Best Practices for all Elevators and Escalators in British Columbia

Similar documents
DIRECTIVE NO: D-L

Guideline for In-Service Assessment of Ammonia Refrigeration Plants

ELEVATING DEVICES CODES REGULATION

Maintenance Program Guideline for Owners of Ammonia Plants

Submission, Review and Approval of Construction Documents Submission and Review of a Completed Application for Permit

8.0 Maintenance Administration

Training Certification Categories

ELEVATORS THE GOOD, THE BAD, AND THE UGLY

Division 14 Conveying Systems

Inspection Program. Inspection Training

RFP for Elevator Maintenance

Elevators and Lifts

british columbia safety authority keeping you safe

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

JULY 10, 2013 INTRODUCTION

GAS. Gas Distribution Systems Safety and Loss Management System Guidelines. Prepared by: Brad Wyatt, Provincial Safety Manager - Gas

HOW TO OBTAIN A BUILDING PERMIT

Major and Minor Alterations Guidelines

2.2 Elevators may not include any proprietary controls or systems.

CITY OF CHICAGO DEPARTMENT OF BUILDINGS

Change of Coordinating Registered Professional (CRP) or Registered Professional (RP)

Gainesville Regional Transit System Facilities and Equipment MAINTENANCE PLAN

BUILDING DEPARTMEN T

ATTACHMENT H Scope of Work

Powered Industrial Truck/Forklift Operations Standards and Procedures. Disaster Cycle Services Standards & Procedures DCS SP DMWT

Missouri Army National Guard (RTI) MOARNG Project No. T Rev. 0 Ft. Leonard Wood, Missouri 15 April 2013 Bid Final Submittal

Maryland Department of the Environment

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 14 - CONVEYING EQUIPMENT DESIGN STANDARDS SECTION

Employers' Guide to Road Safety Requirements

EDM-F Inspector / Consultant

Special Provision No. 199S53 January 2018

CITY OF JOPLIN, MISSOURI

EXETER TOWNSHIP HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS

SECTION PACKAGED, SUBMERSIBLE SEWERAGE PUMP UNITS

Special Provision No. 199S53 February 2012

BUILDING/FIRE/ZONING PERMIT GUIDE

Alternative Solutions

1. Schedule For Preventative Maintenance Requirements:

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

CHAPTER 7 CONVEYANCE SYSTEMS

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

CALIFORNIA STATE UNIVERSITY, LOS ANGELES LOCKOUT / TAGOUT PROGRAM

NATIONAL BUILDING CODE OF CANADA 1985

ELEVATORS AND LIFTS ACT REGULATIONS

TOWN OF HAGUE GUIDELINES FOR PERMIT APPLICATION

PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS

BOOM TRUCK - FOLDING BOOM UNLIMITED TONNAGE

Subcontractor Building Manual

PERMIT APPLICATION CHECKLIST Municipal Address, Phone & Fax NONRESIDENTIAL

SOUTHERN NEVADA AMENDMENTS TO THE 2012 UNIFORM MECHANICAL CODE

CHEMICAL CONTRACTORS DC WATER CONTRACTOR SAFETY PROGRAM CONTRACT PROVISIONS FOR CHEMICAL DELIVERIES 1. RESPONSIBILITY FOR COMPLIANCE

Health and Safety Policy

Lockout/Tagout Procedures

SERENUS LULA PLANNING GUIDE

Practical Skills/Experience Sign-Off Document. Zip Line Mechanics (Under Ontario Regulation 187/03, Technical Standards and Safety Act, 2000)

Maintenance Procedures Propane Facility System Guidelines

UCC CONSTRUCTION PERMIT APPLICATION INSTRUCTIONS

C. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products.

ROADWAY WORKER PROTECTION

Capital Projects Group Gas Fired Warm Air Furnace Specification

MHGR-32: Manhole Guardrail System

Basement Renovation Guide For Residential Dwellings

OPERATIONS INTEGRITY MANAGEMENT SYSTEM

Internal Operating Procedure ISO 9001:2008 SOC NEVADA LLC

COMMERCIAL PROJECT INFORMATION

2001 NBIC Interpretations

MISSOURI UNIVERSITY OF SCIENCE & TECHNOLOGY

APPENDIX A TECHNICAL SPECIFICATIONS FORM ITN FACILITIES REPAIR AND MAINTENANCE OF GENERATORS

CITY OF REDWOOD CITY SENIOR ENGINEERING TECHNICIAN

{CLIENT SITE} {CLIENT COMPANY}

SAMPLE PAGES. Construction Safety and Health Program. [Company name]

PLANNING AND EVALUATION PRELIMINARY DESIGN

WARNING ELECTRIC PALLET TRUCK EPT Revised A company dedicated to solving ergonomic and material handling problems since 1955.

MetroLink Operations 700 South Ewing Street Saint Louis, Missouri

BUILDING CONDITION ASSESSMENT

Quality Control Manual Submission Information

Eurobitume UK. Site Inspection for Delivery of Bitumen

Huntington Building Inspection

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

Roles & Responsibilities

Guide to the Letters of Assurance in the B.C. Building Code 2006 December, 2010 Edition 5

SUBCONTRACTOR MANAGEMENT PLAN

POWER ENGINEERS ACT REGULATIONS

Lockout/Tagout Program

Legal Summary SHE-037 Handbook of Business Operation in Thailand s Industrial Estate Version 2

RANCHO CALIFORNIA WATER DISTRICT POSITION DESCRIPTION CROSS CONNECTION CONTROL TECHNICIAN I/II/SPECIALIST

TECHNICAL BULLETIN Ministry of Transportation

City of Pekin- Zoning and Inspections Department 111 S. Capitol Street, Pekin, Illinois (309)

Design Guidelines October 2016: Issue 3. Section 15 Lifts.

This application process is for the New Modernized Drive Clean Program that uses the new OBD II and/or TSI, and Heavy Duty test equipment.

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

SUBCONTRACTOR MANAGEMENT PLAN

HEALTH AND SAFETY MANUAL

Quality Control Manual Submission Information

Capital Projects Group Mechanical Work Commissioning Specification

The primary needs for electrical power after such an event is for the continuing operation of essential. The IBC has been updated on a threeyear

GENERAL SPECIFICATION FOR WEIGHING OF MATERIALS

Resolution MEPC.11(18) adopted on 25 March 1983 GUIDELINES FOR SURVEYS UNDER ANNEX I OF THE INTERNATIONAL CONVENTION FOR THE PREVENTION OF POLLUTION

P1902 Installation Manual

Procedure: Fixed plant and equipment - machine guarding

Transcription:

Best Practices for all Elevators and Escalators in British Columbia Duties of the BC Safety Authority: Issue annual operating permits. Issue contractors licenses. And approve qualification of contractors. Inspects all new elevator systems before they can be used. Inspects all new equipment for elevators and escalators. Approve all elevator and escalator renovations. Investigate accidents and incidents. Record and monitor schedule inspections. Duties of the Owner s and Owner s Representatives: To keep onsite all manuals, construction prints, schematics, shop drawings plus a disk copy of proprietary software. Annual operating permits must be mounted in the elevator machine room. (check web site for fee schedule) Keep on file current elevator contract. Give a copy to whoever is responsible for the elevators for your company. Make sure they understand all the details of the contract. Keep a hardbound logbook for each elevator. All work done on an elevator must be recorded and signed. All records must be kept 6 years. If the contract is terminated, request from the Safety Authority all elevator records. General duties to ensure all contract commitments are met: 1) Meet the contractor s supervisor periodically to go over all routine and preventive maintenance work that the contractor had agreed to do, as detailed in the contract. Review any deferred maintenance work and make sure the work is being rescheduled. 2) Do a visual inspection of the mechanical systems and elevator cabs with the contractors assigned Service Technician every six months. If you do not have a technical person or a Professional Engineer on staff, a consultant can do this inspection for you. 3) Review all logbooks and maintenance work performed with the assigned Service Technician. (Hydraulic elevators, oil loss and additions must be recorded) 4) Review all callouts, whether during regular hours or after regular hours. 5) Review Safety Authority web site for directives and incident reports. 6) Schedule and approve additional work not in the contract. 7) Review all invoices with the contractor. Continued

8) If an elevator or escalator is not working properly or does not sound right, it must be shut down immediately and the contractor called. This is called an incident and must be reported to the Safety Authority. 9) If a person is trapped, only the contractor s technician should remove them. Building staff should communicate with them until they are freed. To insure maintenance and services received is equal to money paid, it requires the owner or owner s employee to check and prove, all the contract commitments are met, and this requires regular meetings and inspection with the contractor. This is the same for all types of contracts, such as cleaning, A.C., boiler and refrigeration contracts. The duty of a Property Manager is to protect the owner and ensure for the owner, money paid is equal to service received. Elevator Salient Points "mandatory maintenance" means the maintenance of an elevating device that is provided by a licensed contractor under contract to an owner and includes periodic examination and maintenance services such as cleaning and lubrication, all safety-related tests required by the ministry, and immediate treatment of any safety-related deficiency including the adjustment, repair or replacement of any defective equipment or components as required by the adopted codes or manufacturer s specifications, but does not include an alteration as specified by a provincial safety manager or an alteration as defined by the adopted code. Classes of contractor's license: 6 The following classes of elevating device contractor s licenses with their corresponding restrictions are established: (a) Class A restricted to designing, constructing, installing, altering, repairing, maintaining or testing of any elevating device except a passenger ropeway or an amusement ride (b) Class RA restricted to installing, altering, repairing, maintaining or testing of those elevating devices, other than passenger ropeways or amusement rides, that are identified on the contractor s license (c) Class M restricted to maintaining and repairing those elevating devices, other than passenger ropeways or amusement rides, that are identified on the contractor s license Operating permit to be kept on-site: 10 An operating permit for an elevating device must be kept where the device is located and must be readily accessible to a safety officer.

Identification label to be issued following acceptance inspection: 13 (1) A provincial safety officer must issue an identification label for each new elevating device at the time of a successful acceptance inspection. (2) The owner must display an identification label issued under subsection (1) in a conspicuous place within an elevator cab or, for all other elevating devices, adjacent to the elevating device. Incidents in respect of all elevating devices: 20 Unless otherwise specified by a provincial safety manager, an elevating device that has been involved in an incident must be shut down immediately and must not be repaired or returned to service without the permission of a provincial safety officer. Owner's operational and maintenance duties: 21 (1) An owner must ensure that all new and existing elevating devices are operated in accordance with this regulation and the manufacturer's specifications. (2) An owner must engage a licensed elevating device contractor to maintain a program of mandatory maintenance for the elevating device to ensure its safe working condition. (3) Subsection (2) does not apply if the owner is also a licensed elevating device contractor and performs its own mandatory maintenance. (4) The frequency of mandatory maintenance for an elevating device is at least quarterly, unless otherwise provided under an applicable code. (5) When any unsafe or potentially unsafe condition exists, an owner must close an elevating device from the carriage of passengers until a provincial safety officer permits the elevating device to operate. Evacuation procedures 24 If evacuation procedures are performed by a person other than a contractor, the owner must submit the procedures to a provincial safety manager. Submission and filing of technical information documents 25 (1) Before the installation of a new elevating device or a minor or major alteration of an existing elevating device may begin, a technical information package for the elevating device must be submitted to, and filed with, a provincial safety manager in the required form.

(2) A provincial safety manager may specify the conditions under which the documentation in subsection (1) for a new elevating device and for minor and major alterations to an existing elevating device is to be submitted. (3) The technical information package submitted under subsection (1) must include the seal of a professional engineer approving the manufacturer's specifications for the construction and installation of a new elevating device, or the design drawings and specifications for a major alteration to an existing elevating device, and the professional engineer must verify the accuracy of the contents of the technical information package. (4) A person must comply with any requirement of a provincial safety manager in respect of design, construction, installation and alteration features that are not dealt with in the documents submitted under subsection (1). (5) Unless specified otherwise in this regulation, a requirement to submit drawings, technical specifications and manufacturer's specifications to, and file them with, a provincial safety manager does not imply an approval by the ministry of those documents. Documentation of evacuation procedures may be required: 26 Documentation of evacuation procedures for elevating devices must be submitted to, and approved by, a provincial safety manager when required by a provincial safety manager. Sump pump for escalator: 40 A sump pump that is required to prevent water seepage accumulating in the bottom of an escalator must be installed outside the escalator truss area. Oil buffer compression return: 41 An oil buffer installed after January 1, 1991 must be provided with a safety device to prevent an elevator from operating if the oil buffer does not re-extend to its normal position after compression. Elevator machine room venting: 42 A hydraulic elevator machine room must be permanently vented, directly or indirectly, to the building exterior. Emergency services for existing elevators, classification "C": 45 (1) If an existing elevator is voluntarily retrofitted to classification "C" firefighters' emergency operation, the operation must, as a minimum, conform to the following:

(a) Phase I Emergency Recall Operation by Fire Alarm Initiating Devices (Phase I Automatic Emergency Recall Operation) must be installed in accordance with the safety code; (b) Phase I Automatic Emergency Recall Operation by Smoke Detector in Sprinkled Machine Room must be installed in accordance with the safety code; (c) Phase I Automatic Emergency Recall Operation to the Alternate Level must be installed in accordance with the safety code, municipal bylaw and the requirements of this regulation; (d) The placement, functions and operation of all required key switches must be as specified in the safety code; (e) Elevators must be identified at both the main recall level and the alternate recall level using the signage specifications as detailed in the safety code; (f) The location of and need for the duplicate recall switch must be determined by the local authority having jurisdiction. (2) The hat symbol must be a minimum 70 mm in height and the "C" classification, representing Converted Firefighters' Elevator Emergency Operation, must be shown within the shield area on the front of the hat.