Annex A STATEMENT OF WORK Radon Mitigation

Similar documents
Radon Vent Pipe System. Labeling Performance Indicators

RADON ABATEMENT FROM THE GROUND UP

Paul V. Jennemann MARYLAND RADON LABORATORY, INC E Corporate Court Ellicott City, MD

VILLAGE OF DOWNERS GROVE REPORT FOR THE VILLAGE COUNCIL MEETING APRIL 1, 2014 AGENDA

Chapter 2: Foundation

Supplementary Standard SB-12. Energy Efficiency For Housing

Attic Access Hatch to have an area not less than 0.32m²/3.4ft² and no dimension less than 500mm with a min R-15 insulation value Crawlspace

Radon and the Alberta Building Code 2014

Environmental Management Plan Stone Quarry Apartments Project

2010 National Building Code Adoption and Associated Process Changes

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

Home Inspection Report

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

A Closer Look Inspection Service 2015 IECC Residential DFW area handout

Mitigation Standards

1234 Main St Denver CO 80210

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

Hardin County Planning and Development Commission

Canadian Supplement to CERTI Radon Mitigation Course

Radon Resistant New Construction. Topic 8 - Audio 64

RADON REDUCTION GUIDE FOR CANADIANS

The Inspection Process. Waxhaw N.C.

Radon Control Methods for Existing and New Residential Structures


RADON WELLISUMP BASIN FOR NEW HOME CONSTRUCTION

Klickitat PUD Residential Weatherization Energy Efficiency Program Participation Requirements and Instructions PROGRAM REQUIREMENTS

Klickitat PUD Residential Weatherization Energy Efficiency Program Participation Requirements and Instructions PROGRAM REQUIREMENTS

9.36 Energy Efficiency

Healthier Home Environments Benefit Everyone

Homes Across Nebraska Are Being Built to the Latest National Energy Standards Is Yours?

Radon Demonstration: Application of Building Code Changes in Winnipeg New Home Construction. April 2014

SAN MIGUEL COUNTY & TOWN OF MOUNTAIN VILLAGE BUILDING DEPARTMENTS PRESCRIPTIVE ENERGY CODE & GREEN BUILDING STANDARD

component was performing its intended function; installation and condition were appropriate for age and use.

Air Sealing for 5 ACH 50

1234 Main St. Buyer Name. Table of Contents

WeatherSmart Air Barrier Installation Guide

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

Distribution Restriction Statement

COUNTY OF NEVADA BUILDING DEPARTMENT POLICIES

Mention of firms, trade names, or commercial products in this document does not constitute endorsement or recommendation for use.

REScheck Software Version Compliance Certificate

Inspection Report. Property Address:

SUB-SLAB DEPRESSURIZATION SYSTEM DESIGN AND INSTALLATION

Wednesday, November 6, Mrs. x

DuPont Tyvek Air Barrier Installation Guidelines. Canadian Version. Version 2

General Requirements for Mobile Homes

Rental Inspection Checklist

City of New Hope Community Development 4401 Xylon Ave N New Hope MN Phone: Fax: newhopemn.gov

FIELD COPY ATTACHMENT

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

KITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)

Alabama Home Inspections

PRE-ACCEPTANCE INSPECTION CHECKLIST

Work Order (Bid Form) Upper East Tennessee Human Development Agency

Energy Provisions of the Kentucky Residential Code. Guide for Homeowners

REPORT CHECKLIST SUPPLEMENT

Testing Is Easy And Inexpensive

A Summary of the Basic Duties of Maintenance, Repair and Replacement for CARRIAGE PARK CONDOMINIUM ASSOCIATION

Measure 1 Seal Ducts Components Inspected

1 AND 2 FAMILY DWELLING REQUIREMENTS

2015 IECC Air Sealing Multifamily For Code Compliance Funding for Energy Code Training

Foundations. Issue. Slab-On-Grade Liquid Water Control (See Figure 2-2) Goals. Guidance

UP AND UP HOME INSPECTIONS

SAFETY PRECAUTIONS. Do not operate your stove if you smell smoke coming from it. Turn it off, monitor it, and call your dealer.

A. This Section provides information regarding vapor permeable roof underlayment for the exterior roof.

BUILDING EXTERIOR SHELL TRAINING

Encapsulated, Sealed & Closed Crawlspace Installation Manual

Is Yours? Homes Across Missouri are Being Built to the Latest National Energy Efficiency Standards

Natrona County Development Department 200 North Center Street, Room 205 Casper, WY Phone: Fax:

Radon Mitigation Technology

Designing Efficient Sub Slab Collection and Vapor Barrier Systems. Presented By: Tom Hatton Clean Vapor, LLC cleanvapor.com

National Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 Section [ ].

Property Condition Assessment

DIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM

Energy Efficiency For Housing

Gas Protection System Components

Request for Proposal

RESIDENTIAL BUILDING REQUIREMENTS

Residential Miscellaneous Permits

2009 IECC Chapter 1 Additions, alterations, renovations or repairs.

FirstEnergy Program Overview

Property Inspection Report

RESIDENTIAL ENERGY CODE. The 2015 International Energy Conservation Code (IECC) as modified below.

NEW HOMES PROGRAM 2017 PROGRAM GUIDE

RADON MITIGATION STANDARDS

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

SUMMARY 792 Youngfield Ct., Lakewood CO Frank Oz January 13, 2018

DESIGNING COMMERCIAL SUB-SLAB DEPRESSURIZATION SYSTEMS

APPENDIX C. Chapter 9B-53 STANDARD FOR MITIGATION OF RADON IN EXISTING BUILDINGS

Section 22A. Lead Paint Risk Factor NONE-HIGH FLOOR INSULATION FOR CONVENTIONAL HOMES TABLE OF CONTENTS

The ECHO System The basement ventilated and drained insulation system

THE CITY OF FAYETTEVILLE ADOPTED THE 2009 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) ON JULY 17, 2012

Estimating the Concentrations of Soil Gas Pollutants in Housing

City of High Point Airport Overlay District Noise Level Reduction Design Standards

Testing Is Easy And Inexpensive

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

ANNEX A.1 TECHNICAL SPECIFICATIONS. Open Call for Tender. No F/SE/10/05. Provision of Building Inspection, Maintenance, Alteration and Repair services

Work Order (Bid Form) Blount County Community Action Agency, Inc.

Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program

Transcription:

Annex A STATEMENT OF WORK Radon Mitigation OBJECTIVE Royal Canadian Mounted Police (RCMP) requires reduction of the annual radon concentration levels within the noted 15 properties (found on Appendix B) throughout different communities in Manitoba, to be below 100 bq/m3. BACKGROUND RCMP has established radon mitigation systems in 76 of their properties for Phase 1 of their radon mitigation program. RCMP is now entering into Phase 2 of the program. RCMP Environmental Services has tested 27 locations throughout Manitoba and have established radon results over 100 bq/m3 for 15 properties. See Appendix A for current radon level results. The properties are located throughout Manitoba; specifically in the following areas: Fisher Branch God s Lake Narrows Grand Marais Gypsumville Island Lake Lundar Whitemouth Winnipegosis Details of properties will be provided in Appendix B. REGULATONS AND REQUIREMENTS All work shall be performed by a certified Radon Mitigation Contractor for the duration of the contract and listed by the Canadian National Radon Proficiency Program (C-NRPP). All work shall be in accordance with the following guidelines: 1. Health Canada Guidelines and the publication Reducing Radon Levels in Existing Homes: A Canadian Guide for Professional Contractors. Electronic.pdf format or paper copy is available at http://www.hc-sc.gc.ca/ewh-semt/pubs/radiation/radon_contractors-entrepreneurs/indexeng.php 2. CAN/CGSB-149.12-2015 CD-01 Radon mitigation options for existing low rise residential buildings. Electronic copy available at: http://www.carst.ca/resources/documents/mitigation.pdf All work processes will be adhered to throughout this contract: 1. Guarantee that long term radon concentration are below 100 bq/m3 for 1 year after the date of completion. 2. All radon test results shall be certified and provided by a nationally accredited laboratory. 1

2 3. Any additional requirements to the work outlined in the scope of work below will need to be pre-approved by the Project Authority prior to work performed and supplies procured. SCOPE OF WORK 1. Facilities with foundations that have concrete basement or crawlspace slabs or with concrete slab on grade construction or with pressure treated foundation walls and wooden basement floors: a. All accessible floor openings (at perimeter joint with exterior walls and all shrinkage and control cracks, at joints with piping/mechanical/electrical penetrations, and structural supports) shall be filled or caulked with polyurethane sealants with particular attention given to filling all potential air leaks nearest the proposed sub-slab depressurization suction point(s). Move furniture, boxes, appliances etc. as required to access cracks and penetration points. Ensure an effective bond between the new sealant and the concrete by removing all loose or weak material or paint to expose solid concrete. After application or sealant is complete, move items back to their original location. b. Supply and install a radon ball trap or mechanical trap seal on drains that drain to a sump pit or if the weeping tile drain to the sewer. c. Provide a lid and seal to sump pit with caulked seal around pipe and electrical cord penetration. d. Conduct a feasibility test as detailed in the Health Canada Guide Reducing Radon Levels in Existing Homes: A Canadian Guide for Professional Contractors to determine the number and locations of required suction points and to size the sub-slab depressurization fan. e. Upon completion of the feasibility test, install the required 100mm Schedule 40 PVC or ABS piping along with appropriate cavity and course fill, poly, grout, and seal around pipe for an airtight fit. Suction/fan points to be located for best effectiveness and also to minimize impact to useable space in the basement of the facility. f. Supply and install a new in-line sub-slab depressurization fan so that the flow is vertical. Fan to be located in the crawlspace or basement and then run pipe to the exterior with a through wall penetration complete with appropriate weatherproof flashing/sealant. Exit points should be away from windows and air intakes and at least 30 cm above grade or snow line in accordance with CSA-B149. 1 Natural Gas and Propane Installation Code. Exhaust pipe to be kept short in length and slightly sloped down to reduce condensation and frost problems. Install a rodent/bird screen over the end of the pipe. Fan to be sized in accordance with the information determined from feasibility test. Care to be taken to ensure that the fan s operation does not cause back-drafting of combustion appliances such as furnace, water heater, fireplace, or wood stove. FOR THE PURPOSE OF THE TENDER, ALLOW FOR ONE FAN/SUCTION POINT PER FACILITY WITH AN ASSUMED FAN SIZE OF 157 CFM @ 0 wg (Acceptable product to be Fantech Model HP190 (radon) 4 or equivalent). If the feasibility test identifies the need for additional suction points or larger capacity fans to be used, these instances will be dealt with on a

case by case basis with the Project Authority and the contract will be amended accordingly. g. All wiring shall comply with relevant electrical codes and electrical components shall be CSA or UL listed or equivalent. Install the fan disconnect switch or plug within eyesight of the fan. Outlet will be labelled to unplug. h. Install manometer on the vent pipe to monitor fan performance. i. Label the new piping system in a prominent location indicating that it is part of a radon mitigation system. Similar labels shall be placed on the service panel circuit breaker, fan disconnect switch, and sump pit cover. 2. Facilities with exposed soil crawlspaces: a. Install a 100 mm diameter, Schedule 40 PVC or ABS pipe in a perimeter loop around the building area. Pipe to be perforated with multiple holes. b. Over the pipe, install high density, cross-laminated polyethylene sheeting (acceptable product to be Permalon PLY X-150 white in color or equal). Membrane shall run up each wall 100 mm to 300 mm and be attached with pressure treated wooden battens and caulking (ensure caulking is compatible with membrane). Membrane to be lapped a minimum of 300 mm and sealed with appropriate adhesive caulk and tape. A collar is to be cut from the material to fit around each penetration and attached and caulked to the penetration. The membrane is then to be caulked to the collar. Where the system exhaust is brought out through a hole in the membrane, special attention must be paid to prevent air leakage at this point. Use vinyl roof soil stack flashing and caulk to create an air tight seal to the exhaust duct. c. Supply and install a new in-line depressurization fan so that the flow is vertical. Fan to be located in the crawlspace or basement and then run pipe to the exterior with a through wall penetration complete with appropriate weatherproof flashing/sealant. Exit points should be away from windows and air intakes and at least 30 cm above grade or snow line in accordance with CSA-B149.1 Natural Gas and Propane Installation Code. Exhaust Pipe to be kept short in length and slightly sloped down to reduce condensation and frost problems. Install a rodent/bird screen over the end of the pipe. Care to be taken to ensure that the fan s operation does not cause back-drafting of combustion appliances such as furnace, water, heater, fireplace, or wood stove. FOR THE PURPOSE OF THIS TENDER, ALLOW FOR ONE FAN/SUCTION POINT PER FACILITY WITH AN ASSUMED FAN SIZE OF 157 CFM @ 0 wg (Acceptable product to be FanTech Model HP190 (radon) 4 or equivalent). If the specific situation requires for additional suction points or larger capacity fans to be used, these instances will be dealt with on a case by case basis with the Project Authority and the contract will be amended accordingly. 3

d. All wiring shall comply with relevant electrical codes and electrical components shall be CSA or UL listed or equivalent. Install the fan disconnect switch or plug within eyesight of the fan. e. Install manometer on the vent pipe to monitor fan performance. f. Label the new piping system in a prominent location indicating that it is part of a radon mitigation system. Similar labels shall be placed on the service panel circuit breaker, fan disconnect switch, and sump pit cover. g. Install patio blocks over the membrane from crawlspace access to mechanical equipment to allow servicing of equipment with protection to the membrane. h. Complete and provide final radon test (7 day test) to confirm levels are below 100 bq/m3. 4

APPENDIX A CURRENT RADON LEVELS Building Unit # Community Building Type Address Basement Type Radon Results 313 Fisher Branch House 3 Moyer Basement 164 318 Fisher Branch House 4 Moyer Basement 186 287 Fisher Branch House 7 Moyer Basement 422 95 God s Lake Narrows House 1 Poplar Ave. Crawlspace 229 377 God s Lake Narrows Detachment Poplar Ave. Basement & 122 Crawlspace 365 Grand Marais House 365 Hwy 12 Basement 347 307 Gypsumville House 102 First St. Basement 158 308 Gypsumville House 103 First St. Basement 219 310 Gypsumville House 201 Second St. Basement 741 343 Island Lake House 3 Main St. Crawlspace 194 346 Island Lake House 1 Main St. Crawlspace 116 366 Island Lake House 7 Main St. Crawlspace 126 283 Lundar House 17 Third Ave. Crawlspace 363 278 Whitemouth House 100-4 Front Ave. Basement 201 276 Winnipegosis House 193 Bridge St. Basement 172 5

APPENDIX B SITE DETAIL Building Community Building Type Address Construction Total Inside Basement Type Unit # Year Gross (m2) 313 Fisher Branch Single Family 3 Moyer 1981 255.40 Basement 318 Fisher Branch Single Family 4 Moyer 1995 237.10 Basement 287 Fisher Branch Single Family 7 Moyer 1981 217.17 Basement 95 God s Lake Narrows Bungalow 1 Poplar Ave. 1995 119.40 Crawlspace 377 God s Lake Crawlspace & Detachment Poplar Ave. 2003 529.40 Narrows Basement 365 Grand Marais 365 Hwy 12 1983 233.80 Basement 307 Gypsumville Bungalow 102 First St. 1987 250.30 Basement 308 Gypsumville Bungalow 103 First St. 1987 250.30 Basement 310 Gypsumville Bungalow 201 Second St. 1987 250.30 Basement 343 Island Lake 3 Main St. 1969 135.90 Crawlspace 346 Island Lake 1 Main St. 1990 85.50 Crawlspace 366 Island Lake 7 Main St. 1998 233.80 Crawlspace 283 Lundar 17 Third Ave. 1981 217.70 Crawlspace 278 Whitemouth Single Family 100-4 Front Ave. 1981 217.70 Basement 276 Winnipegosis Bungalow 193 Bridge St. 1979 196.50 Basement 6