CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation of infield soil and clay block material at mound and home plate will improve drainage and reduce maintenance. CA-SI-09 CINDER TRACK UPGRADE Additional cinders needed at running track to fill low areas, improve drainage and provide a safe running surface. CA-SI-10 COURTYARD SLAB IMPROVEMENT New expansion joints needed at concrete slab in courtyard to replace existing wood joints that are deteriorating. CA-SI-11 CURB RAMP ADDITIONS Curb ramps needed to provide wheelchair access and to meet ADA requirements. CA-SI-12 CURB REPAIR New curbs needed in parking lot areas where existing curbs are broken or deteriorated. Cascade Middle School Page 1 of 12
CA-SI-21 IRRIGATION SYSTEM UPGRADE CA-SI-23 PAVEMENT MARKING UPGRADE Connection of irrigation system to the school s energy management system will reduce water consumption and utility costs. Thermo-plastic pavement markings and crosswalks needed for traffic control and to meet ADA requirements. CA-SI-29 UNDERGROUND STORAGE TANK REMOVAL Removal of underground fuel tank that is no longer used will reduce the potential for leaks and soil contamination. CA-SI-34 TENNIS COURT FENCE REMOVAL Removal of fencing at basketball courts will improve access, campus appearance and student circulation. CA-SI-35 BASEBALL & SOFTBALL TURF IMPROVEMENTS Aerating, top-dressing and over seeding of grass at baseball and softball fields needed to provide an even and safe playfield. CA-SI-36 BASEBALL & SOFTBALL BACKSTOP IMPROVEMENTS New backstops and added fencing needed at baseball and softball fields to protect adjacent street and houses from foul balls. Cascade Middle School Page 2 of 12
CA-ST-01 MASONRY WALL / ROOF ANCHORING CA-ST-02 PLYWOOD SHEATHING ADDITION Additional structural connections needed at exterior walls and low roof at 500 unit for seismic support. Plywood sheathing needed below floor of 500 unit attic area for seismic support. CA-ST-03 ROOF DIAPHRAGM CONNECTION ADDITION Structural reinforcement needed at 100 unit roof connection between original structure and 1988 addition for seismic support. CA-ST-04 MASONRY CHIMNEY ANCHORING Chimney structure needs to be anchored to roof structure for seismic support. CA-ST-05 COMMONS COLUMN REINFORCEMENT REPAIR Concrete repair is needed at areas of exposed steel reinforcing bars at Commons to protect against structural deterioration. CA-ST-06 MECHANICAL EQUIPMENT ANCHORING Mechanical equipment needs to be anchored in place for seismic support. Cascade Middle School Page 3 of 12
CA-ST-07 GYM COLUMN REINFORCEMENT REPAIR CA-ST-08 CONCRETE COLUMN GROUT REPAIR Concrete repair is needed at areas of exposed steel reinforcing bars at Gymnasium to protect against structural deterioration. Repair of damaged grout at bearing plates at top of concrete columns is needed to maintain structural integrity. CA-EX-01 AUTOMATIC DOOR OPENER ADDITION Installation of an automatic door opener at the front entry will improve access for disabled individuals. CA-EX-08 MASONRY WATER REPELLENT APPLICATION Water repellent needed at exterior masonry walls to protect walls from moisture penetration. CA-IN-03 CARPET REPLACEMENT New carpeting needed in 100 unit offices and library to replace existing carpet that is 21 years old and worn. CA-IN-04 CEILING REPAIRS New ceiling panels needed in areas of 500 unit to replace existing panels that are damaged and unsightly. Cascade Middle School Page 4 of 12
CA-IN-09 FIELD HOUSE CABINET ADDITION CA-IN-10 INTERIOR DOOR HARDWARE UPGRADE Additional cabinets needed in storage building for secure storage of physical education and athletic equipment. Lever handles needed at interior doors to improve access for disabled individuals and to meet ADA requirements. CA-IN-15 PE STORAGE CABINET ADDITION Additional cabinets needed in PE Storage Room for secure storage of physical education and gymnasium equipment. CA-EQ-01 CLASSROOM FURNITURE UPGRADE New furniture needed for students in classrooms to replace existing furniture that is mismatched and worn. CA-EQ-02 COMPUTER FURNITURE UPGRADE Computer furniture is needed to properly accommodate students and computer equipment. CA-EQ-05 GYMNASTICS VAULT TABLE ADDITION Gymnastics vault table apparatus needed to replace existing equipment that does not meet current standards. Cascade Middle School Page 5 of 12
CA-EQ-07 OFFICE & WORKROOM FURNITURE UPGRADE CA-EQ-10 WRESTLING MAT HOLDER ADDITION New desks and chairs needed for teachers and office staff to replace existing desks that are old and lack needed features. Installation of wall hung wrestling mat holders will allow mats to be properly stored and free up needed Storage Room space. CA-ME-01 ART ROOM EYE WASH ADDITION Eye wash needed at Art Room as a safety measure and to meet the current Health Code. CA-ME-02 AUTOMATIC CONTROLS UPGRADE Improvements to mechanical system controls will reduce maintenance costs, energy consumption and utility costs. CA-ME-04 CIRCULATION PUMP REPLACEMENT New circulation pumps needed for the heating system to replace pumps that are unreliable and require frequent maintenance. CA-ME-05 CLASSROOM HVAC IMPROVEMENTS New heating and cooling equip. needed at the 300 & 400 Units to improve classroom comfort and reduce maintenance costs. Cascade Middle School Page 6 of 12
CA-ME-06 CO2 CONTROL ADDITION - 100/200/500 UNITS CA-ME-07 DISHWASHER BOOSTER HEATER REPLACEMENT Installation of CO2 controls for the ventilation systems in the 100, 200 & 500 Units will reduce energy consumption and utility costs. Installation of a new booster heater for the Kitchen dishwasher will reduce energy consumption and utility costs. CA-ME-08 DRINKING FOUNTAIN REPLACEMENT New drinking fountains needed in the 200, 300 and 400 Units to replace existing drinking fountains that do not operate. CA-ME-10 DRYING ROOM HEAT & VENTILATION UPGRADE New heat and ventilation system needed in Drying Rm. to replace equipment that is inadequate and requires frequent maintenance. CA-ME-13 HOT WATER PIPING INSULATION Installation of insulation at heating water pipes will reduce energy consumption and utility costs. CA-ME-14 LOCKER ROOM AIR HANDLER IMPROVEMENT Installation of heat recovery equipment at Locker Room air handling equipment will reduce energy consumption and utility costs. Cascade Middle School Page 7 of 12
CA-ME-15 MECHANICAL COOLING ADDITION CA-ME-17 OCCUPANCY SENSOR CONTROLS - CLASSROOM Air conditioning needed to eliminate overheating in Library and main office area. Installation of occupancy sensors for the classroom heating systems will reduce energy consumption and utility costs. CA-ME-18 OCCUPANCY SENSOR CONTROLS - NON-CLASSRM. Installation of occupancy sensors for the heating systems in nonclassroom areas will reduce energy consumption and utility costs. CA-ME-20 PLUMBING FIXTURE REPLACEMENT Replacement of toilets with new water efficient fixtures will reduce water consumption and utility costs. CA-ME-21 BOILER DAMPERS LINKAGE CONNECTION Installation of missing linkage equipment at the boiler stack dampers will reduce energy consumption and utility costs. CA-ME-22 TESTING, AIR BALANCING, & COMMISSIONING Testing and commissioning of mechanical system will improve operations while reducing energy consumption and utility costs. Cascade Middle School Page 8 of 12
CA-ME-23 TELECOM. RMS. COOLING & VENTILATION ADDITION CA-ME-26 CO2 CONTROL ADDITION - LIBRARY Air conditioning needed in Telecom. Room to eliminate overheating and to protect computer equipment from damage. Installation of CO2 controls for the ventilation system in the Library will reduce energy consumption and utility costs. CA-EL-08 DATA OUTLET ADDITION AT LIBRARY Additional data outlets needed in Library for student computers. CA-EL-09 EMERGENCY GENERATOR REPLACEMENT Emergency generator that operates critical electrical systems is needed to replace existing equipment that does not operate. CA-EL-10 EXIT SIGN REPLACEMENT Replacement of EXIT signs with LED fixtures will reduce energy consumption and utility costs. CA-EL-11 EXTERIOR LIGHTING LEVEL IMPROVEMENTS Additional lighting needed at parking areas and building exterior for safety and security. Cascade Middle School Page 9 of 12
CA-EL-13 MAIN GYM LIGHTING REPLACEMENT CA-EL-15 INTERIOR LIGHTING UPGRADE Replacement of lights in Main Gym with energy efficient fixtures will reduce energy consumption and utility costs. Replacement of interior lights with energy efficient fixtures will improve lighting and reduce energy consumption and utility costs. CA-EL-18 LIBRARY ELECTRICAL OUTLET ADDITIONS Additional electrical outlets needed in Library for student computers. CA-EL-19 OCCUPANCY SENSOR LIGHTING CONTROL ADDITION Installation of occupancy sensors to control interior lights will reduce energy consumption and utility costs. CA-MD-11 FOODS CLASSROOM MODERNIZATION Two additional cooking stations needed in the Foods classroom to adequately accommodate the instructional program. CA-MD-15 INDUSTRIAL TECHNOLOGY MODERNIZATION Modernizations needed to accommodate an industrial technology instructional program. Cascade Middle School Page 10 of 12
CA-MD-23 LOCKER ROOM LOCKER ADDITIONS CA-MD-24 LOCKER ROOM RESTROOM ADDITION Additional lockers needed in locker rooms to adequately accommodate physical education classes. New restrooms needed with direct access to locker rooms for improved supervision and to meet ADA requirements. CA-ME 26 MUSIC OFFICE IMPROVEMENTS Installation of interior windows between Music Office and adjacent Music rooms will improve supervision and security. CA-MD-32 PUBLIC RESTROOM ADDITION Restrooms needed near the Gym and Commons for use by visitors and spectators. CA-MD-34 SPECIAL EDUCATION CLASSROOM Modifications to a standard classroom are needed to provide a special education classroom for students with special needs. CA-MD-38 STRUCTURED LEARNING CLASSROOM ADDITION Modifications to a standard classroom are needed to accommodate the school s structured learning program. Cascade Middle School Page 11 of 12
CA-MD-43 VISUAL COMMUNICATIONS CLASSROOM CA-MD-50 AUXILIARY GYM IMPROVEMENTS Modernizations needed to accommodate a visual communications instructional program. Modernization of the existing large PE room needed to provide the school with a fully functional Auxiliary Gym. CA-MD-51 KITCHEN IMPROVEMENTS CA-MD-52 KITCHEN SERVING AREA IMPROVEMENT Modernization needed to improve kitchen equipment, walk-in cooler and freezer, and room surfaces. Expansion of the kitchen serving area will improve operations and reduce amount time students must wait in line during lunch. Cascade Middle School Page 12 of 12