Siding Installation Manual for: Color Natura Rustica Rivets

Similar documents
Siding Installation Manual for: Color Natura Rustica Rivets

Siding Installation Manual for: Color Natura Rustica Wood Furring

Siding Installation Manual for: Color Natura Rustica 1

Cembrit Windstopper Basic Cembrit Windstopper Extreme

Installation. Cembrit Cover, Solid and Transparent

Installation. Cembrit Patina

Product Catalog and Installation Manual for: Multi-Panels XPS Tile Backer Board, Shower Tray and Underlayment for Floor Heating

Exterior System installation instructions

EQUITONE is a material supplier. Installation Contractors shall be trained and approved by EQUITONE.

SUCCESS ON THE JOB SITE

INDOOR RUBBER FLOORING INTERLOCKING INSTALLATION / MAINTENANCE GUIDELINES MARATHON SERIES. Four-Side Interlock Loose Lay Installation

GENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide. GeneralShale.com

EQUITONE is a material supplier. Installation Contractors shall be trained and approved by EQUITONE.

Impression Graphic panels

Cl/SfB l (42) Rf9 l l May Cembrit HD. Rainscreen cladding/building board for external applications. 1

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com

INSTALLATION MANUAL. METAL INSULATED PANELS -ROXUL -Expanded Polystyrene

Installation Guide Wall Panels

Cladding Installation

Glass Care. Frame Cleaning

MONOLITH. Basin System. installation + maintenance

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

INSTALLATION GUIDE DUOFUSE DECKING

Dynamic Bonding Systems B.V. A division of Dutch Bonding Group B.V.

Vertigo Cladding Board

Exterior Wall Solutions Building Shell

Rev. 08 9/15 Please Read Disclaimers:

ARDEX GUIDE SPECIFICATION ARDEX GS-4 Self-Leveling Repair Underlayment for Distressed Gypsum and Wood Subfloors

SPECIFICATION FOR INSTALLATION OF WALKER ZANGER KAZA CONCRETE TILES ONTO VARIOUS SUBSTRATES

SECTION FIBER CEMENT SIDING. A. Furnish and install CERACLAD fiber cement rain screen siding system.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: FIBER-CEMENT SIDING REPORT HOLDER: EQUITONE

APPLICATION INSTRUCTIONS REALSIDE TM

Guide Specifications for Prodema PRODEX External Cladding

maintenance-free free from painting easy to install Fixing Guide Cedral Click

Installation Guide. IMPORTANT: Read all sections before starting. For the most up-to-date information, visit our website: leadvisioninternational.

Triton BK Backer Board & Tile Underlayment

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: TRESPA NORTH AMERICA, LTD.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: FIBER CEMENT SIDING REPORT HOLDER: RIEDER FASERBETON ELEMENTE GmbH

Rev. 07 8/15 Please Read Disclaimers:

TruGrain 12 Inch Commercial Profile Installation Recommendations

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS REPORT HOLDER: PAREX USA, INC.

Kingspan Day-Lite Klick

Glasboard Liners. installation details. Installation Guide for Glasbord Fibreglass Reinforced Plastic (FRP) panels

Installation Guide. PAROC panel solutions

STORAGE AND TRANSPORTION

General and Installation Instructions Laminate - 2G + 2G

CENTURY HOME LIVING HOLLOW DECKING INSTALLATION GUIDE

For more information on Pictura visit CI/SfB (41) R December New. Pictura. High performance cladding

Cl/SfB 1 (4-) RJ July Cempanel BUILDING BOARD CEMENT PARTICLE BOARD.

AttainSilence & Attain

Install & Maintenance Instructions

YARRABEE 360 GEOLOGY

TRUSSCORE PVC INTERLOCKING LINER PANEL

Asbestos cement products in your home

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: 3A COMPOSITES USA INC.

GENERAL SPECIFICATION FOR FIRE RATED APPLICATIONS

ifix INSTALLATION MANUAL PV flat roof installation system Version

Installation Guide DROP-IN OR FREESTANDING CAST IRON BATH. English page T01-B

Instructions for On-Site Coating of Vinyl Windows

INSTALLATION INSTRUCTIONS LAMINATE

PANEL INSTALLATION GUIDE

GA APPLICATION OF GYPSUM SHEATHING

Insulation. First Revison October DC14 Drainage Mat INSTALLATION GUIDE FOR RESIDENTIAL & COMMERCIAL APPLICATIONS

Technical Data Sheet

ECAILLE Implementation Guide

INSTALLATION GUIDE MODELS DMV2402 / DMV3002 / DMV3602

Rigid Core Installation & Maintenance Instructions

eos LightPanel Systems User Guide

Resysta Wall Cladding Installation Guidelines

Samrat External Wall Cladding.

MANUAL. landscape orientation. portrait orientation. metal roof mounting system for solar panels METAL ROOF MOUNTING SYSTEM. Rev

Facade panel PICTURA Product Information Sheet

PART 1-SAWN THIN VENEER GENERAL

ARDEX GUIDE SPECIFICATION ARDEX K 22 F High Flow, Fiber Reinforced, Self-Leveling Underlayment

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols.

MODEL NUMBER: 1419 SERIES

Installation Guidelines: Magnolia

LUXAPOOL CHLORINATED RUBBER POOL COATING

Application Instructions for Dryvit Backstop NT For Use Beneath Claddings Other Than Dryvit EIFS

HOLLOW DECKING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE

Bulldog Coatings, LLC Limited Product Warranty Bulldog Coatings, LLC Finished-to-Order & Custom-Finished products

ENGINEERED LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

Technical Data Sheet

Fire Resistant: Achieves FRL levels of 90/90/90 for load bearing walls.

SECTION Fiber Reinforced Stucco 1

Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars

aquapanel InstallatIon GuIde

Porcelain Paver Installation Guide

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

USG Tile & Flooring Solutions. Lightweight cement board. Easy to cut and fasten. Faster installation USG DUROCK BRAND CEMENT BOARD INSTALLATION GUIDE

Textura Façade panel Product information sheet 1

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: FUNDERMAX GMBH

Re-Grouting Floor Joints in Commercial Kitchens and Industrial Applications

SLP-ThermoWood Installation and maintenance instruction

DEEP SOAK PRODUCT REQUIREMENTS. A. Product Requirements. B. Product Inspection. C. Clearance Requirements T01-A

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

BACKSTOP NT - Texture A high performance, non-cementitious water-resistive membrane and air barrier. Backstop NT - Texture Application Instructions

Transcription:

Siding Installation Manual for: Color Natura Rustica Rivets 1

Ventilated Siding, Principle For easy handling of the Panels use when mounting Ventilated Siding systems consist of five main components: 1 Support structure 2 Ventilated cavity 3 Thermal insulation layer 4 Siding (Color Natura Rustica - 5/16 thickness) 5 Sub mounting frame (Aluminium Galvanized steel) 1 : Support Structure The exterior wall of a building is mainly made of concrete, CMU blocks, brickwork, steel or timber frame with studs and planked by gypsum panels, M4 panels, OSB or Plywood. Use a BLACK Water Restrictive Barrier (WRB) behind the Siding (no white WRB as gaps so are more visible). 2 : Ventilated Cavity The main task of the air cavity is the evacuation of moisture and excess heat. The air circulation occurs naturally thanks to the pressure difference between bottom and top 3 : Thermal Insulation Layer The advantage of an exterior thermal insulation is to keep the entire building structure at a constant temperature and to minimize thermal bridges and thus reduce the loss of energy to a minimum. Economic as well as ecological advantages result. 2

4 : Siding (Color Natura Rustica) The outer skin of the building envelope has two main functions; to be aesthetically attractive as well as to protect against influences from the climate and environment. 5 : Sub frame Multi-Panels façade panels are installed on aluminum or metal supports. The Multi-Panels siding concept is based on natural rear ventilation as it is the most reliable and sustainable, and provides maximum longevity to exterior Siding Important! Siding with Multi-Panels products must always be carried out as a ventilated facade with min 1 (25 mm) distance between the Siding and the rear wind barrier lining (insulation material). In special situations (e.g. high rise buildings), local regulations may demand a larger ventilation gap, but normally 0.25% - 0.5% of the Siding area must be evenly ventilated and/or the inlet and outlet openings must have a cross section of at least 20 ft2/ft. Fastening of Multi-Panels Siding Multi-Panels panels are installed on metal substructures. The fastening method using rivets allows an efficient attachment to the supporting structures (see below picture). In fact using rivets, (A4 material) are hardly visible even at a slight distance away as they fit with the overall surface and are available in the same shades of color as the panels delivered. Sub-frames are to be designed by a structural engineer/contractor. Thermal expansion/retraction is to be accounted for. 3

Fixed and Gliding Points Diameter of the fixed point hole (F) use #8 drill fit (0.2") (SFS 1257217) and of the gliding point (G) use SFS drill guage (SFS1320659) range.354"-.390" (See page 5) Two fixed points (F) are required per panel. are: always the same height in each panel, close to center of panel as possible, and then either the next adjacent point to the left or right. Be consistent in panel-to-panel location (center and left or center and right, so fixed points are at the same level horizontally for attachment to vertical profiles). Two fixed points on one panel can not be on the same profile, and no two fixed points on two adjacent panels can be on the same profile. For smaller panel sizes with only two rows of fasteners, fixed points to be top center and top left or top right (horizontal applications on vertical profiles). For vertical narrow panel applications on vertical profiles, vertical joints must incorporate two separate profiles Rivets to be located 4

Fixed Point Gliding Point SFS SSO-D15 Blind Rivets Diameter & Length - Part No.- Global Code - Grip Range 5 x 14mm 1262436 SSO-D15-50140-A4 6.0 9.5mm (.236 -.374 ) 5 x 18mm 1262437 SSO-D15-50180-A4 9.0-13.5mm (.354 -.531 ) 5 x 22mm 1262439 SSO-D15-50220-A4 13.0 18.0mm (.512 -.708 ) Drill Gauge SFS for Gliding Points SFS SSO-D15 Rivets Material No. Description for pre-drilled gliding hole diameter 1321704 Drill Gauge 10.0-10.9 mm (.394 -.429 ) DG-146X20-7,0 1320657 Drill Gauge 7.0-7.9 mm (.275 -.312 ) DG-146X20-8,0 1320658 Drill Gauge 8.0-8.9 mm (.315 -.350 ) DG-146X20-9,0 1320659 Drill Gauge 9.0-9.9 mm (.354 -.390 ) DG-146X20-10,0 1257217 Replacement Drill Bit 5.1 x 110 mm (.201 x 4.33 ) #7 bit 5

AccuBird For standard blind rivets 2-5 mm Allways use the special stand-off nosepiece (item no #1291200) for AccuBird for the standard SFS SSO-D15 rivets to avoid force on the panel as leaves a small gap between panel and rivet. Guideline operation parameters for Multi-Panels saw blades D b d Z rpm www.frezite.com 120 1, 8 20 8 6500 A887.120.008.20 160 2, 4 20 10 4800 A887.160.010.20 190 2, 4 30 12 4000 A887.190.012.30 216 2, 6 30 14 3500 A887.216.014.30 250 2, 6 30 16 3000 A887.250.016.30 300 2, 8 30 20 2800 A887.300.020.30 6

Panels cannot bridge a break in the aluminum profile. 7

Fastening with Rivets when Wind Load For wind load demand please see below. This table applies to 5/16 (8 mm) panels, fastened with rivets onto metal sub-framing. Panels vertical mounted. Structural Engineer/Contractor shall assume overall responsibility for the facade engineering. Intermediate values for wind load/ spacing can be interpolated. A safety factor of 3.0 is taken into account for the admissible system load (rivet and panel). The value means the actual wind load occurring on the Siding. Fastener to panel edge distance of 1.57 (40 mm) horizontally and 3.15 (80 mm) vertically. System Type Visible Rivets System Actual Thickness 5/16 Allowable Transverse wind load - ASTM E330-02 Positive Negative 53 psf 47,7 psf Fastening with Rivets The installer is responsible for establishing a plane and strong sub-construction and observing the fixing distances. Facade panels are normally installed in a vertical position on a vertical sub-structure. However, it is also possible to install the panels in a horizontal position. The guidelines for fixing are the same. Thermal expansion/retraction. Wind loads appearing on the actual facade and Applicable wind load values are to be determined for each project in accordance with the local standards and for high-rise buildings with specific wind load studies. Processing and Storing CUTTING All Multi-Panels panels may be cut with a circular saw or a jigsaw equipped with a diamond tipped blade. Sharp edges are made with fast running diamond tipped tools. Cutting to size may be done with normal slow or fast running hand tools or stationary equipment. When using fast running tools, dust exhaustion must be employed. Note: When using hand tools, cut the panels backside up. When using stationary saw equipment, cut the panels front-side up (the saw blade must always attack the board from the front-side). The periphery speed of the circular saw should be as depicted in the below table. Cutting depth should be 3/8 5/8 (10-15 mm) beyond the board. 8

CUT-OUTS Cut-outs may be made with a jigsaw or a key-hole saw equipped with bi-metal or diamond tipped blade. It is recommended to drill a min 7/16 (8 mm) hole before cutting in the inside corner. In order to avoid creating a notch at the inside corner, cut edges should be sanded. CLEANING OF PANELS AFTER CUTTING AND DRILLING It is important to immediately remove dust caused by cutting and drilling from the front and backside of the panels with a soft brush/duster or a vacuum cleaner as it might damage the panel surface. Ensure that the panels are properly cleaned before installation, and if necessary use clean water or water with a mild detergent and a soft sponge or brush to remove dirt and dust from the surface. Thereafter, wipe the panels with a damp cloth. It may also be necessary to wash the surface after installation if the building site conditions have been unfavorable. This is done with clean water or water with a mild detergent and a soft sponge or brush and finally wiping the panels with a damp cloth. PROTECTIVE FILM Multi-Panels painted panels (Color and Natura) are equipped with polyethylene film between the panels for protection of the surface during transport and processing, which can be disposed of during installation. SAFETY As with all other building materials, safety precautions must be taken into account and local laws and regulations must be observed. Cutting and drilling are subject to dust development, and proper precautions must be taken by using appropriate dust extraction equipment. Dust from fiber cement panels is characterized as mineral dust and prolonged exposure to this may cause lung disease. Fast running electrical equipment such as hand held circular saws leave a fine and sharp edge on the panels and provide fine dust. Due to the speed of the blade the dust is dispersed over a larger area. Therefore, it is necessary to establish sufficient exhaustion and it is recommended the operator carry personal safety equipment. APPLICATION CONDITIONS Board temperature and ambient temperature should be + 44 F (+7 C) - 86 F (+30 C) and relative humidity <85 % (optimally 60 %). Process temperature must be min +44 F (+7 C). APPLICATION - FINISHING THE EDGES TO CUT WITH HYDRO BLOCK EDGE SEALER Note: These Instructions are mandatory for Color, Natura and Rustica siding panels. Before use, shake the Hydro Block thoroughly. In case of unventilated premises, use required protective respiratory equipment, wear protective clothing, safety goggles and gloves according to the Safety Datasheet. Carefully apply the solvent-based Hydro Block in a thin layer with a short hair roller. Excess Hydro Block on top of the surface should be removed immediately after painting. Disposal of this product must be with reference to local and national regulations. 9

STORING AND PROPER HANDLING Multi-Panels products are delivered with plastic protection cover on the pallet. If undamaged, the plastic cover protects against weather conditions during transportation. The plastic cover is for dust protection only and should be removed upon arrival at the building site. Hereafter the pallets should be kept under a roof, leaving the possibility of ventilation around the panels. Multi-Panels must be stored on a flat and dry level surface on pallets or sleepers with a minimum distance of 12 between the stacks on all sides. Note: Max. 5 pallets in a stack at the warehouse and on the building site max. 2 pallets in a stack. The panels must be lifted up and off the pallet and not drawn over the next board, as this will cause scratches and damage on the surface. Lift pallet crosswise and set forks apart to minimize bending of pallet. Fork length must support pallet entirely; if required, use fork extensions. General Information ANNUAL INSPECTION Normally, a Multi-Panels facade does not require maintenance to maintain its strength, properties and function, but an annual inspection of the surface, ventilation gaps, joints and fixings is recommended. Environmental impacts may, however, influence the visual appearance of the façade. Detection and repair of possible damages help promote a prolonged lifetime for the facade. HIGH PRESSURE CLEANING Warning High Pressure Cleaning is a rough treatment of a fiber cement siding. Use of a high pressure cleaner may damage the surface. Therefore, high pressure cleaning is not recommended. CLEANING OF DIRT Never clean a facade in bright sunlight, the Multi-Panels facade panels can be cleaned with cold or hot water with the addition of a mild household detergent not containing solvents. Before full scale cleaning it is recommended to test the selected cleaning method on a smaller area to make sure it performs as expected. Rinse with plenty of clean water until the facade is perfectly clean. MOSS AND ALGAE REMOVAL Never clean a facade in bright sunlight. Moss and algae growth can be removed with common detergents available on the market, examples are: Chlorine or Rodalon 2.5% active that has a long-term effect of preventing new growth. After wetting the Multi-panels with clean water, apply detergents according to the supplier s instructions. Do not leave the detergents to dry completely and be sure to rinse with plenty of clean water to remove the moss and algae. IMPACT BY POLLUTION AND NATURE Weather and nearby vegetation may affect the appearance of the panels. Take caution to avoid pollution, dust and leaves from trees, bushes and flowers to not impact the integrity of the panels. 10

SERVICE If you have any questions regarding the Multi-Panels facade panels, our dedicated service team is ready to assist you with advice and guidance. Please visit our website for more information. Warranty This warranty Covers: The warranty covers the ICC-ES certification AC 90 scope/values (US certification of fiber cement) and we confirm that we give a warranty for a period of 10 years, beginning on date of delivery, provided that, the panels were cut/drilled/stored/installed/used prescribed system components etc. according to this Installation Manual. The warranty does not cover: color fading due to the UV light, environmental impact on the panels such as pollution, etc. For the Rustica panel additionally not covered: Color differences between batch/production series. The Rustica panel has a raw look, including some small white spots in different sizes and amounts on the panels. Replacement: Any Multi-panels product which does not comply with these results in the datasheet tested according to ICC-ES AC 90 will be replaced free of charge, ex works Los Angeles, on condition that Multi- Panels Corporation is notified within a period of 4 weeks after the appearance of any accepted claim by Multi-Panels Corporation. In particular, the warranty covers neither the transport costs nor labor expenses for dismantling and dumping defective panels and installing new panels. Multi-Panels Corporation shall not be liable for failure of performance hereunder due to force majeure. DISCLAIMER The information contained in this manual is based on Multi-Panels general experience, best knowledge and belief; however because of factors that fall beyond Multi-Panels knowledge and control, which can affect the use and function of the products, no warranty is given or implied with respect to the information. Multi-Panels policy is one of continuous improvement and therefore reserves the right to alter specifications at any time and without notice. In case of doubt, please contact your local Multi-Panels representative. 11