1 Uncovering the technical specifications for interoperability as determined by the ERA to harmonise European safety standards München, , 4 th annual Fire Protection and Safety in Tunnels

2 Content I. Introduction, role of EBA II. Technical Specifications for Interoperability (TSI) III. TSI for safety in railway tunnels (SRT) 2

3 Content I. Introduction, role of EBA II. Technical Specifications for Interoperability (TSI) III. TSI for safety in railway tunnels (SRT) 3

4 German rail market track km, thereof km electrified 170 infrastructure managers 400 railway undertakings 113 Billion tonkm 85 Billion passengerkm tunnel (number / length in km): 690/ 500 4

5 Railway safety organization Organisation, Legislation, Functional supervision Railways: Safe building*, Keeping in safe condition, Safe operation ensured by installation of a safety management system Federal Railway Safety Authority (EBA): Authorisation of safety relevant regulations Authorisations for Rolling Stock, Railway Infrastructure Licensing and Safety Certification of Railways, Supervision by random checks Accident Investigation Body Accident Investigation, Safety Recommendations *Safe building of RST: manufacturer 5

6 Regional The Federal Organisation Railway Authority its locations 6

7 Content I. Introduction, role of EBA II. Technical Specifications for Interoperability (TSI) and management of safety III. TSI for safety in railway tunnels (SRT) 7

8 Technical harmonisation, TSI in force High Speed Conventional HS + Conv. Infrastructure Infrastructure People with reduced mobility Energy Energy Safety in railway tunnels Rolling Stock Freight wagons, Rolling Stock Rolling Stock, Noise Control Command Signaling (CCS) CCS Operation Operation Maintenance Telematics for passenger application, Telematics for freight application 8

9 Technical harmonisation, principals of the new approach 1. TSI are developed with the principles of the so called New Approach : a) Legal harmonisation limited to essential requirements that a product must meet (Dir. 2008/57/EC, Annex III: safety, reliability and availability, health, environmental protection, technical compatibility; Annex III: more specified in detail.) b) Technical specifications for products are defined in harmonised standards; mandated by the Commission and reference is published in the official journal of the EU, application voluntary but presumption of conformity with the corresponding essential requirements 9

10 TSI to achieve interoperability 2. TSI to achieve interoperability: a) Railway system is broken down into subsystems: structural areas: infrastructure, energy, control-command and signalling, rolling stock; functional areas: traffic operation and management, maintenance, telematics applications for passenger and freight services. b) TSI specify for each of the subsystems the basic parameters and mandatory technical specifications especially regarding: - Subsystems, - Constituents and the - Interfaces 10

11 TSI to achieve an interoperable target system National System Targetsystem National Rules MS 1 National Rules MS 2 National Rules MS 3 National Rules MS 4 SC, OP MS 1 SC, OP MS 2 TSI, Chapter 4 SC, OP MS 3 SC, OP MS 4 MS = Member State SC = Specific Case (in TSI SRT:./.), OP = Open Point (in TSI SRT: Conformity assessment procedure for maintenance rules referred to in Chapter 6 section F4) 11

12 Reference in the TSI are also mandatory 3. Norms, that are referenced in the TSI a) By reference to a standard in a TSI (or part of it) this standard (version, date) becomes mandatory, example: Escape signage This specification applies to all tunnels of more than 100 m length. The escape signage indicates the emergency exits, the distance and the direction to a safe area. All signs shall be designed according to the requirements of Directive 92/58/EC of 24 June 1992 concerning the provision of health and/or safety signs at work and to ISO Only standards that are absolutely necessary to achieve interoperability, should be referenced in the TSI! 12

13 Voluntary Standards 3. Other standards: Voluntary, but presumption of conformity regarding the corresponding essential requirements; Published in the list of the harmonised standards in the Official Journal, Listed in the Application guides for the different TSI (available for ENE, INF, LOC & PAS, CCS, OPE CR and on the ERA web-page: 4. Conclusion: TSI to achieve interoperability, Standards to achieve harmonisation 13

14 TSI verification as part of the placing into service! 14

15 CSM risk evaluation and assessment Reg. 352/2009, applicable since 07/2010 respectively from 07/2012 on CSM conformity assessment for safety certification Reg. 1158/2010 applicable since 01/2011 CSM conformity assessment for safety authorisation Reg. 1158/2010 applicable since 01/2011 CSM Monitoring for RU, IM. ECM Decided in RISC CSM Supervision for NSA regarding RU, IM Decided in RISC Common Safety Methods to support management of safety in the railway system Common Safety Methods CD 2004/49/EC, Article 6 19 April

16 Independent assessment Hazard management Preliminary system definition Significant change? Risk assessment System definition CSM: Methodology to evaluate and assess the risk of technical or organisational changes Hazard identification and classification Broadly acceptable risk? Risk analysis 3 possible ways to evaluate significant changes: Apply recognized rule of technology (Code of practice) Proof that safety level is maintained Qualified risk assessment Code of practice Similar reference system(s) Explicit risk estimation Risk evaluation (Comparison with criteria) Safety requirements Demonstration of compliance with safety requirements

17 Common Safety Methods to support management of safety in the railway system Application of the CSM on RA as the leading system! TSIs NoBo certificate NNTRs DeBo certificate

18 Content I. Introduction, role of EBA II. Technical Specifications for Interoperability (TSI) III. TSI for safety in railway tunnels (SRT) 18

19 TSI for safety in railway tunnels (SRT) All TSI have the same structure 1. Introduction 2. Definition of aspect/scope 3. Essential requirements 4. Characterisation of the subsystem 5. Interoperability constituents 6. Assessment of conformity and/or suitability for use of the constituents and verification of the subsystem 7. Implementation Annex A to G SRT Shall apply from 1. July 2008 Transeuropean Conventional and high-speed rail system 19

20 TSI for safety in railway tunnels (SRT) Principles regarding the scope apply to tunnels longer than 1 km. tunnel longer than 20 km require a special safety investigation. TSI apply to tunnels in the countryside (small traffic volume) as well as to those in the heart of urban areas with a great number of trains and passengers. Applies to new, upgraded and renewed tunnels it prescribes only minimal requirements. TSI conformity does not constitute per se a guarantee for safe placing in service and safe operation Member States have to verify, whether the local circumstances require additional measures to those specified in this TSI. They can do that by mean of a risk analysis or any other state-of-the art methodology. the existing safety level shall not be reduced in a country as stipulated in Directive 2004/49/EC. 20

21 Tunnel-specific Safety measures TSI for safety in railway tunnels (SRT) Principles railway risk: Tunnel-specific incident scenarios: Three types of incidents: - Collision - Derailment - Fire - Explosion - Toxic gas release - Spontaneous evacuation scenarios relate to Hot incidents Cold incidents Prolonged stop 21

22 TSI for safety in railway tunnels (SRT) Tunnel-specific Safety measures Instruments to reduce the RISKS: Prevention Mitigation Evacuation All four successive layers necessary to be applied! Rescue Low level of residual risk 22

23 TSI for safety in railway tunnels (SRT) Principles TSI consists of a coherent set of measures for the subsystems thus delivering an optimal level of safety in tunnels in the most costefficient way Infrastructure Energy control-command & signalling Rolling stock traffic operation & management subsystems 23

24 TSI for safety in railway tunnels (SRT) Selected measures Prevention Mitigation Infrastructure Energy only the minimum number of switch and crossings layouts Hot axle detectors traffic operation & management subsystems Rolling stock Hot axle box incidents, the Defective train shall stop ahead of the tunnel Emergency brake override Running capability for passenger trains Material properties for rolling stock 24

25 TSI for safety in railway tunnels (SRT) Selected measures Evacuation Rescue Infrastructure Energy traffic operation & management subsystems Escape walkways with emergency lighting and escape signage Emergency exits to the surface or to the other tube Fire protection requirements for structure and materials Overhead line or conductor rail earthing Emergency plan Emergency communication Access for rescue services Fire protection requirements for structure and materials Electricity supply Segmentation of overhead line Emergency plan 25

26 TSI for safety in railway tunnels (SRT) Selected measures A low level of residual risk Infrastructure Fire protection requirements for structure and materials Water supply Emergency communication traffic operation & management subsystems Emergency plan aim The tunnel repair in a cost-efficient way and neighbouring structures above the tunnel are not be at risk. 26

27 Thank you for your kind attendance! 27

28 Organizational chart President Mr. Hörster BMVBS Public relations Accident Investigation Notified Body Interoperability Division 1 Central Services Mr Schweinsberg Division 2 Installations Dr. Böhlke Division 3 Rolling Stock, Operation Dr. Thomasch Division 4 Financing Mr Zenker International affairs, Nomination/Supervision of notified bodies Legal affairs Building inspection, approval and inspection of IOHM facilities Placing in service of rolling stock Region North Staff IT Building inspection, approval and inspection of STE-facilities Supervision of rolling stock Budget, Claims Budget, Administration Organisation, Controlling Planning Approval Approval, supervision Tankwagons, transports Of dangerous goods Region Berlin / BB Passenger s rights Supervision of operation Exemptions EBA Region South

29 Revision of the TSI SRT TSI for safety in railway tunnels (SRT) Definition of requirements for Tunnel of more than 20 km, Scope extension Clear definitions for: railway tunnel safe area designated stopping point (two types) a) fire fighting point b) rescue station requirements for subsystem rolling stock (for example: category A and B including necessary conditions) operation rules application guide 29

30 TSI for safety in railway tunnels (SRT) interaction between tunnel length / designated stopping point / rolling stock category Category A passenger rolling stock including passenger locomotives FFP FFP The rolling stock shall not be impacted by type 2 fire and the rolling stock must be able to run at minimum speed of 80 km/h for 4 minutes under this conditions. FFP FFP FFP - fire fighting point RS - rescue station FFP FFP FFP FFP - 5 km - RS FFP 30

31 TSI for safety in railway tunnels (SRT) Category B passenger rolling stock including passenger locomotives - 5 km - The rolling stock shall not be impacted by type 2 fire and the rolling stock must be able to run at a minimum speed of 80 km/h for 15 minutes under this conditions. FFP FFP FFP FFP FFP - fire fighting point RS - rescue station FFP RS - 20 km - FFP 31

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2008D0163 EN 24.01.2013 002.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COMMISSION DECISION of 20 December 2007 concerning

More information

Rolling stock approval process

Rolling stock approval process Rolling stock approval process Presentation to SEETO Working Group by Frank Walenberg Skopje 9 November 2010 1 Overview Need for the approval process RST approval process in the past Interoperability:

More information

COMMISSION REGULATION (EU) No /.. of XXX

COMMISSION REGULATION (EU) No /.. of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2013) XXX draft COMMISSION REGULATION (EU) No /.. of XXX concerning the technical specification for interoperability relating to "safety in railway tunnels" of the

More information

The European Framework for Vehicle Authorisation

The European Framework for Vehicle Authorisation The European Framework for Vehicle Authorisation Torben Holvad 13th Annual Fire Protection of Rolling Stock Conference, 1-2 nd March 2017, Berlin, Germany Content of presentation Brief background about

More information

Railway interoperability. Academic perspective

Railway interoperability. Academic perspective Railway interoperability. Academic perspective Ernesto García Vadillo (Prof) Department of Mechanical Engineering University of The Basque Country (UPV/EHU) Brussels, 7th May 2013 1 Contents 1. Directive

More information

1 Introduction. 2 Abbreviations and Definitions

1 Introduction. 2 Abbreviations and Definitions 1 Introduction This Guideline is intended to give guidance and explanation on the related European legal provisions for the Certification of ECMs. It cannot replace additional self study of the applicable

More information

Assurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock

Assurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock Quality & Safety for Systems & Software Railway Engineering Assurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock Ir. Marc

More information

TSI OPERATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS

TSI OPERATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS INTEROPERABILITY UNIT RATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS Reference: ERA/CON/2011-02/INT Document type: Final report Version : 0.8 Date :

More information

SIS Directory Accreditation number: SIS 0130

SIS Directory Accreditation number: SIS 0130 International standard: ISO/IEC 17020:2012 Swiss standard: SN EN ISO/IEC 17020:2012 SCONRAIL AG Zürcherstrasse 41 8400 Winterthur Head: Heiko Germroth Responsible for MS: Heiko Germroth Telephone: +41

More information

Benefits of harmonized regulations for placing in service of railway equipment - European experiences. Peter Mihm Head of Technical Cooperation

Benefits of harmonized regulations for placing in service of railway equipment - European experiences. Peter Mihm Head of Technical Cooperation Benefits of harmonized regulations for placing in service of railway equipment - European experiences Peter Mihm Head of Technical Cooperation General presentation Railway Safety Interoperability ERTMS

More information

RECOMMENDATION FOR USE

RECOMMENDATION FOR USE Page 1 of 11 CONTENT OF THE TECHNICAL FILE TITLE ORIGINATOR SUBJECT RELATED TO NB-RAIL STRATEGY SG Directive 2008/57/EC (incl. all amendments esp. 2014/106/EU), Recommendation 2014/897/EU, Decision 2010/713/EU

More information

Guide for the application of Technical Specifications for Interoperability (TSIs)

Guide for the application of Technical Specifications for Interoperability (TSIs) European Railway Agency Guide for the application of Technical Specifications for Interoperability (TSIs) According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT

More information

RSC-G-009-E Guideline for the Process of Authorisation for Placing in Service of Railway Sub Systems

RSC-G-009-E Guideline for the Process of Authorisation for Placing in Service of Railway Sub Systems RSC-G-009-E Guideline for the Process of Authorisation for Placing in Service of Railway Sub Systems Guidance for RSC Inspectors, Railway Undertakings/ Infrastructure Managers and Applicants for APIS Prepared

More information

Guide for the application of Technical Specifications for Interoperability (TSIs) Annex 2 Conformity assessment and EC verification

Guide for the application of Technical Specifications for Interoperability (TSIs) Annex 2 Conformity assessment and EC verification European Railway Agency Guide for the application of TSIs European Railway Agency Guide for the application of Technical Specifications for Interoperability (TSIs) Annex 2 Conformity assessment and EC

More information

TSI OPERATION AND TRAFFIC MANAGEMENT, CONVENTIONAL RAIL SYSTEM FINAL REPORT ON THE REVISION

TSI OPERATION AND TRAFFIC MANAGEMENT, CONVENTIONAL RAIL SYSTEM FINAL REPORT ON THE REVISION INTEROPERABILITY UNIT TSI OPERATION AND TRAFFIC MANAGEMENT, CONVENTIONAL RAIL SYSTEM FINAL REPORT ON THE REVISION Reference: IU-OPE_final report Document type: Final report Version : 1.5 Date : 06.05.2010

More information

DEPARTMENT OF NATIONAL SAFETY AUTHORITY OF GREECE ANNUAL SAFETY REPORT FOR THE YEAR 2006

DEPARTMENT OF NATIONAL SAFETY AUTHORITY OF GREECE ANNUAL SAFETY REPORT FOR THE YEAR 2006 DEPARTMENT OF NATIONAL SAFETY AUTHORITY OF GREECE ANNUAL SAFETY REPORT FOR THE YEAR 006 Athens April 008 1 Content A. SCOPE OF THE REPORT... 3 B. INTRODUCTORY SECTION... 3 B.1. INTRODUCTION TO THE REPORT...

More information

Draft delegated act for the TSI revision

Draft delegated act for the TSI revision Brussels, 07 October 2016 Draft delegated act for the TSI revision 1 CER aisbl - COMMUNITY OF EUROPEAN RAILWAY AND INFRASTRUCTURE COMPANIES Avenue des Arts, 53-1000 Bruxelles T: +32 (0)2 213 08 70 F: +32

More information

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment Regulation (EU) N 402/2013 and in UTP GEN- Explanatory note on the CSM Assessment Body referred to in Regulation (EU) N 402/2013 (1) and in UTP GEN-G of 1.1.2016 (2) on the Common Safety Method (CSM) for

More information

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment Explanatory note on the CSM Assessment Body referred to in Regulation (EU) N 402/2013 (1) and in UTP GEN-G of 1.1.2016 (2) on the Common Safety Method (CSM) for risk assessment Author : Dragan JOVICIC

More information

Railway Safety Directive 2004/49/EC & Role of European Railway Agency (ERA)

Railway Safety Directive 2004/49/EC & Role of European Railway Agency (ERA) Railway Safety Directive 2004/49/EC & Role of European Railway Agency (ERA) Dragan JOVICIC Safety Assessment Sector (Safety Unit) Slide n 1 Content of the presentation 1. Role of European Railway Agency

More information

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN- G of on the CSM for risk assessment Regulation (EU) N 402/2013 and in UTP GEN- Explanatory note on the CSM Assessment Body referred to in Regulation (EU) N 402/2013 (1) and in UTP GEN-G of 1.1.2016 (2) on the Common Safety Method (CSM) for

More information

Directive 96/48/EC - Interoperability of the trans- European high speed rail system

Directive 96/48/EC - Interoperability of the trans- European high speed rail system EN Directive 96/48/EC - Interoperability of the trans- European high speed rail system Technical Specification for Interoperability "Operations and traffic management" Sub-System - 1 / 155 - 1. INTRODUCTION

More information

13/12/2012 Page 1 Rule Management Tool ver 1

13/12/2012 Page 1 Rule Management Tool ver 1 13/12/2012 Page 1 Rule Management Tool ver 1 1 type 1-rule 2 type 1-rule 3 type 1-rule concerning existing national safety targets concerning existing national safety methods concerning existing national

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 320/8 Official Journal of the European Union 17.11.2012 COMMISSION REGULATION (EU) No 1078/2012 of 16 November 2012 on a common safety method for monitoring to be applied by railway undertakings, infrastructure

More information

Business Briefing: Interoperability. Peter Knight 2013

Business Briefing: Interoperability. Peter Knight 2013 Business Briefing: Interoperability Peter Knight 2013 1 Purpose of this briefing To bring the recipients to a level of understanding of the Railways (Interoperability) Regulations 2011 such they can: Understand

More information

Guide for the application of the INF TSI

Guide for the application of the INF TSI European Railway Agency According to Framework Mandate C(2010)2576 final of 29/04/2010 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 3.00 Date: 14 December 2015 Document elaborated by Document

More information

Guidance for CRR Inspectors, Railway Undertakings, Infrastructure Managers and Applicants for ECM Certification. Issue Date.

Guidance for CRR Inspectors, Railway Undertakings, Infrastructure Managers and Applicants for ECM Certification. Issue Date. CRR-G-027-B Guidance for CRR Inspectors, Railway Undertakings, Infrastructure Managers and Applicants for ECM Certification Issue Prepared by Reviewed by 2.0 Michael Neale Liam Logan Approved by Issue

More information

DIRECTIVE (EU) 2016/798 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 May 2016 on railway safety (recast) (OJ L 138, , p.

DIRECTIVE (EU) 2016/798 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 11 May 2016 on railway safety (recast) (OJ L 138, , p. 02016L0798 EN 26.05.2016 000.001 1 This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions

More information

Strategic Direction for revised Infrastructure TSI. Issue 1.0

Strategic Direction for revised Infrastructure TSI. Issue 1.0 Strategic Direction for revised Infrastructure TSI Issue 1.0 Approved by the Industry Standards Coordination Committee 22 July 2011 ISCC/012 Copyright 2011 Rail Safety and Standards Board Limited Issue

More information

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN-G of on the CSM for risk assessment

Explanatory Note on the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN-G of on the CSM for risk assessment Regulation (EU) N 402/2013 and in UTP GEN-G Explanatory note on the CSM Assessment Body referred to in Regulation (EU) N 402/2013 and in UTP GEN-G of 1.1.2014 on the Common Safety Method (CSM) for risk

More information

EUROPEAN RAILWAY AGENCY

EUROPEAN RAILWAY AGENCY EUROPEAN RAILWAY AGENCY INTEROPERABILITY UNIT TECHNICAL OPINION ON GERMAN MINISTRY NOTIFICATION REF. 41351 REFERENCE: IU-WAG- TO3 DOCUMENT TYPE: TECHNICAL OPINION VERSION: 1.0 DATE: 19/10/2009 Edited by

More information

Strategic Direction for revised Locomotive and Passenger Rolling Stock (LOC&PAS) TSI. Issue 1.0

Strategic Direction for revised Locomotive and Passenger Rolling Stock (LOC&PAS) TSI. Issue 1.0 Strategic Direction for revised Locomotive and Passenger Rolling Stock (LOC&PAS) TSI Issue 1.0 Approved by the Industry Standards Coordination Committee 22 July 2011 ISCC/010 Copyright 2011 Rail Safety

More information

Impact of interoperability on the global railway network. L. Tordai, UIC, Paris, France

Impact of interoperability on the global railway network. L. Tordai, UIC, Paris, France Impact of interoperability on the global railway network L. Tordai, UIC, Paris, France Introduction There are big changes happening in Europe s railways. Interoperability is already becoming a reality.

More information

Application of CSM on risk assessment at SBB

Application of CSM on risk assessment at SBB ERA-Workshop, 25 June 2013 Application of CSM on risk assessment at SBB Dr Jonathan Shaha Swiss Federal Railways SBB Central Safety Department 25 June 2013 Outline: Implementation of CSM RA at SBB Ú In

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 17065:2012 to provide product conformity certification Gee House Holborn Hill Birmingham West Midlands B7 5PA United Kingdom Contact: Mr Chris

More information

Application note 5 Relationship of Yellow Book with European Directives

Application note 5 Relationship of Yellow Book with European Directives Railway Safety Management Yellow Book 4 Application note 5 Relationship of Yellow Book with European Directives Published by RSSB on behalf of the UK rail industry C:\Documents and Settings\djohnson\Desktop\KJWYBrelationshipwithEUDirectives.doc

More information

RECOMMENDATIONS. (Text with EEA relevance) (2014/897/EU)

RECOMMENDATIONS. (Text with EEA relevance) (2014/897/EU) 12.12.2014 L 355/59 RECOMMDATIONS COMMISSION RECOMMDATION of 5 December 2014 on matters related to the placing in service and use of structural subsystems and vehicles under Directives 2008/57/EC and 2004/49/EC

More information

Application Guide for the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN-G of on the CSM for risk assessment

Application Guide for the CSM Assessment Body in Regulation (EU) N 402/2013 and in OTIF UTP GEN-G of on the CSM for risk assessment Regulation (EU) N 402/2013 and in UTP GEN-G 1 2 Application guide for the CSM Assessment Body referred to in Regulation (EU) N 402/2013 and in UTP GEN-G of 1.1.2014 on the Common Safety Method (CSM) for

More information

Biennial Report on the Progress with Railway Interoperability in the European Union

Biennial Report on the Progress with Railway Interoperability in the European Union 29 Biennial Report on the Progress with Railway Interoperability in the European Union Foreword This is the first report on the progress with railway interoperability in the European Union which the

More information

POSITION PAPER Version 4.0

POSITION PAPER Version 4.0 POSITION PAPER Version 4.0 Revision of the Technical Specification for Interoperability / Safety in Railway Tunnels (SRT) Brussels, September 26 th, 2012 1. REFERENCE DOCUMENT UNION RAIL SYSTEM - SUBSYSTEMS

More information

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8640 Method on Risk Evaluation and Assessment Issue One; June 2014 Rail

More information

Draft working document

Draft working document EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE B EUROPEAN MOBILITY NETWORK Single European Rail Area Draft working document Communication of draft technical regulations

More information

Catalogue of examples

Catalogue of examples Making the railway system work better for society. Examples for the practical arrangements for the vehicle authorisation process Name E. DEL RIO G.TURNER S. YOUNG Drafted by Validated by Approved by H.

More information

INTEROPERABILITY UNIT COMPLEMENTARY STUDY INTERCHANGEABLE SPARE PARTS

INTEROPERABILITY UNIT COMPLEMENTARY STUDY INTERCHANGEABLE SPARE PARTS INTEROPERABILITY UNIT COMPLEMENTARY STUDY INTERCHANGEABLE SPARE PARTS Reference: ERA/REP/10-2011/INT Document type: Final Report Version: 3 Date: 26 September 2011 Edited by Checked by Approved by Name

More information

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES:

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3.1.3. Rail interoperability including interoperability of the Rail Freight Corridors Priority open only to the Cohesion Member

More information

Key developments in the Channel Tunnel safety rules and the wider EU framework

Key developments in the Channel Tunnel safety rules and the wider EU framework Key developments in the Channel Tunnel safety rules and the wider EU framework Caroline Wake Head of UK Delegation, Channel Tunnel Safety Authority September 2012 1 Channel Tunnel content of presentation

More information

"RAILWAY SAFETY: THE WAY FORWARD"

RAILWAY SAFETY: THE WAY FORWARD EUROPEAN RAILWAY AGENCY CONFERENCE ON "RAILWAY SAFETY: THE WAY FORWARD" BRUSSELS, 8 SEPTEMBER 2009 Draft action plan Author: European Railway Agency INTRODUCTION This document has been prepared by, in

More information

Guide for the application of the CR INF TSI

Guide for the application of the CR INF TSI European Railway Agency According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 1. 00 Date: 26 August 2011 Document elaborated by Document Type:

More information

ORR guidance on the application of the common safety method (CSM) on risk evaluation and assessment

ORR guidance on the application of the common safety method (CSM) on risk evaluation and assessment ORR guidance on the application of the common safety method (CSM) on risk evaluation and assessment December 2012 1. 1 2. Second edition published by the Office of Rail Regulation, December 2012 This guidance

More information

RECOMMENDATION FOR USE

RECOMMENDATION FOR USE Page 1 of 10 TITLE ACCEPTANCE OF ASSESSMENT REPORTS ON SAFETY PREPARED BY OTHER PARTIES ORIGINATOR SG STR, SG CCS, SG RST SUBJECT RELATED TO ANY TSI CCS, ANY TSI RST DESCRIPTION AND BACKGROUND EXPLANATION

More information

Towards an integrated European Railway Area

Towards an integrated European Railway Area Towards an integrated European Railway Area Anders Lundström Oslo, 17 October 2007 Organisation chart of the Agency n 2 The legal basis for the Agency s work The Agency s tasks and, hence, its organisational

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 17065:2012 to provide product conformity certification One Cranmore Drive Shirley Solihull B90 4RZ United Kingdom Contact: Mr Jens Wolff Tel:

More information

NSA Monitoring. Making the railway system work better for society. Annex III bis: Referential Compliance Audit NSA Monitoring

NSA Monitoring. Making the railway system work better for society. Annex III bis: Referential Compliance Audit NSA Monitoring NSA Monitoring Making the railway system work better for society. NSA Monitoring 120 Rue Marc Lefrancq BP 20392 FR-59307 Valenciennes Cedex 1 / 23 Making the railway system work better for society. This

More information

ERTMS UNIT TRANS-EUROPEAN RAIL SYSTEM SUBSYSTEM CONTROL-COMMAND AND SIGNALLING

ERTMS UNIT TRANS-EUROPEAN RAIL SYSTEM SUBSYSTEM CONTROL-COMMAND AND SIGNALLING EUROPEAN RAILWAY AGENCY ERTMS UNIT Reference: ERA/ERTMS/034171 Document type: Technical Specification for Interoperability Version : final draft 1.1 Date : 13/01/2011 Edited by Quality review Approved

More information

Guide for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and On-board

Guide for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and On-board CCS TSI Application Making the railway system work better for society. European Union Agency for Railways for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and

More information

Technical considerations and business needs of 1520 mm rail in the EU

Technical considerations and business needs of 1520 mm rail in the EU Technical considerations and business needs of 1520 mm rail in the EU Libor Lochman CER Seminar on 1435/1520 mm border questions Gdansk, 09 th October 2007 1 CER The Community of European Railway and Infrastructure

More information

Vehicle Authorisation after political investigation & safe integration in the Netherlands

Vehicle Authorisation after political investigation & safe integration in the Netherlands Vehicle Authorisation after political investigation & safe integration in the Netherlands Conference /Training Budapest 28th June 2017 ing. Krijn van Herwaarden NSA NL (National Safety Authority) Vehicle

More information

3. OBJECTIVES AND PRIORITIES:

3. OBJECTIVES AND PRIORITIES: 3. OBJECTIVES AND PRIORITIES: 3.1. Priorities related to bridging missing links, removing bottlenecks, enhancing rail interoperability, and, in particular, improving cross-border sections 3.1.4. European

More information

Impact Assessment for Changes to Railway Group Standards

Impact Assessment for Changes to Railway Group Standards Impact Assessment for Changes to Railway Group Standards Version: Final Date: 27 January 2011 Relevant Railway Group Standard Title: Rail Vehicle Maintenance Number: GM/RT2004 Issue: Four Synopsis: This

More information

RID 2015 Impact for the wagon keepers

RID 2015 Impact for the wagon keepers 1 RID 2015 Impact for the wagon keepers 2 RID 2015 Text of RID 2015 is available on the internet sites of OTIF (F, D, EN) and SPF Mobility (F, NL) : http://www.otif.org/en/publications/rid-2015.html http://www.mobilit.belgium.be/fr/traficferroviaire/ssicf/ma

More information

Technical document EUROPEAN UNION AGENCY FOR RAILWAYS REQUIREMENTS FOR CONFORMITY ASSESSMENT BODIES SEEKING NOTIFICA TION

Technical document EUROPEAN UNION AGENCY FOR RAILWAYS REQUIREMENTS FOR CONFORMITY ASSESSMENT BODIES SEEKING NOTIFICA TION Assessment EUROPEAN UNION AGENCY FOR RAILWAYS MNB - scheme 000MRA1O44 ver 1.1 Making the raflway system work better for society. F REQUIREMENTS FOR CONFORMITY ASSESSMENT BODIES SEEKING NOTIFICA TION Drafted

More information

Implications of the proposed interoperability measures for Railway Undertakings and Infrastructure Managers

Implications of the proposed interoperability measures for Railway Undertakings and Infrastructure Managers European University Institute Florence School of Regulation 6th European Rail Transport Regulation Forum Florence, 27 th May 2013 The technical pillar of the 4th Railway Package: Challenges for Standardisation

More information

Dissemination on CSM on monitoring, CSM on risk assessment and certification of ECMs

Dissemination on CSM on monitoring, CSM on risk assessment and certification of ECMs Dissemination on CSM on monitoring, CSM on risk assessment and certification of ECMs Day 2 Borlänge 12th and 13th November 2013 Agenda 2 nd day: 08:30 to 16:00 08:30 09:00: Registration and coffee 09:00

More information

Safety Regulation for Rail Sector in Europe

Safety Regulation for Rail Sector in Europe Safety Regulation for Rail Sector in Europe Roberto Piazza Safety Unit Moscow, 21 June 2007 1 Content 1. The legal basis and the main principles of safety regulation in the EU 2. The role of the European

More information

Report. Sectorial scheme for accreditation of notified bodies under Directive 2008/57/EC HARMONISED REQUIREMENTS

Report. Sectorial scheme for accreditation of notified bodies under Directive 2008/57/EC HARMONISED REQUIREMENTS European Railway Agency Report Report Sectorial scheme for accreditation of notified bodies under Directive 2008/57/EC HARMONISED REQUIREMENTS Elaborated by Validated by Approved by Name Luca TRINCA, Irugo

More information

July 2015 Product Certification Body under BDS EN ISO/IEC 17065:2012. January 2010 Registration of the company

July 2015 Product Certification Body under BDS EN ISO/IEC 17065:2012. January 2010 Registration of the company January 2010 Registration of the company November 2011 Starting aproval and registartion in NANDO September 2013 Designated Body for conformity assessment of the rail subsystems or a part thereof with

More information

INTEROPERABILITY UNIT

INTEROPERABILITY UNIT INTEROPERABILITY UNIT STUDIES: 1) MERGING OF HS AND CR TSIS AND 2) SPLITTING OF THE Reference: ERA/REP/13-2011/INT Document type: Report Annex 3 Version of Annex 3: Date of Annex 3: 0.2 24 November 2010

More information

1. INTRODUCTION Purpose, scope and other addressees of the report Main conclusions of the reporting year... 2

1. INTRODUCTION Purpose, scope and other addressees of the report Main conclusions of the reporting year... 2 Contents. INTRODUCTION... 2. Purpose, scope and other addressees of the report... 2.2 Main conclusions of the reporting year... 2 2. NSA SAFETY STRATEGY, PROGRAMS, INITIATIVES, ORGANIZATIONAL CHANGES...

More information

Dissemination on CSM on monitoring, CSM on risk assessment and certification of ECMs

Dissemination on CSM on monitoring, CSM on risk assessment and certification of ECMs Dissemination on CSM on monitoring, CSM on risk assessment and certification of ECMs Day 1 Borlänge 12th and 13th November 2013 Safety Unit team involved in dissemination: Agency team Nathalie DUQUENNE

More information

DEKRA Rail Company brochure Committed to Safety & improving Performance

DEKRA Rail Company brochure Committed to Safety & improving Performance DEKRA Rail Company brochure Committed to Safety & improving Performance DEKRA Rail in brief Questions we like to answer Safe assets with the required performance Do you want to use and maintain your rail

More information

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Derwent House RTC London Road Derby DE24 8UP Contact: Mr Robert Dale Tel: +44 (0)1332 483811 E-Mail: louise.maw@railwayapprovals.com Website:

More information

ANNEX C2 Assessment Procedures

ANNEX C2 Assessment Procedures Memorandum of Understanding establishing the basic principles of a common system of certification of entities in charge of maintenance for freight wagons 14 May 2009 ANNEX C2 Assessment Procedures 1 /

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2004L0049 EN 30.07.2014 003.002 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B C1 DIRECTIVE 2004/49/EC OF THE EUROPEAN PARLIAMENT

More information

SWEDISH TRANSPORT AGENCY Railway Department. Approval TS JV 2009: Doc. No.: Version: Date: Approval Guidelines

SWEDISH TRANSPORT AGENCY Railway Department. Approval TS JV 2009: Doc. No.: Version: Date: Approval Guidelines SWEDISH TRANSPORT AGENCY Railway Department Approval Doc. No.: Version: Date: TS JV 2009:002 06 30.11.2010 Approval Guidelines 2 (57) REVISION INFORMATION Version Date Description of revision Created/revised

More information

Light Impact Assessment

Light Impact Assessment EUROPEAN UNION AGENCY FOR RAILWAYS O11REC1O28 V1.O Making the railway system work better for society. Light Impact Assessment 4th Railway Package Revision of CCS TSI 120 Rue Marc Lefrancq I BP 20392 ER-59307

More information

QUESTION / CLARIFICATION

QUESTION / CLARIFICATION QUESTION / CLARIFICATION CO-ORDINATION BETWEEN NOTIFIED BODIES INTEROPERABILITY DIRECTIVE AND SUBSEQUENT AMENDMENTS ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE UNION QC-RST-015 Issue 02 Date:

More information

Getting new trains on track

Getting new trains on track Fourth railway package Getting new trains on track Dr. Josef Doppelbauer, Executive Director, European Union Agency for Railways (ERA), Valenciennes, France At the end of the three-year implementation

More information

Background information

Background information Background information The 3 sheets: Back Info-General, Back Info - Roles and Resps, and Back Info - Timeframe shall be filled in with the relevant information. The cells coloured in: are those to be filled

More information

RIS-2708-RST. Rail Industry Standard Freight Technical Committee Audit Protocol. Rail Industry Standard. Issue One: March 2015

RIS-2708-RST. Rail Industry Standard Freight Technical Committee Audit Protocol. Rail Industry Standard. Issue One: March 2015 RIS Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright [2015] Rail Safety and Standards Board Limited RIS-2708-RST Issue One: March 2015 Issue record Issue Date Comments One

More information

European Railway Agency. Application Guide. Rue Marc Lefrancq, 120 BP F Valenciennes Cedex France Application guide Published

European Railway Agency. Application Guide. Rue Marc Lefrancq, 120 BP F Valenciennes Cedex France Application guide Published European Railway Agency Part 1 of the Reference Document envisaged by Article 27 of the Railway Interoperability Directive Application Guide Reference in ERA: ERA/GUI/XA Version in ERA: 3.0 Date: 30/10/2015

More information

Rail Industry Guidance Note for Safe Integration of CCS Systems with Train Operations

Rail Industry Guidance Note for Safe Integration of CCS Systems with Train Operations for Safe Integration of CCS Systems with Train Synopsis This document provides guidance on assessment of changes that affect the interfaces between Control Command and Signalling (CCS) systems and train

More information

ERTMS the right investment for the future. EU Railway Conference Lille, 8 May 2014 Pio GUIDO, Head of ERTMS Unit

ERTMS the right investment for the future. EU Railway Conference Lille, 8 May 2014 Pio GUIDO, Head of ERTMS Unit ERTMS the right investment for the future EU Railway Conference Lille, 8 May 2014 Pio GUIDO, Head of ERTMS Unit ERTMS - European determination ERTMS is a major European industrial project EU Political

More information

ERA TSI OPE Working document

ERA TSI OPE Working document EN EN EN ERA TSI OPE 2013 Working document concerning the technical specification for interoperability relating to the 'operation and traffic management' subsystem of the rail system in the European Union..

More information

Work programme of the Committee of Technical Experts for 2011 and 2012

Work programme of the Committee of Technical Experts for 2011 and 2012 OTIF ORGANISATION INTERGOUVERNEMENTALE POUR LES TRANSPORTS INTERNATIONAUX FERROVIAIRES ZWISCHENSTAATLICHE ORGANISATION FÜR DEN INTERNATIONALEN EISENBAHNVERKEHR INTERGOVERNMENTAL ORGANISATION FOR INTER-

More information

Common approach for supervising the railway safety performance

Common approach for supervising the railway safety performance Computers in Railways X 147 Common approach for supervising the railway safety performance E. M. El Koursi 1 & L. Tordai 2 1 INRETS-ESTAS, Villeneuve d'ascq, France 2 UIC, France Abstract The key aspect

More information

CENELEC - SC9XA WGA15: Maintenance of EN 50129

CENELEC - SC9XA WGA15: Maintenance of EN 50129 CENELEC - SC9XA WGA15: Maintenance of EN 50129 Attilio Ciancabilla SiT Workshop - Braunschweig, 16/17 November 2015 WGA15 maintenance of EN 50129 EU 402 50129 similarities 50126 AsBo and ISA targets and

More information

Safely designing High Speed Two

Safely designing High Speed Two Safely designing High Speed Two Challenges in building the organisation, and demonstrating the railway to be safe Dr Reuben McDonald, Head of System Safety, Security & Interoperability, HS2 16 th June

More information

RECOMMENDATION FOR USE RFU-CCS-077

RECOMMENDATION FOR USE RFU-CCS-077 Page 1 of 9 TITLE CERTIFICATES WITH RESTRICTIONS AND CONDITIONS FOR USE ORIGINATOR ALTRAN, CERTIFER, SINTEF, VŮŽ SUBJECT RELATED TO SUBSYSTEM CCO AND CCT DESCRIPTION AND BACKGROUND EXPLANATION Introduction

More information

M1 DIRECTIVE 2001/16/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 19 March 2001 on the interoperability of the conventional rail system

M1 DIRECTIVE 2001/16/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 19 March 2001 on the interoperability of the conventional rail system 2001L0016 EN 30.04.2004 001.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B M1 DIRECTIVE 2001/16/EC OF THE EUROPEAN PARLIAMENT

More information

DIRECTIVES. (Text with EEA relevance)

DIRECTIVES. (Text with EEA relevance) L 138/44 26.5.2016 DIRECTIVES DIRECTIVE (EU) 2016/797 OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 11 May 2016 on the interoperability of the rail system within the European Union (recast) (Text with

More information

European Railway Agency. Impact Assessment Report

European Railway Agency. Impact Assessment Report European Railway Agency ERA studies: STUDIES: 1) MERGING OF HS AND CR TSIS AND 2) SPLITTING OF THE TRANSVERSAL TSIS Impact Assessment Report Reference: (filename) Document type: Final report Version :

More information

Common Safety Targets and Common Safety Methods for the railway systems in Europe

Common Safety Targets and Common Safety Methods for the railway systems in Europe Common Safety Targets and Common Safety Methods for the railway systems in Europe C.Cassir- ERA 4th session of WG «Standardised Risk Analysis» in Switzerland Bern- Page n 1 First, a few words on the ERA

More information

UITP EU Committee Position on the ERA Draft Final Report. IU-ExtScope FinalReport. on the Extension of field of application of TSIs

UITP EU Committee Position on the ERA Draft Final Report. IU-ExtScope FinalReport. on the Extension of field of application of TSIs Brussels, 22 April 2009 UITP EU Committee Position on the ERA Draft Final Report IU-ExtScope-20090320-FinalReport dated 20th March 2009 on the Extension of field of application of TSIs The UITP European

More information

(Text with EEA relevance)

(Text with EEA relevance) L 356/438 COMMISSION REGULATION (EU) No 1305/2014 of 11 December 2014 on the technical specification for interoperability relating to the telematics applications for freight subsystem of the rail system

More information

Evaluation of the implementation of Regulation (EC) No 881/2004 of 29 April 2004 establishing the European Railway Agency

Evaluation of the implementation of Regulation (EC) No 881/2004 of 29 April 2004 establishing the European Railway Agency Evaluation of the implementation of Regulation (EC) No 881/2004 of 29 April 2004 establishing the European Railway Agency Results of the stakeholder analysis Public seminar Friday, 10 th December 2010

More information

REPORT BY THE CHANNEL TUNNEL INTERGOVERNMENTAL COMMISSION ON SAFETY IN THE CHANNEL TUNNEL FIXED LINK DURING 2013

REPORT BY THE CHANNEL TUNNEL INTERGOVERNMENTAL COMMISSION ON SAFETY IN THE CHANNEL TUNNEL FIXED LINK DURING 2013 REPORT BY THE CHANNEL TUNNEL INTERGOVERNMENTAL COMMISSION ON SAFETY IN THE CHANNEL TUNNEL FIXED LINK DURING 2013 ChannelTunnelASR2013_EN.docx2013 3145826 1/21 Contents A. Scope of the report B. Introductory

More information

RECOMMENDATION FOR USE

RECOMMENDATION FOR USE Page 1 of 5 TITLE Scope of Assessment Requirements for Conformity Assessment by NoBos ORIGINATOR Luxcontrol Nederland B.V 2008/57/EC 2010/713/EU 765/2008 768/2008 SUBJECT RELATED TO DESCRIPTION AND BACKGROUND

More information

The TAP TSI Legal Framework and implementation strategy

The TAP TSI Legal Framework and implementation strategy Twelfth UIC ebusiness Conference - Passenger Workshop The TAP TSI Legal Framework and implementation strategy by Ugo Dell Arciprete Paris, 23 October 2008 TAP TECHNICAL STANDARDS INTEROPERABILITY COMPETITION

More information

Reporting High Risk Defects

Reporting High Risk Defects Railway Industry Standard RIS-8250-RST Issue One Date December 2016 Reporting High Risk Defects Synopsis This document defines requirements for recording, analysing and reporting safety-related defects

More information

Incident Response Planning & Management

Incident Response Planning & Management Incident Response Planning & Synopsis This standard identifies interface requirements for enabling a consistent, comprehensive and structured process for rail incident response planning and management.

More information