Inner Doha Resewerage Implementation Scheme (IDRIS) Bill Van Wagenen- Programme Director Val S. Frenkel Principal PM

Similar documents
Water Quality of Victoria Harbour and its Typhoon Shelters

Construction and Maintenance Challenges with Sudbury s Sewage Rock Tunnel

EFFLUENT REUSE AT EAST LISMORE WASTEWATER TREATMENT WORKS

AGENDA. 1. Dubai Opportunities 2. Key dates for procurement 3. How UK companies can access (mostly SMEs will be present) 4. Q&A

Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel

Public Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

Public Works Authority Apply Sustainable Developments Concept with Sewerage Works, Qatar Khaled El Emadi, Ghazi Abdel Kerim, Hassan El Emadi

OPERATIONAL DECISION SUPPORT SYSTEM

UV Disinfection for a Municipal Wastewater Lagoon Effluent No Prior Filtration Needed? Wayne Wong, M.A.Sc., P.Eng., PMP

by Edward Ollett BEng (Hons) MICE CEng

Case History: Complex Design and Construction of Tunnel and SOE to Accommodate Challenging Site Conditions

When confronted with increasing peaking. Managing the deluge

Improvements to the Missouri River Wastewater Treatment Plant- Schedule BProject. Public Meeting June 4, 2013 South Omaha Public Library

Customer Conference Speedway, IN 46224

Chapter 2: Description of Treatment Facilities

p2m berlin GmbH Tubli Water Pollution Control Centre Expansion of Sewage Treatment Plant with First Sludge to Energy Concept in the Middle East

Ministry of Urban Development, Government of India

Leavenworth Lift Station Replacement Project Public Meeting No. 2. September 19, 2011

A630 Deephams Sewage Works Upgrade. Strategic Options Review Stage 1 Report. Public consultation version

PWA Construction Waste Management and opportunities for Recycling

Texas A&M Wastewater Treatment Plant 9685 Whites Creek Rd., College Station, TX

CITY OF FALL RIVER STORMWATER UTILITY AND THE CSO PROGRAM. OCTOBER 22, 2015 Terrance Sullivan Administrator of Community Utilities

Clinton Combined Sewer Overflow (CSO) Storage Facility Project

SEWAGE TREATMENT AND DISPOSAL

Massachusetts Water Resources Authority

Stevens & Associates, Inc. Tunnel Construction Projects. Fact Sheets

Arlington East WRF Influent Channel Rehabilitation - Final

Fleetwood WwTW in Lancashire is owned and operated by United Utilities and serves a catchment population of

EPA Waste Water Discharge Licence Application

Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA

Lathrop, CA. FACILITY: City of Lathrop Water Recycling Plant No. 1 LOCATION: MBR MANUFACTURER:

Long Term Control Plan Consent Decree Status Report: Quarter No

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto.

17.0 INFRASTRUCTURE AND ENERGY

NTMWD REGIONAL WASTEWATER SYSTEM

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

London s sewerage system was designed by Sir Joseph Bazalgette in the 1850s, for a population of four million

Portsmouth Flood Alleviation Scheme part of Southern Water s 50m programme of improvements to the sewer network in Portsmouth

Water and Waste Department

Brightwater: The Design Challenges of a 39 mgd (150 MLD) Membrane Bioreactor

Consent Decree Appendix 1. Control Measures and Performance Criteria

Myths and Facts. Myth: The Seaterra Program will not provide a high level of treatment for our wastewater.

Pretreatment Improvement for Membrane and Thermal Desalination Systems

Synergy: Addressing Combined Sewer Overflows and Nitrogen

Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project

PMSA Regional Conference The role of innovative technology and PM in delivery of the Durban Harbour Tunnel.

WASTEWATER ASSET MANAGEMENT PLAN

SFPUC Wastewater Master Plan SUMMARY OF SECOND TECHNICAL ADVISORY COMMITTEE MEETING City of San Francisco, California

Use of Alternative Water Sources for Power Plant Cooling

Contents. Glossary 9. Foreword 10

Replacing an old Sewage Treatment Plant

Brightwater Conveyance System. Need for the Brightwater project. Final Conveyance Routes. Brightwater Siting Process. University of Washington

Pre-RFP Meeting for Integrated Wastewater Treatment Plant Master Plan (MWWTP Master Plan) Presentation to Interested Parties. September 13, 2018

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

OPTIMISING WASTEWATER TREATMENT AND REUSE MOUNT ISA A CASE STUDY

Water. Executive Summary

Recommended Qualification Structure for Sub-structure Work Occupations (Construction) Level 2

Decentralised Wastewater Management. A sustainable strategy for wastewater management

Appendix J Effluent Pump Station

TÜV Middle East Member of TÜV NORD Group. Welcome. Water Technology and Water Management through Recycling Process

CONSTRUCTION SPECIFICATION FOR PIPELINE INSTALLATION BY TUNNELLING

Public Procurement Monitoring Construction Sector BULGARIAN CONSTRUCTION CAMBER

Plessis Road Twinning and Grade Separation at CN Redditt Subdivision: Design Challenges and Innovative Solutions

London Tideway Improvements creating a cleaner, healthier River Thames - an overview

March 29, to the. Please sign in and take a Comment Sheet

APPENDIX C. Public Consultation Centre (PCC) Displays. Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3

London Tideway Tunnels Modernising London s Sewerage System Rob Furniss

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013

Welcome Waste Water Quality Breakout

Public Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

Total Water Solutions MARCH 2017

Executive Summary. Introduction

6.2 Umgeni Water Owned Wastewater Works

CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY

Proposed Alterations and Extension to 17 St. John's Road, Sandymount, Dublin 4

PRINCIPAL ENGINEER. 4. Prepare plans and studies to forecast section and division needs; implement recommendations.

How Outcomes are Changing Modelling. Steve Hogg

Bynea Sewage Pumping Station rehabilitating and replacing an existing asset to improve operation, reduce risk and increase resilience

Foul Water Drainage Strategy Monkton Road Minster CT12 4EE

Challenges in Wastewater Treatment and Management in Asia:

ALMEDA TUNNEL PAST, PRESENT AND FUTURE

Public Sewer System Informational Meeting

Public Disclosure Copy

CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING

REGULATORY ACCOUNTING GUIDELINE 2.03

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

Fast-Track Emergency Replacement of Collapsed Sewer by Tunneling in Miocene Clay

Hartford WPCF Master Plan Clean Water Project. Executive Summary. February 2010

A 25 Year Strategic Plan

Study on Economic Partnership Projects. in Developing Countries in FY2009. Da Nang City in Socialist Republic of Viet Nam SUMMARY.

Ideal logo position here. Effective Scheme Design: Ground and Water

Annual Environmental Report

Water / Wastewater Facilities. Jersey City. Evaluation of Water Main Rehabilitation Methods. Force Main Evaluation

Ground Freezing for Tunnel, Shafts, and Adits

The Successful Construction of DC Plants: Saadiyat Island Case

6. WASTEWATER. 6.1 Overview. 6.2 Darvill Wastewater Works

Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan

Water Industry Training in non-metropolitan NSW

MANDATORY PRE-BID MEETING FLORIDA KEYS AQUEDUCT AUTHORITY

Transcription:

Inner Doha Resewerage Implementation Scheme (IDRIS) Bill Van Wagenen- Programme Director Val S. Frenkel Principal PM ICE Qatar Meeting 17-May-2016 Doha, Qatar

WHAT WE WILL PRESENT 1. Safety Moment 2. The Need - Why IDRIS 3. The Solution 4. Our Delivery Unique and Innovative 5. Progress So Far 6. The Future 7. Questions and Answers

3 WHY IDRIS?

SUPPORTING POPULATION GROWTH. Qatar Population Growth 4 South Doha forecasted to grow from 600,000 to 1.5 million By 2030

Flooding in the Heart of Doha. SOUTH DOHA FLOODING Aggravated By Increased Density Of The Area 5

THE PROBLEM.. A Public Health Hazard. 6

AGING SEWERAGE INFRASTRUCTURE. 30 Pumping Stations to be decommissioned Doha South STW operating since 1980 7

IMPACTS TO WORLD CUP 2022. Planned Stadium Next Door to Doha South STW New Stadium 8

9

IDRIS COMPONENTS Sewage Treatment Works Sewage Treatment Works Existing Sewers Existing Sewers Lateral Interceptor Sewers Main Trunk Sewer Pump Pump Station A Sustainable Design that uses gravity to convey the used water Sewer Link Tunnel Main Tunnels New Pump Station New Treatment Plant Treated Effluent Return System 10

IDRIS PROJECT PACKAGES Lateral Interceptor Sewer Main Trunk Sewer Lateral Interceptor Sewer Main Trunk Sewer Lateral Interceptor Sewer LIS-01 MTS-01 LIS-03 MTS-02 LIS-02 Main Trunk Sewer MTS-03 Terminal Pump Station / Sewage treatment Works Lateral Interceptor Sewer TPS/STW LIS-03 11 Treated Return System TRS-01

IDRIS TIMELINE Concept Design Oct 2012 PMC Contract Award Dec 2011 Implementation Contract Prequalification Oct 2013 MTS Contracts Awarded Q1/Q2 2015 Preliminary Design Apr 2013 LIS Contracts Awarded Q3 2015/Q1 2016 TPS/STW Contract Award Q2 2016 Completion Q4 2020 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 12 Today

IDRIS Implementation Packaging Strategy AWARDED AWARDED FINAL TENDER PHASE FINAL TENDER PHASE 13

14 Innovative Technologies Introduced

Technological Innovation Vertical Shaft Sinking Machine 15

Steps Advanced Wastewater Treatment Plant Summary TAKE AWAY HIGHEST QUALITY PRODUCED WATER 1 2 3 Screen Grit Removal Solids Settling 1st Water Reuse 7 6 5 4 UV Inactivation Membrane Filtration Solids Settling 2 nd Biological Treatment Disinfection 16

Integrated Tunnel Precast Segments Primary, secondary and HDPE lining precast together Fiber reinforced concrete Improved quality Safer installation 17

IDRIS is a part of long term Drainage master plan for Qatar including expanded TSE usage No outfall - TSE system integrated 18

PROGRAMME DELIVERY. 19

Enhanced Authority Oversight Model PUBLIC WORKS AUTHORITY PROGRAMME MANAGEMENT CONSULTANT Supervision Consultant Design Consultant Supervision Consultant Design Consultant Supervision Consultant Design Consultant Contract Design Contract Design Contract Design Administration Supervision Consultant Management Administration Supervision Consultant Management Administration Supervision Consultant Management Construction Construction SITE SUPERVISION Supervision Detailed Design Supervision SITE SUPERVISION Construction Detailed Design SITE SUPERVISION Supervision Detailed Design Execution Contractors Execution Contractors Execution Contractors QCE QCE QCE MTS PACKAGE (3 CONTRACTS) LIS PACKAGE (3 CONTRACTS) TPS STW PACKAGE (1 CONTRACT) 20

COLLABORATIVE HSE CULTURE Focus On Worker Welfare Living Quarters Meet QF Standards Centralized dining and food preparation 21 Evaporating Cooling Bandana Workers wets every three hours Reduces temperature by up to 10 c

STRONG GROUNDWATER CONTROL PROGRAM No Active Dewatering Allowed Diaphragm Walls Vertical Shaft Machine 22 Secant Walls Grouting & Rock Bolting

Environmental Sustainability & Assessment rating & award scheme for Infrastructure projects. CEEQUAL celebrates the commitment of the civil engineering industry CEEEQUAL Utilized By Idris / FIRST TIME IN THE GCC CEEQUAL is an environmental award system developed by the engineering community (ICE) for use in analysis of infrastructure projects. Scoring revised through regional assessment team to be appropriate to the Qatar environment. 23

20 year O&M Incentives TPS/STW contractor DBO procurement and delivery strategy - one entity design, build and operate TPS/STW for 20 years 24

CONNECTED BIM.. Benefit the entire project team All IDRIS Contracts Will Have 4D BIM 25

Integrated Document Management System COMMON SYSTEM SHARED ACROSS THE PROGRAMME Contractor PWA SC IDRIS PROJECTS DOCUMENT QCE Sub Contractor PMC 26

27 Our Progress So Far..

28

Eliminate serious public health issue caused by foul sewage Eliminate aging pump stations THE OUTCOME. Accommodate economic & planned growth Provide 50 year sewerage solution for Doha s largest catchment Produce up to 500,000 m 3 /day high quality TSE (reuse 29 water) by 2030

30 THE FUTURE