1 HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS POLICY STATEMENT This policy applies to NEW Hood and Duct systems. The Authority Having Jurisdiction will not waive major criteria in the applicable standards or codes. The codes and standards provide minimum acceptable standards. Equipment and designs that do not meet the minimum standards shall be considered substandard. Whenever provisions of the adopted or reference codes or standards conflict, the more stringent requirement shall prevail. 1. A CONSTRUCTION PERMIT shall be obtained before any hood and duct system is installed, enlarged, extended or replaced. Plans and specifications shall be reviewed by the AHJ prior to issuance of permit. (IFC, IMC 2009). 2. All hood and duct systems shall be designed, installed and maintained in accordance with the requirements of the IBC, IFC, IMC applicable NFPA and local ordinances. (IFC section 101.3) 3. Two (2) sets of construction documents including elevations and details on the hood and duct system shall be submitted for review. One set of plans will be returned to the applicant upon permit issuance. 4. The plan review fee for hood and duct systems shall be 1½ % of the project cost or a $ minimum. The plan review fee shall accompany the plan submission. (Resolution #10-03) 5. The owner or occupant in charge of the premises shall maintain a complete written record of all inspections and cleaning required under the Fire Code on the premises for a minimum of 3 years. Accurate logs shall be maintained, indicating the number of inspections and cleanings. All defects, modification or repair shall be logged, and the log shall be available to the code official. (IFC 2009 edition Section ).
2 HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS Plans that do not contain the following minimum information will not be accepted for plan check. Plans shall be of sufficient clarity to indicate the location; nature and extent of the work proposed and show that it will conform to the provisions of the adopted codes and ordinances. Construction drawings shall be 18" x 24", 24" x 36", or 30" x 42". Plans shall be drawn in indelible ink. Plan sheets that are cut and pasted, taped, or that have been altered by any means (pen, pencil, marking pen, etc.) will not be accepted for plan check. Any registered professional who prepares or supervises the preparation of drawings and construction documents shall stamp and sign such documents. The following information is necessary to verify compliance with the IBC and the IMC. SITE PLAN 1. Scale and north arrow. 2. Dimensions of lot, distance to property lines, location(s) and square footage and use of existing or proposed structures, and street name. 3. Location of roof penetrations, other openings on the roof. CONSTRUCTION PLAN Submit complete details of the kitchen ventilation system to show compliance with the 2009 Edition of the International Mechanical Code. 1. Indicate location of all exits. Required exit doors must be not less than 3' in width and not less than 6 feet 8 inches in height. Providing exiting details showing compliance with IMC , IBC Chapter 11 and IBC Sec Show location of proposed hood and duct systems (s). 3. For ducts exhausting at the roof, exhaust outlets shall be at least 2 feet above the roof surface and at least 10 feet from vertical surfaces of the buildings, adjacent property lines or air intake openings into the building. IMC Sec Provide framing plans and calculations, for vertical and lateral loads, stamped by a registered professional engineer when equipment has a combined weight exceeding 400 pounds (including duct, shaft and hood). 5. Clearly identify the type and size of cooking equipment on the plans along with distances from the bottom of the hood to the top of the cooking surface. The vertical distance between canopy-type hood and cooking surface shall not exceed 4 feet. IMC Sec
3 6. Kitchen exhaust canopy-type hood must extend a minimum 6 inches beyond the cooking surface on all open sides in compliance with IMC Sec If a solid-fuel char broiler if used, provide a separate exhaust system, independent of all other systems serving other cooking appliances IMC Sec Grease ducts and plenums serving a Type I hood must be at least No. 16 gage steel or stainless steel.044 inch in thickness. Type I hood must be No. 18 gage steel. IMC Sec(s) and Ducts serving a Type I hood shall slope not less than ¼ inch per lineal foot toward the hood where the duct length does not exceed 75 feet. IMC Sec When the horizontal portion of the kitchen exhaust duct exceeds 75 feet in length, the slope must be at least 1 inch per lineal foot toward the hood. IMC Sec Indicate clean-out locations on the exhaust duct. IMC Sec Grease filters must be installed with the lowest edge located at the height set forth in IMC Table at an angle greater than 45 degrees from horizontal as required by IMC Sec The kitchen exhaust duct must be enclosed per IMC & IBC. 14. The duct enclosure must be sealed around the duct at the point of penetration and vented to the exterior at the point of termination. The shaft must be separated from the duct by at least 3 inches and not more than 12 inches and should serve a single grease exhaust system. IMC Sec Exposed grease duct systems serving a Type I hood shall have at least 18 inches clearance from unprotected combustible construction. This clearance may be reduced to no less than 3 inches, provided details show that combustible construction is protected with materials required for one-hour fire-resistive construction. IMC Sec Type I hoods shall be designed and installed in a manner to provide an air velocity of not less than 1,500 feet per minute. IMC Sec The following information must be provided to review air quantities and velocities in the duct to ensure compliance with IMC Sec : the horizontal surface area, in square feet, of the hood; the distance in feet between the lower lip of the hood and the cooking surface; that part of the perimeter hood that is open, in feet; the fan s cubic-feetper-minute rating. 18. Show how kitchen exhaust will be provided with make-up air equal to the amount exhausted. Make-up air system must be interlocked with the exhaust system. IMC Sec Kitchen exhaust systems will be provided with approved fire-extinguishing equipment. IMC Sec Fire-extinguishing equipment for protection of kitchen grease hoods and ducts shall be by separate submittal.
4 FIRE PREVENTION PERMIT CONSTRUCTION Fee is 1½% of total job cost or $ minimum Today s Date: Business Starting Date: Business Name: Business Street _ Business Contact Person: Phone: Location / address of work performed: Reason for Application: New Business Change of ownership Change of address Previously operating without permit New Location Other than yours, is there another business operating at this address? Yes No If yes, provide the name of the business: A Fire Code Permit is required to maintain, use, store, or handle materials, or to conduct processes, which produce conditions hazardous to life or property, or to install equipment used in connection with such activities. If your business intends upon engaging in any of the following activities, operations, practices or functions, a Fire Code Permit may be required. Please identify all of your business intended activities by placing an X in the box provided. If you require assistance, or would like more information, contact us at When issued, the permit shall be posted in a conspicuous location on the premises and shall be kept on the premises until removed/replaced by the Fire Official or AHJ. The permit shall be renewed annually. Changes in use or owner will require issuance of a new Fire Code Permit. This section is for application approval only. Inspector Date This section is for on-site final approval only. Inspector Date Items below for Fire Official's Office Use Only Permit # AMOUNT RECEIVED Check No.
5 FIRE PROTECTION SYSTEMS APPLICATION (ALTERATION, INSTALLATION, REPAIR, MODIFY, ENLARGE, EXTEND, REPLACE) DATE: FEE $ CHECK NO. PROJECT DESCRIPTION: NEW INSTALL UPGRADE / RETROFIT FIRE ALARM SPRINKLER #13 SPRINKLER #13R / D FIRE DETECTION FIRE SUPPRESSION STANDPIPE HOOD / DUCT SPECIAL HAZARD FIRE PUMP OTHER PROJECT INFORMATON: Project Name: Project Address: City: State: Zip: SQ. FT.: NO. Of Stories: Construction Type: Use Group / Occupancy Type: Hazard Class: CONTRACTOR INFORMATION: INSTALLER INFORMATION: APPLICANT INFORMATION: (If different from above)
Chapter 4-16 SPECIAL DESIGN STANDARDS FOR TYPE V CONSTRUCTION
Chapter 4-16 SPECIAL DESIGN STANDARDS FOR TYPE V CONSTRUCTION Sections: 4-16-01 PURPOSE 4-16-02 APPLICABLE AREA 4-16-03 CONSTRUCTION AND OCCUPANCY 4-16-04 UPPER BUILDING AREA, HEIGHT, NUMBER OF STORIES
More informationBUILDING CODES & DESIGN CRITERIA
BUILDING CODES & DESIGN CRITERIA Adopted Building Codes: 2006 International Building Code (IBC) 2006 International Residential Code (IRC) 2006 International Mechanical Code (IMC) 2006 International Plumbing
More informationBureau Policy for Tent Permit
Bureau Policy for Tent Permit Introduction: Occasionally we receive applications for erecting temporary or permanent tents at schools or commercial establishments. This policy is generated to give a general
More informationAdvanced Ventilation for Residential applications FBC Res 2010.
Advanced Ventilation for Residential applications FBC Res 2010. Course Description Review of the Residential Ventilation requirements in the Florida Building Code, Residential 2010. I. Introduction Dean
More informationPLAN SUBMITTAL REQUIREMENTS - ARCHITECTURAL
FIRE DEPARTMENT 10573 E Stockton Blvd. Elk Grove, CA 95624 (916) 405-7100 Fax (916) 685-6622 www.yourcsd.com PLAN SUBMITTAL REQUIREMENTS - ARCHITECTURAL I Purpose To advise architects, engineers and contractors
More informationTEMPORARY MEMBRANE STRUCTURES, TENTS AND CANOPIES Created July 2005, Revised January 2012
TEMPORARY MEMBRANE STRUCTURES, TENTS AND CANOPIES Created July 005, Revised January 01 COLORADO SPRINGS FIRE DEPARTMENT Division of the Fire Marshal If you have any questions or comments regarding the
More informationCITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application
CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY
More informationHigh Piled Combustible Storage Guideline
Moreno Valley High Piled Combustible Storage Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: May 5, 2017 Rev: 7-28-16 City of Moreno Valley Fire Department Page 1 of 19 High Piled Storage
More information2014 Commercial Plan Submittal Checklist
City of Aurora Public Works Department AURORA PUBLIC SCHOOLS AND CHERRY CREEK PUBLIC SCHOOLS 2014 Commercial Plan Submittal Checklist Permit Center 15151 E. Alameda Parkway, Ste 2400 Aurora, CO 80012 303-739-7420
More information2012 Fiscal Impact International Mechanical Code
2012 Section No. 306.5 Item 2 2012 Code Information - bold text = new text found in 2012 strike out = text deleted and not found in the 2012 Equipment and appliances on roofs or elevated structures: Item
More informationCity of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax:
City of Des Moines Permit and Development Center 602 Robert D Ray Drive Des Moines, IA 50309 Phone: 515-283-4200 Fax: 515-283-4270 This Code Analysis Form must be completed and returned with the Building
More informationCODE COMPLIANCE PLAN REVIEW PROCEDURES
CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews
More informationHERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW
HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com
More informationCITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION
CITY OF CRANSTON RESIDENTIAL PERMIT PROCEDURE BASEMENT RENOVATION WE WILL NOT ACCEPT ANY PLANS OR PAPERWORK TO START THE REVIEW PROCESS UNTIL ALL ITEMS BELOW ARE SUBMITTED TO US AT THE SAME TIME. PLANS
More informationPRESCRIPTIVE COMPLIANCE METHOD
CHAPTER PRESCRIPTIVE COMPLIANCE METHOD 3 SECTION 301 GENERAL 301.2 Building materials. Building materials shall comply with the requirements of this section. 301.2.1 Existing materials. Materials already
More informationPermit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:
Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,
More informationUNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011
UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 CONTENTS A. PURPOSE B. DESIGNATED RESPONSIBILITIES C. DEFINITIONS D. PROJECT SUBMITTAL PROCEDURE E. REQUIREMENTS
More informationCode Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)
Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently
More informationSpecification Lightning Protection Systems
Specification Lightning Protection Systems General: Summary A) This Section specifies the lightning protection system for the building(s) or structure(s). This system provides safety for the building and
More informationCITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures
CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person
More informationJune 7, 2012 PARTIES INTERESTED IN HVAC DUCT ENCLOSURE ASSEMBLIES
June 7, 2012 TO: PARTIES INTERESTED IN HVAC DUCT ENCLOSURE ASSEMBLIES SUBJECT: Revisions to the Acceptance Criteria for Metallic HVAC Duct Enclosure Assemblies, Subject AC179-0612-R1 (MB/CA) Dear Colleague:
More informationAPPLICATION NUMBER:, TAX MAP KEY: STREET ADDRESS:, PRPOJECT: APPLICANT:, PHONE NO: MAILING ADDRESS:, FAX NO:
COUNTY OF KAUAI BUILDING DIVISION, DEPARTMENT OF PUBLIC WORKS 4444 RICE STREET, SUITE 175, LIHUE, HAWAII 96766 Telephone: (808) 241-6655 Fax Number: (808) 241-6806 BUILDING CODE COMMERCIAL CHECKLIST APPLICATION
More information780 CMR: 9 th Edition Massachusetts State Building Code. Presented to: BSA Codes Committee. DATE: January 20, 2016
780 CMR: 9 th Edition Massachusetts State Building Code Presented to: BSA Codes Committee DATE: January 20, 2016 This course is registered with AIA CES for continuing professional education. Credit(s)
More informationFS , 712, 713, 714
VERTICAL OPENINGS STUDY GROUP REPORT TO CTC MEETNG CHICAGO, IL JUNE 28-29, 2012 PUBLIC COMMENTS CTC Code Change Proposal FS50-12 was Approved as Modified as shown below - No public comments for the Group
More informationCHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION
CHAPTER 26 PLASTIC SECTION BC 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic
More informationBuilding Codes and Ordinances ARC 227
Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive
More informationBASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS
BASEMENT FINISH REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS A construction permit is required. A homeowner may perform the construction work on his own property where he resides, without a
More informationPENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION
PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION Permit No. 175 Beaver Drive, P.O. Box 486 DuBois, PA 15801 Phone: 814-375-1111 Fax: 814-375-1117 Toll Free: 855-PENNSAF LOCATION OF PROPOSED
More informationMSC Guidelines for Review of Ventilation System Plans
K. B. FERRIE, CDR, Chief, Hull Division Purpose: This Plan Review Guideline (PRG) explains the requirements for seeking plan approval of ventilation systems from the Marine Safety Center (MSC) for most
More information2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)
2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:
More informationCITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION
1 PLAN INFORMATION Residential plans must be legible and capable of digital scanning. All sheets shall be the same size and distinctly labeled with a sheet title and number. The minimum dimension of the
More informationKITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)
CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA 92691 (949) 470-3054 KITCHEN REMODELS A permit is required for kitchen remodels that include removal and replacement
More informationFirst Revision No NFPA [ Section No ]
First Revision No. 1001-NFPA 5000-2015 [ Section No. 7.2.5.6.8 ] Global FR-6108 7.2.5.6.8 Exterior Nonbearing Walls. Exterior nonbearing walls tested shall be permitted when tested in accordance with,
More informationComparison of the life safety elements of the 1997 UBC and the IBC 2000.
Comparison of the life safety elements of the 1997 UBC and the IBC 2000. Introduction The Building Performance Research Institute s mission is primarily one of education on building safety and performance.
More informationWON-DOOR CORPORATION Won-Door FireGuard Applications
WON-DOOR CORPORATION Won-Door FireGuard Applications A Code Analysis WON-DOOR CORPORATION Won-Door FireGuard Applications A Code Analysis THE INTERNATIONAL BUILDING CODE is widely recognized in the United
More informationProtecting Penetrations in Fire Rated Construction
Protecting Penetrations in Fire Rated Construction NY State Fire Marshals and Inspectors Conference September 7 th Bruce E. Johnson UL Codes and Advisory Services UL and the UL logo are Trademarks of UL
More informationTOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX
TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ 08014 856-467-3626--- FAX 856-467-9260 Application for Certificate of Occupancy for Change of Occupancy Pursuant to Chapter 119 of the Township
More informationTOWN OF DEWITT PLANNING AND ZONING PERMIT REQUIREMENTS FOR DECKS
TOWN OF DEWITT PLANNING AND ZONING PERMIT REQUIREMENTS FOR DECKS 1) Copy of survey within ten years showing all structures, property lines and deck location drawn to scale. SURVEYS REDUCED IN SIZE ARE
More informationAdministrative Changes
Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings
More information2009 IBC Section 1024 Approved Luminous Egress Path Markings
2009 IBC Section 1024 Approved Luminous Egress Path Markings Where Required Buildings of Groups A (Assembly), B (Business), E (Education), I (Institutional), M (Mercantile) and R-1 (Residential transient
More informationApplying the Building Code During Design
Applying the Building Code During Design A Step-By-Step Process AIA Learning Units The Salt Lake City CSI Chapter is a Registered Provider with The American Institute of Architects Continuing Education
More informationb. Nonfixed and movable fixtures, cases, racks, counters and partitions not over five (5) feet nine (9) inches high.
Section 17.08.090 Permits. A. Permits Required. No person shall cause any work to be done, regulated by the technical codes, unless a permit has first been obtained. B. Except as specified in this code
More informationWARWICK TOWNSHIP Dept. of Planning & Zoning
For Warwick Township Use Only WARWICK TOWNSHIP Dept. of Planning & Zoning 1733 Township Greene, Jamison, PA 18929 : (215) 343-6100 www.warwick-bucks.org Check #: Check Amount: Received by: BUILDING PERMIT
More informationRESIDENTIAL CONSTRUCTION New Dwellings and Additions
How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:
More informationAGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION
AGREEMENT CONCERNING EXISTING AS BUILT CONSTRUCTION Building Permit Number: Date Received: By: I,, as owner of record of the above property, hereby request a permit for and final inspection of the installation
More informationFast Track Re-Roof Permit Checklist
Fast Track Re-Roof Permit Checklist ADDRESS I will abide by attached City Re-Roofing Building Permit Required Guidelines, including applicable Siding and Roofing Match and Smoke Detector requirements.
More informationTOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:
TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be
More informationSITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS
SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS April 2009 General Solid Waste and Recycling Service Responsibilities: The City of Denton is the exclusive provider
More informationBUILDING PERMIT APPLICATION
TOWN OF LEICESTER 132 Main Street Post Office Box 197 Leicester, New York 14481 Phone: (585) 382-3231 FAX: (585) 382-9766 BUILDING PERMIT APPLICATION All Town of Leicester property owners are required
More informationFire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II
Fire Inspection and Code Enforcement, 7 th Edition Chapter 6 Building Construction: Components Today we will Discuss fire walls, party walls, fire partitions, and curtain walls Discuss roof types and coverings
More informationINTERNATIONAL MECHANICAL CODE
INTERNATIONAL MECHANICAL CODE M1-09/10, Part I 202 (New) Proponent: Guy Tomberlin, Fairfax County, VA, representing the Virginia Plumbing and Mechanical Inspectors/Virginia Building and Code Officials
More informationEXIT ACCESS RAMP. An interior ramp that is not a required interior exit ramp.
Coordination with language throughout code 10/05/2011 Stair vs. stairway Repetitive language with stairways and ramps Including ramps when applicable The locations for stair, stairway and ramp as used
More informationBasement Renovation Guide For Residential Dwellings
1 Development Services Department Building Permit & Inspection Services Basement Renovation Guide For Residential Dwellings This document is a guide for home owners and does not cover all possible conditions.
More informationINTERIOR ENVIRONMENT
CHAPTER 12 INTERIOR ENVIRONMENT > SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern ventilation, temperature control, lighting, yards and courts, sound transmission, room dimensions,
More informationUnderground Piping for Private Hydrants & Sprinkler Supply Line
City of Brea Brea Fire Department Fire Prevention 1 Civic Center Circle Phone: (714) 990-7655 Underground Piping for Private Hydrants & Sprinkler Supply Line PURPOSE The provision of adequate water supplies
More informationGENERAL PLAN REVIEW REQUIREMENTS
GENERAL PLAN REVIEW REQUIREMENTS Cover Letter A letter (or an authorized pre-printed form) authorizing CCIS to perform the Plan Review is required. CCIS performs plan reviews for the ICC International
More informationPLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS
PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS NOTE: Building Code compliance is the obligation of design professionals and/or contractors. Plan review and inspection guidelines are to be used to ensure
More informationBUILDING PERMIT BASICS
Corey Bingham, Building Official 2930 Tongass Avenue, Ketchikan, AK 99901 Phone: 907.228.4727 Fax: 907.228.8721 Website: www.city.ketchikan.ak.us BUILDING PERMIT BASICS 1. When is a building permit required?
More informationSECTION : FIRE WALL AND FIRE SUPPRESSION REGULATIONS FOR R1-Z, R-2, R-3 ZONING AND PDD CATEGORIES
SECTION 500.110: FIRE WALL AND FIRE SUPPRESSION REGULATIONS FOR R1-Z, R-2, R-3 ZONING AND PDD CATEGORIES A. Purpose. The intent of this regulation is to amend the current adopted edition of the International
More informationReceived by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:
HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT POST OFFICE BOX 2340 * 640 SOUTH MAIN STREET * LABELLE, FLORIDA 33975 * (863) 675-5245 * FAX: (863) 674-4194 1100 OLYMPIA ST CLEWISTON, FLORIDA 33440
More informationBASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)
BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) PERMIT SUBMITTAL CHECKLIST: Signed and completed Building Permit application form. A separate Electrical permit is required from
More informationMinnesota Health Care Engineers Association
Minnesota Health Care Engineers Association Life Safety Code Potpourri Friday, May 1, 2015 Presenter: Bob Dehler, P.E., Engineering Program Manager, Minnesota Department of Health Minnesota Department
More informationCHECKLIST Inspecting a Garage
CHECKLIST Inspecting a Garage By Ben Gromicko This section deals with the details of the garage or carport inspection that may be performed. At the end of this section, you shall be able to: describe the
More informationMedina County Building Department
Medina County Building Department Charles E. Huber Building Official chuber@medinaco.org Permit Center 791 W. Smith Rd. Medina, Ohio 44256 Main: (330) 722-9220 Fax: (330) 764-8204 http://building.medinaco.org
More information10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction.
Plan Examination 1 Plan ExaminationPurpose 2 Catch problems in advance of construction. 3 1 Discovery of problems in the field results in higher cost. 4 Can a good plan review eliminate all problems in
More information02800 SHADE STRUCTURES
02800 SHADE STRUCTURES for PLAY AREAS ****************************************** SPECIFIER: The shade structure shall utilize a four point hypar system with four columns located a minimum of 10 feet from
More informationCHAPTER 26 PLASTIC SECTION 2601 SECTION 2603 GENERAL FOAM PLASTIC INSULATION
CHAPTER 26 PLASTIC SECTION 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic veneer,
More informationCITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)
CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY 42141 Phone: (270) 651-3921 Fax: (270) 651-9553 Permit # Filing Date: Total Fee: Property Property Owner: Subdivision: Lot #
More informationFire Protection Underground Piping. ASCE Meeting 12/17/14 Columbia, SC
Fire Protection Underground Piping Columbia, SC What We ll Cover Today 2 Applicable NFPA standards Shop Drawing Requirements State Fire Marshal s Review Sprinkler Act Fire Sprinkler System Specification
More informationRESIDENTIAL BUILDING REQUIREMENTS
RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell
More informationHIGH PILED COMBUSTIBLE STORAGE CITY OF NOVI SUBMITTAL CHECKLIST In Accordance with Chapter 23 of the 2006 International Fire Code
Project Name/Tenant: HIGH PILED COMBUSTIBLE STORAGE CITY OF NOVI SUBMITTAL CHECKLIST In Accordance with Chapter 23 of the 2006 International Fire Code Site Address: Applicant: Phone: Bldg/Unit/Suite: A
More information2012 IRC Sections R303 R310 Building Planning II
Study Session 3 2012 IRC Sections R303 R310 Building Planning II OBJECTIVE: To develop an understanding of the health and safety criteria of the code, including light and ventilation; minimum room areas
More informationCode Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)
Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently
More informationLYNN BUILDING DEPT. TABLE OF CONTENTS SECTION 1:00 APPLICABILITY PAGE 1 SECTION 2:00 GENERAL DEFINITIONS PAGE 1, 2 & 3
(. TABLE OF CONTENTS LYNN BUILDING DEPT. SECTION 1:00 APPLICABILITY PAGE 1 SECTION 2:00 GENERAL DEFINITIONS PAGE 1, 2 & 3 SECTION 3:00 GENERAL REGULATIONS PAGE 3 & A SECTION A:00 PROHIBITED SIGNS PAGE
More informationTC54. for architects & designers. Dimensions Clearances Venting
for architects & designers TC54 Series D Dimensions Clearances enting IMPORTANT This booklet is intended as a basic specification guide for architects, designers and builders. Please refer to the Instruction
More informationContinuing Certificate of Occupancy Pre-Inspection Checklist
Pre-Inspection Checklist INTRODUCTION: This pre-inspection checklist has been produced to assist you in preparing for a Continuing Certificate of Occupancy (CCO) inspection. The inspection criteria and
More informationSIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING
PROJECT: 25 E 5 S SALT LAKE CITY, UTAH 84111 CODE ANALYSIS APPLICABLE CODES 675 E. 5 S. Suite 4 DFCM PROJECT NUMBER: 182782 DFCM CONTRACT NUMBER: 18793 STRUCTURAL ENGINEER: REAVELEY ENGINEERS + ASSOCIATES
More informationCITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan
Requirements for Obtaining Building Permits City of Coldwater, Michigan Any owner, owner s builder, architect or agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy
More informationREAD ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter X X X Adopt Entire Chapter as amended (amended sections listed below) X X X X X X
CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE CHAPTER 9 - VENTS (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency authority and building application.)
More informationThe Building Codes A.R.E. Building Design and Construction Exam Prep
Know Thy Codes! The Building Codes Building Codes The Code of Hammurabi 4000bc Developed 19 th and 20 th c. Codes define what you can and can t do Allowable area and height based on degree of danger Fire
More informationResidential Building Permit Application
City of Twin Falls Building Department 324 Hansen Street East P.O. Box 1907 Twin Falls, ID 83303-1907 208-735-7238 208-736-2256 www.tfid.org PROJECT INFORMATION Project Residential Building Permit Application
More informationCity of Aurora Building Division Regulations Marijuana Related Occupancies
The following regulations pertain to Building Division requirements for the plan review, approval and inspection of marijuana-related occupancies. The requirements listed below are only intended to assist
More informationWhat is a Won-Door FireGuard Door?
What is a Won-Door FireGuard Door?. A horizontal sliding accordion fire door that meets all IBC requirements for use in a means of egress and has fire ratings up to 3 hours. A Reference Guide to special
More informationBuilding Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT
Building Permit Application Instructions NOTICE: Keep these instructions for your records. Please read and understand these instructions completely prior to completing and submitting your building permit
More informationChapter 2: Foundation
Chapter 2: Foundation Crawlspace [V502.1.2] [V502.1.2] [V502.1.3] Vents. Vents in the crawlspace help keep floor insulation and floor framing dry. Crawlspace vents also reduce the potential for radon buildup
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More informationCity of Tacoma Planning and Development Services
City of Tacoma Planning and Development Services ORDINANCE NO. 28155 Adopt and Amend the City s Building Code; amending Title 2 of the Tacoma Municipal Code, implement the 2012 International Building,
More information2. Does not require, involve or include any additions to, or repair or modification of, the existing foundation.
SECTION 3109 STRUCTURES SEAWARD OF A COASTAL CONSTRUCTION CONTROL LINE 3109.1 General. The provisions of this section shall apply to the design and construction of habitable structures, and substantial
More informationCOMMERCIAL PLAN REVIEW FOR CODE COMPLIANCE
3800 Laverne Avenue Lake Elmo, Minnesota 55042 (651) 747-3900 Fax (651)747-3901 COMMERCIAL PLAN REVIEW FOR CODE COMPLIANCE Introduction Site Address: Facility Name: Project Contact(s): (Name/address/phone/fax
More informationZONING ADMINISTRATOR AGENDA
COMMUNITY DEVELOPMENT SERVICES PLANNING SERVICES ZONING ADMINISTRATOR AGENDA May 14, 2014 City Council Chambers 3:00 PM 1. 911 Arguello Street (Crown Castle on behalf of Sprint) Use Permit and Architectural
More informationTraining Certification Categories
Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and
More informationCity of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES
City of Bullhead City Development Services/Public Works Permit Submittal Requirements FENCES Contact Information: Building Division (928) 763-0124 Planning & Zoning Division (928) 763-0123 Engineering
More information2012 INTERNATIONAL CODES SIGNIFICANT CHANGES
2012 INTERNATIONAL CODES SIGNIFICANT CHANGES TIM PATE CHIEF BUILDING OFFICIAL CITY AND COUNTY OF BROOMFIELD 2012 IRC 1. Section R302.1 has been modified to allow reduced fire separation distances when
More informationTHE DEVELOPMENT REVIEW BOARD. 1. New construction or relocation of single-family homes, including mobile/modular and manufactured homes.
- I THE DEVELOPMENT REVIEW BOARD The General Plan of the City of Lakewood has been established to guide and promote the orderly growth and development of the community. The goals of the City, specified
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: FUNDERMAX GMBH
0 Most Widely Accepted and Trusted ICC-ES Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3340 Reissued 05/2017 This report is subject to renewal 05/2018. DIVISION: 07 00 00 THERMAL
More informationChapter UNIFORM CODES FOR CONSTRUCTION BUILDING CODE
Chapter 23.12 UNIFORM CODES FOR CONSTRUCTION BUILDING CODE 23.12.010 Adoption of the 2010 California Building Code. Part 2. Title 24 of the California Code of Regulations. There is adopted and incorporated
More informationStandard Plan Review - Project Submittal Checklist
Standard Plan Review - Project Submittal Checklist DATE: PROJECT ADDRESS: PROJECT MANAGER: RETURN TO PM WITH CORRECTIONS 2 nd INTAKE APPOINTMENT Submit the following requirements, as applicable, at the
More informationFCIA Webinar Gypsum Wall Patching
FCIA Webinar Gypsum Wall Patching Firestop Contractors International Association Hillside, IL +1-708-202-1108 - office Bill McHugh bill @ fcia.org Nestor Sanchez, USG Corp. nsanchez@usg.com DIIM Firestopping
More informationBuilding Code 8 th Edition
Massachusetts State Building Code 8 th Edition Kevin S. Hastings, P.E., LEED AP R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com RW R.W. Sullivan Engineering
More informationBuilding Permit Submittal Requirements
CITY OF MONTE SERENO 18041 Saratoga-Los Gatos Road Monte Sereno, CA 95030 Phone (408) 354-7635 Fax (408) 395-7653 www.cityofmontesereno.org Building Permit Submittal Requirements NOTE: Submit three (3)
More information