Brighton & Sussex University Hospital

Similar documents
Construction Method Statement

Construction Environment Management Plan. Planning Condition 5.

ARCHITECTUS FEBRUARY 2010

Audley Square House Presentation January 2017

Audley Square House Presentation

Management Plan: Hazardous Materials Removal & Demolition

Construction Management Statement FOR THE DEVELOPMENT

Ensuring safe deliveries to construction sites

Construction Method Statement

Welcome.

The Nine Elms Vauxhall Partnership. London Borough of Lambeth London Borough of Wandsworth. Construction Charter. Summary SB15-22 APPENDIX 1

JSP Construction Ltd CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN City Road Cardiff CF24 3BJ

Enabling Works Fox Primary School, Kensignton, London. Presentation for Drop-in Session for Fox Primary School Staff & Parents

1. INTRODUCTION. Planning Condition: Date: 4/08/ Purpose of the Document

Audley Square House Presentation

Brighton 3Ts Hospital Liaison Group Construction Logistics 7 th February Steve Chudley Laing O Rourke

A2B. Construction (Design and Management) Regulations 2015 PRE CONSTRUCTION INFORMATION PACK (V ) PROJECT:

MANAGEMENT OF DEMOLITION PROJECTS GUIDANCE FOR CLIENTS & ADMINISTRATORS CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2015

HOW YOU NEED TO PLAN AND PREPARE FOR A SUCCESSFUL DEMOLITION PROJECT

Exhibit G. Construction Mitigation Plan

Earls Court Project. N Framework Construction Logistics Plan. Royal Borough of Kensington & Chelsea Application 1

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES

DEMOLITION TRADE SPECIFICATION

EXHIBIT LIST No Exhibit Name Page 1 P5 Traffic Presentation.pdf (P5) 2-20

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

CONDITIONS & SECTION 106 AGREEMENT

MAINE MEDICAL CENTER

Code of Construction Practice Part B: Site Specific Requirements

McGrath works in partnership with Hackney Homes

Construction Management Plan (CMP) 227 Princess Highway, Dandenong

THE EXO BUILDING POINT VILLAGE CONSTRUCTION METHODOLOGY PLAN PROJECT NO. C th SEPTEMBER 2015

Code of Construction Practice Part B: Site Specific Requirements

Sydney Port Botany Terminal 3 Project Out of Hours Works Protocol

Centre Buildings Redevelopment Explaining the impact on LSE staff and students

MacKimmie Redevelopment Project Public Protection Site Safety Plan. Prepared by Stuart Olson Construction Ltd.

6.0 CONSTRUCTION PROGRAMME

E13: MANAGEMENT OF TRAFFIC DURING CONSTRUCTION

New Stadium Project. Construction Activity Mitigation Program. January 22, 2014

BARRY S CORNER. Draft Construction Management Plan

UCLH Community Liaison Group

Guidance for ensuring safe deliveries to construction sites

Box Clever Consulting. Executive Summary Project Report. July Strand Plaza. Liverpool. for. Primesite Developments

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

HS00: CONSTRUCTION PHASE HEALTH & SAFETY PLAN JOB THE PADDOCKS - SAMPLE PROJECT FOR TRIAL USERS: THE PADDOCKS 2015

Code of Construction Practice Part B: Site Specific Requirements

Draft Code of Construction Practice

Radstone Fields, Brackley Construction Traffic Management Plan Taylor Wimpey & Barratt Strategic

Managing Site Compounds & Containers

Design out. Waste Workshop. A guidance document produced by Network Rail in collaboration with:

D2: SELECTION OF THE LOCATION OF CONSTRUCTION COMPOUNDS

LIDL, DOVER SUSTAINABILITY STATEMENT

Issue 7 24 February Job number

Pre- Construction Information. For. Internal Alteration and Associated Works. London College of Communication Elephant & Castle London SE1 6SB

Active Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc.

Health & Safety Plan DEMOLITION WORKS: No 2 Substation

PROJECT ADDRESS: THRIFT AVE, WHITE ROCK, BC EXCAVATION -

TAYLOR WIMPEY MOUNT PLEASANT PHOENIX PLACE. Construction and Environmental Management Plan

We re building for your future KEEPING YOU INFORMED ON ALL CONSTRUCTION NEWS FROM TRAFALGAR PLACE HELPLINE ISSUE 01 SUMMER 2013

Striving for Zero to Landfill

Outline Construction Management Plan. Redevelopment of Hawkins House Hawkins House, Hawkins St, Dublin 2

Health Safety, & Environment

TAYLOR WIMPEY MOUNT PLEASANT PHOENIX PLACE. Construction and Environmental Management Plan

Health Safety Wellbeing and Environment Minimum Standards Revision 5. Issued June 2018 Page 1 of 28

Traffic Management Plan. Environmental Management and Monitoring Program. Appendix VI

811 Emerson St. - Demolition & Site Prep

Waste Management Plan

Environmental Code of Practice

Gunlake Quarry. Traffic Management Plan

Box Clever Consulting. Executive Summary Project Report. June Strand Plaza. Liverpool. for. Primesite Developments

Guide for Loading and Unloading Concrete Pipes

Application Recommended for Approval Lanehead and Briercliffe Ward

North West Site Waste Management Plan September 2011

HIGH RISK ACTIVITIES. GD02 Scaffold planning and work at height activities checklist. Design stage. Tender stage. Element Yes No N/A Comments

Health and Safety Toolkit

FLOOD RESPONSE PLAN PROPOSED WASTE MANAGEMENT FACILITY AT UNIT C, MAERDY INDUSTRIAL ESTATE, RHYMNEY, TREDEGAR, NP22 5PY. On behalf of Mekatek Ltd

UCL ESTATES & FIRE STANDARD - GENERAL PERFORMANCE FOR SITE HOARDING AND CONTRACTOR CABINS

Local Authority Borough: Caerphilly County Borough Council. Contact: Huw Morgan

DRAFT Operational Traffic Management Plan

BUILDING PRODUCTS DIVISION

Date: May 4, Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis

a guide to help businesses during construction projects

Demolition & Enabling Works. Construction Logistics Plan

LOADING UNLOADING OPERATIONS

Example Only. Outline Health and Safety Plan. Introduction. Project Brief. Appointments. Introduction. Description of Project. Location.

CONSTRUCTION TRAFFIC MANAGEMENT PLAN for LEICHHARDT PARK CHILDCARE CENTRE

Crushing and Screening Management Procedure Environment

Jackson s Edge Service Reservoir - Compartment 1 innovative Design for Manufacture and Assembly (DfMA) approach to service reservoir construction

Cheshire East Highways

Contractors Safety Code of Practice

SUSTAINABILITY POLICY 2017

West Village, 70 Mississauga Road South, Mississauga. Construction Management Plan Phase I: Demolition & Remediation

Constructability Guidelines

Response to a Bridge Strike. at a Bridge carrying the Railway. over a Road

Outline Construction and Environmental Management Plan

The role of FORS in protecting pedestrians and cyclists

MC2191 Rissington Bund and Pond Construction and Export of Excess Soils. Victory Field, Upper Rissington Report

3.02 SPECIFICATION FOR NON HAZARDOUS WASTE COLLECTION AND DISPOSAL - SKIPS

The movement of construction vehicles is predicted to: give rise to some measurable increases in the early morning and evening;

Loading Docks. Version 1.0 I Last Updated Date 26/02/2015 Page 1

Traffic Management Plan

Transcription:

Brighton & Sussex University Hospital

Regional Centre for Teaching, Trauma & Tertiary Care known as the 3Ts Programme Project Address: Eastern Road, Brighton BN2 5BE Principal Contractor: Laing O Rourke Construction (LOR)

Presentation Content 1.0 Project Milestone Dates 2.0 Scope of Works 3.0 Site Logistics 4.0 Protection of the Public 5.0 Traffic Management & Vehicle Routes 6.0 Waste Management 7.0 Site Working Hours 8.0 Site Accommodation 9.0 Highway Works 10.0 Employment Strategy 11.0 Environmental Monitoring 12.0 Public Liaison

(1.0) 3Ts Project Milestone Dates Work element: Programme period: Enabling Works Locate Existing Services 26/08/15 22/04/16 Enabling Works Drainage Connections 20/11/15 03/11/16 Early Works South Service Rd Works 22/04/16 29/01/17 Early Works TKT/Helideck Works 04/01/16 05/12/17 Early Works Energy Centre 04/01/16 09/01/19 Stage 1 12 storey building 01/04/16 23/04/20 Stage 2 5 storey building 21/07/20 11/04/23 Stage 3 single storey units + service yard 27/06/23 02/07/24

(2.0) Scope of Works Site Plan TKT Energy Centre Stage 3 Stage 2 Stage 1

(2.0) Scope of Enabling Works Bristol Gate Drainage South Service Road

(2.0) Scope of Enabling Works Install Service Gantry Royal Alexandra Children's Hospital Thomas Kemp Tower

(2.0) Scope of Early Works TKT / Helideck

(2.0) Scope of Early Works Energy Centre 3-D images of completed Thermal Energy Centre

(2.0) Scope of Stage 1 Works

(2.0) Scope of Stage 2 Works

(2.0) Scope of Stage 3 Works

(3.0) 3Ts Project Logistics Pavement Closure (for each concurrent Stage) - Hoarding 300mm back from kerb line

(3.0) 3Ts Project Logistics Early Works

(3.0) 3Ts Project Logistics Stage 1 Works Pavement Closure (for each concurrent Stage) - Hoarding 300mm back from kerb line

(3.0) 3Ts Project Tower Cranes Stage 1

(3.0) 3Ts Project Logistics Stage 2 Works Pavement Closure (for each concurrent Stage) - Hoarding 300mm back from kerb line

(3.0) 3Ts Project Tower Cranes Stage 2

(3.0) 3Ts Project Logistics Stage 3 Works

(3.0) 3Ts Project Logistics Logistics Holding Facility

(3.0) 3Ts Project Logistics Traffic route from site

(3.0) 3Ts Project Logistics Park & Ride

(4.0) 3Ts Project Protection of the Public All operations fully risk assessed public safety paramount Traffic Marshals to ensure vehicles enter and leave the site safely Secure site access via Aurora facial recognition full height turn-styles Best practice methods monitored by Considered Constructors Scheme No parking for construction / delivery vehicles on public roads Regular visiting HGV & PCV drivers to attend Driver CPC Safe Urban workshop Public and Emergency Vehicles given priority at all times Clean roads policy wheel wash and road sweepers No reversing onto public roads Sliding site vehicle access gate Aurora pedestrian access security system in hoarding line

(4.0) 3Ts Project Protection of the Public Dust suppression in accordance with BS:6187:2000, Control of Pollution Act 1974, Environmental Protection Act 1990 and Local Guidelines Noise mitigation as BS:5228 (Noise & Vibration on Construction Sites). Catch fans or crash decks installed where necessary No lifting over people Warning signage and adequate lighting Neighbourhood liaison including Hospital Liaison Group Meetings

(5.0) 3Ts Project Traffic Management & Vehicle Routes 80-100no planned deliveries per day Juggler web-based interactive delivery coordination system Delivery Driver Instructions + Map provided prior to arrival on site All deliveries held at remote Logistics Facility until site can accept delivery Juggler

(5.0) 3Ts Project Traffic Management & Vehicle Routes Security manned access and egress gates Traffic Marshals to control vehicle movements and ensure clean wheels on exit Physical segregation of pedestrian routes from vehicle No parking or reversing for construction / delivery vehicles on public roads Public and Emergency Vehicles given priority at all times Provision of adequate signage and lighting Continuous H,S & E monitoring of the site environment including perimeter

(6.0) 3Ts Project Waste Management Demolition materials will be crushed off site and re-used on site as hardcore Waste such as plastic, cardboard & timber protection will be minimised at source through agreements with Laing O Rourke supply chain partners Waste skips on site: Mixed Waste / COSHH / Scrap Metal Dedicated Site Logistics Team to manage waste collection Juggler system to coordinate skip delivery/collection

(6.0) 3Ts Project Waste Management Licensed Waste Management Contractor employed to remove & recycle Waste stream separation at remote waste transfer station Waste Management Contractor to provide certification and waste collection and recycling data to monitor performance against kpi s Target >97% waste diverted from landfill

(7.0) 3Ts Project Working Hours Monday Friday 7.00 am site open for mobilisation and preparation, including transportation of operatives from logistics area to site, daily activity briefings and training 8.00 am commencement of construction activities, with vehicle movements onto and around the site 6.00 pm conclusion of construction vehicle movements on site 7.00 pm site security enabled and final operatives transported back to logistics area Saturday working hours as above but concluding at 1pm.

(8.0) 3Ts Project Main Site Accommodation at St Marys

(8.0) 3Ts Project Main Site Accommodation at St Marys

Eastern Road / Bristol gate proposed junction design (9.0) 3Ts Project Highway Works

(9.0) 3Ts Project Highway Works Proposed highway realignment at Eastern Road / Freshfield junction widen road + finishes and signal modifications

(9.0) 3Ts Project Highway Works Eastern Road / Arundle Road traffic signal design finishes and traffic signal installations

(9.0) 3Ts Project Highway Works Re-located Pedestrian Crossing Stage 2 Eastern Road Bus Stop Locations

(10.0) 3Ts Project Employment Strategy DIRECTION SOCIAL VALUE PLAN DELIVERY Equality, Diversity & Inclusion Plan Employment & Skills Plan Local Procurement Plan Education Plan Communication Plan ENABLER E&D TRAINING PLAN E&D DATA CAPTURED AT INDUCTION E&D POLICY SHARED WITH SUB- CONTRACTORS DIVERSITY CHAMPIONS FORUMS JOB CARVING LABOUR FORECAST ADVERTISE THROUGH LOCAL JOB BROKERAGES SUPPLY CHAIN CHARTER LINKS WITH EDUCATIONAL ESTABLISHMENTS ADVERTISE OPPORTUNITIES LOCALLY BUILD CAPACITY OF SME s AND SOCIAL ENTERPRISES WORK EXPERIENCE CAREER TALKS SITE TOURS ENTERPRISE EVENTS MENTORS STAKEHOLDER MAPPING INTERNAL COMMS LIAISON PR PROTOCOL & EXTERNAL COMMS PLAN PERFORMANCE MEASURE, MONITOR, REPORT

(11.0) 3Ts Project Environmental Monitoring LOR Environmental Management Plan (EMP) based upon requirements of BS EN ISO 14001:2004 Environmental Management Systems** The EMP consists of key operational control documents including the Aspects and Impacts Register**, Site Waste Management Plan** and Environmental Emergency & Contingency Plan Environmental Incident Reporting & Complaints Register (**documents will be revised in line with ISO 14001:2015 requirements)

(11.0) 3Ts Project Environmental Monitoring Records of Waste Carrier Licenses, Transfer & Consignment Notes Active monitoring of site generated noise, dust and vibration Monitoring of energy and water consumption against kpi s Monthly HSE Action Plan Waste Data Records Noise monitoring station

(12.0) 3Ts Project Public Liaison LOR s liaison responsibilities: Communication with the Trust s Head of Engagement & Communication re. neighbourhood and staff Attending Hospital Liaison Group Meetings Preparation and distribution of a local news letter Briefings to neighbours on progress and issues Liaison with all stakeholders, as required, with regards to the works on site Dealing with the police - particularly with regard to traffic movements and permits Applications to the Local Authority for road closures, etc. Monitoring and updating licences, e.g. hoarding, crane over-sailing, etc. Point of contact for the client, arranging site visits, etc. Preparing reports for the site meetings on neighbourhood issues Monitoring compliance with the Considerate Constructors Scheme