Beginning Inventory (ACT Tagged)

Similar documents
There are a couple of ways that you can activate the tracking of A/R invoices; In COMPANY SETUP By opening the INVOICE TRACKING MANAGER

Finance Manager: Human Resources

ClubSelect Accounts Receivable Special Charges Overview

Item Transfers. SIMMS Inventory Management Software 7.3. November 22, 2010

Recording Over the Counter Sale Invoices

Retail Streamlining End of Month Procedures with a Percon Data Collector

Logistics Guide. Avontus Software Corporation Avontus.com US AUS. Page 1

Inventory Replenishment

ClubConnect Accounts Payable Understanding Invoice and Check Types for Easy Processing

Sage 100 ERP 2015 What s New

CHAPTER 3: GENERAL JOURNALS

Accounts Receivable Reference and Maintenance E-Docs: System Information

Finance Manager: Payroll

BOLO Integration User Guide Basware P2P 17.4

Welcome to the topic on purchasing items.

New for 2009! Detecting and Correcting with the Client Data Review Feature

Printed Documentation

CENTRAL SUSQUEHANNA INTERMEDIATE UNIT Application: Fund Accounting

How do I Reconcile MCPS Invoices?

Cadacus Solutions for SYSPRO. Table of contents

SedonaOffice Release Notice

Micropay Professional

Adding Inventory. 1. From the Home screen, go to Operations Inventory Search Product Inventory. The Search Product Inventory screen displays.

This version of the software has been retired

What s Up With the MORE Button?

Items and Warehouses - Solutions

Munis (v 10.5) Dashboard (v 6.1)

Order Entry Freight Tables. Setting Up Freight Items

Microsoft Dynamics GP. Manufacturing Core Functions

Time Entry MUNIS Version 9.1

MICROSOFT DYNAMICS GP

At the end of this module, you will be able to:

Accounting Master Update for Version 14.2

CENTRAL SUSQUEHANNA INTERMEDIATE UNIT Application: Personnel. Setting up Directories for the Sub Payroll Worksheet Step-by-step Instructions

Chapter 5: ACCOUNTS RECEIVABLE (AR)

Finance Manager: Payroll

Adjutant Desktop Release Notes Version

Purchase Invoice Overview

Inventory Physical Count Process

Appointment Scheduler Set Up (DR) Provider

Warehouse Management System for Adagio Accounting

Munis Purchase Card Processing

Sales Order Fulfillment

Version 4 Reference Guide. Mobile Inspections. January 2013

Payment Manager Users Guide - Updated 011/1/2012

Fast Start. prorm Fast Start. User Guide. promx AG Nordring Nuremberg

Fast Start. prorm Fast Start. User Guide. promx GmbH Nordring Nuremberg

MICROSOFT DYNAMICS GP INVENTORY YEAR-END CLOSING PROCEDURES

Setting up company preferences

DacEasy Point of Sale Version 15

A. Locating the Job Requisition:

(Multi-store) Only Headquarters can define assembly items, but remote stores can build and break assemblies as necessary to meet local sales demand.

Atoma and Diem Product Equivalents

Microsoft Office Project 2010 Basic Course 01: Getting Started

Day-to-Day Processing When Using a Payroll Service

Release Notes

Virtual Training Workbook

ESTIMATES. Create an Estimate

IBackOffice 7.3 Release Notes IBackOffice Global

Orders. Enter a new order... 2 Manage Orders Date Last Revised:8/30/2017 Date Last Printed:8/30/2017 Page 1

Item Management. SIMMS Inventory Management Software 7.3. Updated September 28, 2010

Overview Invoices to be entered through this program are invoices that do not have supporting purchase order or contract documents.

MomentumPro Mobility Warehousing Functional Overview

SunRISE Chemical Container Inventory Quick Guide

Day-to-Day Payroll Processing When Using QuickBooks

CHAPTER 1: FINANCIAL MANAGEMENT SETUP

Goods Receipt against an Inbound Delivery

Version 12.3 Service and Maintenance New Features

QUICKBOOKS PRO 2008 WORKSHOP 5: PART A MARS COMPANY

P-Card Expense Report

Barcode Printing. SIMMS Inventory Management Software February 24, 2012

Proteus MMX Enhancements (3.7)

FLEETMATE. Overview. CUSTOMER GUIDE: Inventory and Receiving

Table of Contents Golf Course & Park Tree Inventory

PP 1: Display Stock/Requirements List

Unit: Additional Financial Topics Topic: Currencies

Once the Posting Edit on a job is changed to N, the job can no longer have ANY ACTIVITY ON IT

Purchase Order Overview

Landed Costs. Overall Business Processes PURCHASING. Related Business Process PURCHASING. Responsible Department ACCOUNTING

Eagle Business Management System - Manufacturing

RESOLV THIRD PARTY MANAGEMENT (3PL)

MUNIS REQUISITION ENTRY

USING QUANTIFY WITH QUICKBOOKS

SedonaOffice Release Notice

How to Work with Multiple Branches in SAP Business One

Wave Batch Picking. Contents. 1 Version KRC

Invoicing Overview - 1 -

Personnel Master Data & Terminal

Technical Note: Reconciling Inventory Balances with Physical Count Results

Test Guide: Testing PrimeroEdge POS Functionality

Inter Branch Transfer work-flow for stock items. Customer Services. Sparkstone Technology Ltd

AP TRICKS & TIPS Sept. 22, 2010

AMI AutoAGENT Shop Floor Manager

v10.5 Enhancements List

Introductory Exercise: The Trucks Case

This training presentation will be used if re-printing or Re-submission of W2 Information becomes necessary.

Kuali Cashier Applications

SellWise User Group. Wednesday, May 18, Presenters

How to Create a Non-PO Invoice in Ariba. 3) Select Non-PO Invoice from the Create drop-down menu:

Welcome to the Project Manager guide

Transcription:

Beginning Inventory (ACT Tagged) Inventory will have pre-printed tags. The cost of the beginning inventory is entered and establishes the ACT of each tag using the BEG-INVENTORY Financial Amount. 1.0 Physical Count in yard or print Inventory report from current system. Create a Work Order for each Grouping of inventory counted based on value grouping. 2.0 Create Work Order Header 2.1 From the Menu View, select Production Work Order. 2.2 - or - use the Work Orders filter to select the work orders to view. 2.3 to create a new work order header - or - right-click in the header and select New. Complete the appropriate fields in the Work Order header. 2.4 The New Work Order window defaults with the Work Order category open. Enter the following fields in the Work Order category: Location Reference # = Grade/Size/Thickness grouping Machine Center = BEG-BAL As this window is customizable, your window may not look the same as shown here. Please refer to "Customizing Data Entry Windows" for information on customizing this, and other entry windows. Type in valid entries in each required field, or use the lookups to select an entry.

3.0 Add Items 3.1 Select the Production tab. Since costs are ACTUAL, one line item per known cost/product grouping will be required to have accurate ACT costing. Right-click in the Production tab and select New. The New Production: <work order number> window displays. The New Production: <work order number> window defaults with the Product category open. As this window is customizable, your window may not look the same as shown. Type valid entries in each required field, or use the drop downs or lookups to select entries. The following are required for each product class. 3.2 LUMBER: Length Pkg Type HW-LUMBER: Width Length MACHINED: Thickness Width SIDING: Length Tag Entry Tags may be assigned on the Production tab once the product is entered. To add tags to production items: 1. Select an item in the Production tab and click on the Toolbar. The Production Tags window displays. 3.3 When this dialog first displays, the grid is empty as no tags have been assigned to items. 2. Click to begin entering tag numbers of the items to receive. If working with pre-printed tags, use the information in the following section. If not using pre-printed tags, use the information in "Working With

Non-Preprinted Tags". Working With Non-Preprinted Tags Use the steps below if tags are to be assigned to products with non-preprinted tags (Preprint tags option is set to "No" in the Location Master). With preprinted tags, tags may be entered one at a time, or generated for a product by using the "Generate" feature. To add items using non-preprinted tags: 1. From the Production Tags window click The New Production Tags / New Detail window displays. 3.4 2. The tag header information is entered in the New Tags pane and the tag detail information is entered in the New Detail pane. Enter the required information as described: A. Add The Tag Header With preprinted tags, the tag number is entered automatically. Enter the required information in the New Tags fields: Field Name Description Aged Date: The aged date of the tagged item. Shrinkage: The percentage of shrinkage, if applicable to the HW-LUMBER product so The header information is saved, and the tag detail pane is available for entry. B. Add The Tag Detail The tag detail may consist of multiple tag entries for each tag header. Enter the required information in the New Detail fields Field Name Description Length: Enter the length for the tagged item. Width: Enter the width for the tagged item.. Pieces: Enter the number of pieces within the tag. The tag detail is saved. Additional tag detail may be entered (repeat "B" above). 3. At this point, the tag has been successfully entered. To add another tag click - or - To return to the Production Tags window click

Adding Items Using Preprinted Tags Use the following steps if tags are assigned to products with preprinted tags (Preprint tags option is set to "Yes" in the Location Master). Tag numbers are either entered manually, one at a time or several tags are created using the generate option. To add items using preprinted tags: 1. From the Production Tags window click The New Production Tags / New Detail window displays. 3.5 2. The New Tags / Detail window contains 2 panes for entering the tag (New Tags and New Detail), and there are 2 separate steps required to create each tag. The tag header information is entered in the New Tags pane and the tag detail information is entered in the New Detail pane. A. Add The Tag Header The first step in creating tags is to enter the tag header information. The tag number is entered manually. Enter the required information in the following fields: Field Name Description Tag Number The unique value identifying the tagged item. With preprinted tags, the tag generated automatically and cannot be entered. Shrinkage: The percentage of shrinkage, if applicable to the HW-LUMBER product so Aged Date: The aged date of the tagged item. Categories: The product categories as defined in the Product Type Master. The header information is saved, and the tag detail pane is available for entry. B. Add The Tag Detail The second step in creating tags is to enter the tag detail information. The tag detail may consist of multiple tag entries for each tag header. Enter the required information in the following fields Field Name Description Length: Enter the length for the tagged item. Width: Enter the width for the tagged item. Pieces: Enter the number of pieces within the tag.

The tag detail is saved. Additional tag detail may be entered (repeat "B" above). 3. At this point, the tag has been successfully entered. To add another tag click - or - To return to the Production Tags window click Close the Production Tags window by clicking The Work Order window displays. 3.6

4.0 Add Beginning Inventory Value to access the Financial Amounts window: 4.1 Select to add new Financial Amounts. Select BEG-INVENTORY as the Financial Amount. Enter Total Value of inventory produced on the work order. 4.2 4.3 Financial Amounts are automatically calculated and displayed.

4.4 Close the Financial Amounts window.

5.0 Allocate Costs 5.1 Select the Allocate Costs tab. Right-click and select Allocate Costs. ** THE DATE MUST REFLECT THE ACCURATE DATE TO STAMP THE CORRECT FISCAL PERIOD. You can back date it. Cost Allocation Calculation: 5.2 Consumption Cost + Cost Operations = Costs allocated to Production Costs are allocated and the Allocate Costs tab displays. 5.3

6.0 Modify Costs (if necessary) 6.1 Select the Allocate Costs tab. Right-click and select Modify Costs. You must leave one item not modified to absorb the balance. 6.2 Enter the new Unit Costs or Total Costs for each item. 6.3 Effect on ACT: Total cost of a produced item divided by total units produced will become the ACT for the item. ** Total Cost must be allocated (i.e. Balance = 0.00) before the modified costs can be saved. 6.4 To save modified costs and return to Work Orders click

7.0 Complete Work Order to change the work order status: 7.1 **Status Changes Work Orders must only be changed to Complete" once the A/R is all entered in lumbertrack, reconciled and correct. This is to ensure no Beginning Balances are stamped in an incorrect Fisca Period. It is best to enter ALL Work Orders, ALL Production, then complete them all. 7.2 Select "Complete" and click Once all work orders have been completed, print the Inventory Status Report to ensure on hand inventory in lumbertrack matches the physical count sheets or inventory report used for determining the beginning inventory, as well as the ACT Reconciliation Report to validate costing is true.