Retained Logic and Progress Override in Primavera P6

Similar documents
Global Project Management, LLC

2017 Construction CPM Conference Ron Winter, PSP, FAACE Schedule Analyzer Software CPM ACTIVITY STATUS

The Survey Says! Source: The Project Manager, Pinnell-Bush, Inc. Owner s say 31% of contractors do not submit monthly updates. 41% don t submit recove

PMP EXAMINATION PREP CHAPTER 6 SCHEDULE MANAGEMENT. PMP Exam Prep

Lessons Learned Schedule Updating and Maintenance using Primavera P6

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Lessons Learned Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI-SP, LEED AP Hill International

Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.2 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management

Welcome to the Eastwood Harris Pty Ltd Primavera P6 Version 7 and Earlier Versions 3 day training course

Artificial Intelligence

Team Member Application

Project Management THE MANAGERIAL PROCESS

Andrew Avalon, P.E., PSP

Primavera P6 R8.3 Professional Fundamentals Training Course Outline

CIPRIANI COLLEGE OF LABOUR & CO-OPERATIVE STUDIES BSC IN PROJECT MANAGEMENT PRM 135: PROPOSAL DEVELOPMENT & COSTING WEEK 8

How to Develop, Manage and Communicate Effective Schedules Using Primavera P6 Professional

MnDOT Project Management Office Presents: Impact Schedules. Presenter: Jonathan McNatty Senior Schedule Consultant DRMcNatty & Associates, Inc.

Views and Layouts for Program Management

Project Forecast Survey Results Good Scheduling Practices June 2016

P6 Instructors Sample Presentation

6 PROJECT TIME MANAGEMENT

User Guidance Manual. Last updated in December 2011 for use with ADePT Design Manager version Adept Management Ltd. All rights reserved

Chapter 3 Managing Systems Projects

P6 Version 8.2 to 8.4 EPPM Web Power Sample Point Slide Show

Network Diagram 11/10/2016 WORK BREAKDOWN STRUCTURE (WBS)

P6 Instructors Sample Presentation

Project Time Management

LONG INTERNATIONAL. Robin K. Long, PMP

Developing a Project Plan

Document No: SB002-P3 Revision No: Last Updated: April

Mastering Microsoft Project 2010

SECTION CONSTRUCTION SCHEDULES (COMPUTERIZED CPM FORMAT) UNIT PRICE CONTRACTS

Guten Tag. (good day)

Planning & Scheduling

Scheduling Maturity Reading the Signs. Planning & Earned Value SIG SIG Steering Group Member

Lecture- 10. Project Scheduling. Dronacharya College of Engineering

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR CRITICAL PATH METHOD SCHEDULE. CFS:BD 1 of 14 APPR:MB:JJG FHWA:APPR:

Primavera Training - P6 Basic Course (102)

Borderlink Resources Limited.

What's New - Task Planning

Information Technology Project Management, Seventh Edition

SECTION CONSTRUCTION SCHEDULES (COMPUTERIZED CPM FORMAT) [LUMP SUM CONTRACTS]

2-Day Oracle Primavera P6 Professional Advanced Scheduling - Training Outline -

SECTION CONSTRUCTION PROGRESS DOCUMENTATION SECTION CONSTRUCTION PROGRESS DOCUMENTATION

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.

MSP How to guide session 3 (Updating)

// Does Better Scheduling Drive Execution Success?

by Ron Winter Consulting LLC January 6, 2015

Using SimVision for Organization Development. 1. Solving Organization Development Problems with SimVision

MnDOT Project Management Office Presents: Risk Management. Presenter: Jonathan McNatty Senior Schedule Consultant DRMcNatty & Associates, Inc.

Sample book with one chapter

Consulting Newsletter

// Improving Project Plans using a Schedule Maturity Framework

Project Time Management

SECTION NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD 8/10

Project Management PSGLE 122. Time and Resources

East Central College

IST 302 : Project Time Management

4/28/2016. Presented for Boston College Employee Development Office April 6, 2016 by Denise M. Guérin, JD, MS-PPM, PMP. Q&A from Session #2

Simply. manage. SureTrak Project Manager 3.0. all your projects. the best way to

Chapter 3 Managing the Information Systems Project

Schedule Management User Guide

MBP1133 Project Management Framework Prepared by Dr Khairul Anuar

1 - Introduction to Microsoft Project Describe how Project relates to the discipline of Project management.

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Constructing Networks

Estimating and Scheduling

SAN FRANCISCO PUBLIC UTILITIES COMMISSION WATER SYSTEM IMPROVEMENT PROGRAM CONSTRUCTION MANAGEMENT PROCEDURES

Your easy, colorful, SEE-HOW guide! Plain&Simple. Microsoft Project Ben Howard

EXHIBIT 2-2-C SCHEDULES

Estimating Project Schedule-Time and Cost

2.0 SCHEDULE DEVELOPMENT

Understanding Import & Export with NetPoint 4.2

3-Day Oracle Primavera P6 Professional Fundamentals - Training Outline -

Project Time Management

Design Process & Project Management AN ITERATIVE DESIGN PROCESS. Prof Picone, Mississippi State University. Test Verification

SECTION CONSTRUCTION PROGRESS DOCUMENTATION

Microsoft Project Tips & Tricks. Project Solutions Group, Inc.

Project Planning and Control Using Oracle Primavera P6 : P8.3, 8.4, 15.2

Cambridge International AS & A Level Computer Science

Scheduling Concepts and MS. Project AZURITE PROJECT TRAINING AND CONSULTING PVT LTD (OPC) 2014

Planer ET 2011 professional. Programming time-location Economic planning

Administration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT AND PMBOK GUIDE FOURTH EDITION training course presented by.

The concept of linear scheduling

P6 Schedule Maintenance Process

PROMASTAR Instructor led Professional Training Services Primavera Accredited/Certified Class Courses

NAVSEA STANDARD ITEM. 1.1 Title: Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

Course Outline. Objectives. Getting Started with Project Management. Initiating a Project. Planning for Time and Cost.

What s new in PrimaveraReader

Community. Prepared. Supervised. Gaza,

Time Management PLANNING

Chapter 5 Project Scheduling. (Source: Pressman, R. Software Engineering: A Practitioner s Approach. McGraw-Hill,

Prepared by: Mr.M.SYED SHAHUL HAMEED CHAPTER 3 SYSTEMS PLANNING - MANAGING SYSTEMS PROJECTS

Managing Takt Plans using vplanner

Project Scheduling: Lagging, Crashing and Activity Networks

I. Application overview

Index. Backup plans for presentations, Backward pass, 55 59, 72 73, 102. Saleh Mubarak

What Should an Owner Do With the Contractor s Schedules? Seminar for the FEFPA Ted Trauner Trauner Consulting Services, Inc.

Chapter 7 at a Glance

Transcription:

By Pat Hendricks TEPCO, LLC www.tepco.us Retained Logic and Progress Override The retained logic and progress override setting can drastically affect a schedule depending on which is used, so understanding the details of each is key. In the Schedule Options window, P6 gives us three options to determine how it will schedule activities when out-of-sequence progress occurs. An example of out-of-sequence progress is when a successor task is able to start prior to the finish of its predecessor, assuming a Finish-To-Start relationship is assigned between the two. By pressing F9 on your keyboard and selecting Options, the Schedule Options screen will be available for you to choose Retained Logic, Progress Override or Actual Dates. 1 P age

These three options determine how P6 treats out-of-sequence progress 2 P age

There are three ways P6 can react when activities are conducted out-of-sequence. Retained Logic: The remaining duration of a progressed activity is not scheduled until all predecessors are complete. It also prevents tasks from front-loading since the remainder of the work is held out. Although Activity B started early, P6 will not allow the remainder of the activity to continue until its predecessor is complete. The overall activity path will still reflect the gain in duration progress As you can see, even though Activity B started early, P6 will not allow the remainder of the activity to continue until its predecessor Activity A is complete. The staffing plan below shows how Retained Logic prevents front end- loading. 3 P age

Progress Override: Network logic is ignored and Activity B can progress without delay. Although the predecessor logic remains intact, the relationship is ignored and the predecessor is treated as if it has an open end, resulting in unrealistic positive float. It also shows the task now capable of running in parallel, but resource availability may not allow this. Although it s not apparent, Activity A is treated as open-ended, resulting in an unrealistic increase of float. (This example increased float from 13 to 27 hours.) Activity A and B are also now running in parallel. This type of scheduling does not prevent front end-loading which could lead to an increased staffing plan or improper staffing of the work. As you can see, Activity B is now running in parallel with Activity A. Activity C was originally scheduled to Finish on March 28 th, but is now scheduled to Finish on March 27 th ; doing so has pulled all scheduled work back and increased the staffing. 4 P age

Actual Dates: Similar to Retained Logic, but the actual dates are used to calculate the forward and backward pass and treats the actual dates similar to constraints. The result can be an unrealistic amount of negative float. Treats Activity A as if it was required to complete before its successor s actual start date causing an unrealistic amount of negative float. The remainder of the activity is still treated the same as when we use Retained Logic. P6 will not allow the remainder of the activity to continue until its predecessor is complete. The activity path will still reflect a gain in duration progress. Viewing the Schedule Log will provide details about your project and its settings. Out-of-sequence activities are one of these items that can be viewed by running the log. To view the Schedule Log for your project follow the steps below: 3 5 2 1. Click F9 on your Keyboard 2. Check the Log to file box 3. Click Schedule 4. Click F9 on your Keyboard again 5. Now that Log to file location has been selected you can select View Log 5 P age

Viewing the Schedule Log Retained Logic and Progress Override in Primavera P6 The Schedule Log records scheduling results, including: Scheduling / leveling settings Statistics Critical activities Errors, warnings (Out-of-sequence activities) Scheduling / leveling results Exceptions For additional information on Retained Logic and Progress Override view this tutorial: http://bit.ly/1rwewso. 6 P age