Florida Gas Transmission Section #3 Hydrostatic Test

Similar documents
Florida Gas Transmission Section #1 Hydrostatic Test

Florida Gas Transmission 24-Inch Pipeline Hydrostatic Test

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

PORT OF FERNANDINA TRUCK CIRCULATION STUDY

INCIDENT MANAGEMENT TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSM&O) FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT SIX

North American Society for Trenchless Technology (NASTT) NASTT s 2017 No-Dig Show. Washington, D.C. April 9-12, 2017.

AIR QUALITY TECHNICAL MEMORANDUM

Targeted Promotional Campaign Report for Recreational Product

Transit Carrying Capacity MPO Transit Study

The Gateway Expressway FTBA Conference. February 2-3, 2017

Florida s Automated Vehicle Initiative

Transportation Management Plan

I-90 ALLSTON INTERCHANGE

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

Air Quality Analysis Technical Memorandum

Active Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc.

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Minnesota Statewide Freight Bottlenecks

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 12/31/2013

FDOT and NTPEP Pavement Marking Materials Test Decks

MAINTENANCE OF TRAFFIC NOTES

Florida Department of Transportation District-Wide DESIGN-BUILD TOPICS PUSH BUTTON Contract

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

MAINTENANCE OF TRAFFIC NOTES

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

I-4 Ultimate Social Media

Military Highway Interchange

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

AN UPDATE OF A STUDY OF THE RELATIONSHIP BETWEEN DIGITAL BILLBOARDS AND TRAFFIC SAFETY IN CUYAHOGA COUNTY, OHIO

All Citrus Acreage, by Variety and Survey Year, and Changes Between Surveys Florida: Specialty fruit. Total

Dynamic Corridor Congestion Management (DCCM) Project Streets and Freeways Subcommittee Meeting

2018 FTBA CONSTRUCTION CONFERENCE February 8-9, 2018 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

Zoo Interchange Reconstruction

To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project

Gov. Scott Issues Updates on Hurricane Matthew Preparedness Efforts as Storm Approaches Florida

Crater Lake Hwy inch Water Transmission Main Improvements CIP Addendum No. 1

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director

Exposition Light Rail Transit Project

PAVEMENT DESIGN MEMORANDUM

Chapter 6 Freight Plan

I-95/US 322 Interchange Improvement Project. Website Update

Progress Report on the Implementation of the Strategic Intermodal System (SIS)

PUBLIC INFORMATION MEETING June 24, 2015

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Exposition Light Rail Transit Project

HERNANDO COUNTY BOARD OF COUNTY COMMISSIONERS DEPARTMENT OF PUBLIC WORKS ENGINEERING SERVICES

Highway 15 Project Hutchinson, MN

Executive Summary. Overview

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

PRT 505 Assignment 2 Targeted Promotional Campaign Report for Recreational Product YOUR NAME: Shamika Key

Targeted Promotional Campaign Report for Recreational Product. PRT 505: Assignment 3 Sarah E. Chambers North Carolina State University

Air Quality Analysis Technical Memorandum

Lehigh Valley Transportation Study

Draft Noise Study Report

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction

April 16 th, 2011 Malahat Incident. Traffic Management & Communication Review. Completed May 13, Dave Duncan, Assistant Deputy Minister

Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT

VIII. LAND USE ISSUES

III. Regional TSM&O Overview from the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.)

Community Advisory Committee Meeting No. 2. June 22, 2006

AGENDA ITEM C8. COST/FUNDING SOURCE: $215,348.48/Uniform Rate (Total project costs $520, includes $304,952 previously committed to Phase II)

Maryland Transportation Authority (MDTA)

Chapter 6: Regional Transportation

1971 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District

Air Quality Analysis Technical Memorandum

Table of Contents. List of Appendices

HILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION

Decision Support Systems for FDOT District 4 TSM&O

Florida s Automated Vehicle Initiative

TRANSFORM66: OUTSIDE THE BELTWAY

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

MDX PROCUREMENT/CONTRACT NO.: RFP MDX WORK PROGRAM NO.:

Gardiner East EA & Integrated Urban Design Study

Highway 417 Bridge Replacement

Final Air Quality Report

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4G. Intergovernmental Coordination and Review Log

Woodburn Interchange Project Transportation Technical Report

CUY-90-Innerbelt ODOT PID No 77510

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Air Quality Analysis Technical Memorandum

Joe Santos Transportation Safety Engineer Florida Department of Transportation

Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis

CONSTRUCTION CONFERENCE

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

RECOMMENDATION This item is for your information only. No action is required at this time. A public hearing is scheduled for December 12, 2011.

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011

PRT 505 Assignment 3 Targeted Promotional Campaign Report for Recreational Product

Freight Planning and Performance Measures: Historical Context and Statewide Perspectives

Chapter 4: Freight Mobility & Intermodal Transportation

Now this is how you serve Florida s largest and fastest growing market.

IMPROVING I 81 IN MARYLAND

Ramp Metering 2010 evaluation report

Transportation Management Plan

Draft Location Hydraulic Report

CEI Services Transit Bus Stop Infrastructure

Transcription:

Florida Gas Transmission Section #3 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From East of Lake Magdalene to West of County Line Hillsborough and Pinellas Counties

Today s Outline Who is Florida Gas Transmission (FGT)? Why is FGT testing? What is the test exactly? When will the test occur? Where will the test take place? How will the test be conducted? How will the test affect me? 1

Florida Gas Transmission Company Natural gas transmission company operating a 5,000 mile pipeline system along the Gulf Provide majority of the natural gas for power generation in Hillsborough County 14-inch diameter pipeline serving Tampa area Customers include: Electric utility companies Local distributors Industrial clients 2

Need for the Test The U.S. Department of Transportation regulates all interstate pipelines Testing is federally mandated Best practice to confirm the safety and reliability of the pipeline Safety is our #1 priority Ensure continued superb client service 3

Nature of the Test Hydrostatic Test Remove the natural gas from the line Controlled release vents harmlessly into atmosphere Service is maintained on another system Test the integrity of the pipeline by filling the line with water Put the water under pressure for a fixed period of time 4

Hydrotesting the 14-inch lateral system Standard, common pipeline test procedure Recent, successful pipeline tests were completed in: Miami-Dade Saint Lucie Palm Beach Background Martin Broward Hillsborough testing began in September 2014 5

Project Process Begin Project Obtain Permits Prepare System for Testing Conduct Hydrotest End Project Public Awareness Campaign 6

Project Schedule TASK Community Awareness Permit Applications System Preparation Test Preparation DATE January April January February February March March Conduct Hydrotest 23 March 2015 Test window is set: Monday, 23 March 2015 Early morning, midnight 4:00 a.m. 7

Project Location Total Project Length = 11.2 miles Begin: East of Lake Magdalene End: West of County Line Generally follows 3 roadway alignments: West Fletcher Avenue Lowell Road Gunn Highway / Citrus Park Drive Within Unincorporated Hillsborough and Pinellas Counties 8

Project Location (con t) 9

How the Test is Performed Remove natural gas from the pipeline Completed the week before the hydrotest Fill the line with water Pressurize the system Normal operating pressure is 888 PSI Test pressure is up to 1,500 PSI Relatively short duration (approx. 30 minutes) Reduce to intermediate pressure at 1,357 PSI Maintain for 8 hours 10

How the Test is Performed (con t) De-pressurize the line Drain the water from the system If any integrity issues are found: They are corrected as soon as possible The hydrotest is performed again Any re-testing will be performed as soon as possible, during the same hours Resume normal natural gas service 11

Safety During the Test Safety is our #1 priority Performed extensive test preparations, including an inspection of the entire system Any pipe anomalies will be repaired in advance of conducting the hydrotest For the duration of the high pressure test, as a safety consideration, we plan to isolate sections of the pipeline route from people and traffic 12

Conducting the Test Advance Preparations Make all key stakeholders aware Adjacent property owners Emergency service providers General driving public Announcements Flyers, newspaper, website, etc. Dynamic message signs 2 weeks in advance 13

Conducting the Test (Con t) Night of the Test Begin at midnight Close roads/lanes with barricades Law enforcement support Confirm all-clear along the 11.2-mile corridor Conduct hydrotest Reopen roadways at approximately 4:00 AM 14

Traffic Control During the Test General Utility Permit from the Florida Department of Transportation is in process Officers will be stationed at road and lane closures Emergency responders will be able to cross as needed Detours will include signs and officer support 15

Closures During the Test Three Veterans Expwy Ramps: NB off to WB SB off to EB EB on to NB WB Gunn Hwy Lowell Rd N Armenia Ave 16

Detour During the Test (1) For Northbound Veterans Expwy: Linebaugh Ave Sheldon Rd Citrus Park Dr (Gunn Hwy / follow detour) 17

Detour During the Test (2) For Southbound Veterans Expwy: Ehrlich Rd Gunn Hwy Citrus Park Dr (U-Turn on Gunn Hwy) 18

Detour During the Test (3) For Eastbound Citrus Park Dr: Gunn Hwy Ehrlich Rd (Gunn Hwy / Lynn Turner Rd / Ehrlich Rd) 19

Detour During the Test (4) For Westbound Gunn Hwy: Lynn Turner Rd Ehrlich Rd Gunn Hwy Citrus Park Dr 20

Detour During the Test (5) For N Armenia Ave: W Fletcher Ave Magdalene Shores Ave 21

Hillsborough County District 2 22

Hillsborough County District 1 23

Pinellas County District 4 24

For More Information Please visit our website: www.fgthydrotest.com Or contact FGT: Mr. Terry Coleman 2405 Lucien Way, Suite 200 Maitland, FL 32751 Toll Free 844-FGT-INFO (844-348-4636) Office 407.838.7054 Fax 407.838.7052 Email Terry.Coleman@energytransfer.com 25

FGT Section #3 Hydrotest Summary Federal mandate Testing with water Monday, 23 March 2015 Midnight 4:00 AM Three ramp closures WB Gunn Hwy closure Lowell Rd closure N Armenia Ave closure With law enforcement Emergency vehicles can always cross 26

Thank You