TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS

Similar documents
GENERAL SPECIFICATION FOR ELECTRICAL WORK

GENERAL SPECIFICATION FOR ELECTRICAL WORK

GENERAL SPECIFICATION FOR ELECTRICAL WORK

TS 804 CABLES TABLE OF CONTENTS TRAFFIC SIGNAL EQUIPMENT POLE WIRING DIAGRAM LOCATIONS WITH CENTRE MEDIANS

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE

CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

TS 805 POLES TTS CONSTRUCTION SPECIFICATION FOR POLE INSTALLATION TTS MATERIAL SPECIFICATION FOR STEEL POLES BASE MOUNTED

CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION

SPECIFICATIONS SCOPE OF WORK

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT

CONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES

A. Section includes busway and fittings including plug-in units.

1.1 Related Work.1 Electrical Pathway Lighting Design Spec.: Section 16010

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS

CONSTRUCTION SPECIFICATION FOR GROUNDING

CITY OF WINDSOR STANDARD SPECIFICATIONS JULY 2012 S-31 KEYHOLE EXCAVATION TABLE OF CONTENTS

SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF TRAFFIC SIGNAL CONTROLLERS

SECTION MAINTENANCE OF EXISTING CONDITIONS

Special Provision No. 199S53 January 2018

General Symbols, Ducts and Cables

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF CONTENTS

CHAPTER 13 GROUNDING AND BONDING

E. CONSTRUCTION PROCEDURES

STATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF COASTAL ENGINEERING

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ROADWAY LUMINAIRES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF DUCTS

The following is a summary of parameters for preparation of a traffic impact analysis when such analysis is required by the City of Highland:

Construction Specification for Concrete Unit Pavers

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

ELECTRICAL SAFETY Information Bulletin

General Symbols, Ducts and Cables

SECTION EXTERIOR ATHLETIC LIGHTING

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF DUCTS

Special Provision No. 199S53 February 2012

General Symbols, Ducts and Cables

SECTION ENCLOSED BUS ASSEMBLIES

SECTION TRAFFIC REGULATIONS

CONSTRUCTION SPECIFICATION FOR TEMPORARY PROTECTION SYSTEMS

Technical Guideline for. Section 8. Inspection and Approval of Construction

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

SECTION GROUNDING AND BONDING

SECTION REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

It is the CONTRACTORS RESPONSIBILITY to use OSHA approved shoring

Apprenticeship Curriculum Standard. Powerline Technician. Level 1. Trade Code: 434A

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

RIGHT-OF-WAY PERMIT SUBMITTAL CHECKLIST

SECTION G40 SITE ELECTRICAL UTILITIES 11/10

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

Appendix 3. POLICY & PROCEDURE No

City Of Mendota Construction Procedures

Bylaw 3847, 2016 Adopted Mar 21, 2016 SCHEDULE G - REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING

SPECIAL SPECIFICATION 6664 Level (3) Communications System

Volume 3 - Section I Method of Measurement for Road Works. Chapter TV - Series 100 Preliminaries

SPECIAL SPECIFICATION 6658 Time Warner Communications System

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

Special Provision No. 599S22 March 2001

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Department of Environmental Services. Streetlight Specifications

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

A. This Section includes administrative and procedural requirements for quality assurance and quality control.

CONSTRUCTION SPECIFICATION FOR POLE ERECTION

5-1 Street Lights Required Street Lights on Private Roadways Developer s Responsibility...5-1

Welcome to Douglas County PUD

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

400 watt, high pressure sodium. Type C watt, high pressure sodium Collector Street Light Units

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES

SECTION ENCLOSED BUS ASSEMBLIES

Merrimac Municipal Light Department. Commercial Developments Policy

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION

Chapter 3: Permit Procedures and Requirements

SECTION BASIC ELECTRICAL REQUIREMENTS

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

MATERIAL SPECIFICATION FOR HIGH PRESSURE SODIUM LUMINAIRES FOR HIGHWAY LIGHTING

GENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES

Specifications. Level 1 Essential Energy Works for the Warialda Truck Wash

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER

A. This Section includes steel cable trays and accessories.

Construction Specification for Cathodic Protection of New Watermains

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC

A. Hazardous Areas: Hazardous areas as defined by the NEC as Class I, Division 1, Group D, or Class I, Division 2, Group D hazardous are as follows:

Post Office Box 500 Carson, WA Phone (509) Fax (509) Toll Free (800)

ELECTRICAL SAFETY Information Bulletin

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CHAPTER 11 CONDUITS AND FITTINGS

SECTION GROUNDING

Basic Service. This Section provides information regarding a. Introduction

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control

Transcription:

TORONTO TRANSPORTATION January 2012 TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS 1. DRAWINGS TTD 801.001 ELECTRICAL ABBREVIATIONS AND SYMBOLS TTD 801.005 ELECTRICAL LEGEND I TTD 801.006 ELECTRICAL LEGEND II TTD 801.007 ELECTRICAL LEGEND III TTD 801.008 ELECTRICAL LEGEND IV TTD 801.009 ELECTRICAL LEGEND V TTD 801.010 ELECTRICAL LEGEND VI TTD 801.320 FIGURE 1 AND FIGURES 3 THROUGH 26 2. CONSTRUCTION SPECIFICATIONS TTD 801.100 CONSTRUCTION SPECIFICATIONS FOR ELECTRICAL WORK - GENERAL 3. MATERIAL SPECIFICATIONS NOT USED 4. RECOMMENDATIONS TTR 801.305 ROUTINE MAINTENANCE FOR TRAFFIC SIGNAL TTR 801.320 DESIGN RECOMMENDATION FOR TRAFFIC SIGNAL INSTALLATION - LOCATION OF TRAFFIC SIGNAL EQUIPMENT

TABLE OF CONTENTS 1.0 Scope 2.0 References 3.0 Definitions 4.0 Submissions and Design Requirements 5.0 Materials 6.0 Construction 6.1 Qualification of Workers 6.1.1 Contractor's Representative 6.1.2 Work Requiring Qualified Workers 6.2 Coordination with Hydro Authorities 6.2.1 Work to be Done in Coordination With the Hydro Power Supply Authority 6.2.2 Work to be Coordinated with Others 6.2.3 Permits, Fees, Certificates 6.3 Traffic Signal Systems 6.3.1 Existing Traffic Signal Systems 6.3.2 New Traffic Signal Systems 6.3.3 Traffic Signal Systems Switchover 6.3.4 Traffic Signal Controller Operation 6.3.5 Maintenance of Traffic Signal Systems 6.4 Temporary Electrical Work 6.5 Layout of Equipment 6.6 Adjustment of Equipment 6.7 Asphalt Saw Cutting - Asbestos 6.8 Open Excavations 6.9 Disposal 6.10 Removal and Restoration 6.11 Quality Control 6.10.1 General Requirements 7.0 Quality Assurance 8.0 Basis of Payment 8.1 Maintenance Costs

1.0 Scope This specification covers the requirements for electrical work and is applicable to all electrical work in the contract. The requirements of TS 1.00 and TS 801 shall apply to this work. 2.0 References This specifications refers to the following standards, specifications or publications: Toronto Transportation: TS 1.00 TS 815 Maintenance of Traffic Removals Others: City of Toronto Measures and Procedures for Roadwork with Asphalt Containing Asbestos Fibres Ontario Electrical Safety Code Current Edition. 3.0 Definitions For the purpose of this specification, the following abbreviations apply: ASCII - American Standard Code for Information Interchange. BCD - Bolt Circle Diameter. CSA - Canadian Standard Association. EEMAC - Electrical and Electronic Manufacturing Association of Canada. EIA - Electronic Industries Association. ESA Electrical Safety Authority IEEE - Institute of Electrical and Electrical Engineers. IES - Illuminating Engineering Society of North America. IMSA - International Municipal Signal Association. IPCEA - Insulated Power Cable Engineers Association. ITE - Institute of Transportation Engineers. MUTCD Manual of Uniform Traffic Control Devices NEMA - National Electrical Manufacturer's Association. OTM Ontario Traffic Manual UL - Underwriters Laboratories. For the purpose of this specification, the following definitions apply: Bonding Jumper a conductor connecting two or more metal parts to maintain electrical continuity.

Cable Cable System Climbing Space Code Contract Administrator Contractor Direct Buried Down Time Drainage Pocket Duct a solid or stranded, bare or insulated metal conductor or wire or group of conductors or wires enclosed in a common jacket, or twisted or connected to form a group a complete system of cables required for the operation of all or a particular portion of electrical equipment installations space for access by a person, consisting of a straight vertical axis and a minimum area of 760mm x 760mm which is clear of all cables, ducts and apparatus and is directly adjacent to manhole steps, climbing steps or ladder rungs where such exist the Ontario Electrical Safety Code a qualified person of, or retained by Toronto Transportation for administration of the agreement between Toronto Transportation and the Contractor to ensure the timely flow of information and decisions to the Contractor, to enable him to complete the traffic signal installation as required by the documents the firm or individual acting as contractor and commissioned by Toronto Transportation to install the traffic signal system directly buried in native or imported material without substantial auxiliary works or protection the time during which an electrical system is de-energized or not under full operation a cavity excavated and back-filled with crushed stone to permit drainage of water that would otherwise accumulate a circular pipe of conduit for the mechanical protection of cables Electrical Chamber a chamber for placing and maintaining conductors, cables, ducts or electrical apparatus. General name for electrical maintenance holes, handwells and pedestals. Handwell a subsurface chamber not large enough for a person to enter, and affording facilities for placing and maintaining underground conductors, cables and associated apparatus. Electrical a surface mounted chamber affording facilities for access to or Communications to and maintenance of conductors, cables and associated apparatus. Pedestal Electrical Work any work associated with the installation, modification or removal of electrical equipment including work required for all auxiliary

concrete, mechanical, metallic or non electrical components or equipment Electrician Electronic Technician Energized Engineer Main Road Inspector Night-time Pad Phase Power Supply Equipment PXO Qualified Person Riser Wire Side Street a person in possession of a certificate of qualification for the trade of 'Electrician, Construction and Maintenance' issued by the Ministry of Colleges and Universities, Ontario a technician or technologist qualified for certification in the field of electronics by the Ontario Association of Certified Engineering Technicians and Technologists (OACETT). electrically alive the Supervisor - Traffic Signals of Toronto Transportation or his designate. the roadway approach or approaches at an intersection, normally carrying the major volumes of vehicular traffic. an employee of Toronto Transportation or any agent who has been assigned to inspect the work, materials and method of installation of the contractor the time during which the ambient natural horizontal illuminant at ground level is less than 15 lx a concrete footing with a level surface used to mount electrical equipment (traffic signals) a part of the total time cycle allocated to any traffic movements receiving the right-of-way or to any combination of traffic movements receiving the right-of-way simultaneously during one or more intervals electrical equipment installed to provide a low voltage or extra low voltage source of power for electrical systems; includes transformation, switching and control equipment Pedestrian Crossover one familiar with the construction and operation of the apparatus and the hazards involved the wire or wires between a pole handhole or pole mounted junction box and electrical equipment mounted on the pole the roadway approach or approaches at an intersection normally carrying the minor volume of traffic

Signalized Intersection Sleeve Specialist Splice Sub-Surface Installation Supply Pole Switchover Temporary Traffic Signal an intersection or junction of two or more roadways or walkways where the vehicular and pedestrian traffic is controlled by a traffic signal system a duct installed so as to provide a cavity for the purposes of installing other ducts within a person who is competent, knowledgeable and experienced in the special work to be performed a mechanical device connecting two or more conductors, establishing an electrical contact and insulated equal to or better than the cable in which it is installed installation of ducts, conduits or liners under a surface in such a manner that the materials overlying and surrounding the location for the ducts, conduit or liner is not distributed a pole where power is obtained the act of closing down an electrical system and bringing a new or modified electrical system into operation work which is completed, to serve a specific temporary function and removed upon completion of the temporary usage required for the contract a system of traffic signal equipment, poles, traffic signal controllers, traffic signal actuation and interconnection equipment and all associated materials required to regulate vehicular and pedestrian traffic at an intersection or intersections Underground any work which requires underground installation such as ducts, duct Electrical Provisions banks, conduits, concrete footings and pads, electrical manholes, and handwells and associated equipment installed for the purpose of providing facilities for future electrical work Underpavement Crossing Voltage, Extra-low Voltage, Low Voltage, High a rigid duct installed underground any voltage up to and including 30 V any voltage from 31 to 750 V inclusive any voltage above 750 V, up to 44 kv Other definitions shall be specified in the Code.

4.0 Submissions and Design Requirements When required, the Contractor shall submit copies of shop drawings to the Contract Administrator for review. Shop drawings for all items shall include all information required in the applicable Owner's Material Specification and shall be submitted in advance of the commencement of fabrication of the equipment. Shop drawings submitted for review will be stamped with "permission to construct" for the Contract Administrator if found to be acceptable, or will be marked with corrections if found to be unacceptable. Three copies of unacceptable drawings will be returned to the Contractor for correction. The Contractor shall submit seven copies of corrected shop drawings to the Contract Administrator. If the corrected drawings are found to be acceptable by the Contract Administrator, they will be stamped with "permission to construct". Three copies of drawings stamped with the words "permission to construct" will be returned to the Contractor. The Contractor shall then submit an additional four copies of these drawings to the Contract Administrator. Once fabrication of the equipment has commenced, materials and dimensions shown on the final shop drawings shall not be changed without approval of the Contract Administrator; resubmission of four copies of revised shop drawings showing any changes from the final shop drawings will be required. 5.0 Materials Unless otherwise indicated in the contract, all electrical materials shall be new and of uniform pattern throughout the work. 6.0 Construction 6.1 Qualification of Workers 6.1.1 Contractor's Representative For the electrical work to be performed the Contractor shall appoint a representative who is an electrician and is experienced in the work. The Contractor's representative shall be in attendance at the work during all operations listed in subsection 6.1.2. The Contractor's representative shall attend such meetings required by Toronto Transportation to coordinate services affected by the contract. 6.1.2 Work Requiring Qualified Workers Electricians shall be employed to do the following work:

Extra-low and low voltage cable installation Extra-low and low voltage splices and connections Panel board, fuse and circuit breaker installation Traffic signal control device installation Traffic signal equipment installation Traffic signal control cabinet installation Traffic signal control equipment installation Electronic equipment installations Electronic equipment testing 6.2 Coordination with Hydro Authorities 6.2.1 Work to be Done in Coordination With the Hydro Power Supply Authority The Contractor shall coordinate the following work with the hydro power supply authority unless otherwise specified: (a) (b) (c) (d) (e) (f) (g) Mounting of any equipment on a pole owned by or under the jurisdiction of the hydro power supply authority. Work near high voltage conductors requiring temporary insulation of the cables by the hydro power supply authority. patrol of high voltage aerial cable systems prior to energization by the hydro power supply authority. Installation of transformers and low voltage bus at supply poles by the hydro power supply authority. Service cable connections at supply pole by the hydro power authority. Initiating and coordinating processing of any service contracts required between the Owner and the hydro power supply authority. Informing the hydro power supply authority of the status of Electrical Safety Authority requirements and ensuring that the hydro power supply authority receives a copy of the inspection certificate. The Contractor shall allow sufficient time for proper scheduling of any work to be done by the hydro power supply authority. 6.2.2 Work to be Coordinated with Others The Contractor shall where required coordinate the following work with the Contract Administrator:

(a) (b) Mounting of any equipment on a pole of any structure owned by or under the jurisdiction of a communications company, commission or hydro power supply authority. Mounting of any equipment in close proximity to, or requiring modification of, any plant owned by a utility company or by a private person or company. 6.2.3 Permits, Fees, Certificates Unless otherwise directed, the Contractor shall obtain permits for all work requiring Electrical Safety Authority Inspection and shall file applications for inspection with Electrical Safety Authority Inspection Department as necessitated by the Progress of the work. The Contractor shall pay all fees related to permits, applications and inspections. The Contractor shall correct all defects in his workmanship and electrical equipment that is not approved by the Electrical Safety Authority. This work shall be done within such time and in such a manner as indicated by notices of deficiency from the Electrical Safety Authority. Upon completion of all work, the Contractor shall obtain a final certificate of approval from the Electrical Safety Authority and shall furnish the original copy of the certificate to the City of Toronto. 6.3 Traffic Signal Systems 6.3.1 Existing Traffic Signal Systems Except where the contract requires modifications to existing traffic signal systems, the Contractor shall perform his operations so as to leave existing traffic signal systems undisturbed and fully operational. Where traffic signal systems are to be installed and the existing traffic signal is to be removed or modified, the new traffic signal system shall be installed independently of the existing system such that short duration switchover from one system to the other is effected without appreciable down time. Hybrid systems consisting of combinations of existing, temporary or permanent signal systems will not be allowed unless otherwise indicated in the contract. 6.3.2 New Traffic Signal Systems A new traffic signal system, at an intersection not previously signalized, shall be initially switched on for operation to conform the following requirements: (a) (b) For the testing of circuitry and components operation of the system shall take place with signal head covers in place. Covers shall remain in place for up to a maximum of 30 days before the signals are put into operation, unless otherwise approved by Toronto Transportation. The Contractor shall give the Contract Administrator a minimum of two (2) days notice of when the system will be ready for operation and shall reconfirm that the work will be done as scheduled 24 hours prior to doing the work.

(c) (d) (e) Activation will not be permitted on Mondays, Saturdays, Sundays or Statutory Holidays unless otherwise advised by the Contract Administrator. The Contractor shall complete all preliminary system testing as indicated in the contract and shall complete all repairs or replacement of defective components prior to activation. Traffic at the intersection shall be under police supervision during this operation. Switchover of systems shall be done during periods of light traffic volume as determined by the Contract Administrator. 6.3.3 Traffic Signal Systems Switchover A new traffic system installed at an intersection to replace an existing traffic signal system, shall be initially activated to conform to the following requirements: (a) (b) (c) (d) (e) The Contractor shall give the Contract Administrator a minimum of two (2) days notice of when the system switchover will be done and shall reconfirm that the work will be done as scheduled 24 hours prior to doing the work. The Contractor shall complete all preliminary system testing as indicated in the contract and shall complete all adjustments or replacement of defective equipment in the new system prior to system switchover. For the testing of circuitry and components, operation of the new signal system shall take place with the signal head covers in place and the existing signal system operational. Covers shall remain in place for up to a maximum of 30 days before the signals are put into operation, unless otherwise approved by Toronto Transportation. Signal heads of the existing traffic signal system shall be covered and covers shall be removed from the new signal heads with both systems not activated. Traffic at the intersection shall be under police supervision during this operation. Switchover of systems shall be done during periods of light traffic volume as determined by the Contract Administrator. 6.3.4 Traffic Signal Controller Operation Unless otherwise specified, Toronto Transportation will set up the traffic signal controller, perform all programming, time settings and switch settings, and switch the controller to the normal operational mode. The Contractor shall not adjust any programming controls, mode switches, keyboard or timing switches or devices unless otherwise indicated in the contract.

6.3.5 Maintenance of Traffic Signal Systems Toronto Transportation will perform all routine and emergency maintenance work upon operation of the traffic signal system for public use of the intersection. 6.4 Temporary Electrical Work All temporary electrical work indicated in the contract shall be installed and made ready for operation prior to opening the associated traffic lanes or sidewalks which the work is intended to serve. Removal of temporary work shall conform to MT 815. 6.5 Layout of Equipment The electrical layout drawings are a schematic representation of the requirements. All equipment shall be installed in locations detailed in the contract. 6.6 Adjustment of Equipment The Contractor shall adjust all traffic signal heads, optical lens assemblies, and other devices which may be adjusted to give optimum performance. 6.7 Asphalt Saw Cutting - Asbestos The use of asbestos in the surface layer of roadways during the 1960s, 1970s and early 1980s was common in many City of Toronto roadways. This potential hazard can be encountered when saw cutting the asphalt. The City of Toronto has developed Measures and Procedures for Roadwork with Asphalt containing Asbestos Fibres. These measures include training, notification, separation, special signing, use of respirators, protective clothing, dust control and decontamination procedures. The Contractor is to follow all procedures as outlined in the City of Toronto policy. 6.8 Open Excavations Any excavations within the roadway and/or boulevard shall not be left open. 6.9 Disposal Excess materials or materials unsuitable for the contract requirements shall be managed as specified elsewhere in the contract, as the City of Toronto policy. 6.10 Removal and Restoration Removal and restoration of pavement, sidewalk, curb and gutter shall be carried out as per the Contract Administrator. 6.11 Quality Control

6.11.1 General Requirements Tests on electrical wiring shall conform to the Electrical Code or Toronto Transportation Specifications. Tests on electrical equipment shall conform to the appropriate specifications covering the work. The Contractor shall supply all labour, equipment and material required to carry out all test specified in the contract. 7.0 Quality Assurance All equipment requiring the submission of shop drawings, as detailed in Section 4.0, is subject to inspection by Toronto Transportation or it s designate, prior to shipping of the equipment. The inspection shall take place at the manufacturer's factory or at the supplier's place of business. The Contractor shall inform the Contract Administrator of when the equipment fabrication is approximately 80% and 100% complete and shall make suitable arrangements for any required inspection. All underground work (ducts, handwells, pole bases, controller bases, etc.) must be inspected by Toronto Transportation before the above ground installation can proceed. The contractor will notify Toronto Transportation in advance of underground work and in advance of re-instatement. 8.0 Basis of Payment 8.1 Maintenance Costs Where Toronto Transportation performs maintenance work on systems installed by the Contractor prior to acceptance of the work by Toronto Transportation, the actual costs of maintenance work which are a result of inadequate workmanship or defective materials supplied by the Contractor will be charged to the Contractor.