CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix B

Similar documents
For Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of

EXHIBIT E SCHEDULE OF UNIT PRICES

WEST BENCH SUPPLY OPTIONS

DOCUMENT ADDENDA AND MODIFICATIONS

MEMORANDUM TO THE INDUSTRY

West Bountiful City. Water System Capital Facilities Plan

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

ATTACHMENT 8 STIPULATED UNIT PRICES

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.

Sample. Bid Proposal. Not Valid for Use

APPENDIX E. Cost Estimating Assumptions

33rd Street Outfall (Curtis to Lafayette) Schedule A

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

Addendum No: 3 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO.3. Closing Time: 2:00 P.M., December 18, 2018 Opening Time: 2:01 P.M., December 18, 2018

Please ensure receipt of this Addendum is acknowledged on page 1 of the Form of Tender.

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of


Forsyth County Procurement

Ivins City Standard Specifications for Design and Construction Part 2 Engineering and Design Standards

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

M E M O R A N D U M. Location Description Cost. Demolish the existing structure. Construct 52 x25 Atlas block

SCHEDULE OF QUANTITIES AND PRICES

November 29, CITY OF PLANT CITY Purchasing Division (813)

Attachment D-1: Civil/Structural Scope of Work

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE:

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

North Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6

INVITATION TO BIDDERS. Solicitation No. CO-00157

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

Culinary Water Impact Fee Facilities Plan

Addendum No. 1 STMGID ARROWCREEK BPS MAIN. PWP Bid No.: WA TMWA Capital Project No.: April 16, 2018 QUESTIONS AND RESPONSES

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents

UNIT PRICE LIST January 2009

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

Addendum 1 City of Portsmouth Bid # Chestnut Street Streetscape Project. Issued: July 21, 2017

A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards General 11 a. Future Extensions 11

BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2

SECTION MEASUREMENT AND PAYMENT

SECTION 1500 REMOVALS

IFB # R Blythe Creek Grinder Pump Eliminations

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

DOCUMENT ADDENDUM No. 2

LJA Engineering, Inc.

Statement of Quantities

Freitas + Freitas Engineering and Planning Consultants, Inc.

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

YES, we received Addendum No. 1

Bid Tabulation Report 2011 Pump Station Rehabilitations

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance

FREELAND WATER & SEWER DISTRICT BERCOT ROAD INTERTIE STUDY

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

Job Order Sewer Repair Services

SPECIAL SPECIFICATION 2022 Water Mains and Wastwater Main Appurtenances

PROPOSAL KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO NW Golf Club Hill Road Culvert Replacement To the Honorable Board of Co

SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO.

4TH STREET SEWER EXTENSION TO MBR PLANT BID SOLICITATION NO

Addendum 3 City of Portsmouth Bid # Chestnut Street Streetscape Project. Issued: August 1, 2017

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02

CHAPTER 8 WATER SUPPLY SYSTEM

2. SECTION MEASUREMENT AND PAYMENT:

DALLAS WATER UTILITIES BID ITEM AND COST ESTIMATING MANUAL

CITY OF ELKO BID TABULATION FOR Sports Complex

OAK MARSH PHASE II FEASIBILITY REPORT CITY OF MANKATO MINNEOSTA. January 20, 2015 Project No

CITY AND COUNTY OF DENVER

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

Page Intentionally Left Blank

Pay Item Manual for Water and Sewer Construction

C. W. Matthews Contracting Co., Inc. (L)

City of Kettering. Bid Tabulations SWR PROJECT. Description: 2017 Sidewalk, Curb and Drive Approach Repair Account # PO#

ADDENDUM NO. 1 SR163/N 46TH ST TO N 54TH ST INTERSECTION IMPROVEMENT PROJECT REVISIONS TO CONTRACT DOCUMENTS

ADDENDUM NO. 3. Please make note of the following clarifications:

City of Parshall, ND Municipal Infrastructure Needs Assessment August 2012

PART 5 WATER SYSTEMS

CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS

SECTION 4 RECOMMENDED DISTRIBUTION SYSTEM IMPROVEMENTS

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

Addendum No. 1 Issue Date: March 29, 2016

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

CORPORATION OF THE CITY OF NEW WESTMINSTER CONTRACT NO. NWIT DITCH INFILL AT WOOD, BOYD AND BOYNE STREETS ADDENDUM NO. 3

BID FORM (LUMP SUM CONTRACT)

Replace BID SCHEDULE with attached revised BID SCHEDULE.

Each Respondent shall acknowledge receipt of this Addendum No. 1 by noting such and signing the Bid Proposal.

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

10:00 AM, Wednesday, May 6, Peters Creek Sanitary Sewer Rehabilitation Project

INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

SECTION MEASUREMENT AND PAYMENT

MONTECITO WATER DISTRICT. March 13, 2017 ADDENDUM NO. 2

Transcription:

CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix B

RIVERDALE CITY CAPITAL FACILITIES PLAN CULINARY WATER Engineer's Cost Estimate January 2009 Project Name: Culinary Water Reservoir - Tank Replacement Project Location: South of Ritter Drive Project Number: Project #1 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $20,000.00 $20,000.00 2. Demolish and disposal of existing tanks 2 ea. $10,000.00 $20,000.00 3. Construct 1.5 million gallon tank 2 ls. $750,000.00 $1,500,000.00 Subtotal $1,540,000.00 Engineering and Construction Contingencies (20%) $308,000.00 Estimated Total for Improvements $1,848,000.00

RIVERDALE CITY CAPITAL FACILITIES PLAN CULINARY WATER January 2009 Project Name: Riverdale Road Water Line - Replacement Project Location: 550 West to North City Line Project Number: Project #2 Item Description Quantity Units Unit Price Amount 1. Replace water mains and cross overs 5,800 lf $144.00 $835,200.00 Subtotal $835,200.00 Construction Contingencies $14,800.00 Estimated Total for Improvements $850,000.00

RIVERDALE CITY CAPITAL FACILITIES PLAN CULINARY WATER Engineer's Cost Estimate January 2009 Project Name: 5400 South - 16 " Transmission Pipeline Improvements Project Location: Reservoir to Distrubtion Pipelines Project Number: Project #3 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $17,000.00 $17,000.00 2. Construct 16" ductile iron culinary water pipeline 1,300 lf. $85.00 $110,500.00 3. Connections to existing reservoir supply piping 1 ea. $1,700.00 $1,700.00 4. Installation of 16" diameter butterfly valves 4 ea. $4,425.00 $17,700.00 5. Connection to distrubution pipelines 1 ea. $1,500.00 $1,500.00 6. Railroad crossing permits and 22" diameter casing 120 lf. $335.00 $40,200.00 7. Construct 10" ductile iron drain pipeline 650 lf. $53.00 $34,450.00 8. Connection of drain pipeline to de-silting vault 1 ls. $1,900.00 $1,900.00 9. Connection of drain pipeline to reservoir bypass pipe 1 ls. $1,500.00 $1,500.00 10. Construction of hillside anchors/cut-off blocks 5 ea. $850.00 $4,250.00 11. Furnish trench backfill materials 450 tons $4.50 $2,025.00 12. Furnish bedding materials 865 tons $10.50 $9,082.50 13. Remove surface improvements - asphalt 600 lf. $4.75 $2,850.00 14. Roadway patching 380 sy. $19.50 $7,410.00

15. Landscaping & surface restoration 1 ls. $3,000.00 $3,000.00 Subtotal $255,068.00 Engineering and Construction Contingencies (20%) $51,000.00 Estimated Total for Improvements $306,100.00

RIVERDALE CITY CAPITAL FACILITIES PLAN CULINARY WATER Engineer's Cost Estimate January 2009 Project Name: 1700 West Street - Pipeline Upgrade Improvements Project Location: 1700 West Street Project Number: Project #4 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $3,000.00 $3,000.00 2. Construct 8" ductile iron culinary water pipeline 560 lf. $42.50 $23,800.00 3. Connection to existing system 2 ea. $2,400.00 $4,800.00 4. Install 8" gate valve 2 ea. $1,765.00 $3,530.00 5. Install fire hydrant 2 ea. $3,400.00 $6,800.00 6. Furnish trench backfill materials 230 ton $4.50 $1,035.00 7. Furnish bedding materials 190 ton $10.50 $1,995.00 8. Remove surface improvements - asphalt 560 lf. $4.75 $2,660.00 9. Roadway patching 325 sy. $19.50 $6,337.50 10. Re-connect service laterals 6 ea. $400.00 $2,400.00 11. Landscaping & surface restoration 1 ls. $2,000.00 $2,000.00 Subtotal $58,358.00 Engineering and Construction Contingencies (20%) $11,700.00 Estimated Total for Improvements $70,100.00

RIVERDALE CITY CAPITAL FACILITIES PLAN CULINARY WATER Engineer's Cost Estimate January 2009 Project Name: Waterline Connection with Weber Basin Project Location: 1500 West - Park & Ride Parking Area - South side Project Number: Project #5 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $3,500.00 $3,500.00 2. Construct 12" ductile iron culinary water pipeline 250 lf. $63.75 $15,937.50 3. Connection to existing system 2 ea. $3,500.00 $7,000.00 4. Install 12" gate valve 2 ea. $3,600.00 $7,200.00 5. Install meter vault 1 ls. $35,000.00 $35,000.00 6. Furnish trench backfill materials 50 tons $4.50 $225.00 7. Furnish bedding materials 80 tons $10.50 $840.00 8. Landscaping & surface restoration 1 ls. $1,000.00 $1,000.00 Subtotal $70,703.00 Engineering and Construction Contingencies (20%) $14,100.00 Estimated Total for Improvements $84,800.00

RIVERDALE CITY CAPITAL FACILITIES PLAN CULINARY WATER Engineer's Cost Estimate January 2009 Project Name: 500 West Street - Pipeline Upgrade and Improvements Project Location: 4800 South Street to Highland Drive Project Number: Project #6 Item Description Quantity Units Unit Price Amount 1. Mobilization 1 ls. $21,000.00 $21,000.00 2. Connect new prv vault to existing waterline. 1 ea. $1,650.00 $1,650.00 3. Install PRV piping & vault, complete. 1 ea. $79,500.00 $79,500.00 4. Furnish gravel for vault bedding material. 40 tons $18.50 $740.00 5. Furnish excavation backfill material. 20 tons $11.50 $230.00 6. Remove existing excavation & prv materials. 1 ls. $2,750.00 $2,750.00 7. Remove asphalt roadway surface materials. 45 sy. $5.35 $240.75 8. Install 8" thick roadbase material. 25 tons $24.50 $612.50 9. Install 3" thick asphalt material. 10 tons $85.50 $855.00 10. Remove & replace curb & gutter near vault. 30 lf. $22.50 $675.00 11. Connect new waterline to prv vault. 1 ea. $1,350.00 $1,350.00 12. Install new 8" ductile iron culinary waterline. 2,235 lf. $42.50 $94,987.50 13. Install new 8" gate valves. 2 ea. $1,765.00 $3,530.00 14. Install fire hydrant and valve. 5 ea. $2,350.00 $11,750.00 15. Furnish gravel for pipe bedding material. 580 tons $14.50 $8,410.00

16. Furnish excavation backfill material. 1,160 tons $11.50 $13,340.00 17. Remove existing asphalt surface materials. 990 sy. $5.35 $5,296.50 18. Remove & install service lateral to meter. 16 ea. $975.00 $15,600.00 19. Remove existing excavation materials. 1 ls. $2,750.00 $2,750.00 20. Install 8" thick roadbase material. 435 tons $24.50 $10,657.50 21. Install 3" thick asphalt material. 170 tons $85.50 $14,535.00 Subtotal $290,460.00 Engineering and Construction Contingencies (20%) $58,100.00 Estimated Total for Improvements $348,600.00