Thomas Connors Executive Director, Construction Site Safety

Similar documents
Buildings Department Safety and Inspection Requirements

NEW YORK CITY DEPARTMENT OF BUILDINGS. Notice of Public Hearing and Opportunity to Comment on Proposed Rule

SAFEGUARDS DURING CONSTRUCTION

5/15/2013. Approved Course Title 2010 Existing Building Code Chapters Florida Building Code, Existing Building. Chapters

Jobsite Specifications The A standard provides jobsite specifications for each of the following hazards:

5/9/ Florida Building Code, Existing Building. Chapters Approved Course Title 2010 Existing Building Code Chapters

2014Construction Code: Chapter 33 Key Revisions

Property and Public Protection Plan

THE REAL ESTATE BOARD OF NEW YORK CONSTRUCTION SAFETY

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

NEW YORK CITY DEPARTMENT OF BUILDINGS. Notice of Public Hearing and Opportunity to Comment on Proposed Rules

Fall Protection Safety Program and Training Materials

SECTION 23 DEMOLITION

Section Subparts T. Cleveland State University Work Zone Safety and Efficiency Transportation Center. Demolition

SECTION TEMPORARY FACILITIES AND CONTROLS

Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date

SAMPLE PAGES. Construction Safety and Health Program. [Company name]

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

DEMOLITION BY USE OF EXPLOSIVES

EM385 Construction Safety and Health Certification Course Section 23 Demolition

BARRY S CORNER. Draft Construction Management Plan

FIRE SAFETY DURING CONSTRUCTION, ALTERATION, DEMOLITION & ABATEMENT INSPECTIONAL GUIDE 2008

Demolition Safety!!!!

TOWN OF PERINTON 1350 TURK HILL ROAD. FAIRPORT, NEW YORK (585) , Fax: (585) ,

Jobsite Layout Considerations

General Building Information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

MMM MASONRY, INC. Employee Safety Guidelines

Savard Labor & Marine Staffing, Inc. Fall Prevention Program Rev3/14

Are designed to provide a safe working environment, and Govern use of fall protection procedures and equipment.

Able Electric. Aerial/Boom Lifts Workers in aerial lift are not tied off to boom or basket ( ) 3 Category Total 3

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

Workplaces must be kept clean, orderly, and sanitary. Workroom floors must be maintained as clean and dry as possible.

ATTACHMENT A. Bid # 6793

MUNICIPALITY PERMIT Issued by the City of Holyoke 63 Canal Street, Holyoke, MA Phone (413) FAX (413)

APPLICATION FOR PORCH / DECK PERMIT

Fall Protection Plan for Construction

TRENCHING AND EXCAVATION

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

ESCALATORS & MOVING WALKS

Richmond Hill Primary Renovation SECTION SELECTIVE DEMOLITION

August 11, Bill Grant President/Owner Best Company 1234 Main St Anywhere, USA Construction Safety Survey Omaha, NE.

I. Introduction/Welcome to MAPP

Subcontractor Project Management Plan

TABLE OF CONTENTS. CHAPTER 2 DEFINITIONS Section 201 General Definitions... 15

Iron Ore Company of Canada Health, Safety & Environment

SECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section:

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

The Hong Kong Polytechnic University Facilities Management Office

Roadway Surfaces and Traffic Control Elements

ROAD CUT PERMIT APPLICATION & INSTRUCTIONS

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

Your Company Name. Hospital Phone: (318) Do cell phones work at the site? Yes No If no, location of the nearest landline:

Excavation Safety Program

CONSULTING OFFICE OF MORRIS S. FARKAS PROFESSIONAL SAFETY ENGINEER

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR'S OFFICE CONSTRUCTION SAFETY STANDARDS PART 20. DEMOLITION

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

Construction Look Ahead February 2018

WORKING AT ELEVATED PLACES Working on Roofs

MVDC F041 Safety Inspection Checklist

CONSTRUCTION SAFETY GUIDE

Current as of 11/10/08 1 of 5

TYPICAL APARTMENT FLOOR PLAN

THE CONSTRUCTION SUPERVISOR

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

WORKING AT HEIGHT PROCEDURE

WHITMAN COLLEGE TRENCHING AND SHORING PLAN

FRAMING INSPECTION GENERAL

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard.

Installing metal decking, curtain walls, window walls, siding systems, miscellaneous metals, ornamental iron, and similar materials; and

Water service and distribution. Temporary electric power and light. Telephone service.

Phoenix Building Construction Code Updated Amendments to the Administrative Provisions

Continuing Certificate of Occupancy Pre-Inspection Checklist

Protective Barriers, Warning Signs and Tags

SITE ACCESSIBILITY AND PARKING

CITY OF DANA POINT SITE ACCESSIBILITY AND PARKING B103 SITE INTRODUCTION

SCAFFOLDS Revision No: 3

Chapter WAC Construction Work

NEW YORK CITY DEPARTMENT OF BUILDINGS. Notice of Public Hearing and Opportunity to Comment on Proposed Rule

Building Guide. Introduction. Construction Design Requirements. Revised 31-Jan-2018 Adopted 01-Mar-2018

MAINE MEDICAL CENTER

0103 Plan Reading 4% Read plans to verify the project conforms with the code, approved plans, and construction documents.

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE # 5A Metal and Structural Steel 09/01/11

Basement Build-Out Guidelines

Chapter 8 MINIMUM CONSTRUCTION STANDARDS

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

City of North Mankato 1001 Belgrade Avenue North Mankato, MN (507)

Emerg. Contact: EMERGENCY CONTACT INFORMATION Fire Department Info: Municipal Police Info: County Sheriff Info: Dept Name: Dept Name: Dept Name:

RISK CONTROL MANUAL SCHOOL SAFETY CHECKLIST (sample)

Commercial and Residential Projects (after appropriate Board approvals have been made if necessary):

SUNCHASER VACATION VILLAS FAIRMONT RESORT RECREATION CENTRE FAIRMONT HOT SPRINGS, BC

Peter Amato, President Andrey Vishev, Executive Vice President Sandeep Gunnala, Vice President Mark Merollo, Director of Operations Jodie Lupo,

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Southwest Health System Construction Newsletter October 21, 2017

811 Emerson St. - Demolition & Site Prep

Exhibit G. Construction Mitigation Plan

Architectural Breadth Study

Transcription:

Thomas Connors Executive Director, Construction Site Safety

Agenda Site Safety Plans Site Safety Requirements BEST Squad Inspections 2

Site Safety Plans 4

Site Safety Logistics Plan Material/ Personal Hoist Sidewalk Shed Protection Siamese Pedestrian Connection Traffic Radius Craneof Location Crane Flagperson(s) Worker Traffic Construction Fence FDNY Lockbox Roof Protection 5

Site Safety Manager/Coordinator Requirements: Site Safety Coordinator Required on All Construction and Demolition Permits for Buildings 10-14 Stories Site Safety Manager Required on All Construction and Demolition Permits for Buildings 15 Stories and Above 7

Site Safety Manager/Coordinator Must Confirm Compliance Site Safety Requirements on Buildings and Demolitions Standpipe Inspections Proper Safety Netting Adequate Sidewalk Protection Suitable Housekeeping Scaffold Maintenance Proper Material/Equipment Handling Construction Safety Standards 8

Proper Safety Netting 9

Adequate Sidewalk Protection 10

Poor Housekeeping 11

Shed & Scaffold Maintenance 12

Proper Material Handling 13

Demolitions 14

Site Safety Manager/Coordinator 1. Maintenance of Site Safety Log 2. Maintenance of Permit Log Jobsite Equipment Documentation Both logs must be on-site and available 15

Site Safety Manager/Coordinator Standpipe Inspection Weekly Tracing of the Entire System Daily Inspection of Valves Below Construction Floor Daily Inspection Siamese Connection 16

Site Safety Manager/Coordinator Inspections: Verify Standpipe Operability Connection to Water Source (if applicable) and Siamese Connection Siamese Connections Unobstructed, Marked with Red Light and Sign No Breaches in System 17

Site Safety Manager/Coordinator Inspections: Maintenance of Site Verify Areas Used by Public are Unobstructed Openings/Holes in floors are Covered & Secured 18

Site Safety Manager/Coordinator Protection of Adjoining Properties 19

Site Safety Manager/Coordinator Inspections: Housekeeping Floors and Stairs are Unobstructed Tools and Equipment Not in Use Away from Edges and Openings Sidewalk Shed Roof and Street are Free of Debris Sufficient Storage and Trash Receptacles are Provided Full Containers are Covered and Secured 20

Site Safety Manager/Coordinator Inspections: Removal and Storage of Material Stored Material is At Least 10 Feet From Perimeter of Building Combustible Materials are Removed Daily Insure the Safe 21 Removal of Debris

Site Safety Manager/Coordinator Inspections: Protection Of The Public Installation of Sidewalk Sheds: Current Permits Proper Illumination Temporary Footbridges and Walkways Warning Signs and Lights Flagperson where Required 22

Hoisting Systems Exterior Hoists Personnel Material Combined Temporary Certificates are valid for 90 days. 23

Hoisting Systems Engineered Monorail Hoisting Systems: DOB Permit Required Controlled inspection upon installation 24

Site Safety Manager/Coordinator Inspections: Material Handling and Hoisting Cranes & Derricks Verify Certificates of Approval and Operation are Available at Site Licenses of Crane Operators are Available Jumping Operations are in Accordance with Approved Schedule Submitted by P.E. 25

Future Fire Suppression System Safety Requirements The following requirements are currently being drafted: Uniform color coding Alarm system for new buildings and demolitions Licensed Plumber or Fire Suppression Contractor: Required to pressure test system Permit requirement for cut and cap system during full demolition 26

New Safety Legislation Local Law 06/09 Authorizes Department to Assign Safety Compliance Officer to Accident Prone Construction Sites Passed By Council on Thursday, January 28, 2009 Signed by Mayor on February 10, 2009 27

28

Concrete Safety Manager (CSM) New Requirements: Buildings where at least 2,000 cubic yards are to be poured Required During all Forming, Pouring and Stripping Operations A Separate Log Book Must Register by: July 1, 2009 29

Concrete Form Failure Concrete Safety Manager 30

Building Enforcement Safety Team: Inspections Exterior: Fences, Sheds, Barriers and Walkways Hoisting Operations, Material Deliveries and Flagperson Siamese Connection Free of Obstructions 32

Building Enforcement Safety Team: Inspections Exterior: Vertical and Horizontal Netting Curtain Wall and/or Glass Installation 33

Building Enforcement Safety Team: Inspections Interior: Standpipes & Elevator in Readiness Stairs, Handrails & Ladders Housekeeping & Material Storage including Flammable Gases Floor Openings and Toe Boards Personal Fall Arrest Systems Forming and Stripping Operations Re-Shores Smoking 34

$2,400 Fine 35

Building Enforcement Safety Team: Inspections Administrative: Site Safety Manager Review of Log Books Review of Buildings and FDNY Permits 36

Building Enforcement Safety Team: Inspections Excavation Team Cranes & Derricks Scaffold Safety Team Low Rise 37

Low Rise 38

Top 5 Violations 1. Missing Site Safety Manager 2. Failure to Institute Safety Measures 3. Inadequate Standpipe/Siamese Connection 4. Failure to Safeguard Persons & Property 5. Failure to Maintain Elevator in Readiness 39

Stop Work Order Program Improved Coordination Enhanced Communication 40

Over night Work not permitted After-Hours Work Variance Permit: Sidewalk Shed Lighting Elevator in Readiness Watchperson New York City Fire Code Siamese Connection Vehicular Barricades No Smoking Site Safety Manager 41

Building Enforcement Safety Team: Inspections In Development: Standardize Inspection Practices Laptop/Handheld Devices On-site Access: Buildings Website Building Code Respondent Information 42

Working For Buildings BEST Squad Chief Needed 1 Centre St., 23rd Floor, New York, N.Y. www.nyc.gov/buildings 43