PRÄSENTATION Windpower Offshore Base Mukran Folie 1
Windpower Offshore Base Mukran Part I Location Port of Sassnitz General Information Folie 2
Location Sassnitz / Mukran (I) Uncomplicated navigational conditions No pilot obligation Folie 3
Location Sassnitz / Mukran (II) Germany`s northeastern-most deepwater port at the Baltic Sea Germany`s northeastern-most deepwater port at the Baltic Sea Folie 4
Location Sassnitz / Mukran (III) Specialist for handling of combined ferrytransport Wide storage facilities at the Port of Sassnitz Wide storage areas at the Rail Terminal Quality Certificate according DIN EN ISO 9001/2008 Folie 5
Port of Sassnitz: Shareholder Structure Shareholders - Port of Sassnitz/Mukran: City of Sassnitz, Federal State Mecklenburg-Vorpommern 1993: Foundation of Port of Sassnitz/Mukran City of Sassnitz Federal State Mecklenburg-Vorpommern 90 % 10 % Folie 6
Hinterland Connection (I) 96 Sassnitz 1 Hamburg 24 19 20 11 2 Düsseldorf 7 2 14 Leipzig 13 Berlin 1 9 17 96 n Stuttgart 9 München New construction of the B 96n as a three lane road on Rügen Island between 2011-2017 Folie 7
Hinterland Connection (II) With the completion of the Motorway A 20, the new Strelasund bridge and the B 96n on Rügen Island there is improved road access to the Port of Sassnitz due to: New three lane road between Stralsund and Bergen No interruption of the traffic by traffic lights Establishment of a traffic management system Folie 8
Windpower Offshore Base Mukran Part II Potentials & Advantages Offshore Wind Folie 9
Location and Market Potentials Offshore Wind Folie 10
Windpower Offshore Base Mukran Advantages Short sea distance from Germany to the offshore wind farm projects in the Baltic Sea Ideal position directly at the open sea Water depths of max. 10.5 meter Uncomplicated approach No channel navigation No obligation for pilot service New offshore infra- and superstructure Ideal project, marshalling and service port for the offshore wind energy Ideal preconditions for industrial development of port related business and industries Folie 11
Windpower Offshore Base Mukran Part III Offshore Terminal South Folie 12
Port of Sassnitz / Mukran Offshore Terminal South (I) Construction of 100 000 m² Offshore Terminal until end 2013 Bearing capacity: max. 50 t/m² Water depth: 10,50 m Total length of new berth: 410 m Purpose: Pre-assembly, storage and transshipment of offshore May 2013 components Summer 2010 September 2010 October 2010 December 2010 Folie 13
Port of Sassnitz / Mukran Offshore Terminal South (II) Layout Offshore Terminal Sassnitz Berth 3 Berth 3a Berth 1: Conventional/CTVs/OSVs L: 100 m / ND: 5,5 m / QH: 2,20 m Berth 2: Conventional/RoRo L: 110 m+ / ND: 6,3 m / QH: 2,55 m Berth 3: Multipurpose L: 210 m / ND: 10,5 m / QH: 3,10 m Berth 3a: Multipurpose L: 200 m / ND: 10,5 m / QH: 3,10 m Berth 3a is currently being investigated for Jack-Up operations Berth 4a: Option for RoRo-delivery Folie 14
Port of Sassnitz / Mukran Offshore Terminal South (III) Berth 2 RoRo - Solution Berth 2 Berth 2 RoRo Length: 110 m+ ND: 6,50 m QH: 2,55 m RoRo Ramp Width: QH: Load capacity: 21,0 m 1,55 m max. 340 t Possible quay site for RoRo-Vessel with stern ramp or pontons Delivery of wind components by trucks or multi-wheeler No height restriction Direct access to offshore terminal south Folie 15
Port of Sassnitz / Mukran Offshore Terminal South (IV) Folie 16
Port of Sassnitz / Mukran Offshore Terminal South (V) Berth 2 Berth 3a Berth 3 Folie 17
Port of Sassnitz / Mukran Offshore Terminal South (VI) Folie 18
Port of Sassnitz / Mukran HLV Svanen / Ballast Nedam (VII) Folie 19
Port of Sassnitz / Mukran Offshore Terminal South (VIII) Offshore Warehouse Construction of offshore - warehouse until end of 2013 Roofed storage area: 1 500 m² L: 65,0 m / W: 26,0 m / H: 7,50 m Wide doors Bearing capacity: > 3,5 t/m² Direct access to the offshore terminal Folie 20
Port of Sassnitz / Mukran Offshore Terminal South (IX) Offshore Office Building Construction of office buildings (container modules) with 80 workplaces until end of 2013 Example Example All office workplaces are connected via telephone and data network incl. LAN/DSL Conference rooms Locker rooms Social rooms with kitchenettes and chairs for 50 pers. Sanitary and drying facilities Parking space Folie 21
Windpower Offshore Base Mukran Part IV Terminal North Buss Sea Terminal Sassnitz Folie 22
Port of Sassnitz / Mukran Terminal North (Overview) Available industrial area of approx. 150.000 m² with direct access to the quay side. Folie 23
Port of Sassnitz / Mukran Terminal North (I) Construction of new berth 9 Water depth: 10,50 m Length: 175 m (plus 190 m already existing) Purpose: Transshipment, storage and pre-assembly of May 2011 offshore components Size of area: approx. 150.000 m² September 2009 June 2010 Summer 2010 Oktober 2010 Folie 24
Port of Sassnitz / Mukran Terminal North (II) Folie 25
Port of Sassnitz / Mukran Buss Sea Terminal Sassnitz (I) General Information Shareholders of the Buss Sea Terminal Sassnitz GmbH & Co. KG are: BUSS Group GmbH & Co. KG and Fährhafen Sassnitz GmbH Buss Sea Terminal Sassnitz GmbH & Co. KG was founded at 01.01.2005 90 % 10 % Folie 26
Port of Sassnitz / Mukran Buss Sea Terminal Sassnitz (II) General Information Berth 8 (Multipurpose) Terminal area: 20 000 m² Quay length: 190 m Length of railway track: 1 000 m Water depth: 9,50 m Berth 9 (Multipurpose/Heavy Cargo) Terminal area: 17 500 m² Quay length : 175 m Water depth: 10,50 m Folie 27
Port of Sassnitz / Mukran Buss Sea Terminal Sassnitz (III) Main Handling Equipment 2 x Mobile Port Crane LHM 400 104 tons lifting capacity each, up to 200 to in tandem 48 m arm length Suitable for bulk and break-bulk handling Suitable for heavy-cargo Fitted for container handling and pipe handling Grabs 9 up to 15 m³ for various bulk cargo Spreader Fully automatic, for 20 and 40 containers an Offshorepipes Conveyor Belts Conveyor belts (max. 300t/hour) Additional Handling Equipment Forklifts 2.5-16 tons Terminal truck, Rolltrailer Reach Stacker (9) for up to 45 to Hydraulic Mobile Excavator Folie 28
Windpower Offshore Base Mukran Part V Overview Offshore Terminals Folie 29
Port of Sassnitz / Mukran Offshore Terminals Sassnitz / Mukran Offshore Terminals Sassnitz Terminal 1 Offshore Terminal South Area: 100 000 m² Quay length: 410 m Terminal 2 Offshore Terminal North Area: 70 000 m² Quay length: 365 m Berth 10 (new): 200 m Folie 30
Windpower Offshore Base Mukran Part VI Existing Buildings and Facilities Folie 31
Port of Sassnitz / Mukran Overview Folie 32
Port of Sassnitz / Mukran Multipurpose Warehouse Multipurpose Warehouse Construction: 2012 Roofed area: 3 410 m² Length: 110.0 m Width: 31.0 m Height: 15.2 m Two cranes, each with a lifting capacity of 25 t Folie 33
Port of Sassnitz / Mukran Logistic Warehouse Logistic Warehouse with rail connection Construction: 2012 Roofed area: 2 880 m² Length: 60.0 m Width: 48.0 m Height: 12.2 m Two cranes, each with a lifting capacity of 10 t Folie 34
Port of Sassnitz / Mukran Factory Building New 18 000 m² production facility (currently used for Nord Stream Project) April 2009 Roofed area: 10 000 m² (Coating Plant) Height: 12 m Length: 120m, Width: 60 m Roofed area: 8 000 m² (Steam Curing Plant) Cranes and technical equipment available April 2008 Summer 2008 November 2008 Folie 35
Windpower Offshore Base Mukran Part VII Port of Sassnitz - References Folie 36
Offshore Reference: Nord Stream Project Folie 37
Offshore Reference: Handling of Test Piles for OWF Baltic 2 by JB Goliath (I) Folie 38
Offshore Reference: Handling of Test Piles for OWF Baltic 2 by JB Goliath (II) Folie 39
Offshore Reference: Transport and Handling of 81,5 m Wind Blade Folie 40
Overview Offshore References: Windpower Folie 41
Further Reference: City Tunnel Copenhagen Part II Production and export of 121 000 tunnel segments for the metro-city-ring in Copenhagen (DK) Folie 42
Further Reference: Liebherr Container Gantry Pre - assembly and transshipment of three Liebherr Container Gantries (each approx. 800 t) from Port of Sassnitz to Sankt Petersburg Folie 43
Windpower Offshore Base Mukran Part VIII Location Port of Sassnitz - Area Management Folie 44
Area Overview Ideal preconditions for industrial development Huge areas at the port and railway site available Entire size of the area: approx. 348 ha (FHS + Rail Station Mukran) Masterplan 2013 Port of Sassnitz / Mukran Folie 45
Contact Details Fährhafen Sassnitz GmbH D-18546 Sassnitz / Neu Mukran Managing Director Harm Sievers Phone +49 (0) 38392 55210 Fax +49 (0) 38392 55240 Mobile +49 (0) 171 6425570 e-mail: sievers@faehrhafen-sassnitz.de Head of Offshore Wind Patrick Schwabe Phone +49 (0) 511 35384932 Fax +49 (0) 38392 55203 Mobile +49 (0) 172 1538417 e-mail: schwabe@faehrhafen-sassnitz.de Head of Industrial Development Leon Kräusche Phone +49 (0) 38392 55218 Fax +49 (0) 38392 55214 Mobile +49 (0) 172 3207649 e-mail: kraeusche@faehrhafen-sassnitz.de Nautical Industrial Engineer / Offshore Wind Jörn Gorzelski Phone +49 (0) 38392 55241 Fax +49 (0) 38392 55270 Mobile +49 (0) 173 3152057 e-mail: gorzelski@faehrhafen-sassnitz.de Folie 46
Thank You for Your Attention Port of Sassnitz - Your Port for Doing Offshore Business in the Baltic Sea Folie 47