TAF TSI revision - recommendation Working Group on TELEMATICS in the transport of dangerous goods. Bordeaux,

Similar documents
Telematic Applications for Freight (TAF TSI)

The Content of TAF TSI: RU/IM Communication and Legal Obligations

The content of TAF TSI - General Framework

INTEROPERABILITY UNIT

(Text with EEA relevance)

"Step by Step" Guide to implement TAF TSI. Paris, 22/02/2016. ERA Telematics Team

INTEROPERABILITY UNIT

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES:

INTEROPERABILITY UNIT

ERA s view on Implementa3on of Telema3c TSIs

1 Introduction. 2 Abbreviations and Definitions

Kick-off meeting on TAF/TAP Master Plans

Kick-off meeting on TAF/TAP Master Plans

Rail Interoperability

INTEROPERABILITY UNIT

Telematics Applications for Freight Technical Specification for Interoperability

TAF-TSI Preliminary Master Plan. 13 th May 2012

TAP TSI Update and Masterplanning. Brussels 26 January TAF/ TAP Masterplanning kick-off 1

RSRD² Rolling Stock Reference Database

ERA - OTIF regional workshop Introduction of the general framework of Telematics application for freight (TAF) Vienna, 27 April 2016

Version 1.0. JSG Pilot Programme Governance Document

INTEROPERABILITY UNIT

Telematic Applications for Freight (TAF) Telematic Applications for Passengers (TAP)

Deliverable 5 Strategic European Deployment Plan. PROJECT No: 2005-EU S

"RAILWAY SAFETY: THE WAY FORWARD"

TAF TSI Executive Summary

The TAP TSI Legal Framework and implementation strategy

Promoting Digital Transport Wagon Keeper s View

Digital Transport and Logistics with support of EU funds

Towards an integrated European Railway Area

TSI OPERATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS

Boosting International Rail Freight. Sector Statement on Rail Freight Corridors

ERA conference Safety and Interoperability registers

Telematics Governance and framework

11 th UIC Railway Noise Workshop

DECISIONS CONCERNING THE ACCOUNTS OF PROJECTS / ACTIVITIES FREIGHT

EU strategic scenario: white paper, ITS and railway Interoperability

TAF - TSI Regional Meeting Bucharest 7-8 March 2018

The first implementation of TAF RU-IM: Czechia, ČD CARGO and SŽDC experience

COTIF in the framework of ESCAP. F. Davenne Bangkok September 2017

TAF/TAP workshop Brussels, September 2017

EXCHANGE of FREIGHT WAGONS in EUROPE

Sector Handbook for the Communication between Railway Undertakings and Infrastructure Managers

Safety Regulation for Rail Sector in Europe

COMMISSION REGULATION (EU)

A Digital Single European Railway Area. Kathrin Obst Unit B2-Single European Rail Area European Commission Directorate General Transport and Mobility

Joint topics and proposals by SNCF Réseau and DB Netz Presentation to TAF/TAP-Plenary (Prague 26./ ) SNCF Réseau, DB Netz

Redesign of the International Timetabling Process (TTR) Project results

Guidance for CRR Inspectors, Railway Undertakings, Infrastructure Managers and Applicants for ECM Certification. Issue Date.

Draft delegated act for the TSI revision

COTIF unified railway law to connect Europe, Asia and Africa. F. Davenne Brussels October 2017

Vienna Declaration Progress on boosting rail freight

Action Plan RFC North Sea - Mediterranean

Legal basis and wagon status

UITP EU Committee Position on the ERA Draft Final Report. IU-ExtScope FinalReport. on the Extension of field of application of TSIs

Atelier : Découvrir l offre de service internationale

ERA TSI OPE Working document

Wagon noise and EU Rail Noise Policy Sian Prout, Head of Unit, Single European Rail Area, DG MOVE 29 May 2013

Rolling stock approval process

RID 2015 Impact for the wagon keepers

13/12/2012 Page 1 Rule Management Tool ver 1

***I POSITION OF THE EUROPEAN PARLIAMENT

Draft. COMMISSION REGULATION (EU) No /..

SHIFT²RAIL Stakeholder meeting Innovations Programs - IP4 & IP5

Uncovering the technical specifications for interoperability as determined by the ERA to harmonise European safety standards

Getting new trains on track

Railway Safety Directive 2004/49/EC & Role of European Railway Agency (ERA)

Telematic Applications Freight. Technical Specification for Interoperability

ANNEX C2 Assessment Procedures

RASCOP 5 th Plenary Meeting

TAP Phase one Minutes. Second meeting of the STEERING COMMITTEE 8 July 2011

RSC-G-009-E Guideline for the Process of Authorisation for Placing in Service of Railway Sub Systems

TAP Phase One Masterplan Report

Technical and legal interoperability. Secretary General of OTIF François Davenne Bangkok, 9 December 2015

4 th Railway Package Implementation of the Technical Pillar

The European Framework for Vehicle Authorisation

DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES

Railway Interoperability and Safety Committee. Working document

TSI OPERATION AND TRAFFIC MANAGEMENT, CONVENTIONAL RAIL SYSTEM FINAL REPORT ON THE REVISION

RECOMMENDATION FOR USE

OPINION OF THE EUROPEAN RAILWAY AGENCY ERA/OPI/ QC-RST-015. European Railway Agency. Executive Director FOR

Subregional Meeting on Rail-based Intermodal Transport in Northeast and Central Asia

DIRECTIVES. (Text with EEA relevance)

Guide for the application of Technical Specifications for Interoperability (TSIs)

Single-Entry-Point - SEP User Manual

TASK FORCE INTERMODAL TRANSPORT

Proposal for a COUNCIL DECISION

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note

The European legal background for the safety of the rail freight transport including dangerous goods

Use of ITS technologies for multimodal transport operations River Information Services (RIS) transport logistics services

The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information.

CONCLUSIONS OF THE RID ATMF WORKING GROUP

RECOMMENDATIONS. (Text with EEA relevance) (2014/897/EU)

Smithers Pira Cleeve Road Leatherhead Surrey, KT22 7RU +44 (0)

ELECTRONIC INFORMATION EXCHANGE SYSTEMS IN RAIL FREIGHT TRANSPORT

COMPARISON GLOSSARY TrainID (WG10/TG4), TAP/TAF IMPLEMENTATION GUIDE AND ERA. Page 1 van 38

Ernest Godward, EU Agency for Railways. Rail Freight in the European Union

REDUCING THE OCCURRENCES AND IMPACT OF FREIGHT TRAIN DERAILMENTS. Results of the D-Rail project

Study Group WAGON USERS Groupe d Etudes UTILISATEURS WAGONS Studiengruppe WAGENVERWENDER

DIRECTIVE (EU) 2016/798 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 May 2016 on railway safety (recast) (OJ L 138, , p.

Transcription:

TAF TSI revision - recommendation Working Group on TELEMATICS in the transport of dangerous goods Bordeaux, 03.06.2014

Directive 2008/57/EC says: Annex II - 2.5: Telematics Applications: TAF TSI Legal Framework b) applications for freight services, including information systems (real-time monitoring of freight and trains), marshalling and allocation systems, reservation, payment and invoicing systems, management of connections with other modes of transport and production of electronic accompanying documents. Mandate C(2010)2576 final to review Technical Specifications for Interoperability with a view to extending their scope to the whole rail system in the European Union.

TAF TSI Revision ERA launched the TAF TSI Revision WP July 2012 -> June 2013. ERA Recommendation containing the revised TSI TAF repealing the former TSI TAF was delivered in December 2013. ERA presented the Revised TSI TAF in RISC in January 2014, It has been submitted for opinion in June 2014.

TAF TSI Revision Methodology Methodology followed: 1 st STEP-TAF Revision WP - Technical & Geographical Scopes definition. 2 nd STEP-TAF Revision WP - Revision Chapters 1 to 4. Economic Assessment Questionnaire to be delivered to 5 countries.

TAF TSI Revision Outcomes I Main achievements of Revision WP: - Approval of New Geographical and Technical Scope: TEN network + Off- TEN network. - Reinforcement of the role of Freight customers within the regulation: Under Contractual Agreement the customers will receive the messages Train Running forecast, Train Running Information and ETA (estimated Time of Arrival).

TAF TSI Revision Outcomes II Main achievements of Revision WP: - Alignment TAF core text to TAF Technical Documents: Deletion of some messages: Train Enquiries, Train at Start, Wagon Exception message new ETI/ETA Request, TrainNotSuitable message etc.. Database withdrawn by the Sector: IRNDB (Infrastructure Restriction Notice Database), however the functionality remains (Chapter 4.2.2 Path Request and Chapter 4.2.3 Train Preparation.

TAF TSI Revision Outcomes III Main achievements of Revision WP: - Dependencies between TAF TSI and OPE TSI: Requirements requested in OPE TSI for Train Composition. Alignment of requirements for Service Disruption in TAF TSI and in OPE TSI. - Better alignment with TAP TSI (Reference Files, Central Repository and Common Interface). - Intermodal Transport -> Adoption of BIC- or an ILU-Code for the identifiers of the loading units.

TAF TSI Revision Outcomes IV Main achievements of Revision WP: - To make feasible the implementation of TAF TSI in the Baltic Countries. - To use of other existing standards for some messages within TAF framework if there is a bilateral agreement between the RU and the IM, for instance Path Request.

TAF TSI Revision Outcomes V A combination of information sources: -> what train is where at what time? TAF TSI train running information -> what is carried in/on what wagon? TAF TSI train composition message inc. wagon number....ru must have access to the infrastructure restriction notices, to the technical wagon data (Rolling Stock Reference Databases, chapter 4.2.10.2: The Rolling Stock Reference Databases), to the dangerous goods reference file -> how can the information concerning Dangerous Goods be reached by third parties? Several options need to assessed

TAF TSI Revision Outcomes V -> what train is where at what time? Functionalities: Long-term planning, Path Request on Short Notice, Train Preparation, Train Running Forecast/Information and Service Disruption Information... RU 1 RU 2 RU N IM 1 IM 2 IM 3 IM N

TAF TSI Revision Outcomes V -> what is carried in/on what wagon? TAF Revision + TAF CCM: ERA TAF TSI Technical Documents (Appendixes attached to Annex I) New message Electronic Consignment Note - agreed with CIT. Complete definition of RID elements within TAF catalogue.

TAF TSI Revision Outcomes V -> what is carried in/on what wagon? TAF Revision + TAF CCM: Minimum required set of data, taking into account EU proposal concerning the univocal identification of the carried goods New baseline contains dangerous goods elements allowing the exchange of this information. New elements included in Consingment Order Message

TAF TSI Revision Outcomes V -> what is carried in/on what wagon? TAF TSI aims at establishing an optimum level of interoperability of data exchanges related to rail freight business To date, the following information is within the TAF TSI catalogue - Consignment order message: CIM/SMGS consignment note, including dangerous goods description (required by Chapter 5.4 of RID) Other RID requirements concerning legally binding exchange of information between RUs and IMs, for example section 1.4.3.6

TAF TSI Revision Outcomes V -> what is carried in/on what wagon? Sequence diagram in ERA-TD-100:

TAF TSI Revision Outcomes V -> what is carried in/on what wagon? Section A (WHO DOES WHAT RID table) elements integrated in the TAF TSI data catalogue. Consignment order message Wagon Goods

TAF TSI Revision Outcomes V -> what is carried in/on what wagon? RID Section A elements integrated in the TAF TSI data catalogue:

TAF TSI Revision Outcomes V -> what is carried in/on what wagon? RID Section A elements integrated in the TAF TSI data catalogue

TAF TSI Revision Outcomes V -> what is carried in/on what wagon? In the revised TAF TSI Core Text, Section 4.2.11.1, it is stated: Locally stored andadministrated: Reference File of the emergency services, correlated to type ofhazardous goods.

TAF TSI Revision Outcomes V -> how can the information concerning Dangerous Goods be reached by third parties? RU/IM system architecture:

TAF TSI Revision Outcomes V -> how can the information concerning Dangerous Goods be reached by third parties? Common Interface: Interfaz Comun Legacy System Data TAF/TAP complaints Data

TAF TSI Revision Outcomes V -> how can the information concerning Dangerous Goods be reached by third parties?

TAF TSI Revision Outcomes VI New Provision Agreed for Chapter 4.2.10.2: Wagon Keepers may store the ECM certification identification number in the individual Rolling Stock Reference Databases

TAF TSI Revision Outcomes VII New Provision Agreed for Chapter 4.2.10: 1. RUs and IMs must measure the quality 2. Individual quality parameter, route/location and a measurement period. 3. Measurement process must show the achievement level against the target

Revised TSI TAF is done! WE ARE IN THE IMPLEMENTATION PHASE!!

Revised TSI TAF is done! Commitment of the Sector Infrastructure Managers Track-Kms Railway Undertakings Tonne-Kms no response 15% no response 22% responded 85% responded 78%

26 Implementation Timeline for TAF RU/IM functions (Min/Max/Avg)

RU/IM Communication Implementation ERA Role Monitor the implementation progress in Member States on the technical level and report to the TAF Steering Committee, Assist stakeholders and Member States on the TAF TSI implementation, ERA is doing already Dissemination.

TAF TSI Co-operation Working Group ERA Role