STATE OF NEW JERSEY Honorable Jon S. Corzine, Governor

Similar documents
STATE OF NEW JERSEY Honorable Jon S. Corzine, Governor

SCOPE OF WORK. Energy Audit & Cogeneration (CHP) Feasibility Study PROJECT NO. A

SCOPE OF WORK SWITCHGEAR REPLACEMENT PROJECT NO. C STATE OF NEW JERSEY Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt.

SCOPE OF WORK. Energy Audit & Cogeneration (CHP) Feasibility Study PROJECT NO. A

SCOPE OF WORK NEW ELECTRIC CHILLERS PROJECT NO. A STATE OF NEW JERSEY Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt.

SCOPE OF WORK. Emergency Generator Installation PROJECT NO. S

SCOPE OF WORK NEW POTABLE WATER WELLS. New Lisbon Developmental Center New Lisbon, Burlington County, N.J. PROJECT NO. M

CHAPTER 3: DESIGN. TN Higher Education Designers Manual October 2018 Page 1 of 12

SCOPE OF WORK. Fire Protection Upgrades for Emergency Generator Fuel Supply System PROJECT NO. A

STATE OF NEW JERSEY Honorable Jon S. Corzine, Governor

SCOPE OF WORK HVAC UPGRADES PROJECT NO. A STATE OF NEW JERSEY Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt.

SCOPE OF WORK. New Chillers and Cooling Towers PROJECT NO. M

SCOPE OF WORK. Life Safety and Fire Escape Improvements PROJECT NO. M

SCOPE OF WORK. Restroom #1 Fire Damage Restoration PROJECT NO. P

SCOPE OF WORK PARVIN LAKE DREDGING PROJECT NO. P STATE OF NEW JERSEY Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt.

SCOPE OF WORK. Generator Installation. NJDOT Freehold Maintenance Facility Freehold, Middlesex County, N.J. PROJECT NO. T

SCOPE OF WORK. Anti-Ligature Hardware Installation PROJECT NO. M

SCOPE OF WORK. Sanitary Sewer and Water Service Installation PROJECT NO. T

SCOPE OF WORK INSTALLATION & PIPING FOR THREE HEAT EXCHANGERS PROJECT NO. C

SCOPE OF WORK. Mechanical Equipment Room Relocation PROJECT NO. A

SCOPE OF WORK. Facility Improvement Assessment PROJECT NO. C

SCOPE OF WORK. Bulkhead Replacement PROJECT NO. P STATE OF NEW JERSEY Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt.

SCOPE OF WORK. Elevator Upgrades PROJECT NO. A STATE OF NEW JERSEY Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt.

SCOPE OF WORK. Chilled Water Piping Insulation PROJECT NO. A

SCOPE OF WORK. Floor Structural Repairs. Trenton Psychiatric Hospital Ewing, Mercer County, N.J. NO. M

SCOPE OF WORK. Structural Repairs & Window Installation PROJECT NO. T

SCOPE OF WORK. Campsite Electric and Water Service PROJECT NO. P

STATE OF NEW JERSEY Honorable Jon S. Corzine, Governor

SCOPE OF WORK. Wash Bay Installation PROJECT NO. T STATE OF NEW JERSEY Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt.

SCOPE OF WORK. Roof Replacement. Project No. P

SCOPE OF WORK. Bordentown Training Facility Renovations PROJECT NO. T

SCOPE OF WORK. Building HVAC and Lighting Controls Upgrade. Project No. A

SCOPE OF WORK HVAC EQUIPMENT REPLACEMENT PROJECT NO. T

SCOPE OF WORK. Structural Repairs & Window Replacement. Project No. T

SCOPE OF WORK. Renovations to Mid-State Correctional Facility PROJECT NO. C

SCOPE OF WORK. Covered Shooting Ranges PROJECT NO. P

SCOPE OF WORK. Woodbridge Training Center Renovations PROJECT NO. C

SCOPE OF WORK. Boiler Replacement Project PROJECT NO. S

ENERGY AUDIT. Prepared For: Wayne Public School District. John D. Maso, Director of Facilities Mgmt. Office of Building Services

SCOPE OF WORK. Ivy Hall Transformer Replacement and HVAC Upgrades PROJECT NO. M

SCOPE OF WORK. Salt Storage Structure Installation. Project No. T

ENHANCED BUILDING OPERATIONS PROGRAM

SCOPE OF WORK. Communication Tower Installation PROJECT NO. C

Request for Proposals Town of Plymouth, New Hampshire

DIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING

Energy Study. Commercial Custom Design Program Retrofit Projects. November 2014

SCOPE OF WORK. Boiler Replacement PROJECT NO. T STATE OF NEW JERSEY Honorable Chris Christie, Governor Honorable Kim Guadagno, Lt.

Plant Wide Audit Proposal & Report Guide. Industrial Optimization Program

SCOPE OF WORK. Salt Storage Structure. Project No. T

SCOPE OF WORK. Chiller Replacement. Project No. A

Title: Guideline for Existing Building Energy Efficiency Improvement Program

New Jersey s Clean Energy Program

New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response

CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS

SCOPE OF WORK. Interior Stair Modifications PROJECT NO. C

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT

STATE UNIVERSITY CONSTRUCTION FUND

SCOPE OF WORK. Honey Lake Dam Rehabilitation PROJECT NO. P

Centre for Addiction and Mental Health Queen Street Campus Energy Conservation and Demand Management Plan

REQUEST FOR PROPOSAL. Commissioning Services College of Pharmacy Building Construct New Facility University of Iowa #

Flemington Raritan Regional School District; Energy Saving Improvement Program (ESIP)

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

DIRECTIVE 1B-7 Issue date: October Energy, Sustainability, LEED and Executive Orders

Establishing a Baseline, Energy Audits and Energy Star s Portfolio Manager

South Carolina Society for Hospital Engineers

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016

Energy Auditing for Schools. Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007

Connecticut Housing Finance Authority. Construction Guidelines: Energy Conservation 2019

WAKE TECHNICAL COMMUNITY COLLEGE SUSTAINABLE ENERGY PLAN. Energy Plan

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

Business Programs: Commercial and Industrial Renewable Energy Loan Program. Technical Application and Instructions

NJHMFA ENERGY BENCHMARKING TECHNICAL MANUAL

VFA SAMPLE RFP (DETAILED FACILITY CONDITION ASSESSMENT)

Local Government Energy Audit:

the weidt group Implementation Rates of Energy Conservation Measures for Health Care Buildings collaboration analysis research

REQUEST FOR QUALIFICATIONS ARCHITECTURAL

Energy Benchmarking Report for Bacon Elementary School. Millville, NJ

Building Performance Evaluation Guide

East Central College

ENERGY AUDIT REPORTS SUMMARY

UNIFORM CODE ADMINISTRATION AND ENFORCEMENT REPORT (REPORTING YEAR: 2018)

FOR ADDITIONS and REMODELS Before filling out this application, read Green Building & Green Points Guideline Booklet for more in-depth information.

Energy Benchmarking Report for Forked River Elementary School Forked River, NJ

BRICK TOWNSHIP BOE LOCAL GOVERNMENT ENERGY AUDITS. Presented By: John Marchiafava, PE, CGD.

CLEAN WATER SERVICES AND CAROLLO ENGINEERS, INC. RECITALS. 1. District and Consultant previously entered into the Master Contract.

Absolute Energy Raters Commissioning Plan Outline Template

Commercial Retro-Commissioning Program Manual for 2015 SECTION 1

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

Focus on Energy s Biogas Feasibility Study Grants for Anaerobic Pretreatment and Anaerobic Digester Facilities

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services

REQUEST FOR PROPOSALS ENERGY AUDIT GASTONIA HOUSING AUTHORITY MARCH 23, 2009

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)

PLEASANT GROVE CITY FIRE STATION AND POLICE AND COURTSBUILDINGS

Energy Benchmarking Report for LaMonte Annex Elementary School Bound Brook, NJ

Energy Benchmarking Report for LaMonte Elementary School Bound Brook, NJ

Energy Benchmarking Report for Mill Pond Elementary School Lanoka Harbor, NJ

BGE Smart Energy Savers Program Combined Heat and Power Program Manual

Energy Benchmarking Report for Mt. Pleasant Elementary School. Millville, NJ

Measurement & Verification for Performance Contracts Through Rebuild Colorado. January Rebuild Colorado

Reducing Costs with Energy Efficiency

Transcription:

SCOPE OF WORK FACILITY ENERGY AUDIT New Lisbon Developmental Center Woodland Twp, Burlington County, N.J. PROJECT NO. A1085-00 STATE OF NEW JERSEY Honorable Jon S. Corzine, Governor DEPARTMENT OF THE TREASURY R. David Rousseau, State Treasurer DIVISION OF PROPERTY MANAGEMENT AND CONSTRUCTION Steven Sutkin, Director Richard Flodmand, Deputy Director Raymond A. Arcario, Deputy Director Date: April 17, 2009 Document Format Revision (2/1/08)

SECTION TABLE OF CONTENTS PAGE I. OBJECTIVE... 4 II. CONSULTANT QUALIFICATIONS... 4 A. CONSULTANT & SUB-CONSULTANT PRE-QUALIFICATIONS III. PROJECT BUDGET... 4 A. PROJECT COSTS B. COST ESTIMATING IV. PROJECT SCHEDULE... 5 A. AUDIT SCHEDULE B. CONSULTANT'S PROPOSED PROJECT SCHEDULE V. PROJECT SITE LOCATION & TEAM MEMBERS... 6 A. PROJECT SITE ADDRESS B. PROJECT TEAM MEMBER DIRECTORY 1. Department of Human Services 2. Office of Energy Savings VI. PROJECT DEFINITION... 7 A. BACKGROUND B. FUNCTIONAL DESCRIPTION OF THE FACILITY VII. CONSULTANT ENERGY AUDIT RESPONSIBILITIES... 8 A. PROJECT COMMENCEMENT 1. Scope of Work Review 2. Site Visit Policies 3. Existing Documentation B. ENERGY AUDIT 1. Data Gathering Coordination 2. Building, Equipment and Systems Profile 3. Building Energy Usage and Costs 4. Energy Type Utility Rates 5. Energy Type Annual Cost 6. Green House Gas Emissions PAGE 2

C. ENERGY AUDIT REPORT 1. Table of Contents 2. Executive Summary 3. Building/Facility Information 4. Utility Summary 5. Measurements & Observations 6. Energy Conservation Measures 7. Renewable/Distribute Energy Measures 8. Costs Estimates 9. Energy Audit Report Copies D. MEETINGS & PRESENTATIONS 1. Meetings 2. Presentations E. SUB-CONSULTANT PARTICIPATION VIII. GENERAL REQUIREMENTS... 14 A. SCOPE CHANGES IX. SOW SIGNATURE APPROVAL SHEET... 15 X. CONTRACT DELIVERABLES... 16 XI. EXHIBITS... 19 A. DPMC-38 PROJECT COST ANALYSIS FORM B. PROJECT SITE MAP C. NEW LISBON CONTRACTOR S USE OF THE PREMISES, pages 1-2 D. FACILITY ENERGY PROFILE SUMMARY TABLE (REQUIRED SUMMARY FORMAT WITH SAMPLE DATA) E. ECM SUMMARY TABLE (REQUIRED SUMMARY FORMAT WITH SAMPLE DATA) PAGE 3

I. OBJECTIVE The objective of this project is to conduct a comprehensive Energy Audit of the New Lisbon Developmental Center to identify Energy Conservation Measures (ECM s), projected savings of each ECM and cost to implement each ECM II. CONSULTANT QUALIFICATIONS A. CONSULTANT & SUB-CONSULTANT PRE-QUALIFICATIONS The Consultant shall be a firm pre-qualified with the Division of Property Management & Construction (DPMC) in the P051 Energy Auditing Discipline and have in-house capabilities or Sub-Consultants pre-qualified in the P025 Estimating/Cost Analysis Discipline and all other Engineering and Specialty Disciplines necessary to complete the project as described in this Scope of Work. The firm shall also demonstrate that they have previous experience in conducting energy audits of other campus type facility infrastructure, similar in size and scope to this project. III. PROJECT BUDGET A. PROJECT COSTS The Consultant shall determine the costs associated with the improvements recommended for each ECM in the audit, including but not limited to, construction costs, design and construction administration fees, affirmative action, DPMC management fees, construction management services, monitoring fees, testing and survey services, inspection fees, contingencies, permits, allowances, and escalation factors for the anticipated construction year(s) of the improvements. PAGE 4

The cost estimate shall be adjusted for items including, but not limited to premium time, construction phasing, regional location, site environmental factors, weather conditions, restrictions regarding the contractor s use of the premises, imposed constraints caused by Client Agency program schedules or building occupants, temporary relocation and moving costs, demolition costs, removal of hazardous materials, location of work within the buildings, security issues, utility interruption and shut down constraints caused by building use, and concurrent construction activities with other projects at the facility. B. COST ESTIMATING The Consultant or Sub-Consultant providing the cost estimate must be pre-qualified with DPMC in the P025 Estimating/Cost Analysis Specialty Discipline. All cost estimates must be submitted on a DPMC-38 Project Cost Analysis form at each phase of the project with a detailed construction cost analysis provided for all appropriate divisions and subdivisions identified in the 2004 Edition of the CSI Master Format. See Exhibit A for a copy of the DPMC-38 Project Cost Analysis form. IV. PROJECT SCHEDULE A. AUDIT SCHEDULE The following schedule identifies the estimated phases for this project and the estimated durations. PHASE ESTIMATED DURATION (WEEKS) 1. Kick-off Meeting & Data/Document Gathering 1 2. Preliminary Audit Phase (25% Completion) 2 OES, DHS & DPMC Approvals (Concurrent w/draft Audit Phase) 1 3. Draft Audit Phase (90% Completion) 5 OES, DHS & DPMC Approvals 2 4. Final Audit Phase (100% Completion) 2 OES, DHS & DPMC Approvals 1 PAGE 5

B. CONSULTANT S PROPOSED PROJECT SCHEDULE The Consultant shall submit a project bar chart schedule with their technical proposal, which reflects the projected schedule for performing the Energy Audit described in this Scope of Work. This schedule will be reviewed by the Consultant Selection Committee as part of the evaluation process and will be assigned a score commensurate with the information provided. V. PROJECT SITE LOCATION & TEAM MEMBERS A. PROJECT SITE ADDRESS New Lisbon Developmental Center Route 72 East Woodland Township, New Jersey See Exhibit B for the facility site plan. B. PROJECT TEAM MEMBER DIRECTORY The following are the names, addresses, and phone numbers of the Project Team members. 1. Department of Human Services: Name: William Schaffer, Director Address: Department of Human Services 225 Warren Street Trenton, New Jersey 08625 Phone No: (609) 633-8492 E-Mail No: william.schaffer@dhs.state.nj.us PAGE 6

2. Office of Energy Savings: Name: Address: Edward E. Mercer, Project Manager Office of Energy Savings 50 West State St., 4 th floor Trenton, New Jersey 08625 Phone No: 609-984-1624 E-Mail No: ed.e.mercer@treas.state.nj.us VI. PROJECT DEFINITION A. BACKGROUND By virtue of Executive Order # 11, dated April 22, 2006, Governor Jon S. Corzine created within the Department of Treasury, the position of Director of Energy Savings. The Executive Order stated that the Director shall implement programs to increase energy efficiency and reduce energy consumption. It was further directed that Energy Audits were to be conducted at State Facilities, and subsequently the recommendations contained in the audits were to be implemented in the most cost-effective manner available. These audits shall, at minimum, analyze energy efficiencies and the feasibility of installing on-site renewable energy systems. B. FUNCTIONAL DESCRIPTION OF THE FACILITY The New Lisbon Developmental Center, located in Burlington County, NJ is a campus type, in-patient residential care facility for developmentally disabled adults. The site consists of over 60 buildings totaling over 519,273 square feet. The facility includes a central boiler plant, central chiller plant, primary electrical sub-station and distribution system, administrative buildings, hospital care, food service and many other related ancillary service buildings. See Exhibit B for the facility site plan and building locations. PAGE 7

VII. CONSULTANT ENERGY AUDIT RESPONSIBILITIES The information provided in this section of the Scope of Work is intended as a guide for the Consultant to understand the overall basic objective of the Energy Audit for this project. The Consultant is expected to use their professional judgment to include items that may not be listed and that will demonstrate major energy savings for the facility. The Consultant shall also review all aspects of interdependency or contingency of equipment and/or controls so that recommended ECM s are assured of compatibility with other elements of the structure and systems. A. PROJECT COMMENCEMENT Prior to the start of the Energy Audit, the Consultant shall meet with the members of the Project Team to obtain and/or coordinate the following information: 1. Scope of Work Review: Conduct a meeting with the Project Team members and approved facility representatives to discuss the objective of the project scope of work, the project schedule, and the procedures that will be used by the Consultant to inspect the buildings, equipment, systems, and facility infrastructure for the Energy Audit. 2. Site Visit Policies: Review the Exhibit C entitled Contractor s Use of the Premises, New Lisbon Developmental Center with the Project Team and edit the document so that it is specific to this project and add any additional special security and policy requirements that must be followed during all work conducted at the facility. Develop a project directory that identifies the name and phone numbers of key designated representatives of the facility that must be contacted to arrange the project site visits and building inspections. Review the Contractor s Use of the Premises document with all personnel that will be conducting the Energy Audit to ensure they comply with the rules and regulations of the facility. PAGE 8

3. Existing Documentation: Obtain and review all available facility documentation that is related to this project such as reports, studies, surveys, equipment manuals, as-built drawings, maintenance records, utility energy data, etc. The State does not attest to the accuracy of the information provided and accepts no responsibility for the consequences of errors by the use of any information and material contained in the documentation provided. It shall be the responsibility of the Consultant to verify the contents and assume full responsibility for any determination or conclusion drawn from the material used. If the information provided is insufficient, the Consultant shall take the appropriate actions necessary to obtain the additional information required for the project at no additional cost to the State. All documentation shall be returned to the provider at the completion of the project. B. ENERGY AUDIT 1. Data Gathering Coordination: The Consultant shall meet with the Project Team members and approved representatives of the facility to develop an approved schedule and time to access each building, identify the areas and equipment that will be inspected, describe the methods and equipment that will be used to acquire needed data, the number of interviews to be conducted, and the duration of each building inspection. Surveys, measurements, photographs and other data collection methods shall be performed in such a way as to minimize disruption to the building occupants. A structured interview process shall be used to determine existing equipment, utilities, maintenance and operation issues for the building. Note: The Consultant is responsible for protecting the information collected and preventing its disclosure to unauthorized personnel. Individual site requirements will be discussed at the Consultant Pre-bid meeting. A one week look ahead schedule shall be provided to the facility representatives for review and approval prior to each building inspection. 2. Building, Equipment and Systems Profile: Provide the name and number for each building, the year of original building construction and any building additions, building square footage, and fuel type. PAGE 9

Characterize the building usage, type of construction, occupancy profiles, construction features including a description of the building envelope. Provide a detailed inventory and descriptive narrative for all building energy consuming equipment including an estimate of their energy consumption, efficiency, and remaining useful life. Items shall include, but not be limited to boilers and furnaces, cooling systems, energy recovery systems, heating systems, ventilation systems, domestic hot water heaters, meters, automatic control systems, energy management systems, electrical systems and lighting, data centers, motors, and manual controls. Assess how the various building systems and equipment are set-up, their actual operating conditions, and the control methods used to manage the systems. Provide colored photographs of the equipment and systems inspected. For example, for lighting, for each area of each building, provide existing fixture type, existing lamp type, existing lamp count and existing ballast type, current watts per fixture and current energy cost per room/building. Similar detail should be provided for other equipment. Evaluate the building envelope for energy consumption, including but not limited to the roof and walls, insulation, external windows, and doors. Evaluate the operation, maintenance, and testing programs for the building equipment. 3. Building Energy Usage and Costs: Compile monthly energy usage and costs for each building for the twelve months prior to the audit including kw, kwh, BTUs, therms, gallons, etc. 4. Energy Type Utility Rates: Identify the utility rate or contract rate schedules under which services are provided to each meter or delivery point for each energy type. 5. Energy Type Annual Cost: Provide the annual average unit cost for each energy type, per unit volume and per MMBTU. 6. Green House Gas Emissions: Provide the equivalent annual GHG (Green House Gas) emissions associated with each fuel type. PAGE 10

7. Facility Energy Profile Summary Table: Provide a list of all of the primary energy types audited and related data in the required summary format depicted in Exhibit D. C. ENERGY AUDIT REPORT Based on the results of the audit findings, the Consultant shall prepare a bound 8 ½ x 11 copy of the facility Energy Audit Report that incorporates the following elements: 1. Table of Contents: 2. Executive Summary: Include a brief introduction to the New Lisbon Developmental Center and a description of the project objective and overall conclusions and recommendations of the Energy Audit. 3. Building/Facility Information Provide a general background description of the facility, building components, mechanical systems, electrical systems, automation systems, and operational profiles and schedules. A description of the building envelope, age and construction history, number of employees, occupancy patterns, and a discussion of the O&M program shall be included. The building information section shall also contain relevant photos of the facility, buildings, and mechanical systems, a description of energy types used, and a description of the primary mechanical systems and controls. 4. Utility Summary: Provide energy accounting information for a minimum of one year, as well as selected charts and graphs that will demonstrate the overall energy usage patterns of the facility or building. A copy of the utility rate schedules and any other discussion or evaluation of rate alternatives for which the facility may qualify can be part of this section. 5. Measurements & Observations: Provide specific measurements such as temperature, relative humidity, light levels, air flows, etc. where appropriate. Also, relevant observations shall be noted such as damper positions, operating deficiencies, control settings, damaged equipment, maintenance shortfalls, etc. PAGE 11

6. Energy Conservation Measures: Provide a narrative summary for each recommended ECM that meets the objective of this project scope of work. Provide the estimated cost, estimated savings, simple payback, and other data for each ECM in the required summary format depicted in Exhibit E. No-cost measures such as adjusting equipment, control systems, or schedules shall be addressed first. For example, for lighting recommendations, for each area of each building, provide proposed fixture type, proposed lamp type, proposed lamp count, proposed ballast type, total watts per proposed fixture, projected energy savings per building, projected energy cost savings per building and before and after lighting levels. Similar detail should be provided for all other measures. A one or two page description of each ECM and supporting calculations shall follow this summary table. The description of each ECM shall include energy use and savings calculations and economic analysis and list any assumptions that were made regarding operation or equipment efficiency. Provide the following for each recommended ECM: Description of energy conservation measure Estimated installation cost, including cost of all equipment and materials, and source of cost estimate Estimated energy savings (in energy specific volume units and total MMBTU s) Estimated annual energy cost savings based on current historical energy costs of the facility. Estimate of any rebates/financial incentives available through New Jersey s Clean Energy Program or from other sources Estimated annual operating cost savings, including reductions in maintenance expense Estimated lifetime energy cost savings Simple payback Options for funding the installation of recommended measures 7. Renewable/Distributed Energy Measures: Recommend any viable renewable/distributed energy technologies, including combined heat and power, solar power, wind power, geothermal systems, etc. which could be cost effectively implemented for the subject facility. PAGE 12

8. Cost Estimates: The cost to implement each ECM shall be estimated and presented in CSI format (2004) in an appendix of the report. A table shall be included that identifies costs associated with each improvement. The information and cost data will be used to make decisions on facility planning and yearly capital appropriation requests. Each ECM cost estimate shall include: Narrative explanation of the work, including diagrammatic sketches if required to explain the work. List of assumptions made in compiling the estimate. Cost of demolition of existing systems, if applicable. Cost of impact of facility operations on ECM implementation (work restrictions) See Section III A & B of this Scope of Work for additional information. 9. Energy Audit Report Copies: Provide 6 copies of the Energy Audit Report at each phase of the project to the Project Manager. Also provide 2 CD disks of the final approved report and all of the contents with any drawings in.dwg (native file format for AutoCAD) and.tif (Tagged Image File) file formats. D. MEETINGS & PRESENTATIONS 1. Meetings: Conduct the appropriate number of review meetings with the Project Team members during each phase of the project so they may determine if the project meets their requirements and make changes where appropriate. The Consultant shall describe the philosophy and process used in the development of the Energy Audit. Selected studies, sketches, cost estimates, schedules, and other relevant information shall be presented to support the recommendations proposed. It shall also be the responsibility of the Consultant to arrange and require all critical Sub- Consultants to be in attendance at the meetings. PAGE 13

2. Presentations: The minimum number of presentations required for each phase of this project is identified below for reference: Preliminary Audit Phase (25% Completion): One (1) oral presentation at the phase completion. Draft Audit Phase (90% Completion): One (1) oral presentation at the phase completion. Final Audit Phase (100% Completion): One (1) oral presentation at the phase completion E. SUB-CONSULTANT PARTICIPATION It is the responsibility of the Consultant to ensure that they have provided adequate hours and/or time allotted in their technical proposal so that their Sub-Consultants may participate in all appropriate phases and activities of this project or whenever requested by the Project Manager. This includes the pre-proposal site visit and the various meetings and site visits described in this Scope of Work. All costs associated with such services shall be included in the base bid of the Consultant s fee proposal. VIII.GENERAL REQUIREMENTS A. SCOPE CHANGES The Consultant must request any changes to this Scope of Work in writing. An approved Consultant Amendment Request DPMC 9d form reflecting authorized scope changes must be received by the Consultant prior to undertaking any additional work. The DPMC 9d form must be approved and signed by the Director of DPMC and written authorization issued from the Project Manager prior to any work being performed by the Consultant. Any work performed without the executed DPMC 9d form is done at the Consultant s own financial risk. PAGE 14

IX. SOW SIGNATURE APPROVAL SHEET This Scope of Work shall not be considered a valid document unless all signatures appear in each designated area below. The Client Agency approval signature on this page indicates that they have reviewed the design criteria and construction schedule described in this project Scope of Work and verifies that the work will not conflict with the existing or future construction activities of other projects at the site. PAGE 15

X. CONTRACT DELIVERABLES The following is a listing of Contract Deliverables that are required at the completion of each phase of this project. The Consultant shall refer to the DPMC publication entitled, Procedures for Architects and Engineers, Volumes I and II, 2 nd Edition, dated January, 1991 to obtain a more detailed description of the deliverables required for each item listed below. The numbering system used in this Contract Deliverables section of the scope of work corresponds to the numbering system used in the Procedures for Architects and Engineers manual and some may have been deleted if they do not apply to this project. PRELIMINARY AUDIT PHASE (25%) 5.1 Meetings & Minutes (Minutes within 5 working days of meeting) 5.2 Correspondence 5.3 Project Commencement 5.3.1 SOW Review 5.3.2 Site Visit Policies, Contractors Use of the Premises, Project Directory 5.3.3 Collect Existing Documentation 5.4 Energy Audit Submission Requirements 5.4.1 Data Gathering 5.4.2 Building, Equipment & Systems Profile 5.4.3 Facility Energy Profile Table 5.5 Energy Audit Report Submission Requirements 5.5.1 Table of Contents 5.5.2 Executive Summary 5.5.3 Building/Facility Information 5.5.4 Utility Summary 5.5.5 Measurements & Observations 5.5.6 Energy Conservation Measures 5.5.7 Renewable/Distributed Energy Measures 5.5.8 Cost Estimates in CSI Format & Cost Analysis 38 Form PAGE 16

5.5.9 Energy Audit Report (25%) 6 sets 5.5.9.1 Diagrammatic Sketches/Drawings if appropriate: 6 hardcopy sets and on disc in.dwg (native file format for AutoCAD and tif (Tagged Image File) file formats. 5.3.10 Bar Chart of Energy Audit Schedule 5.5.11 Oral Presentation of Submission to Project Team 5.3.12 SOW Compliance Statement 5.3.13 This Submission Checklist 5.3.14 Deliverables Submission in Booklet Form: 6 sets 5.4 Approval of Submission 5.4.1 Respond to Submission Comments DRAFT AUDIT PHASE (90%) 5.1 Meetings & Minutes (Minutes within 5 working days of meeting) 5.2 Correspondence 5.4 Energy Audit Submission Requirements 5.4.1 Data Gathering 5.4.2 Building, Equipment & Systems Profile 5.4.3 Facility Energy Profile Table 5.5 Energy Audit Report Submission Requirements 5.5.1 Table of Contents 5.5.2 Executive Summary 5.5.3 Building/Facility Information 5.5.4 Utility Summary 5.5.5 Measurements & Observations 5.5.6 Energy Conservation Measures 5.5.7 Renewable/Distributed Energy Measures 5.5.8 Cost Estimates in CSI Format & Cost Analysis 38 Form 5.5.9 Energy Audit Report (90%) 6 sets 5.5.9.1 Diagrammatic Sketches/Drawings if appropriate: 6 hardcopy sets and on disc in.dwg (native file format for AutoCAD and tif (Tagged Image File) file formats. 5.3.10 Bar Chart of Energy Audit Schedule 5.5.11 Oral Presentation of Submission to Project Team PAGE 17

5.3.12 SOW Compliance Statement 5.3.13 This Submission Checklist 5.3.14 Deliverables Submission in Booklet Form: 6 sets 5.4 Approval of Submission 5.4.1 Respond to Submission Comments FINAL AUDIT PHASE (100%) 5.1 Meetings & Minutes (Minutes within 5 working days of meeting) 5.2 Correspondence 5.4 Energy Audit Submission Requirements 5.4.1 Data Gathering 5.4.2 Building, Equipment & Systems Profile 5.4.3 Facility Energy Profile Table 5.5 Energy Audit Report Submission Requirements 5.5.1 Table of Contents 5.5.2 Executive Summary 5.5.3 Building/Facility Information 5.5.4 Utility Summary 5.5.5 Measurements & Observations 5.5.6 Energy Conservation Measures 5.5.7 Renewable/Distributed Energy Measures 5.5.8 Cost Estimates in CSI Format & Cost Analysis 38 Form 5.5.9 Energy Audit Report (90%) 6 sets 5.5.9.1 Diagrammatic Sketches/Drawings if appropriate: 6 hardcopy sets and on disc in.dwg (native file format for AutoCAD and tif (Tagged Image File) file formats. 5.3.10 Bar Chart of Energy Audit Schedule 5.5.11 Oral Presentation of Submission to Project Team 5.3.12 SOW Compliance Statement 5.3.13 This Submission Checklist 5.3.14 Deliverables Submission in Booklet Form: 6 sets 5.4 Approval of Submission PAGE 18

5.4.1 Respond to Submission Comments XI. EXHIBITS The attached exhibits in this section will include a DPMC 38 Project Cost Analysis Form, Site Plan, Contractor s Use of the Premises document, Sample Facility Energy Profile Table, ECM Summary Table. END OF SCOPE OF WORK PAGE 19