The Port of Cape Town Latitude S Longitude E

NAMPORT (NAMIBIAN PORTS AUTHORITY) N th ROAD PO Box 361 WALVIS BAY NAMIBIA

TERMINAL INFORMATION AVONMOUTH, BRISTOL

Terminal Particulars Questionnaire

Please find below some general information about COMVEX dry bulk terminal, according to Appendix no.1.2 of B.L.U. Code :

2008 Investor Site Visit - Maputo

SRIRACHA HARBOUR DEEP SEAPORT

Korea to Vancouver, Wa. by ship discharge directly to river barge transit time about 15 days.

RIO HAINA. Port Handbook. 6A OR Container Carrier M/V MSC ANAHITA IMO# (2245 TEU) GT LOA 225,0 m (738 ft) DWT t

Port Information for Studstrup Power Station

SYRIA CRISIS BEIRUT PORT ASSESSMENT (LEBANON) (29 AUG 2013)

LOGISTICS & TRANSPORTATION CHALLENGES FOR OILS & FATS IN SUB-SAHARAN AFRICA PREPARED BY: DERRICK FRANCIS FR WARING (INTERNATIONAL) (PTY) LTD

TRADE OCEAN RESOURCE CENTRE

Ports Handbook. Section 17/ Rev Page 3 of 12

MAIN CARGO GUIDELINES

LOADING OF BULK LIMESTONE AT MUSANDAM ANCHORAGE

UPDATED 2018 CAGLIARI

COUNTRY REPORT. Phnom Penh. Autonomous Port. Main infrastructures consist of -Area of Sihanoukville Port 975,000m 2 -Length of port berth

Port Information for Avedøre Power Station

Broadening our horizons

SECTION I CHARGES FOR MARINE SERVICES AND SHIP DUES

INTE-TRANSIT 3 rd Training Workshop Strategic Roadmap to 2020 for Piraeus Container Terminal

KENYA PORTS AUTHORITY PO Box MOMBASA KENYA. Phone Fax Web:

THE PORT. REASONS CHOOSE THE PORT OF Montréal PORT FACILITIES

Port Feeder Barge. Floating infrastructure for container ports.

The Operating Concept Peter Beamish, MA MICE Technical Director, Royal HaskoningDHV

The Foundation of Infrastructure

Multi-purpose port. I n t e r n a t i o n a l S h i p p i n g L a n e. Senai Airport

Bunkering in Mauritius

APPENDIX OF CHAPTER 2

Oil Companies International Marine Forum MTIS Programme Terminal TPQ

Although tremendous efforts have been made in worldwide port development following issues are still on the agenda in many (container) ports:

BUILDING AN INDEPENDENT TRANSPORT CHAIN NORILSK NICKEL

For personal use only

Port Machinery Container cranes:

CALL FOR PROPOSALS FOR MAKING AREAS AVAILABLE AT THE TRADING PORT OF SÈTE WITH A VIEW TO OPERATING A CONTAINER AND GENERAL CARGO YARD.

Wharf structures and Quay Deck landing areas, will be built in stages to accommodate the following transport fleet:

Guidelines on Port Entry

FALCONARA OIL TERMINALS INFORMATIONS = API REFINERY = S.P.M. abt 8 miles

BS 6349:Part 1.1: 1: General Code of practice for planning and design for operations. David Veale

CALL FOR EXPRESSIONS OF INTEREST (CEI) OPERATION OF A CONTAINER AND GENERAL CARGO TERMINAL IN THE PORT OF SETE

The Port of Saldanha Bay Latitude S Longitude E

Tariffs (rates, charges, fees) for works and services executed in JSC Sea port of Aktau

TANJUNG BRUAS PORT CORPORATE INTRODUCTION

American Patriot Holdings LLC & PPHTD Creating Inland Marine Innovation

American Association of Port Authorities Harbors & Navigation Committee September 27, 2018

WARRENPOINT HARBOUR AUTHORITY PORT OF WARRENPOINT SCHEDULE OF CHARGES OPERATIVE FROM 1 JANUARY 2018

3752 (Khalifa Port and approaches) 3176 (Ajman to Sir Abu Nu'ayr) 2889 (Dubai to Jebel Al Az Zannah & Jazirat Das)

BAHRAIN PORTS TARIFF 2016 (MILITARY)

OUR COMPANY YOUR MARITIME AND OFFSHORE PARTNER OUR MISSION AND VISION GROWTH AND COOPERATION MISSION SHE-Q SAFETY, HEALTH, ENVIRONMENT AND QUALITY

Cai Lan Port Investment JSC (CPI) was founded in 2007 with three members who are Vinalines, Quang Ninh Port and Ha Noi General Import Export JSC

Round Table Constanta Port on the Silk Road Constanta, 5 th April 2017

SERVICE HANDBOOK PORT OF PIETARSAARI / JAKOBSTAD 2018

London Container Terminal MAKING CONNECTIONS

JLTOC Update. October 7, 2016

Connecting. markets. you to key

15. Coastal Defences. Executive Summary: Chapter 15. Coastal Defences

Patrick Adelaide Stevedoring Wheat Demand Management Policy and Reference Pricing. January 2016

Waterways 1 Water Transportation History

The Next Mode of Transportation. Presented By: Ronald J. Silva CEO-Westar Transport

THE AMAZON. The map of the Amazon region below is our point of departure for this report:

COMPANY PROFILE. seypec.com

Boosting Natural Potential

CHAPTER-5 OPERATIONAL PROBLEMS OF COCHIN PORT

AAPA Harbors, Navigation and Environment Seminar Vancouver, B.C.

TARIFF.

Haiphong International Container Terminal Co., Ltd. The First & Best Deep-water Terminal In The North Of Vietnam

EUROPEAN SEA PORTS ORGANISATION RAPID EXCHANGE SYSTEM GUIDELINES 2016

Port of Algoma. Focal Point of the Great Lakes Region

PRICING TARIFF. Effective 01 July 2017 to 30 June Page 1 of 13

PRICING TARIFF. Effective 01 August 2018 to 30 June Page 1 of 13

Growth In Container Volumes

Member of the SEA-invest Group

Bulk. and breakbulk sectors

Sustainable freight transport in support of the 2030 Agenda for Sustainable Development

Penang Port Sdn. Bhd. ( D) Headquarters : No.1. Pesara King Edward, Georgetown, Penang, Malaysia Postal : P.O. Box 1204, Penang,

OVET_omslag_Brochure_nov14_sn :11 Pagina 3 Quality in Bulk

INFRASTRUCTURE PARTNERSHIPS FOR AFRICAN DEVELOPMENT (ipad) EAST AFRICA AUGUST 2009 KILIMANJARO KEMPINSKI HOTEL DAR ES SALAAM, TANZANIA

Present Conditions of the Port of Constantza

Sidi Kerir Port and Ain Sukhna Port are connected with the Suez Mediterranean Pipeline (SUMED) which is in close relation with the Canal traffic.

Adelaide Stevedoring Wheat Demand Management Policy and Reference Pricing

GRINDROD INTERMODAL TAILOR-MADE SOLUTIONS

Marine Guide for Agents

2. THE CONTEXT OF PORT PRICING

EUROGATE WIND ENERGY SIZE IS OUR DAILY BUSINESS

SWOT Analysis 24/11/2014

Development of port Infrastructure: Bangladesh Perspective FAHMIDA AKHTAR DEPUTY SECRETARY MINISTRY OF SHIPPING

AMER BADAWI Vice President Columbia Grain, Inc.

TARIFF FOR PORT SERVICES

New Container Terminal Development for a Proposed Area

MAXIMUM TARIFFS TERMINAL CONTAINERS

SEPETIBA TECON. OVERVIEW Strategic location Technical data sheet / equipment One-stop-shop

SEPETIBA TECON. OVERVIEW Strategic location Technical data sheet / equipment One-stop-shop

case centre Cost assessment and tariff determination: Cargo handling experiences at a private port.

BLU CODE - SHIP / SHORE SAFETY CHECKLIST

1- Introduction..1. Final Report. page 1

Transcription:

Mozambique Port description

Beira Access Specification Mozambique Map reference number and Description Length (m) Draught (m) Fishing vessel 76.77 N/ Operational 2 to 4 Container 484 2 5 Container 6.53 2 6 General Cargo 70 9.5 7 General Cargo 65.5 9.5 8 Coal 87.9 9.5 9 General Cargo 67.3 9.5 0 General Cargo 67.3 9.5 Previous fuel berth 28.55 9.5 2 Fuel terminal 264 The Port of Beira is situated on the Pungoe river estuary. It is the second largest port in Mozambique with 2 quays. Beira has always been essentially a transit port, handling the import and export cargoes from Zimbabwe, Malawi, Zambia and other countries Port in the region. description The entrance of the port is 20 nautical miles from the open water along the dredged 60,0 m wide Macuti channel which has buoys and lighting, with a minimum depth below chart datum of 2 m. Anchorage for shallow draft vessels is situated at Franquia near the port entrance. Pilotage is compulsory. Advanced notice is required 24 hours before arrival of the vessel. Max. permissible draught on spring tide is 9 m, max. permissible draught on tide is between 6.5 m and 8.5 m, max. length overall (LOA) permissible is 95 m / Water density :.005/.025 (river estuary) / ISPS : Level / Weather : Prevailing winds SE during March and NE during October to February. Oil Terminal : Designed for heavy oils handling only, berth can accommodate tankers up to 20000 DWT, and is fitted with a pipeline for refined products. Berth was the official tanker berth, but mooring is not always possible at this berth due to strong tidal currents. The berth has a pipeline system with capacity of 400 tonnes per hour with the following pipes : 4 x 2 for unloading, 6 x 8 for loading. Fuel Terminal : Located at quay 2, the modern fuel terminal, which was inaugurated in 994 has the capacity to load and unload tankers of 500 to 2 500 SWT and from 500 to 50 000 DWT. The terminal system consists essentially of four pipelines for refined products such as diesel, petrol, Jet Avgas and fuel oil. This terminal handles 200kl per hour and has an installed capacity of 2,5 million tonnes per year. Cold storage terminal : This infrastructure is equipped with cold stores that have a capacity for 00 tonnes at temperatures of,5 to 4,5 degrees centigrade, and for 490 tonnes at temperatures of -9 to -20 degrees centigrade respectively. The terminal is equipped with electrical forklifts for handling the cargo. 3/32, quai de Dion Bouton - 928 PUTEAUX CEDEX (33) 46.96.42.84 - afritramp@bollore.com - http//www.afritramp.eu customer-service.shipping@bollore.com

Beira Port facilities >> Storage capacities Port covered warehouse 5,000 sqm 40,000 mtons Agents covered warehouse 7,000 sqm 47,000 mtons Agents open area warehouse 28,000 sqm Electric reefer points for refrigerated containers 44 >> Stevedoring equipement >> Other facilities Quantity Capacity Mobile cranes 45 T Ship to shore gantry cranes 2 45 T Reach stackers 3 45 T Top loader 2 45 T Top loader 42 T Sidelifter 6 T Front loaders 42 T Shipyard Mac Lifter 25 T Coldstorage Forklift 30 T Forklift 32 T Forklift 42 T Forklift 6 3 T - 0 T Timber loader 2 T Bagging machines cereals 4 325 mtons / WWD Bagging machines fertilizer 2 325 mtons / WWD Rail transfer crane Tugs serving 200,000 sqm 2 3/32, quai de Dion Bouton - 928 PUTEAUX CEDEX (33) 46.96.42.84 - afritramp@bollore.com - http//www.afritramp.eu customer-service.shipping@bollore.com Yes/No Bunkering (by truck tanker load) Water (by truck tanker load) Slops Shipchandler no (by pre-requested / approved provision list) no

Maputo Access Specification Map reference number and Description Length (m) Draught (m) Coastal terminal 300 8 General cargo terminal I 200 General cargo terminal D 200 9 General cargo terminal C 200 9 Steel / Granite / Project cargo terminal 200 0.5 Container terminal 300 Sugar terminal 70 0.5 Citrus terminal 380 Molasses terminal 79 0.5 The port of Maputo is the largest port in Mozambique and is ideally situated as it is the closest port to the industrial heartland of South Africa. All berths have between 7,0m and.0m draft alongside and entrance to Maputo is via Canal du Nort. Pilotage / tugs is compulsory in daylight hours only and pilots board at Buoy 6. Berthing / sailing is presently only permitted during daylight hours. The port of Maputo normally works 24 hours a day, seven days a week.

Maputo New dredging access (Sept 4th, 202) 3799(P)/2 MOZAMBIQUE - Baía de Maputo - Baixo Fawn to Barra Norte - Depths. Buoyage Source: Maputo Port Development Company. A channel, maintained depth 0m, has been dredged into the Port of Maputo. The channel extends 50m either side of a line joining the following positions: 25 38 0S., 32 53 02E. 25 39 22S., 32 52 5E. 25 46 2S., 32 49 63E. 25 49 78S., 32 50 80E. 25 52 75S., 32 5 42E. 25 55 46S., 32 5 53E. 25 56 0S., 32 44 32E. 25 57 53S., 32 39 02E. 25 59 53S., 32 35 33E. 25 59 28S., 32 34 69E. 25 58 56S., 32 33 8E. 25 57 74S., 32 32 66E. 25 57 28S., 32 3 73E. 25 57 26S., 32 3 46E. 25 57 3S., 32 3 5E. 25 57 42S., 32 30 89E. 25 57 60S., 32 30 47E. 25 57 88S., 32 29 7E. 2. A recommended route exists in the centre of the channel between positions 25 38 0S. 32 53 02E. and 25 56 0S., 32 44 32E. 3. Lateral buoys are located in the centre of the channel. Vessels must pass as close as possible to these buoys on the appropriate side. 4. Light-buoy N (25 38 3S., 32 53 06E.) has been reported as unlit. 5. Light-buoy 8 (25 56 89S., 32 4 25E.) has been reported missing. 6. Canal do Sul is closed to navigation. Light-buoys S (25 54 64S., 32 56 7E.) and 2S (25 53 39S., 32 55 8E.) have been removed. (All positions are referred to WGS84 Datum) 7. These changes will be included in the next New Editions of Chart 644, to be published November 202, and Chart 646, to be published in 203. Charts affected - 644 646 3738* MOZAMBIQUE - Baía de Maputo - Baixo Fawn to Barra Norte - Depths. Buoyage. Recommended track. Source: Maputo Port Development Company & Fugro Survey Africa Ltd Chart 644 [ previous update 205/2 ] WGS84 DATUM Insert the accompanying block, showing amendments to depths, buoyage and recommended track, centred on: 25 48 95S., 32 5 0E. Wk34/

Maputo New dredging access (Sept 4th, 202)

Maputo Port facilities >> Stevedoring equipment Quantity Capacity Gantry cranes 2 35 T Shore cranes 2 20T Vacuvator 300 MT / h Forklifts 9 20T Gantry 2 capable of handling 6 m and 2 m containers Spreaders 2 capable of 360 rotation Ship loaders 2 Cranes 5 5 T >> Storage capacities Container terminal area Sugar terminal area Steel berth,000 TEU 20,000 MT 50,000 T >> Other facilities Yes/No Bunkering Water Shipchandler Shipyard (by barge) (by pipe) no

Nacala Access Specification Map reference number and Description Length (m) Draught (m) North quay - General cargo 600 Quay - General cargo 7 Quay 2 - General cargo 7.2 Quay 3 - General cargo 8.6 2 Quay 4 - priority for tanker vessel 9.5 3 Container terminal 395 4 Draught is calculated basis level 0. / Water density :.024./ ISPS : Level / Weather : prevailing winds SE'ly during March to September and NE'ly during October to February. 32, quai de Dion Bouton - 928 PUTEAUX CEDEX ) 46.96.42.84 - afritramp@bollore.com - http//www.afritramp.eu tomer-service.shipping@bollore.com

Nacala Port facilities >> Storage capacities >> Other facilities Open area 25,000 sqm Covered storage 36,700 sqm >> Stevedoring equipement Bunkering Water Slops Shipchandler Shipyard Yes/No no no no Quantity Capacity Tugs 50 hp Reach stackers 3 42 T Forklifts 2 42 T Forklifts 35 T Forklifts 5 2.5 to 6 T Trailers 6 20' - 40' Bell Tractors 2 Payloader 7.5 T Bobcat 2 Hoppers 5 Grabs 9 3 cbm 3/32, quai de Dion Bouton - 928 PUTEAUX CEDEX (33) 46.96.42.84 - afritramp@bollore.com - http//www.afritramp.eu customer-service.shipping@bollore.com

Pemba Access Specification Map Description Length (m) Draught (m) Berth 82.5 8.50 Max draft allowed for berth : 8.5 m / Max ship's LOA allowed : 72.5 m / Owner of terminal : CFM-North / Depth of channel : 20 m / Draught is calculated basis level 0. / Water density :.024./ ISPS : Level / Weather : prevailing winds SE'ly during March to September and NE'ly during October to February. The main exports are containerised sawn timber and cotton. Import cargo is essentially limited to consumer goods, foods, light industrial products and occasional fuel deliveries. Berthing only conducting during day hours and unberthing non restriction. /32, quai de Dion Bouton - 928 PUTEAUX CEDEX 33) 46.96.42.84 - afritramp@bollore.com - http//www.afritramp.eu ustomer-service.shipping@bollore.com

Pemba Port facilities >> Storage capacities >> Other facilities Total port area 5,000 sqm The small yard area (apron) is mostly used for container storage. There is a small port warehouse dedicated to cotton-storage. The port equipment fleet and maintenance facility is situated within the Apron area maintenance. Bunkering Water Fuel Yes/No 3/32, quai de Dion Bouton - 928 PUTEAUX CEDEX (33) 46.96.42.84 - afritramp@bollore.com - http//www.afritramp.eu customer-service.shipping@bollore.com