb Time: 7:40 pm. User: brady. 10 ft

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

The GLOBE Academy at Heritage School

Thurgood Marshall Recreation Center Summary

AGILITAS Property Development

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. : The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CHIMNEY 4 5 6 7 Brick Chimney - Concrete/ Mortar Liner YEL 4 17 17 LF $93,594 $93,594 DOORS Exterior Stainless Steel Door Exterior Steel Door 4 YEL 4 1 5 6 GRE 6 9 7 1 EA $5,097 9 EA $2,973 $8,069 Assessment Date: 1/4/2013 Page 1 of 10

ENTRANCE Concrete Exterior Stairs Entrance Controls - Audio Stair Handrails FOUNDATION 4 5 6 GRE 6 201 GRE 6 2 GRE 6 66 7 201 LF $21,557 2 EA $858 66 LF $22,415 Concrete Foundation 4 5 6 7 GRE 7 611 611 LF LIGHTING Exterior Lights - Wall Mounted LINTELS Lintels - Steel PARAPET Coping - Metal Coping - Stone Parapet < 16" Height Parapet 16" to 30" Height 4 5 6 GRE 6 7 4 5 6 GRE 6 363 4 5 BLU 5 21 6 GRE 6 597 GRE 6 48 GRE 6 21 549 7 7 7 7 EA $1,502 $1,502 363 LF $13,704 $13,704 21 LF $589 597 LF 48 LF $7,475 570 LF $120,731 $128,794 Assessment Date: 1/4/2013 Page 2 of 10

ROOF SYSTEM Asphalt Gravel Ballast Roof Exterior Downspouts Metal Roof Roof Structure: Concrete 4 5 BLU 5 11,830 6 20 GRE 6 682 7 GRE 7 11,830 11,830 SF $150,730 120 LF $2,231 682 SF $5,149 11,830 SF $158,110 SUPERSTRUCTURE Concrete 4 5 6 7 GRE 7 16,056 16,056 SF WALLS Brick Stone - Cut Stucco WINDOWS Windows - Sash Aluminum Double-pane EXTERIOR ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Corridors and Stairs 4 5 6 GRE 6 8,890,525 ORA 3 237 4 5 6 GRE 6 2,046 4 5 6 ORA 3 2,228 7 7 7 8,890 SF $58,733 1,525 SF $21,808 237 SF $11,862 $92,402 2,046 SF $17,555 $17,555 $536,145 1 EA $1,430 2,228 SF $6,850 Assessment Date: 1/4/2013 Page 3 of 10

Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency Battery Packs - Toilets Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - CCTV Security System - Intrusion detection MAIN SERVICE Main Electrical service 1000 A and below 120/208/3PH POWER DISTRIBUTION Lighting and power panels ELECTRICAL FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System FIRE PROTECTION ORA 3 1,834 ORA 3 870 ORA 3 18 ORA 3 5 ORA 3 6 ORA 2 9 ORA 2 2 6,056 6,056 6,056 4 5 6 4 5 6 GRE 6 3 4 5 6 6,056 6,056 7 7 7 1,834 SF $3,278 870 SF $3,110 18 EA $9,730 5 EA $2,703 6 EA $3,243 9 EA $8,366 2 EA $1,859 1 EA $1,430 16,056 SF $9,643 16,056 SF $22,960 16,056 SF $14,924 $89,526 1 EA $6,435 $6,435 3 EA $2,145 $2,145 $98,106 16,056 SF $5,740 16,056 SF $19,516 $25,256 $25,256 Assessment Date: 1/4/2013 Page 4 of 10

MECHANICAL AIR HANDLING SYSTEMS 4 5 6 7 Air Handling Package - Single Zone - Steam less than 4,000 cfm ORA 2 1 1 EA $35,750 $35,750 HEATING DEVICES 4 5 6 7 Radiators - Steam ORA 3 34 34 EA $47,648 $47,648 VENTILATION Exhaust Fan - Indoor MECHANICAL PLUMBING PIPING 4 5 6 7 1 EA $501 $501 $83,898 4 5 6 7 Domestic Piping - Cold Water from Risers to Fixtures 16,056 SF $2,755 Domestic Piping - Cold Water Risers 16,056 SF $5,281 Domestic Piping - Hot Water from Riser to fixtures 16,056 SF $18,368 Domestic Piping - Hot Water Risers 16,056 SF $4,133 Domestic Piping Cold Water Horizontal lines 16,056 SF $14,235 Domestic Piping Hot Water Horizontal lines 16,056 SF $8,495 Sanitary Piping 16,056 SF $9,873 Vent Piping 16,056 SF $5,740 $68,880 Assessment Date: 1/4/2013 Page 5 of 10

PUMPS Ejector Pump PLUMBING INTERIOR ADMINISTRATIVE SUITES Ceiling - Splined Flooring - Tile/Sheet Lighting - Pendant/Surface Walls - Concrete Block Walls - Structural Glazed Tile DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw DRINKING FOUNTAINS Single Fountain KITCHEN Ceiling - Exposed Flooring - Tile/Sheet 4 5 6 4 5 6 GRE 6 892 GRE 6 892 GRE 6 9,126 GRE 6 354 4 5 6 GRE 6 28 4 5 6 GRE 6 3 4 5 6 GRE 6 477 GRE 6 477 7 7 7 7 7 1 EA $3,003 $3,003 $71,883 892 SF $1,913 892 SF $1,276 9 SF $6 1,126 SF $3,220 354 SF $2,531 $8,947 1 EA $283 28 EA $7,928 $8,211 3 EA $1,158 $1,158 477 SF $1,241 477 SF $682 Assessment Date: 1/4/2013 Page 6 of 10

Lighting - Pendant/Surface Wall - Concrete Block LUNCHROOM Ceiling - Exposed Flooring - Tile/Sheet Lighting - Pendant/Surface Wall - Concrete Block MECHANICAL/SERVICE ROOMS Janitor's Closet Storage Room STAFF RESTROOM Accessories Ceiling - Exposed Ceiling - Splined Floor Drain Flooring - Concrete Flooring - Tile Ceramic/Porcelain Lavatory Lighting - Pendant/ Surface Lighting - Wall Mounted Partitions Urinals Wall - Concrete Block Wall - Structural Glazed Tile GRE 6 4 GRE 6 868 4 5 6,834,834 2,556 4 5 BLU 5 1 6 GRE 6 437 4 5 6 GRE 6 870 21 GRE 6 749 GRE 6 2 21 GRE 6 749 GRE 6 7 GRE 6 6 GRE 6 5 5 GRE 6 530,587 7 7 7 4 SF $3 868 SF $2,482 $4,409 1,834 SF $3,462 1,834 SF $2,623 12 SF $9 1,556 SF $4,450 $10,543 1 SF $11 437 SF $2,062 $2,074 870 SF $6,718 121 SF $228 749 SF $1,607 2 EA $601 121 SF $571 749 SF $1,907 7 EA $2,603 6 SF $4 5 EA $143 15 EA $2,690 1 EA $372 530 SF $1,516 1,587 SF $11,347 Assessment Date: 1/4/2013 Page 7 of 10

Water Closet INTERIOR ROOM CASEWORK Casework CEILING 5 4 5 6 35 7 15 EA $5,577 $35,883 $71,224 135 LF $4,826 $4,826 4 5 6 7 Splined Ceiling BLU 5 7,022 7,022 SF $39,764 $39,764 CHALK BOARD 4 5 6 7 Chalk Board YEL 4 184 184 LF $22,365 $22,365 CORRIDORS Concrete Block Pendant/Surface Splined Stair Handrails Structural Glazed Tile Tile/Sheet Flooring 4 5 6 GRE 6 3,168 GRE 6 2,209 GRE 6 2,209 GRE 6 45 GRE 6 2,342 GRE 6 2,228 7 3,168 SF $9,060 2,209 EA $1,579 2,209 SF $4,738 45 LF 2,342 SF $16,745 2,228 SF $3,186 $35,310 Assessment Date: 1/4/2013 Page 8 of 10

FLOOR Tile/Sheet LIGHTING 4 5 6 BLU 5 5,514 1,508 7 7,022 SF $33,381 $33,381 4 5 6 7 Pendant/Surface YEL 4 72 72 EA $28,314 $28,314 STAIRS Tile WALL Concrete Block Structural Glazed Tile ROOM SITE CIVIL/DRAINAGE 4 5 6 8 4 5 6 GRE 6 6,832,688 7 7 18 SF $136 $136 6,832 SF $19,540 1,688 SF $12,069 $31,609 $195,705 Catch Basin Site Drain Site Manhole 4 5 6 GRE 6 2 7 GRE 7 3 1 EA $543 2 EA $223 3 EA $766 Assessment Date: 1/4/2013 Page 9 of 10

FENCING Chain Link Ornamental Iron 4 5 BLU 5 17 6 7 GRE 7 228 17 LF $608 228 LF $608 LANDSCAPE Grass Hardscape - Concrete Planting Beds/ Areas SIDEWALKS Internal Walks Perimeter Sidewalks SITE Campus Need ² ³ 4 5 6,883 GRE 6 78 2,855,018 4 5 6 GRE 6 93 GRE 6 2,718 7 7 1,883 SF $754 2,933 SF $5,875 1,018 SF $6,629 93 LF $878 2,718 SF $5,130 $6,008 $14,012 $1,096,229 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 1/4/2013 Page 10 of 10