PPC Cement TUTORIAL. how to screed a floor

Similar documents
Pre-build: TOOLs & Materials

Working with Concrete

ARTEX AND PLASTER. 2 - Choosing the right product

DATA SHEET DEKSTER 131 SELFLEVELLING FLOOR COAT / UNDERLAY

PPC PRODUCT BROCHURE PPC prod brochure portrait 2017_1.indd /04/11 3:09:48 PM

Method Statement. For RSA Cement Renders Over Masonry Substrates

ARDEX A 38 MIX Rapid Set, Premixed Screed

Application Instructions for Keystone Kool Deck on Existing Concrete

ARDEX A 38TM Rapid Set Screed

Mix and lay concrete tutor notes

Installation Recommendations Ceramic Floor and Wall Tiles. Floor Tiles

Concreting. A guide to managing a concrete pour

TECHNICAL BULLETIN TB102

CONCRETE SCREEDS, INTERIOR FLOORING AND WALL COVERINGS. BME Lepel, Adrienn PhD

Method Statement. For RSA Coating Systems Over AAC Lightweight Blocks N.B. Please refer to separate Application Guidelines for AAC Lightweight Panels

Method Statement. For RSA Coating Systems Over AAC Lightweight Blocks N.B. Please refer to separate Application Guidelines for AAC Lightweight Panels

Method Statement. For RSA Coating Systems Over M Grade Expanded Polystyrene (EPS)

GENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide. GeneralShale.com

For RSA Coating Systems over For RSA Coating Systems over Austech Foamula Extruded Polystyrene (XPS) (Skin Off)

MONOBASE AAC/ SIDER-PLAST THE ULTIMATE EXTERIOR HARD COAT STUCCO SYSTEM FOR AUTOCLAVED AERATED CONCRETE

Polymer bonding aid and mortar additive bonding agent for old and new concrete. Test method Typical result Control. Compressive strength (BS6319,Pt2)

7Do not walk on concrete for 24 hours. 8

SIDER-BASE CONCENTRATE AAC/ MONOSIDERAL AAC THE ULTIMATE OLD-WORLD AERATED CONCRETE-AAC DECORATIVE STUCCO SYSTEM

Slab on Grade. Introduction CHAPTER 10

Resin Bound Installation Guide

Levelling compounds.... plane, smooth surfaces with Alfix

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com

Water for the World. 7 y

Frequently Asked Questions (FAQs) Product Use

Chapter 8: External solid plastering

Product Data Sheet. Description. Uses. Suitable Surfaces. Polymer enhanced, pre-blended, bag mix, coarse float render.

Semstone Construction Details

CTIOA REPORT

4. Floor Substrate Testing Prior to Floor Paint application

Multipurpose latex additive for mortar and cementitious adhesive

Hemp Mortars St Astier Limes and Mortars telephone:

Manufacturers and suppliers of quality coating systems and associated materials to the Floor Covering and Building Industries

Stepping Stone. Name: Date:

Hardscaping Installation Manual

FLOORWORX SELF LEVELLING SCREED PRODUCT DATA_

STANDARD INSTALLATION GUIDELINES

TECHNICAL BULLETIN TB029

Finish Flooring- Hard Flooring Materials

When I started tiling, we didn t do our own shower pans that BATHS

Construction. SikaTop 111 Plus. Application Instructions. Sika Corporation

SUPER multi purpose structural adhesive. Polymer admixture for cement systems

TECHNICAL BULLETIN TB029

UNDERLAYMENT INSTALLATION INSTRUCTIONS

.2 Related Work Specified Elsewhere:.1 Section Substitutions..2 Section Cast-In-Place Concrete

Which way up? There seems to be some confusion about the way you lay natural stone. Please see the diagram as detailed below

Application Guides for BASF Floor Products

PART A: JOB PROCDRE FOR PLASTERING

Good Construction Practices Part II

m2 Anti-Slip Tape Daylight Fluorescent R13

SECTION CAST IN PLACE CONCRETE PART 1 GENERAL 1.01 RELATED DOCUMENTS

INSTALLATION GUIDELINES

Suggested laying methods for STONE pavers

General Brick Installation Instructions

Installation Instructions Tuscan Field Applied Limestone Finish

Superior Internal & External Wall Finishes

Joint Free Slabs On Grade Website:

FIVE STAR PRODUCTS, INC. (800)

TECHNICAL DATA SHEET

Con-Spec Industries Ltd.

TECHNICAL INFORMATION CEMSCREED 5

FIVE STAR PRODUCTS, INC. (800)

Pool Plasters & Pool Paint

Sanitation Marketing Toolkit MANUAL FOR PRODUCTION AND INSTALLATION OF POUR-FLUSH LATRINES

Installation Instructions

COLOUR HARDENER Dry-shake screed floor finish

Technical Data Sheet. Ultralevel Bulkout. Self Levelling High Build Cementitious Underlay

TECHNICAL BULLETIN TB018

Emer-Proof Quick Dry Two Part

Tidy tiles Walls, floors, stairs and tiles on tiles Building materials of brand-name quality for your home Nur im

Ultralevel SL Self Levelling Cementitious Underlay

AQUATITE. Also designed as: Crack/gap filler for masonry and unglazed ceramics Sealants against leaks Repairer for roof cracks and gutters

Unit 9 Reinstatement of modular surfaces and concrete footways

FLOORING INSTALLATION INSTRUCTIONS

STONE PRODUCT SPECIFICATION SANDSTONE. Some typical installation methods are: Pedestrian traffic only: reinforced concrete* 75mm thick

PART 1-SAWN THIN VENEER GENERAL

4.16. APPLICATION INSTRUCTIONS Construction Joints & Details

Isocrete K-Screed Standard and Heavy Duty

TECHNICAL DATA SHEET

ARDEX UI 720 FLEXBONE

Construction. SikaRepair 223. Application Instructions. Sika Corporation

Construction. SikaRepair 223. Application Instructions. Sika Corporation

Single-skin, externally reinforced, brick tank. Instructions for manufacture

Contents. Before you begin. Introduction: Carrying out concreting to simple forms 1. Element 1: Planning and preparing 3

San Antonio Water System Standard Specifications for Construction ITEM NO. 307 CONCRETE STRUCTURES

Tactile Pad Installation Guide. All Surfaces.

Removing or plastering over artex

Concrete. Copyright: Quasar Management Services Pty Ltd

Screeds. RonaScreed Underfloor Heating Screed. Rapid drying additive for floating screeds. Description. Drying Time of 50mm screed

tennis courts Concrete

The Heritage Range.

L. W. Mountain, Inc. Floating Glue Installation Instructions *For use with engineered floors only*

GENERAL SPECIFICATION FOR SCREEDING / LEVELLING AN INTERIOR FLOOR USING TAL SCREEDMASTER SELF LEVELLING SCREEDING COMPOUND

Building Construction 14. Dr Nabil El-Sawalhi Associate professor Engineering Projects Management

PRODUCT DATA SHEET Sika Level-315 F

SPECIFICATION FOR INSTALLATION OF WALKER ZANGER KAZA CONCRETE TILES ONTO VARIOUS SUBSTRATES

Transcription:

PPC Cement TUTORIAL how to screed a floor

Pre-build: TOOLs & Materials ITEM Quantity Check. Builders bucket. Wheelbarrow 3. Shovel 4. Builder s line 5. 50mm steel pegs 6. Rigid timber forms 7. Flexible forms 8. Stiff bristled brush or broom 9. Straight edge 0. Spirit level. Tape measure. Wood float 3. Edging tool 4. PPC Surebuild Cement 5. 9mm stone 6. Clean concrete sand 7. Polythene sheeting

Step : Assess the surface of the base The base surface onto which the screed is to be bonded should be well cured, sound and durable. This can be checked by drawing a steel nail or other sharp object across the surface. If the surface crumbles or dusts, then mechanical preparation may be required. Step : Calculate the materials Use the PPC Builders app to calculate how much sand and Surebuild cement will be required. Alternatively, multiply the length (in meters) by the width (in meters) to calculate the area of the floor. Multiply this by the thickness of the screed (in millimeters) to calculate the volume of screed mix required in litres. Length x width x depth = volume 3 3 As a guide, bag of Surebuild cement mixed with wheelbarrows clean, coarse sand and water will yield 0 litres, which is sufficient to screed 4.4 m² at 5 mm thick. + = 0 litres x Surebuild cement x Clean concrete sand

Step 3: Prepare the base The entire base should be prepared to result in a rough surface, suitable for bonding. Use a chipping hammer, pick or other suitable equipment to break the surface, remove mortar, plaster, paint etc. Remember, the entire surface must be roughened to ensure a good bond. If the surface of the base was wood floated or struck rough, mechanical preparation may not be necessary. Clean the entire surface with a stiff bristled brush or broom, sprinkling clean water as you work to keep the dust to a minimum. 3 Fix 30 mm wide soft-board, closed-cell foam or polystyrene strips to the perimeter walls to isolate the screed. 4 Wet the prepared surface with clean water for at least hour before applying the bond coat.

Step 4: Preparing the screed mix Either use a mechanical mixer or a wheelbarrow and shovel to mix. mix part Surebuild cement with 4 parts clean, coarse sand with sufficient water until a plastic consistence similar to cement plaster is achieved. or + Machine Wheelbarrow x 5x Excess water should be avoided as this will reduce the strength and will increase the risk of cracking. A stiff mix with too little water will not allow full compaction, and the screed may crumble over time.

Step 5: Prepare and apply the bonding slurry Mix parts water with 5 parts Surebuild cement until a smooth, thick slurry of paint consistency is achieved. An acrylic bonding agent may be added in accordance with the manufacturer s instructions to assist with bonding to the base. + ACRYLIC BONDING AGENT x 5x 3 Remove excess water from the prepared surface and using a stiff bristled brush or broom, scrub the bonding slurry into the surface immediately ahead of the screed mix placement. 4 The screed mix must be cast onto the wet bonding slurry within 0 to 5 minutes.

Step 6: Placing and compaction Begin placing in the furthest corner of the room. Place the screed mix onto the bonding slurry whilst it is still wet Spread the mix and compact with a chopping motion of the straight edge and wood float to ensure that the air is expelled. This will also ensure that there is full contact between the bonding slurry and screed mix. Check the thickness of the placed screed regularly and use the straight edge and spirit level to check that the screed is level in all directions. 3 4 If the screed is to receive carpets or ceramic tiles, use the same swirling motion of the wood float held in a flat position to create a textured paste at the surface. 4 If the screed is to receive vinyl tiles, or if a smooth wearing surface is required, use the same swirling motion of the steel trowel held in a flat position to create a smooth paste at the surface. NOTE THAT: a. When the surface is firm enough, you can place knee boards onto the surface and whilst standing on one, move the other towards the corner where you started placing the screed. (This will prevent footprints in the screed.) b. Ensure that the openings remain closed to prevent evaporation from the surface while waiting for the screed to set sufficiently to permit final finishing.

Step 7: Cure the screed Immediately after final finishing, cover with polythene sheeting or pond the surface with water for at least 7 days. 7 days These instructions are only a guide. There are many other alternative methods to screeding a great floor that will impress your friends. Always remember to wear protective clothing.