Conclusions & Lessons Learned

Similar documents
500 Interchange Design

UNION CENTRE BLVD AND I-75 INTERCHANGE WEST CHESTER, OHIO

500 Interchange Design

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge

Exit 73 I-29 Interchange Modification Justification Study

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013

Diverging Diamond Interchanges in Michigan

INTERCHANGE MODIFICATION REPORT

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No TS-03 December 5, 2016

COMPARISON OF SPUI & TUDI INTERCHANGE ALTERNATIVES WITH COMPUTER SIMULATION MODELING

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

Interchange Design. Nick Hoernke, Bill Roth and Eric Sorensen

Project History Interchange Innovation Existing Conditions Proposed Design Approval Process Final Details PRESENTATION FOCUS

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

LOCATION AND DESIGN DIVISION

Breaking the Diamond: DDIs, CFIs, and SPUIs

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

Comparing Roundabout Capacity Analysis Methods, or How the Selection of Analysis Method Can Affect the Design

Conceptual Design Report

Appendix B Highway 407 Interchange Review - Cochrane Street Area

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

Chapter GRADE SEPARATIONS & INTERCHANGES

BILLINGS BYPASS UPDATE

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

Environmental Consequences and Mitigation

Community Advisory Committee Meeting No. 2. June 22, 2006

Performance Based Practical Design (PBPD)

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

I-10 CONNECT. Public Meeting #1

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

Peterborough County Road Safety Audit Guideline Pilot

Performance Based Practical Design. An FHWA Perspective

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project.

The Secrets to HCM Consistency Using Simulation Models

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont)

FINAL REPORT GUIDELINES FOR PRELIMINARY SELECTION OF THE OPTIMUM INTERCHANGE TYPE FOR A SPECIFIC LOCATION

INTERCHANGE SAFETY. Steve Allen. Houston Daugherty. Director, Strategic Transportation Investments Division (TDOT)

TRAFFIC SAFETY EVALUATION. Using the Highway Safety Manual and the Interactive Highway Safety Design Model. I 15 Dry Lakes Design Exception

CHAPTER 3 SCOPE SUMMARY

MEMORANDUM: INITIAL CONCEPTS SUMMARY

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5

PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) ,

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD

Highway Construction Program

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

CITY OF DRAPER TRAFFIC IMPACT STUDY DESIGN GUIDELINES

APPENDIX D ACCESS MANAGEMENT GUIDELINES

Geometric Design: Past, Present, and Future

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

I-17 and Happy Valley Road Diverging Diamond Interchange (DDI)

CHAPTER 2: MODELING METHODOLOGY

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange

Introductions. ASHE Technical Session June 11, Chesterfield County Transportation Department. McCormick Taylor, Inc.

CLA /10.54, PID Project Description:

I-35/80 Operations Study: Douglas Avenue to NW 86 th Street FOR

1000 Performance Based Project Development (PBPD)

SPAGHETTI BOWL. RTC Workshop April 20, 2018

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016

LOCATION AND DESIGN DIVISION

NCHRP 3-88 Guidelines for Ramp and Interchange Spacing

Air Quality Analysis Technical Memorandum

Between existing Interstate 70 in St. Louis, MO to west of the IL 203 Interchange on existing I-55/70 in Madison, IL

South Dakota Interstate Corridor Study. Phase I Summary Report

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT

Air Quality Analysis Technical Memorandum

APPENDIX A TIER 1 ANALYSIS

Operational and Safety Attributes of an Alternative Design, Space-Efficient One-Sided Interchange

DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS

RIDOT S Statewide Roadway and Asset Data Collection Project

HALDIMAND COUNTY DESIGN CRITERIA SECTION T TRAFFIC IMPACT STUDY GUIDELINES

NCHRP Report 687 Guidelines for Ramp and Interchange Spacing

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

DRAFT. Draft Carbon Monoxide (CO) Traffic Air Quality Analysis

Impacts of Replacing a Tight Diamond Interchange with a SPUI A Wilsonville Interchange Study

2017 Highway Safety Improvement Program Call

Chapter URBAN & RURAL FREEWAY DESIGN

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

Interchange Justification Report (IJR) I-75 at Bethlehem Road Henry County

M D 355 [FR E D E R IC K R O A D] OVER

BCEO TRAFFIC IMPACT STUDY GUIDELINES

Operational Analysis of Dulles Toll Road Ramps to Tysons. Board Transportation Committee Meeting September 17, 2013

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES

Readily Implementable Signal Phasing Schemes for Diverging Diamond Interchanges

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

S.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award

Transcription:

What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned

It s not about you, it s about the public

Developed by Access Utah County (AUC), I-15 CORE and the TOC Reviewed by UDOT Technical Committee For DDI feasibility on other projects

Main goal is to reduce delay: Accommodate the left turn movements Reduce the number of signal phases Only two signal phases are required, compared with 3 for a SPUI, or 4 with a diamond

Operational Failure when: A + B > 1900 vph

Operational Failure when: A + B > 1900 vph A + C > 1900 vph

Operational Failure when: A + B > 1900 vph A + C > 1900 vph B + C > 1900 vph

Operational Failure when: A + B > 1900 vph A + C > 1900 vph B + C > 1900 vph A + B + C > 2100 vph

Operational Failure when: A + B > 1900 vph A + C > 1900 vph B + C > 1900 vph A + B + C > 2100 vph Transition from LOS D to LOS F is very short. For this reason, UDOT defines LOS C as a minimum for acceptable operation.

Considerations: Weaving and merging Signal timing Driver behavior Intersection spacing Requires use of micro-simulation software UDOT requires use of VISSIM (PTV America) for analysis

Considerations: Traffic & Pedestrian Volumes Multi-Lane Turning Movements Merging & Weaving Operations within the Interchange Non-traditional Signal Warrant Analysis

Proximity of side streets, railroads, etc. Accommodation of pedestrians Existing geometric constraints in retrofit projects

Ramp terminal separation distance Crossover intersection layout and grading Signing and Striping Lane and Shoulder Widths Glare Reduction Roadway Cross-Section

To provide for queue storage and weaving space, crossover intersections should be spaced 850 apart, with adjacent signalized intersections 1000 from the crossover intersections. Right-in/Right-out access points may be placed according to the UDOT Access Management rules. Placement of accesses closer than 1000 should be analyzed using VISSIM to determine potential operational effects.

Design speed through the crossover is reduced at least 10 mph, with a minimum speed through the curves of 25 mph. Utilize reverse curves without tangents to minimize length of crossover zones.

Placement of glare screen is specific to each DDI design, and may affect horizontal alignments. Line-of-sight calculations should be used. Additional study required to identify appropriate design parameters.

Shoulder widths should NOT be reduced across structure Lane widths should be at least 12 feet Turning templates for side by side WB-67 or other appropriate design vehicle should be applied

500 East, American Fork Why a DDI Crossover geometry & glare reduction Side street & ramp terminal separation

SR-92, Lehi Why a DDI Crossover geometry & glare reduction Side street & ramp terminal separation

Access Justification Report (AJR) Used by FHWA for all modifications to the interstate system. The AJR is not a substitute for the NEPA process, and the NEPA process does not eliminate the need for a AJR document. Addresses the eight policy points defined by FHWA as a type of warrants process.

When compared with SPUI or Diamond interchanges: ADVANTAGES Higher left-turn capacity No exclusive left-turn lanes Smaller structures Two-phase signal provides flexibility in timing Smaller ROW footprint at the interchange DISADVANTAGES Contrary to driver expectation Operation sensitive to signal and street spacing Rapid transition from LOS D to LOS F ROW impacts at crossover intersections Integration of pedestrian traffic

Design/Build contractors may submit the DDI interchange type as an alternate concept; RFP should be written to address the possibility. Operational analysis of a DDI requires specific software and requires more review time. Retrofit of existing structures may extend the operational life of the interchange for much less than reconstruction.

Thank you for your time.