M&EE Networking Group

Similar documents
Workplace Transport. Introduction

BRITISH CONSTRUCTIONAL STEELWORK ASSOCIATION LIMITED

Trip and slip Hazard policy

HFM Asset Management Contractor Induction Queens Riverside Apartments

Civil Engineering Technical Requirement CIVIL-SR-008 PROTECTION SCREENS. Revision: 3 Updated: 13/01/2017

Railway Engineering Works at Box Tunnel, Bathampton Junction and Sydney Gardens, Bath

Risk Assessment Form (Qualitative)

BNSF RAILWAY COMPANY

Risk Assessment Form (Qualitative)

M&EE Networking Group

SITE SPECIFIC HEALTH & SAFETY PLAN

Contractors Safety Code of Practice

Hazards Outside The Laboratory: Loading Dock Safety

Walking-Working Surfaces

User Guide. Scaffold Trolley

Health and Safety Tools. Copies of these checklists and forms can be downloaded from ACT WorkCover s website:

SHE 002 Method Statements and Risk Assessments

User Guide. Scaffold Trolley

Walking-Working Working Surfaces. OSHA Office of Training and Education 1

M&EE Networking Group

Basic Track Awareness

RISK BULLETIN. Walking & Work Surfaces: Floors, Stairs and Elevated Workstations Checklist DATE / / NAME SIGNATURE WALKWAYS YES NO ACTION ASSIGNED

Walking Working Surfaces

Walking Working Surfaces.

Max. building height (m)

Alberta Transportation The City of Edmonton The City of Calgary

No. 1 SPINNINGFIELDS MANCHESTER

Purpose. Scope and restrictions. Responsibilities. Faculty of Health and Wellbeing Biosciences STANDARD OPERATING PROCEDURE.

Wayleave Application for Non-Queensland Rail Service

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number E-2.0 Safety Audits and Inspection Program

HEALTH AND SAFETY ISSUES IN WOOD DRYING OPERATIONS

Housekeeping Program. 29 CFR Housekeeping, and 29 CFR Fire Prevention.

ACT Scaffolding Services LTD METHOD STATEMENT Scaffold erection

181 State Road 415, New Smyrna Beach. Railey Harding & Allen, P.A. Barcelo Developments, Inc. Scott Ashley, AICP, Planning Manager

EXAMPLE conducted for Drillers Inc'

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

Scaffolding. Safety Guide. STOP! Before you climb

Scope of Work. Project Title: Rail Grinding Services

JOB DESCRIPTION. Approved : Dave Reage Date: February 2016

PRE-CONSTRUCTION (PRE-PRODUCTION) INFORMATION FOR TOURING PRODUCTIONS AND CO-PRODUCTIONS USING THE CAPITOL, HORSHAM

University of Manitoba - Project Site Safety Plan

2.21 Risk Assessment Policy and Procedures Table of Contents

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # )

M&EE Networking Group

What is the likelihood of the RISK OF INJURY (risk rating) regarding the hazards described above? Harm 4 X Likelihood 4 = 16

PRE-CONSTRUCTION (PRE-PRODUCTION) INFORMATION FOR TOURING PRODUCTIONS AND CO-PRODUCTIONS USING THE CAPITOL, HORSHAM

Harrison's Logistics Warehouse Logistics Avenue Any Town QWERTY. Auditor Name Mark Phillips Audit Date 21/01/2016 Reference

SAFETY STATEMENT. ABC Company. Address Line 1 Address Line 2. Approved by number. owner. number 01 xx/xx/xx Manager 1 Manager 1 1

High-Clearance Alloy Scaffolds

Canadian National Contractor Safety Orientation Canadian Based Operating Companies Course Exam

Your Company Name. Hospital Phone: (318) Do cell phones work at the site? Yes No If no, location of the nearest landline:

Emerg. Contact: EMERGENCY CONTACT INFORMATION Fire Department Info: Municipal Police Info: County Sheriff Info: Dept Name: Dept Name: Dept Name:

SLIPS, TRIPS AND FALLS POLICY FOR EMPLOYEES

SEASONAL APPRENTICE LINEMAN Position Description Effective: March 2018

Uncontrolled When Printed Document to be withdrawn as of 03/12/2011 To be superseded by GERT8000-RBBL Iss 21 published on 03/09/2011

Good Call. Better Close Calls for a safer Network. 11-Feb-16 / 1

Warehouse Safety Checklist

Current Risk L S RR Mortar Mill

MOTI -- Five Strand Barbed Wire & Paige Wire Fence Specifications

This policy will be reviewed annually from the date of first issue, or when significant changes have occurred.

Does the Work Package Plan include the relevant items as stated in the WPP template? Is the information presented in the same order as the template?

Example risk assessment for chilled warehousing

A. CORPORATE HEALTH AND SAFETY TRAINING LIST # TOPIC Employee

Chapter 24 Route window W3 Old Oak Common Depot. Transport for London

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)

Fall Protection Safety Program and Training Materials

SECTION 14 - GENERAL INDUSTRIAL ZONE (M2) REGULATIONS

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

MVDC F041 Safety Inspection Checklist

John Parker & Son Limited Metal Products Delivery Plan

Examples of Recommended Text for Documenting Traffic Noise Analyses

HEALTH & SAFETY MANUAL Legislated Duties and Responsibilities

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities.

Rail Safety Management Procedure General Engineering and Operational Systems Railway Track Signals - Detonators

DOWNTOWN OXNARD PARKLET PILOT PROGRAM PARKLET DESIGN GUIDELINES

Introduction. Disclaimer. Table of contents

Network Rail Project No: Issue: 002 Date 11/07/2017 Work Package Plan Arena Tunnel LSM773 Prepared by: Start Date: 15/07/17 Finish Date: 23/07/17

SITE SAFETY RULES - SILVERSTONE CLASSIC 2018

Workplace Safety and Health

A GUIDE TO WORKING SAFELY AROUND VECTOR S ELECTRICITY, GAS AND COMMUNICATIONS NETWORKS.

Brown Bear Forest School

HAZOP Checklist for Sewage Treatment Plant

UNCOVERED DECK AND BALCONY PACKAGE

1. Introduction Noise Analysis Results Figures. List of Tables

ESSENTIAL DUTIES AND RESPONSIBILITIES

Disability Access Audit Checklist

Please check with your local inspection authority for any additional requirements before installation.

This User Guide provides you with step by step instructions to ensure your system is erected easily and safely.

Haulage Conveyors. Standard Operating Procedures Haulage Conveyors. (Cont.)

Americans with Disabilities Act Accessibility Survey

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE

Planning Approval Consistency Assessment Form

TfL Managing Adaptation to Climate Change

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice.

The International Centre. Site Induction. Construction Design & Management 2015

The International Centre. Site Induction. Construction Design & Management 2015

Mobile Towers - 3T Method

RISK CONTROL SOLUTIONS

INDUCTION INFORMATION

Workplaces must be kept clean, orderly, and sanitary. Workroom floors must be maintained as clean and dry as possible.

Transcription:

Stabling Point Safety Survey Issue 2 Sept 2011 Location Tulloch sidings Date of assessment 27/08/2014 Prepared By Thomas McCulloch John Shields M&EE Networking Group

Issue 2 Date Sept 2011 Page 2 of 8 Document revision history Issue Date Reason for change 1 Sept 2010 New Issue 2 Sept 2011 Disclaimer added along with section for stone bin Background A sub-group of the M & EE Networking Group have looked at an Operational Risk and recommend the following as good practice for the industry. Reviewed & signed off by Signature (s) Company Grade John Shields Babcock Rail Operations Standards Manager Purpose The purpose of this document is to give sufficient information and guidance for assisting in setting up a safe system of work at this particular location. The document can be altered to suit other company needs. CONTENT 1) SITE INFORMATION 2) EMERGENCY CONTACT DETAILS 3) LOCATION FACILITIES 4) LIST OF GENERIC HAZARDS 5) LOCAL INSTRUCTIONS 6) LOCATION PHOTOGRAPHS 7) ROAD/RAIL ACCESS PLAN 8) COMPANY SPECIFIC SITE INFORMATION (APPENDIX A) This Safety Survey has been produced following a site visit and was found at the time of production to be an accurate description of the location. Although it has been designed to meet our company requirements it can be used by other railway companies providing the end user accepts that they are responsible for ensuring its accuracy and that it meets their company requirement before use.

Issue 1 Date Sept 2010 Page 3 of 8 SITE INFORMATION No Item Comment 1 Site Postal Address Tulloch Station Roy Bridge, Inverness-Shire PH31 4AR 19 miles North of Fort William 2 Grid reference NN 36624 80660 3 Site Owner Network Rail 4 Person in charge N/A 5 Method of Access Via Locked access gate Key No534 6 Authorized walking route Access to yard via gate Item Yes No N/A Comment 7 Suitable road vehicle parking 5 + vehicles 8 Security arrangements No Item 1 Local Hospital (address & contact details) Via Locked access gate key 534 Emergency contact details Comment Belford Hospital Belford Road Fort William PH336BS +44 1397 702481 2 Controlling signal Box Banavie north Signaller 01397707703 3 Emergency services 999 4 E.C.O. N/A 5 Any other useful contact numbers for location Eg; person in charge NR MOM Fort William 01397 707724 Location Facilities Item Yes No N/A Comment Nearest Facilities Spean Bridge 9mi 1 Welfare facilities (24hrs) Nearest NR Depot Ft William 19mi 2 Pit facilities 3 Covered maintenance 4 Fuelling facilities 5 Bowser access

Issue 2 Date Sept 2011 Page 4 of 8 List of Generic Hazards No Item Yes No N/A 01 TRAIN MOVEMENTS 02 OVERHEAD ELECTRIFIED LINES 03 DC LINES 04 UNDERFOOT CONDITIONS (ballast, rail, uneven ground, oils, frost, wet surfaces) 05 OIL & GREASES 06 LIMITED CLEARANCE 07 MOVING PARTS ON OTMs 08 LIMITED HEADROOM BELOW SOLEBAR LEVEL 09 WORKING AT HEIGHTS (above cab floor level) 10 NOISE 11 BIOLOGICAL HAZARDS (Leptospirosis, Faeces etc) 12 LACK OF, or POOR SITE LIGHTING 13 BURIED SERVICES (contractors to comply with * HSG 47) 14 SIDINGS USED BY OTHER TRAIN COMPANIES 15 * WASTE DISPOSAL AVAILABLE HSG 47 Avoiding Danger from Underground Services. All waste including replacement machine parts to be put into skip/bins provided, or removed from site.

Issue 1 Date Sept 2010 Page 5 of 8 LOCAL INSTRUCTIONS (sectional appendix) None for OTM LOCATION PHOTOGRAPHS Access gate View of siding to buffers Ground frame instructions attached View of alternative buffer end

Issue 2 Date Sept 2011 Page 6 of 8 ROAD ACCESS PLAN From Fort William take the A82 towards Inverness for 9 miles towards Spean Bridge. Just after the SP Mill turn right onto the A86 towards Newtonmore and stay on this road for 9.6 miles until you reach Tulloch Station which sits off to the right of the A86 RAIL ACCESS PLAN

Issue 1 Date Sept 2010 Page 7 of 8 Appendix A COMPANY SPECIFIC SITE INFORMATION No Item Comment 1 Length of sidings Two roads, one at 80meters,one at 60meters 2 Please state location whereby Maintenance tasks will be completed on site. 3 For Maintenance tasks, Distance and speed of nearest running line? 4 Any other hazards or issues operatives or visitors to site should be aware of ( e.g. Points, Limited clearances or other hazards etc) Suitable for minor to medium maintenance and general housekeeping. Company process and DP to be applied when working on OTM. 20 meters from nearest line.15mph Using Groundframe Siding Unlit Materials lying about Underfoot conditions Slip Trip and Fall Sidings lack maintenance Winter season Extreme weather conditions 5 Stone Bin No Item Yes No N/A Comment 11 Are Any Roads unavailable 12 Any areas to keep away from (EG Restricted areas) 13 Could a lorry enter site (e.g. for loading Kirow etc) 14 Is the site suitable for carrying out heavy maintenance tasks and carrying equipment to machine? 15 Is the site close to a residential area 16 Is there a Water Hydrant? 17 Are there spill kits available on site? 18 Are there vehicle lifting facilities on site? 19 Is the site accessible to anyone (e.g. member of the public, local businesses Noise level needs to be controlled Kept on OTM Locked access gate key No534. Must be closed and secured at all times.

Issue 2 Date Sept 2011 Page 8 of 8 Ground Frame Operation 1/ Obtain Signallers Authority to operate the GF 2/ Unlock the GF using the Castell Key. 3/ Pull Blue/Brown Lever No2 4/ Pull blue lever No1 (points lock) 5/ Pull Lever No3 to operate points 6/ Restore Lever No1 to lock points for train movement To restore; Pull Lever No1 (points lock) Replace Lever No3 (points) Replace Lever No1 Replace Lever No2 Lock the GF and remove the Castell Key. Advise the signaller that the GF has been secured normal. Note the clearence from the down loop, max speed 15mph. Arriving at sidings you are protected by your own train. Extra care is required when operating the GF.