CREATION OF WATER RESOURCES Construction of Farm ponds for individual farmers

Similar documents
Implementation Guidelines

7. REFER VANS (Refrigerated Transport):

7. REFER VANS (Refrigerated Transport):

3. INTEGRATED PACK-HOUSE

DETAILED GUIDLINES FOR CULTIVATION OF DIFFERENT MEDICINAL PLANT SPECIES UNDER NMMP & ONWARD

Impact of Andhra Pradesh Micro Irrigation Project (APMIP) on the Beneficiaries

Government of Karnataka

Guidelines for Paddy Mission under NADP

APPENDIX APPLICATION FOR SANCTIONING PART- FINAL WITHDRAWALS FROM GENERAL PROVIDENT FUND

ECONOMIC ANALYSIS OF FARM PONDS IN TUNGABHADRA PROJECT COMMAND AREA OF KARANATAKA, INDIA

GOVERNMENT OF TELANGANA

Subsidy Scheme for GlobalGAP Certification for growers of Alphonso Mango, Kesar Mango, Banana, Pomegranate, Orange Fruit for the Year

PUNJAB AGRO FARMING. A Part of Himalaya Group of Companies PROFILE SINCE 2007

INITIATIVES OF THE MINISTRY UNDER MGNREGA FOR ADDRESSING THE DESERTIFICATION, LAND DEGRADATION & DROUGHT(DLDD) CHALLENGE

CHAPTER VII. Tamil Nadu Watershed Development Agency

GUIDELINES FOR REPAIR, RENOVATION AND RESTORATION WATER BODIES WITH EXTERNAL ASSISTANCE

To achieve the above objectives, the following strategies will be adopted:

Convergence of Schemes for Livelihood Promotion in FRA Lands: A Case Study of ITDA, Bhadrachalam in the Erstwhile Andhra Pradesh L REDDEPPA 1

GPS INSTITUTE OF AGRICULTURAL MANAGEMENT- BENGALURU

A Brief excerpt from NBA Guideline Bihar State Water and Sanitation Mission (BSWSM)

Directorate of Horticulture Odisha, Bhubaneswar

Convergence of NREGS with Water Resource Department in the State of M.P. Date

NOTICE INVITING QUOTATION

G.O.Rt. No.1292 Dated: Read the following

Cost of Cultivation and Yield Rates of Paddy Crop in Agriculture: A Comparative Study between Irrigated and Un-Irrigated Areas of Telangana State

Impact Assessment of Watershed Development Programme A Case Study of Itagi Sub Watershed

NOTICE INVITING TENDERS

GOVERNMENT OF ODISHA DEPARTMENT OF AGRICULTURE AND FARMERS EMPOWERMENT

Feasibility of Pipe Distribution Network (PDN) over Canal Distribution Network (CDN) For Irrigation

Guidelines for the programme of Integrated Development of 60,000 Pulses Villages in. Rainfed Areas under RKVY for the Year

Template for the Information Handbook under Right to Information Act

Comparative economics of Banana cultivation in Anand district of Gujarat

Standard Bidding Document TECHNICAL BID. Raja Narendra Lal Khan Women's College

TENDER APPLICATION FORMAT

t)l URGEI\T Implementation of Jammu and Kashmir Right to Information Act, Subject:- Circular wo.jf - GAD of / Dated:- 0f

A PROJECT FOR DEVELOPMENT OF GRAPE ORCHARD

Employment Notification No.: WBPDCL/Recruitment/ /04

THE NATIONAL SMALL INDUSTRIES CORPORATION LTD. (A GOVERNMENT OF INDIA ENTERPRISE) Technical Services Centre, Balitikuri, Howrah

Revised Guideline of PKVY as per 10 th December 2015

institutions and Public Sector Undertakings for similar works.

Project Proposal For Establishment

NORTHERN POWER DISTRIBUTION COMPANY OF TELANAGANA LIMITED WARANGAL, TELANAGANA Appendix I APPLICATION FOR SUPPLY OF ELECTRICITY AT LOW TENSION

7. AGRICULTURAL ENGINEERING

MKSP KUDUMBASHREE ABSTRACT THE RESTRUCTURED MKSP PROJECT FOR THE SECOND PHASE OF IMPLEMENTATION THROUGH THE JLGS UNDER KUDUMBASHREE

BHAVAN, 4/2ASHOK NAGAR,.P.B NO: 227 GUNTUR PH.NO: /943,FAX:

This issues with the approval of the competent authority.

3. AGRICULTURAL ENGINEERING. 1. Introduction

KARNATAKA COUNCIL FOR TECHNOLOGICAL UPGRADATION (A

INVITATION OF E- TENDER RE-DISCOVERY OF MICRO IRRIGATION SYSTEM COMPONENTS PRICE AND

Context: Public works programs in India

Bio-data of the Promoters

TENDER DOCUMENT FOR PROVIDING OFFICE / FACTORY STAFF IN THE UNITS OF

Indian Maritime University Chennai Campus (A Central University Govt. of India) East Coast Road, Uthandi, Chennai

Odisha Power Generation Corporation Limited IB Thermal Power Station

INDIAN INSTITUTE OF TECHNOLOGY INDORE

Name of the Work Estimated Value Earnest Money Cost Of Detailed NIT.

Vidarbha Intensive Irrigation Development Programme

MSME-TECHNOLOGY DEVELOPMENT CENTRE (Central Footwear Training Institute, Chennai)

Implementation. Guidelines

The National Small Industries Corporation Ltd 422, Anna Salai Chennai NOTICE INVITING TENDER

Department of Information and Public Relations, Government of Andhra Pradesh invites applications from reputed advertising agencies for empanelment.

Convergence of MGNREGS. with other Schemes in the Area. A Resource Booklet for MGNREGS Functionaries:

REGISTRATION DOCUMENT

COST AND RETURNS ESTIMATES

DECCAN COLLEGE AND POST GRDUATE &RESEARCH INSTITUTE, PUNE TENDER DOCUMENT FOR B-1 FORMAT AGRREMENT BOND NO OF 2018

Circular No.1 /04, Dt. 28 th CIRCULAR

TENDER NO- 02/2012/RAJ

RECRUITMENT NOTICE FOR THE FOLLOWING POST IN HQ EASTERN COMMAND (ADM), PIN , C/O 99 APO

A. PROOF OF CLAY MINING FOR BRICK KILN

No. C2/Rect./Sr. Dy. CAO/2016 Dt To The Chairmen, All Major Ports.

BRIEF NOTE ON WATER CONSERVATION MISSION (NEERU-MEERU)

FARM MECHANIZATION GUIDE LINES ANDHRA PRADESH

NABARD Consultancy Services Private Limited (An ISO 9001:2008 Company) A Wholly owned subsidiary of NABARD

Obligations of Public Authorities as per Section- 4 (1) (b) of RTI Act, 2005

Agriculture & Farmers welfare in. Andhra Pradesh

(i) Total service (including broken period of service) : Date on which he/she has been completed fifteen

Flagship Program. August Pradhan Mantri Gram Sadak Yojana (PMGSY)

Advt. No. 1/2010, website Closing date: Closing Time: hrs.

Principal Secretary, Agriculture welcomed all the dignitaries and guests and briefed about the meeting.

No. J-11017/ 40/2011-MGNREGA (UN) Subject: Muzaffarpur Model on road side plantations under MGNREGS

6 Details of Artifacts available for exhibition including the reserve collections: Please enclose detailed lists showing the following parameters:

CIVIL DEPARTMENT. Name of the Work-RW: - GI Chainlink fencing. Name of the Bidder: - Address: - Phone No.: - Mobile: - -

AGRICULTURE DEPARTMENT

EPDCL, VSP P&MM Prevention of misuse of material and streamlining of procedures Guidelines issued Regarding.

Central Research Institute for Dryland Agriculture Hyderabad

HMT MACHINE TOOLS LIMITED, Regd. Office HMT Bhavan, No. 59, Bellary Road, BANGALORE

EXPRESSION OF INTEREST (EOI)

OFFICE OF THE TRANSPORT COMMISSIONER, (CHAIRMAN STATE TRANSPORT AUTHORITY), J&K, GOVERNMENT, JAMMU TENDER NOTICE

PROJECT REPORT 5MT COOL CHAMBER

Watershed Success Stories from Andhra Pradesh

Implementation of MGNREGS in Andhra Pradesh In India India case in controlling error, fraud and corruption. Government of Andhra Pradesh, India

HMT MACHINE TOOLS LIMITED, Regd. Office HMT Bhavan, No. 59, Bellary Road, BANGALORE

Transit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur Notice Inviting Tender

ICT solution for NREGA Implemented in Andhra Pradesh

Governance of surface water and groundwater for irrigation in Hard rock areas of India

KBK Districts: A unique approach towards development

Economics of Supplemental Irrigation to FCV Tobacco Using Harvested Water in Alfisols of Prakasam District, Andhra Pradesh

RASHTRIYA MADHYAMIK SIKSHA ABHIJAN, ASSAM

Title: RKVY Project Seed Replacement Ratio by National Seeds Corporation Ltd

COLLEGE OF AGRICULTURE, NAGPUR

Transcription:

CREATION OF WATER RESOURCES Construction of Farm ponds for individual farmers Introduction: Farm ponds are the man made tanks constructed for storage of water in the farmers field during rainy season from canals, bore wells, rainfall etc., and to provide life saving irrigation to the crops or orchards during peak / critical stages of summer to save the plants from drying up. These are constructed by excavating the soil and depositing the earth on the banks to form bund. The HDPE geo-membrane sheet/rcc lining is laid in the excavated pond to arrest seepage and infiltration losses. Subsidy pattern: As per the MIDH norms of GOI, the size of the farm pond should be 20mx20mx3m with the volume of 1200 cu.mt. The total cost of the unit is Rs.1.50 Lakhs. The financial assistance is 50% i.e Rs 75,000/- for 1200 cu.mt @ 125/- per cu.m on the total cost including 300 micron plastic / RCC lining. Cost for non-lined ponds (only black cotton soils) will be 30% less. For smaller size of ponds, cost will be admissible on pro rata basis depending upon the command areas/volume of the Farm pond. Procedure 1 Farmers are to be sensitized and Motivated by HOs/ADHs to understand the concept of farm ponds to provide lifesaving irrigation to the orchards/ crops during peak periods of summer to save the gardens. 2 Beneficiaries are to be identified in Gramasabhas and list has to be approved in Gramasabha.

3 The Horticulture officer and MI Engineer of APMIP have to conduct the preliminary inspection of site identified by the farmer and collect the following details for assessing the feasibility. Name of the farmer Father/ Husband s name Caste/ category of farmer i.e. SF/MF & SC/ST. Name of the Horticulture crop grown and its extent in Ha. Nature of irrigation source: whether the Bore well is functional Yes/No. Energization was done Yes/No. Nature of soil condition suitable for excavation of farm ponds and feasibility of the site for taking up of farm ponds. 4 At the time of inspection of the site, the geocoordinate of the location and a digital photo may be taken along with the farmer and HO & MI Engineer at the site proposed for farm pond (Before excavation). This together with the techno feasibility report duly certified by HO & MI Engineer and application of farmer should be submitted to ADHs. 5 The ADH should strictly follow the SC/ST allocation while implementation of the programme. 6 After receipt of the application along with techno feasibility report, the same will be placed before District Mission committee for approval. 7 Based on the DMC approval, the administrative sanction will be issued to the farmers, for taking up the farm pond as per the guidelines, and time limit for completion of farm pond may be indicated as 60 days from the date of issue of administrative sanction. 8 The farmers have to take up excavation work, bunding and covering of plastic sheet as per specification (300 microns)/ RCC lining. Lining material should confirm with BIS standards. The farmer has to provide fencing to farm pond at his own cost. 9 Chain linked mesh for fencing preferred rather than barbed wire fencing.

10 The farmer should strictly follow the specifications of farm ponds as given in the administration sanctions. The farmer is also allowed to use 500 microns Geomembrane sheet with 200 GSM in place of 300 microns plastic sheet. However the farmer has to meet additional expenditure over and above the unit cost fixed by GOI. 11 The existing RCC lined farm ponds and old incomplete farm ponds are not eligible for subsidy. 12 The HO/ADH will assist the farmer technically on quality of plastic sheet proposed for lining etc. and also inspect the farm pond from time to time and give necessary technical advice. 13 After completion of the farm ponds, the farmer has to submit completion report of farm pond along with specification to HO and ADH of their district. 14 The MI Engineer will take the check measurements of farm pond and record it in the M Book and if the farm pond is completed as per specification, then photograph will be taken with farmer & joint inspection team with farm ponds. 15 The size of the farm pond should be 20m length X 20m width X 3m depth. The length 20m indicates the average of the Top and Bottom lengths of the farm pond. Width is also calculated in a similar manner and the total volume of the farm pond should be 1200 cu.m. The eligible subsidy should be calculated basing on the actual volume @ Rs 62.50/- /cu.m of the pond 16 For smaller size of ponds, cost will be admissible on pro rata basis depending upon the command areas / Volume of the farm pond. 17 Payment will be made to the beneficiary in 2 installments. 50% of the eligible subsidy will be released as 1 st installment after completion of excavation and bund formation. The ADH should send proposal to COH for release of assistance in format I. (enclosed) along with bond executed by farmer with ADH. 18 Final payment of 50% of eligible subsidy will be released after completion of farm pond including erection of fencing and sign board after inspection by the Joint committee. (enclosed)

19 The installments will be released to the farmers subject to condition that the farmer has to enter an agreement on stamped paper worth of Rs. 100/- stating that the farm ponds will be completed as per the norms & guidelines of MIDH, within the specific time. In case if the farm pond is not completed as per norms and stopped in the middle after receipt of installment I. The farmer should be liable for return of the amount to the Department of Horticulture, to the extent of subsidy received by him along with panel interest. 20 The Joint committee comprising of Farmer/MI Engineer or HO/ADH/ DDH (or) PD APMIP should finally inspect the farm pond and take digital photographs. 21 The Joint inspection report should be submitted in format II to the Commissioner of Horticulture for release of final installment of eligible subsidy. 22 ADHs/Hos shall ensure that the beneficiary will take up maintenance of the farm pond. 23 The outer slopes of the farmpond bunds are to be utilized for taking up seasonal crops which will not only strengthen/ Control the soil erosion of the bund and also remunerative for income generation to the farmers. The ADHs/HOs are requested to motivate the farmers to take up the crops on the outer slopes of the farmponds. 24 Fencing should be completed simultaneously. 25 Farm ponds should be linked with drip irrigation. 26 A display board (Iron) of Size 2x4 ft depicting the following details in Telugu version has to be erected. Department of Horticulture Government of Andhra Pradesh and MIDH GOI Name of the farmer: Father / Husband: Total expenditure: Village : Subsidy amount(rs): Size of farm pond : Non- subsidy amount: Capacity of farm pond: year of sanction: Command area:

27 If the farm pond is completed in all aspects as per the specification then the ADH will upload the final photos through HORTNET and eligible subsidy will be paid to farmer account by online directly. 28 The ADH is responsible for proper implementation of this programme, strictly as per the norms/guidelines of GOI without any deviation.

FORMAT I ( Individual Farm Pond) Joint inspection report for release of 1 st Instalment Total S. No Particul ars Specifications Obs erva tion s Cost incurre d (Rs) Remarks 1 2 3 4 5 6 7 8 9 10 1 2 3 Pond Excavati on Capacity in Cu Mts Bund formation Grand Total Measurements : Top:L1XB1 mts: Bottom:L2XB2 mts, depth (L1 + L2) X (B1 + B2) X depth 2 2 Eligi ble sub sidy Ist instalm ent Eligibl e Subsid y (Rs) Certificates: 1) This is to certify that the land is uitable for the construction of farm ponds. 2) This is to certify that Sri/Smt S/o was issued DMC administrative approval 3) This is to certify that Sri/Smt S/o has constructed Farm pond as per the specifications of MIDH. 4) This is to certify that all the original bills of the expenditure incurred towards the items mentioned above have been verified by the team and found correct. 5) This is to certify that Sri/Smt S/o was not sanctioned subsidy under Farmpond earlier. 6) The farmer is eligible for release of the subsidy amount of Rs. (Rupees ) as 1 st in Rs. may be released as 1 st instalment. Na me of the Ba nk & Br an ch Ban k A/c No and IFS C cod e Farmer MI Engineer Horticulture Officer ADH DDH/PD APMIP

S. N o Particulars Specifications FORMAT II ( Individual Farm Pond) Joint inspection report for release of 2nd & final instalment Obse rvatio ns Total Cost (Rs) Eligi ble cost (Rs) Eligibl e Subsid y (Rs) Subsidy relesed Propose d to be release d Bank detail s 1 2 3 4 5 6 7 8 9 10 1 Pond Excavation Measurements : Top:L1XB1 mts: Bottom:L2XB2 mts, depth Rema rks 2 Capacity in Cu Mts 3 Cost of Sheet Smoothening 4 of surfaces Sheet fixing 5 charges 6 Sub Total 7 Fencing Sub Total Grand Total (L1 + L2) X (B1 + B2) X depth 2 2 Geomenbrane/HD PE sheet of 500 microns Cost of link mesh No.of granite poles Labour Charges Certificates: 1) This is to certify that Sri/Smt S/o has constructed farm pond as per specifications of MIDH. 2) This is to certify that all the original purchase bills of the items mentioned above have been verified by the team and found correct. 3) This is to certify that Sri/Smt S/o was not sanctioned subsidy under Farmpond earlier. 4) This is to certify that an amount of Rs. (Rupees ) is released as 1st instalment. 5) The farmer is eligible for subsidy of Rs. (Rupees ) as per the specifications of farm pond and an amount of Rs (Rupees ) may be released after deducting amount released as 1st instalment. 6) The subsidy amount of Rs. (Rupees ) may be released. Farmer MI Engineer Horticulture Officer Assistant Director of Horticulture DDH/PD APMIP

APPLICATION FORM FOR COMMUNITY FARM FONDS/ INDIVIDUAL FARM POND. (Separate application has to be collected along with photograph for all the farmers involved in community farm ponds) 1. Name of the Farmer in Full : 2. Father (or) Husband name : 3. Village : 4. Mandal : 5. Survey No. : 6. (A).Category of SC /ST / BC : (B). Category of SF / MF/OF : 7. Total extent of land holding Ha : Details from web land records 8. Adhar card No. : (Enclose & Xerox copy of Adharcard) 9. Name of the existing crop Ha : No. of plants per Ha Photo of farmer (Including of Horticulture plantations) 10. No. of Bore / Bores : Functioning Yes / No 11. Energisation done to motor : Yes / No 12. Electrification facilities existing : Yes / No 13. Bank details: 1. Farmer SB A/C No : 2. Name of the bank & Branch : 3. I.F.S.C. code : 14. Nature of soil condition : Suitable for soil excavation. (i.e. Black soil/ sandy loan / Red soils/ other) 15. Drip facilities available : Yes / No 16. Mobile No: Certified that the information furnished by me is true and correct to the best of my knowledge. I/ we agree to take up farm pond (community / individual) as per the specifications and guidelines of MIDH, for release of eligible subsidy. Signature of Farmer.

Certification of the inspected authority HO & MI Engineers 1. Certified that the preliminary inspection has been conducted, for the proposed community irrigation tank. Contacted the group of farmers ( ), and found that the soil is suitable for taking up community farm pond with size, can irrigate Ha, and recommended for taking up community farm pond as per MIDH guidelines & specifications. The Digital photo graph of the site before taking up community farm pond is enclosed. Signature of Ho Date: Signature of MI Engineer Date: Approval of ADH

CREATION OF WATER RESOURCES COMMUNITY TANKS / ON FARM PONDS / ON FARM WATER RESERVOIR Objective: The main objective of Construction of community tanks / on farm ponds / on farm water reservoir with use of plastic / RCC lining is to ensure life saving irrigation to crops in 10 ha. of command area. Cost norms / pattern of assistance of Government of India: Item Cost norms Pattern of assistance Community tanks / on farm ponds / on farm water reservoirs with use of plastic / RCC lining Rs. 20.00 lakhs/ unit in plain areas and Rs. 25.00 lakhs / unit for hilly areas. 100% of cost to irrigate 10 ha. of command area, with pond size of 100mx100mx3m (or) any other smaller size on prorate basis depending upon the command area either use of minimum 500 micron plastic films (or) RCC lining, owned & managed by a community / farmer group. Cost for non-lined ponds / tanks (only in black cotton soils) will be 30% less. Assistance will be restricted to the cost of plastic / RCC lining. However, for non MNREGS beneficiaries, assistance on entire cost including construction of pond/ tank as well as lining can be availed under the scheme. The community tanks / on farm ponds / on farm water reservoir with use of plastic / RCC lining should be taken up by group of 5-10 farmers, for which farmer wise details, indicating crop etc need to be collected. The unit cost is Rs. 20.00 lakhs/unit in plain areas and Rs. 25.00 lakhs/unit for hilly areas. The pond size shall be 100m x 100m x 03 m to irrigate 10 ha. command area (or) any other smaller size on prorate basis depending upon the command area. Cost for non-lined ponds/tanks (only in black cotton soils) will be 30% less, and assistance will be restricted to cost of plastic / RCC lining. Either RCC lining or 500 micron plastic films shall be used for lining of community tanks. Linning material should confirm with BIS standards.

This programme can be done in conjunction with MGNREGS and wherever possible adequate convergence has to be ensured. The water bodies shall be linked with micro irrigation facility for judicious use of water. However, where MGNREGS assistance is not available, 100% assistance including cost of lining/rcc lining will be provided, within subsidiary norms MIDH i.e. not exceeding Rs 20.00 laksh in plain area and 25.00 lakhs in hilly areas, and additional expenditure if any over and above subsidy limit need to be born by farmer / farmers. PROCEDURE FOR IMPLEMENTATION: 1. Farmers cultivating horticulture crops are eligible. 2. Farmers are to be sensitized and Motivated by HOs/ADHs to understand the concept of farm ponds to provide lifesaving irrigation to the orchards/ crops during peak periods of summer to save the gardens. 3. Beneficiaries are to be identified in Gramasabhas and list has to be approved in Gramasabha. 4. The Horticulture officer and MI Engineer of APMIP have to conduct the preliminary inspection of site of identified farmer and collect the following details for assessing the feasibility (Application Form of farm / farmers inspection report of site is enclosed). Name of the farmer Father/ Husband s name Caste/ category of farmer i.e. SF/MF & SC/ST. Name of the Horticulture crop grown and its extent in Ha. Nature of irrigation source: whether the Bore well is functional Yes/No. Energization was done Yes/No. Nature of soil condition suitable for excavation of farm ponds and feasibility of the site for taking up of farm ponds. 5. After inspection of the site, a digital photo may be taken along with the farmer and HO & MI Engineer at the site proposed for farm pond (Before excavation) and the techno feasibility report duly certified by HO & MI Engineer along with application of farmer is to be submitted to ADHs. The

opinion of the local engineer, irrigation department has to be taken in respect of techno feasibility assessment. 6. The ADH should strictly follow the SC/ST allocation in implementation of the programme. 7. After receipt of the application along with Technical feasibility report, the same shall be placed before District Mission Committee for approval. 8. Based on the approval by DMC, the administrative sanction shall be accorded, for taking up the farm pond as per the guidelines. The time limit for completion of community tanks may be indicated as 60 days from the date of issue of administrative sanction. 9. The farmers have to take up excavation work, bunding and lining with plastic sheet as per specification (500 microns) / RCC lining. The farmers have to provide chain linked mesh fencing to community tanks at their own cost. 10. The farmers should strictly follow the specifications of community tanks as given in the administration sanction. 11. The existing RCC lined community tanks and old incomplete community tanks are not eligible for subsidy. 12. Lining material should confirm to BIS standards. 13. Farm ponds with a group of farmers proposed to be constructed; the ADH should discuss with PD, DWAMA for convergence or get it approved by district Collector. 14. The water bodies shall be linked with micro irrigation facility for judicious use of water therefore the farmers having electricity connection are to be selected. 15. The HO/ADH shall give technical assistance to the farmer on quality of plastic sheet/ RCC proposed for lining etc. besides inspecting the community tanks from time to time for necessary technical advice. 16. After completion of the community tanks, the farmers have to submit completion report of community tanks along with specification to HO and ADH of the district.

17. The MI Engineer shall check measure community tanks and record it in the M Book. If he community tanks are completed as per specification, the joint inspection team consisting farmer, HO/MI Engineer, ADH, PD APMIP/DDH should inspect and recommend for subsidy based on ground reality. 18. The Geo Coordinates for the calculation of area of farm ponds shall be obtained by using GPS coordinators for accuracy and effective implementation of the scheme. 19. The size of the Community tank should be 100m length X 100m width X 3m depth. The length 100m indicates the average of the Top and Bottom lengths of the farm pond. Width is also calculated in a similar manner and the total volume of the farm pond should be 30000 cu.m. 20. For smaller size of ponds, cost will be admissible on pro rata basis depending upon the command areas / Volume of the farm pond. 21. The measurement of smaller size farm ponds less than 100mX100mX3m should be calculated taking average of the Top and Bottom length of that particular side as done for normal size and volume. The eligible subsidy should be calculated basing on the actual volume on prorate basis. 22. The assistance will be released stage wise in three installments as detailed below and the unit cost will be limited to the ceiling prescribed under MIDH. Before release of subsidy in installments directly to farmers an agreement has to be executed by farmers / farmers group with ADH of the in the district on Rs.100/- stamp paper stating that we (farmer / farmers (indicate names)) are responsible for completion of community farm ponds as per the guidelines and specifications given under MIDH, and complete the unit within prescribed period and maintenance of farm pond in future. If the unit is not completed as per norms (or) stopped in the middle, after receipt of 1 st & 2 nd installment. We (farmers) are responsible for repayment of the subsidy amount to the Department of Horticulture Govt. of AP, to the extent of subsidy released along with panel interest. Instalment Stage of work Subsidy releases 1 st Completion of excavation of Pond. 25%

2 nd After Sheet laying / RCC lining 50% 3 rd After completion of farm pond including fencing. 25% 23. 1 st installment will be released after Completion of excavation of Pond. The ADH, MI engineer and ADH should inspect the tank and submit the details in Format I to the Commissioner of Horticulture, AP, Hyderabad (enclosed). Along with copy of agreement entered by farmers with ADH. 24. The Joint inspection committee comprising of Farmer, HO/MI Engineer, ADH, PD APMIP/DDH shall finally inspect the community tanks, verify all the bills, check & confirm the quality of the lining of farm ponds as per the standards and take digital photographs and submit Format II & III to COH, AP, Hyderabad, for release of 2 nd and 3 rd installments. (enclosed) 25. If the community tanks are completed in all aspects as per the specification then the ADH shall submit the proposal along with the Xerox bills and photographs to the COH for release of assistance through online. 26. The HO/ ADH shall ensure that the community farm pond is owned & managed by a community / farmer group. 27. Display board ( Irorn) of suitable size depicting the following details in Telugu version has to be erected. Department of Horticulture Government of Andhra Pradesh and MIDH GOI Name of the farmers: Father / Husband: Total expenditure: Village : Subsidy amount(rs): Size of farm pond : year of sanction: Capacity of farm pond: Command area:

FORMAT I ( Community Farm Ponds) Inspection Report for release of Ist Instalment Name of the Group No.of farmers in the group:(mention with names) Particul Observati Rem S.No ars Specifications ons arks 1 2 3 4 5 6 7 8 9 10 1 2 3 Pond Excavati on Capacity in Cu Mts Bund formatio n Grand Total Measurements : Top:L1XB1 mts: Bottom:L2XB2 mts, depth (L1 + L2) X (B1 + B2) X depth 2 2 Eli gib le su bsi dy To tal Co st (R s) Total cost incurre d on excava tion (Rs) Ist instalme nt Eligible Subsidy (Rs) Name of the Bank & Branch Bank A/c No and IFSC code Certificates: 1) This is to certify that the land is suitable for the construction of Community tank. 2) This is to certify that the said group of farmers were issued DMC administrative approval. 3) This is to certify that said group of farmers has completed excavation of Community pond as per the specifications under MIDH. 4) This is to certify that all the original bills for the expenditure incurred towards the items mentioned above have been verified by the team and found correct. 5) This is to certify that said group of farmers were not sanctioned subsidy under Farmpond earlier. 6) The farmers are eligible for release of the subsidy amount of Rs. (Rupees ) as 1st instalment and an amount of Rs. may be released as 1st instalment Farmer MI Engineer / Horticulture Officer Assistant Director of Horticulture

S. N o Particulars Specifications FORMAT II ( Community Farm Ponds) Joint Inspection Report for release of 2nd Instalment Observ ations Total Cost (Rs) Eligibl e cost (Rs) Eligibl e Subsid y (Rs) Subsid y release d so far To be release d as 2 nd install ment Balance to be released 1 2 3 4 5 6 7 8 9 10 Bank details 11 1 2 Pond Excavation Capacity in Cu Mts Measurements : Top:L1XB1 mts: Bottom:L2XB2 mts, depth (L1 + L2) X (B1 + B2) X depth 2 2 3 4 5 Cost of Sheet/RCC Smoothening of surfaces Sheet fixing charges/rcc Lining 6 Sub Total Grand Total Geomenbrane/HDPE sheet of 500 microns Certificates: 1) This is to certify that said group of farmers has completed lining of Community tank with as per specifications of MIDH. 2) This is to certify that all the original purchase bills of the items mentioned above have been verified by the team and found correct. 3) This is to certify that the lining is as per BIS standards. 4) This is to certify that group of farmers has not sanctioned subsidy under Farmpond / Community tank earlier. 5) This is to certify that an amount of Rs. (Rupees ) is released as 1st instalment. 6) The farmers are eligible for subsidy of Rs. (Rupees ) as per the specifications of Community Tank and an amount of Rs (Rupees ) may be released as 2nd instalment. Farmer MI Engineer Horticulture Officer Assistant Director of Horticulture DDH/PD APMIP

S. N o Particulars Specifications FORMAT III ( Community Farm Ponds) Joint Inspection Report for release of 3rd Instalment Observ ations Total Cost (Rs) in terms of earth work done Eligib le cost (Rs) Eligibl e Subsid y (Rs) Subsidy released so far Subsid y propos ed to be release d 1 2 3 4 5 6 7 8 9 10 Bank detail s Rem arks 11 1 Pond Excavation Measurements : Top:L1XB1 mts: Bottom:L2XB2 mts, depth 2 3 4 5 Capacity in Cu Mts Cost of Sheet/RCC Lining Smoothening of surfaces Sheet fixing charges/rcc Lining 6 Sub Total 7 Fencing Sub Total Grand Total (L1 + L2) X (B1 + B2) X depth 2 2 Geomenbrane/HDPE sheet of 500 microns Cost of link mesh No.of granite poles Labour Charges Certificates: 1) This is to certify that group of farmers have constructed farm pond as per specifications of MIDH. 2) This is to certify that all the original purchase bills of the items mentioned above have been verified by the team and found correct. 3) This is to certify that group of farmers were not sanctioned subsidy under Farmpond earlier. 4) This is to certify that an amount of Rs. (Rupees ) is released as 1st and 2nd instalments. 5) The balance subsidy amount of Rs. (Rupees ) may be released. Farmer MI Engineer Horticulture Officer Assistant Director of Horticulture DDH/PD APMIP