Energy and Mineral Resources for People s Prosperity

Similar documents
EXPANDING OPPORTUNITIES GEOTHERMAL DEVELOPMENT IN INDONESIA. ABADI POERNOMO PRIJANDARU EFFENDI Indonesian Geothermal Association

Regulatory Revitalizati on of Indonesia s Geothermal Program. Mike Crosetti 3 November 2010

WOMEN IN GEOTHERMAL. Click to edit Master subtitle style MINISTRY OF ENERGY AND MINERAL RESOURCES

Indonesia s Geothermal Sector Under The Volcano: A Regulatory Update on Indonesia s Geothermal Potential

Master Plan Study for Geothermal Power Development in the Republic of Indonesia. Final Report

Geothermal in Indonesia: Government Regulations and Power Utilities, Opportunities and Challenges of its Development

CDM Financing for Geothermal Project in Indonesia: Current Status and Post 2012 Prospect

PROSPECTIVE BUSINESS COOPERATION IN INDONESIA S RENEWABLE ENERGY

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

Country Update: Geothermal Energy Use and Development in Indonesia

THE ROLE OF GEOTHERMAL ENERGY

Table Geothermal Potential in Indonesia, as of April 2016

Geothermal Deregulation and Energy Policy in Indonesia

Women In PT Pertamina Geothermal Energy. Jakarta, 8 March 2018

Trend Focus. Geothermal - Enormous potential for renewable energy. Trend Focus October 10, 2017

NEW AND RENEWABLE ENERGY POLICY

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Regulation and Development of New and Renewable Energy in Indonesia

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

POLICY ON SOLAR AND BIOENERGY DEVELOPMENT IN INDONESIA

Fiscal Support for the Efficient and Sustainable Management of Natural Resources in Indonesia: Renewable Energy and Forestry Resources

Renewable Energy. Development Plan. Presented in Japan-Indonesia Business Forum for Energy Efficiency, Conservation and Renewable Energy

ALIGNMENT ON THE POLICIES AND REGULATIONS FOR GEOTHERMAL DEVELOPMENT IN FOREST AREA

EMR for People s Welfare

PROJECT DESIGN DOCUMENT (PDD)

SARULLA GEOTHERMAL PROJECT

BP REDD+ REDD+ Management Agency: Operational Strategy

Kardaya Warnika MINISTRY OF ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA. By: Director General of New Renewable Energy and Energy Conservation

SECTOR OVERVIEW. Government of Indonesia, State Electricity Corporation (PLN). Electricity Power Supply Business Plan (RUPTL ). Jakarta.

INDONESIAN. Exploration & Development. Indonesian Geothermal. Opportunities. March Asia Pacific Edition EXPRESSIONS OF INTEREST.

DIRECTORATE GENERAL OF MINERAL AND COAL MINISTRY OF ENERGY AND MINERAL RESOURCES

Study on Economic Partnership Projects. in Developing Countries in FY2008. Study on Geothermal Power Development Projects

TABLE OF CONTENTS ABBREVIATIONS PREAMBLE NATIONAL ENERGY REGULATORY FRAMEWORK FINANCIAL INCENTIVES REGULATORY FRAMEWORK MINI HYDRO POWER GEOTHERMAL

March The Ministry of Economy, Trade and Industry

Economic and Environmental Emissions Analysis in Indonesian Electricity Expansion Planning: Low-rank Coal and Geothermal Energy Utilization Scenarios

Waste to Energy Status in Indonesia

Greening Energy Supply - The Perspective of a Development Finance Institution -

WATER SUPPLY OF JAKARTA

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

Dr. Hasrul Laksmana Azahari

COORDINATING MINISTRY FOR ECONOMIC AFFAIRS REPUBLIC OF INDONESIA REGULATION STRATEGY TO IMPROVE DEVELOPMENT OF RENEWABLE ENERGY IN INDONESIA

Energy and Mineral Resources for the People s Welfare

Optimization of Indonesian Geothermal Energy Resources for Future Clean Electricity Supply: A Case of Java-Madura-Bali System

National Council on Climate Change Indonesia. Registered CDM Projects Average Annual. Review N. of. Total ERs by Amount of Issued

Additional information on calculating the emission factors of Indonesia for the JCM. Table 1 Grid emission factor PV Case 1 and Case 2

ECONOMIC AND ENVIRONMENTAL EMISSION ANALYSIS IN INDONESIAN ELECTRICITY EXPANSION PLANNING: LOW-RANK COAL AND GEOTHERMAL ENERGY UTILIZATION SCENARIOS

Opportunities and challenges of the Indonesian electrification drive. March 2015

Indonesia s Geothermal Development: Where is it Going?

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375)

Presentation of. Clean Energy Asia 2013: Renewable Energy Policies in Indonesia A Report Card. Mini hydro power plants

ENERGIZING THE ECONOMY

TACKLING REGIONAL DISPARITY THROUGH LOCAL INITIATIVES

SOLAR PV PROMOTION PROGRAM IN INDONESIA

SEAFDEC/AQD Institutional Repository (SAIR)

DEFORESTATION NDONESIA S COMMITMENT IN ACHIEVING MINISTRY OF ENVIRONMENT AND FORESTRY OF REPUBLIC OF INDONESIA ZEROI

Promoting Geothermal Energy Utilization in Indonesia Challenges and Opportunities

July Impact of Environmental Polluted and Environmental Degradation, Climate Change

By: Dr. Dadan Kusdiana Director for Bioenergy

INDONESIAN MINING POLICY UPDATE

Organisation for Economic Co-operation and Development DAF/COMP/WP2/WD(2018)16

DETAILED DESCRIPTION OF PROGRAM

RENEWABLE ENERGY AS A NATIONAL DEVELOPMENT PRIORITY

EXECUTIVE SUMMARY IGNITING THE RING OF FIRE: A VISION FOR DEVELOPING INDONESIA S GEOTHERMAL POWER.

Ministry of Energy and Mineral Resources Republic of Indonesia Electricity Investment Opportunity In Indonesia Economic Development Corridors

NUSANTARA REPORT. Review of Regional Economic and Finance JULI 2013

INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati

(Regulation of the Minister of Public Works Number 08/PRT/M/2014 dated August 8, 2014)

Developing Choices for Optimal Binary Power Plants in the Existing Geothermal Production Areas in Indonesia

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4685 Project Name. Geothermal Clean Energy Investment Project Region

SUNSET OF OIL AND GAS INVESTMENT IN INDONESIA: IS IT TRUE?

Gas Pricing and Financing

Indonesia 2050 Pathway Calculator

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC21537

FEED-IN TARIFF FOR INDONESIA S GEOTHERMAL DEVELOPMENT

SOLAR PV IN INDONESIA TAKING ADVANTAGE OF THE NEW LANDSCAPE

Insights and Commentary from Dentons

STUDY ON FISCAL AND NON-FISCAL INCENTIVES TO ACCELERATE PRIVATE SECTOR GEOTHERMAL ENERGY DEVELOPMENT IN THE REPUBLIC OF INDONESIA

Energy Poverty. Jeffrey Haeni USAID/EGAT/I&E. Infrastructure Workshop

Indonesia Preparedness to CDM Impmentation

Energy and exergy analysis of dry-steam geothermal power plant: Case study in kamojang geothermal power plant unit 2

High-Value Applications for Renewable Energy and Energy Efficiency Technologies in Indonesia

Ministry of Village, Development of Disadvantaged Region, and Transmigration SEIZING THE OPPORTUNITY OF EQUITABLE DEVELOPMENT THROUGH VILLAGES

THE IMPACT OF THE NEW LAW OF REPUBLIC OF INDONESIA NUMBER 20 OF 2002 TO THE ENERGY PLANNING IN INDONESIA

Land Accounts in Indonesia

PT PLN (PERSERO): Electricity Infrastructure Development and Investment Opportunity in Indonesia. London March 15, 2018

Summary of Terminal Evaluation

Scaling-Up Renewable Geothermal Energy in Indonesia

Client Alert. Finance & Projects Jakarta. New Geothermal Law Finally Issued

GoI s Policy on Renewable Energy Development

With the support of the PV Market Alliance. APVIA & GSC Q Market Report

Mining Investment in Indonesia

The IDHS obtained data from representative samples of ever-married women and currently married men to:

DOMESTIC AND FOREIGN DIRECT INVESTMENT REALIZATION

Low Carbon Development on Energy Sector Overview of the EC and NRE Sector in Indonesia

Ex-Ante Evaluation (for Japanese ODA Loan)

Draft Market Readiness Proposal (MRP) Presentation

TECHNICAL ASSISTANCE RELATED TO THE SUSTAINABLE AND INCLUSIVE ENERGY PROGRAM, SUBPROGRAM 2

NATIONAL FRAMEWORK FOR ACCELERATING THE UPTAKE OF NATURED-BASED SOLUTIONS

DOMESTIC AND FOREIGN DIRECT INVESTMENT REALIZATION IN QUARTER II AND JANUARY JUNE 2017

Analysis Of Micro And Small Industry Development In Indonesia

Transcription:

MINISTRY OF ENERGY AND MINERAL RESOURCES DIRECTORATE GENERAL OF NEW, RENEWABLE ENERGY AND ENERGY CONSERVATION by: Sjaiful Ruchijat Directorate of Geothermal APERC Annual Conference 2014 Tokyo, March 27, 2014

I. BACKGROUND II. GEOTHERMAL POTENTIAL AND DEVELOPMENT IN INDONESIA III. GEOTHERMAL POLICIES IV. BARRIERS AND SOLUTIONS IN GEOTHERMAL DEVELOPMENT V. INVESTMENT OPPORTUNITIES

I. BACKGROUND

BACKGROUND Indonesia s geothermal potential is approximately 28.6 GW which distributed in 299 locations along the country, yet its utilization has only reached 1,3 GW or equal as 4,5%; National Energy Policy encourage development of renewable energy by 23 % in year 2025. Geothermal is expected to contribute 7,12% or equal to 7,210 MW as mentioned in the national electricity system; To support utilization of geothermal energy, the Government of Indonesia (GoI) has issued Crash Program Phase II to accelerate 10.000 MW electricity development that derived from geothermal power plant (4,965 MW) as mandated in the Ministry of Energy and Mineral Resources Regulation No. 21/2013; Achieving the proposed 4,965 MW new geothermal capacity would automatically lead Indonesia to the single largest CO2 mitigation program in the world. The proposed program will reduce in the period of 2010 2025 over 400 million tco2.

II. GEOTHERMAL POTENTIAL AND DEVELOPMENT IN INDONESIA

GEOTHERMAL POTENTIAL MAP No Island Number of Location Total Installed 1 Sumatera 90 12.760 122 2 Java 71 9.717 1.134 3 Bali-Nusa Tenggara 28 1.805 5 4 Kalimantan 12 145 5 Sulawesi 65 3.044 80 6 Maluku 30 1.071 7 Papua 3 75 Total 299 28.617 1.341 Note: Preliminary Survey Detail Survey Source: Geological Agency, MEMR (2011) Ready to be developed Installed

DISTRIBUTION OF GEOTHERMAL POTENTIAL Potential Energy (Mwe) No Island Number of Location Resources Reserve Speculative Hypothetical Possible Probable Proven Total Installed 1 Sumatera 90 3089 2427 6849 15 380 12760 122 2 Java 71 1710 1826 3708 658 1815 9717 1134 3 Bali-Nusa Tenggara 28 360 417 1013 0 15 1805 5 4 Kalimantan 12 145 0 0 0 0 145 5 Sulawesi 65 1323 119 1374 150 78 3044 80 6 Maluku 30 545 97 429 0 0 1071 7 Papua 3 75 0 0 0 0 75 Total 299 7247 4886 13373 823 2288 28617 1.341 12.133 16.484 28.617 Source : Geological Agency, MEMR Status : December 2012

Distribution of Geothermal Working Area (GWA) ACEH 2 WKP Jaboi: 70 MW Seulawah Agam: 130 MW Total : 58 GWAs Lisence Issued Tender on Progress Tender Preparation Tender Failed : 39 GWAs : 2 GWAs : 13 GWAs : 5 GWAs SOUTH SUMATERA & LAMPUNG 1 WKP Danau Ranau: 210 MW NORTH SUMATERA 5 WKP Sibayak Sinabung: 130 MW Sibual Buali: 750 MW Sipaholon Ria-ria: 75 MW Sorik Marapi: 200 MW Simbolon Samosir : 155 MW JAMBI 1 WKP Sungai Penuh: 70 MW SOUTH SUMATERA 2 WKP Lumut Balai: 250 MW Rantau Dedap: 106 MW GORONTALO 1 WKP Suwawa: 110 MW NORTH SULAWESI 2 WKP Kotamobagu: 410 MW Lahendong-Tompaso: 358 MW NORTH MALUKU 2 WKP Jailolo: 75 MW Songa Wayaua: 140 MW WEST SUMATERA 4 WKP Bukit Kili: 83 MW Gn Talang: 35 MW Liki Pinangawan: 400 MW Bonjol: 200 MW BENGKULU 2 WKP Tmbg Sawah-Hululais: 873 MW Kepahiyang : 180 MW BANTEN 2 WKP Kaldera Danau Banten: 115 MW G. Endut: 80 MW BALI 1 WKP Tabanan: 276 MW CENTRAL SULAWESI 2 WKP Marana: 35 MW Bora Pulu : 152 MW LAMPUNG 4 WKP Gn.Rajabasa: 91 MW Suoh Sekincau: 230 MW Waypanas Ulubelu: 556 MW Way Ratai :105 MW WEST JAVA 10 WKP Ciater - Tgkban Perahu: 60 MW Cibeureum Parabakti: 485 MW Cibuni: 140 MW Cisolok Cisukarame: 45 MW Gn. Tampomas: 50 MW Gn. Tgkuban Perahu: 100 MW Kamojang-Darajat: 1465 MW Karaha Cakrabuana: 725 MW Pangalengan: 1106 MW G. Ciremai: 150 MW WEST NUSA TENGGARA 2 WKP Hu'u Daha: 65 MW Sembalun : 100 MW CENTRAL JAVA 5 WKP Baturaden: 175 MW Dataran Tinggi Dieng: 780 MW Guci: 79 MW Gn. Ungaran: 100 MW Umbul Telomoyo : 72 MW EAST JAVA 3 WKP CENTRAL JAVA & EAST JAVA 1 WKP Gunung Lawu : 195 MW Blawan Ijen: 270 MW Gn. Iyang Argopuro: 295 MW Telaga Ngebel: 120 MW MALUKU 1 WKP Tulehu: 100 MW EAST NUSA TENGGARA 5 WKP Atadei: 40 MW Sokoria: 30 MW Ulumbu: 199 MW Mataloko: 63 MW Oka Ile Ange : 40 MW

INSTALLED GEOTHERMAL POWER PLANT CAPACITY BY JANUARY 2014 Kamojang: 200 MW Lahendong: 80 MW Sibayak: 12 MW Ulubelu: 110 MW Darajat: 270 MW Salak: 377 MW Wayang Windu: 227 MW Dieng: 60 MW Ulumbu: 5 MW TOTAL 1.341 MW

III. GEOTHERMAL POLICIES

Relating to geothermal utilization, there are three cores of regulation: 1) Law 27 Year 2003 on Geothermal: The Law is the basic guidance for geothermal development in Indonesia 2) Government Regulation No. 59/2007 on Geothermal Business Activity: This regulation consists of particular provisions in the area of geothermal business activity 3) Ministerial Regulation No. 11/2009 on Guidance for the Implementation of Geothermal Business Activity: Regulates the geothermal tender and supervision, as well as stages in geothermal business activity According to the Law 27 Year 2003 on Geothermal, there are 5 (five) stages in utilizing geothermal energy: Preliminary Survey Exploration Feasibility Study Exploitation Utilization GEOTHERMAL BUSINESS STAGES

Geothermal Working Area (GWA) Determined by the Minister of Energy and Mineral Resources Offered by the government or local governments within their authority through the tender mechanism The tender winner could initiate geothermal activities after obtaining Geothermal Businness Permit (IUP). The authority issuing the Permit depends on the location where the GWA is located.

Fiscal Incentives policies: 1) Income Tax Article 21 Tax Holiday 1. An exemption from corporate income tax for 5 to 10 years 2. A two-year, 50% reduction in corporate income tax Tax Allowance 1. Reducing net taxable income to 30% of the total investment value, carried over six years 2. Accelerated depreciation and amortization 3. Impose income tax of 10% for dividends 4. Loss carry forward of at least 5 years and up to 10 years 2) Taxes and duties on imported goods - Duty exemption (for exploration and exploitation activities) - Free of Value Added Tax (VAT), Luxury Goods Sales Tax (LGST) and Income Tax based on Minister of Finance Regulations No. 27/2012 and No. 70/2013 Other policies including: accelerating the tender process of new GWAs, building the "public awareness" on the utilization of geothermal as green and environmentally friendly energy

Pricing policies previously set by the government does not provide a significant impact on geothermal development. It is considered that they are not taking into account some crucial aspects such as location, generation capacity, transmission, escalation, assignment mechanisms and reservoir quality. Therefore, the government is currently developing a comprehensive pricing structure which includes upstream and downstream sides. PROPOSED CEILING PRICES FOR GEOTHERMAL POWER No. Generation Capacity Ceiling Price for Geothermal Power (cent US$/kWh) 1. > 55 MW 10,5 2. > 20 MW - 55 MW 12,5 3. > 10 MW - 20 MW 15,5 4. 10 MW 19,0

IV. BARRIERS AND SOLUTIONS IN GEOTHERMAL DEVELOPMENT

BARRIERS AND SOLUTIONS IN GEOTHERMAL DEVELOPMENT (1/2) 1. Overlapping Areas with Forestry: most of geothermal potentials are located within the forestry area (15% in conservation forest, 18% in protected forest) Solution: Ministry of Energy and Mineral Resources (MEMR) and Ministry of Forestry (MF) have signed the MoU No. 7662/05/MEM.S/2011 to accelerate the geothermal utilization permit within the area of protected, production and conservation forest. 2. Legal Uncertainty: disharmony in geothermal business regulations Solution: improvement and harmonization of regulations in Geothermal Business are as follows: Draft on Geothermal Law is currently being discussed by the Special Committee of the House of Representatives Second amendment of the Government Regulation No. 59/2007 soon will be issued Revision of Minister of Energy and Mineral Resources Regulation No. 11/2009 on Guidance for the Implementation of Geothermal Business Activity Improvement of Minister of Energy and Mineral Resources Regulation No. 22/2012 relating to electricity price from geothermal energy, through the ceiling price mechanism

BARRIERS AND SOLUTIONS IN GEOTHERMAL DEVELOPMENT (2/2) 3. Geothermal Price: competitiveness of geothermal energy price Solution: develop a new pricing structure that meets economic value 4. Funding: high investment cost and unbankable project Solution: - Provides financial support and Government guarantee - Government guarantees on the feasibility of PT. PLN (buyer) - Provides Geothermal Fund" for geothermal exploration 5. Bidding Process Solution: the policies regulate bidding process are being revised in order to make the tender process simpler, more transparent and bankable 6. Shortage of Competent Human Resources Solution: create training, short courses and advanced level education in collaboration with local and international educational institutions 7. Others Absence of Technology and Research & Development Supports Low Environmental Awareness Continuing Subsidy of Fossil Fuel Price

V. INVESTMENT OPPORTUNITIES

INVESTMENT OPPORTUNITIES 1. Development of 4,965 MW electricity from Geothermal in 10,000 MW Crash Program Phase II requires more than US$ 15 billions for the investment. 2. To achieve the targets, international supports are needed in terms of finance, technology, human resources and Technical Assistance. 3. Foreign ownership in Geothermal Business is allowed up to 95 %. 4. Access to Potential Geothermal Resources for Investors: a) Preliminary Survey Assignment b) Participate in the geothermal business through GWAs tendering mechanis 5. Other business opportunities in geothermal sector: a) Geothermal direct use b) Low temperature geothermal potential c) Small scale power plant d) Services company to support the core business of geothermal

THANK YOU ` Go Green Indonesia! Geothermal, Energy Solution for Better Future MINISTRY OF ENERGY AND MINERAL RESOURCES DIRECTORATE GENERAL OF NEW RENEWABLE ENERGY AND ENERGY CONSERVATION Jalan Pegangsaan Timur No. 1 Menteng - Jakarta 10320 www.ebtke.esdm.go.id www.indogeothermal.or.id