Sawmill Safety & Health. Presented By: John Boysen Safety Consultant OHSA Consultation Program

Similar documents
An unattended saw and other woodworking machinery must not be left running if a worker could be endangered.

Workplaces must be kept clean, orderly, and sanitary. Workroom floors must be maintained as clean and dry as possible.

Savard Labor & Marine Staffing, Inc. Fall Prevention Program Rev3/14

XXVI. Contractor Safety & Environmental Guidelines (For General Contractors and Sub-Contractors)

PROGRAM OVERVIEW WALKING/WORKING SURFACE INDUSTRIAL SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR

PART 22 POWERED MOBILE EQUIPMENT GENERAL. Application 22.1 This Part applies to every workplace where powered mobile equipment is used.

OSHA LOGGING OVERVIEW

Effective Date: 14-March Table of Contents

The following is Queen's Printer for Ontario, Occupational Health and Safety Act - R.R.O. 1990, Reg. 851

RISK BULLETIN. Walking & Work Surfaces: Floors, Stairs and Elevated Workstations Checklist DATE / / NAME SIGNATURE WALKWAYS YES NO ACTION ASSIGNED

SECTION 17 CONVEYORS. 17.A.01 Conveyor systems shall be constructed and installed in accordance with the manufacturer's recommendations.

Fall Protection Safety Program and Training Materials

Model Safety Program

PORTABLE LADDER SAFETY

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS CONSUMER AND INDUSTRY SERVICES DIRECTOR S OFFICE BUREAU OF SAFETY AND REGULATION

Section 17 TABLE OF CONTENTS Conveyors. 17.A General B Operation C Training

HAZOP Checklist for Sewage Treatment Plant

Excavation Safety Program

Scaffolding Safety. Scaffolding

HEALTH AND SAFETY ISSUES IN WOOD DRYING OPERATIONS

Walking-Working Surfaces

Chapter WAC Construction Work

U N I V E R S I T Y TREE TRIMMING AND REMOVAL PROGRAM

Walking-Working Surfaces

Marshall Municipal Utilities EXCAVATIONS AND TRENCHING Effective August 1, 2011 Revised August 17, 2017

Health & Safety Policy and Procedures Manual SECTION 8 FALL PROTECTION PROGRAM

BP OIL -- TOLEDO REFINERY

Guardrail Clamping System. Installation Instructions

Walking-Working Working Surfaces. OSHA Office of Training and Education 1

Guarding Floor and Wall Openings and Holes OSHA Standard

Contractor EHS Program Attachments

MATERIAL HANDLING, STORAGE, AND DISPOSAL

TABLE OF CONTENTS PART 12 - FORESTRY OPERATIONS AND WOOD PRODUCTS

Developing Your PPE Program

TAMPA ELECTRIC COMPANY ENERGY SUPPLY SCAFFOLD PROGRAM

WORKING AT ELEVATED PLACES Working on Roofs

Reliant Holdings Ltd Safety Management System

NLBMDA Monthly Safety Assessment for LBM Yards

Welding, Cutting and Brazing - General Requirements

Iron Ore Company of Canada Health, Safety & Environment

NCCER Progress Blvd, Alachua, Florida Phone: (888)

Section Subparts T. Cleveland State University Work Zone Safety and Efficiency Transportation Center. Demolition

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Elevated Work Safety Meeting

EM385 Construction Safety and Health Certification Course Section 14 Material Handling, Storage, and Disposal

Job Site Safety Checklist

DEPARTMENT OF ARCHITECTURE ABUBAKAR TAFAWA BALEWA UNIVERSITY, BAUCHI ARC 624: ADVANCED BUILDING SERVICES LESSON 2: CONVEYANCE SYSTEMS IN BUILDINGS

Barricades. Preparer: Owner: Approver: EHS Specialist EHS Team Leader Site Director J. Walker (Electronic Signature on File)

2600SEG135 SAFETY STANDARD FOR INDUSTRIAL LADDERS AND STAIRCASES IN BUILDINGS

Contractor EHS Program Attachments

1 IMHOFF CUSTOM SERVICES INC. AERIAL LIFT POLICY

Ergonomic Lifting Solutions Photo Gallery

&56, 6RXWK :HVW &KDSWHU 0HHWLQJV

FCX Department of Occupational Health and Safety. Contents. Open-Hole Policy

Written Safety and Health Program

Cal/OSHA s Top 25. The Cal/OSHA Regulations Most Frequently Violated in 2016

Demolition Safety!!!!

VPL-3200B Residential Vertical Platform Lift Technical Specifications

Safety Policy and Procedure

Fall Protection Program Prepared by: Western Assurance Corp

SAFE ACCESS AND FALL PROTECTION

The NORTH. Location. **List all of the. Department: employees NAME PID # Date

29 CFR 1926 Construction Subpart P

311.7 Stairways Width Headroom. Exception: Walkline Stair treads and risers Tread depth.

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE CONSTRUCTION SAFETY STANDARDS PART 20. DEMOLITION

JOB SITE AUDIT CHECKLIST

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS PART 44. FOUNDRIES

QUORUM MINING & RELINING SERVICES HEALTH AND SAFETY MANAGEMENT

OUTLAW AUTOMATION INC. Safety Management System

Document Revision Change Table Revision Number

MMM MASONRY, INC. Employee Safety Guidelines

FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision

SAFEGUARDS DURING CONSTRUCTION

INSPECTION PROGRAM ENVIRONMENT-HEALTH-SAFETY

Each enclosed presentation is copyrighted by the author of the presentation, and may not be used, re-used, or otherwise reproduced without the

Spray Booth Guideline

FFA Forestry CDE Chainsaw Information Study Guide:

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 9. Working at Height

NON-LABORATORY PPE HAZARD ASSESSMENT FORM

SECTION 23 DEMOLITION

Common Violations in Manufacturing

HIGH HAZARD TASKS. Injury During Maintenance

Multi-Fab sells to registered dealers only; however, we can assist in finding you a dealer.

SCAFFOLDS Revision No: 3

VPL-3300B Commercial Vertical Platform Lift Technical Specifications

PAGE 1 OF 7 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S400 Scaffolding REV 4.0 8/13/2012

HOUSING CONVERSION Guidelines for the conversion of a house to commercial use.

DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS. Public Safety Services ADA-ABA COMMENT ASSISTANCE GUIDE

CITY OF OCEANSIDE. Single Family Dwelling Stairways/Guards. Informational Bulletin

Blackhawk Millworks, Inc.

Hazard Identification and Risk Assessment Form. Risk Assessment

Health, Safety and Environment

Elevators and Lifts

PURPOSE OF THE PROCEDURE To minimize the incidence of employee injuries from machines and equipment as per OSHA

EM385 Construction Safety and Health Certification Course Section 23 Demolition

Pallet Handling Systems Photo Gallery

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE GENERAL INDUSTRY SAFETY STANDARDS

Safe Work Procedure for installation of

Document Number: HSE Created: February 21, 2013 SCAFFOLDING. Author: A Holland

Transcription:

Sawmill Safety & Health Presented By: John Boysen Safety Consultant OHSA Consultation Program

Objectives To gain awareness of the OSHA requirements. To understand how to apply those requirements. To understand how to recognize actual and potential safety and health hazards.

Frequently Cited Standards Top 12 for Sawmills 29 CFR 1910.147 1910.265 1910.219 1910.212 1910.213 1910.305 Description The Control of Hazardous Energy, Lockout/Tagout Sawmills Mechanical Power-Transmission Apparatus Machines, General Requirements Woodworking Machinery Requirements Electrical, Wiring Methods, Components and Equipment

Frequently Cited Standards Top 12 for Sawmills 29 CFR 1910.303 1910.1200 1910.23 1910.178 1910.215 1910.95 Description Electrical Systems Design, General Requirements Hazard Communication Guarding Floor and Wall Openings and Holes Powered Industrial Trucks Abrasive Wheel Machinery Occupational Noise Exposure

Written Programs Lockout/Tagout Hazard Communication PPE Hazard Assessment Respiratory Protection Employee Emergency Plans and Fire Prevention Plans Bloodborne Pathogens Confined Spaces

Vehicles and Mobile Equipment Warning Signals Horns are required Brakes Capable of holding and controlling the vehicle upon any grade which it may be operated. Overhead Guard Applies to all Powered Industrial Trucks Lights Required for operation in dark or poorly lighted areas

Lumber Hauling Trucks Where movement of load on stopping would endanger the operator, a substantial bulkhead shall be installed behind the cab.

Log Unloading Methods

Log Unloading Methods Do not release binders on logs prior to securing with unloading lines or other unloading devices.

Log Storage Areas Log unloading areas must be arranged and maintained to provide a safe working area.

Cutoff/Swing Saws Swing saws on log decks must be equipped with a barricade and stops for protection of employees who may be on the opposite side of the log haul chute.

Cutoff/Swing Saws Circular log bucking or cutoff saws shall be so located and guarded as to allow safe entrance to and exit from the building.

Cutoff/Swing Saws Where the cutoff saw partially blocks the entrance from the log haul runway, the entrance must be guarded.

Elevated Platforms or Walkways 4-feet or higher requires a standard railing 42-inch top rail 21-inch mid rail Exceeding 6-feet6 Requires a Toe Board

Strength Width Angle Platforms Stairways 5 times the intended load or a minimum of 1000 lbs. live load. 22-inch minimum 30-50 degrees to the horizontal No less than the width and a minimum of 30-inch length.

Stairways Railings and Handrails 4 or more risers 30-34 34 inches above the tread Vertical Clearance Minimum of 7-7 feet overhead

Rotary Debarking Rotary barking devices must be guarded to protect employees from flying chips, bark, or other material.

Debarking The hazardous area around ring barkers and their conveyors must be fenced off or posted as a prohibited area. Hydraulic barkers must be enclosed with strong baffles at the inlet and outlet. The operator must be protected by adequate safety glass or equivalent. Holddown rolls must be installed at the infeed and outfeed sections of mechanical ring barkers to control the movement of logs.

Log Decks Log decks must be provided with adequate stops, chains, or other safeguards to prevent logs from rolling down the deck onto the carriage or its runway.

Log Decks Safe access to the head rig must be provided. Erect a barricade to stop any log between the sawyer's stand and the log deck.

Log Carriages and Carriage Runways A substantial stop or bumper with adequate shockabsorptive qualities shall be at each end of the carriage runway.

GIT-R-DONE!!

Provide a control locking device, carriage tie-down, or both to prevent unintended movement of the carriage. Provide a barrier to prevent employees from entering the travel space of the carriage. Post warning signs at possible entry points to this area.

Conveyors Belts and Pulleys Chains and Sprockets

Saws Inspect Frequently. Do not operate at speeds in excess of those specified by the manufacturer. Maintain all original guarding as equipped by the manufacturer. Where employees are exposed to the point of operation and additional guarding is not feasible, provide a minimum safe distance of 42-inches for the hazardous area (by erecting barriers).

Chainsaw Safety Devices Chain Brake Chain Catch Throttle Interlock Chaps and Eye Protection are required Personal Protective Equipment

Woodworking Equipment Guarding Requirements

Edgers Shall be adequately guarded. Equipped with pressure feed rolls. Equipped with anti- kickback devices. Shall not be located in the main roll case behind the head saws.

Planers All cutting heads shall be guarded. Pressure feed rolls and pineapples shall be guarded.

Planers Cover cutting heads with a metal guard or cage. The exhaust system may be integrated with the guard.

Whole Log Chippers The feed system shall be arranged so the operator does not stand in direct line with the spout or hopper. The spout shall be enclosed to a height of not less than 36-inches from the floor or operator s platform. Otherwise, a safety belt and lifeline shall be worn by the operator (to prevent falling into the chipper).

Lumber Piling and Storage Foundations must be designed and arranged to support maximum loads without sinking, sagging or permitting the piles to topple. Piles of lumber which have become unstable, shall be immediately made safe.

Health Hazards Steam pipes may be insulated with asbestos. Some babbits may contain lead. CO2 formed as a byproduct of combustion form LPG powered equipment. High temperatures in drying kilns and power plants. Lasers are injurious to eyes and body. Paints and adhesives may necessitate PPE.

Health Hazards cont. Silver Solder (used in saw sharpening) may contain cadmium. Welding Fumes Wood Preservatives may cause dermatitis and severe irritation of the eyes and respiratory track. Wood Dust (most hardwood dusts are considered to be toxic) Ventilation mechanical exhaust

Blower, Collecting, and Exhaust Systems Collecting Systems Applies to all machines creating dust, shaving, chips, or slivers during a period of time equal to or greater that 25% of the working day. Exhaust or Conveyor Systems Applies to all machines that create dust, shavings, chips, or slivers. Located and adjusted to remove the maximum amount of refuge.

Exhaust System Exhaust pipes shall not discharge into an unconfined outside pile if uncontrolled fire or explosion hazards are created. They may empty into settling or dust chambers, designed to prevent the refuse from entering the work area. Refuse must be removed daily in all operations not required to have an exhaust system.

Lighting Illumination shall be provided in work areas. It shall be adequate and effective.

Comments or Questions