Due to the rigorous nature of the plant preparation process, the following are used as control points for the process.

Similar documents
HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993

USING TITHONIA AS A FERTILISER

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment

Muhlenberg College Tree Plan

METHOD STATEMENT OF CONSOLIDATION GROUTING

Progressive Rehabilitation of Halle cement quarry in Korea

Examining Reforestation Practices

Appendix 4. Soil Management Plan

25 m2 (270 sq ft) Extension Kit

Unit C: Forest Management. Lesson 6: Examining Deforestation Practices

METHOD STATEMENT. MVV O&M GmBH, South West Devon Waste Partnership & Kier Construction Limited. Document No: CMS/ E0788 /003 FOR

Research Forest. Potential causes of basal forking in young lodgepole pine plantations Establishment Report. Quick Sheet #11.

HANDLING OF LARGE NURSERY STOCK

2014 HURRICANE PROCEDURE MANUAL THE FOUNTAINS AT COUNTRYSIDE CONDOMINIUM ASSOCIATION, INC.

MiniSTrY Of PriMarY and SeCOnDarY education. agriculture. junior (grade 3-7) SYllaBuS ( )

To establish the Panama Canal Authority (ACP) occupational safety requirements for excavations.

Code of Practice For Timber Management Operations In Riparian Areas

Conergy SolarFamulus II

Reduction Pruning. Community Forester Alabama Cooperative Extension System

Stage 4 Geotechnical Investigations Information Sheet

HEALTH & SAFETY POLICY

CURRICULUM MAP Cluster: Agriculture, Food and Natural Resources CTE Program of Study: AG0130 Forest Industry

E16. Trees in open space zones

CORNER SLIDE RAIL OPEN PIT INSTALLATION INSTRUCTIONS

REFERENCE ID: AGR / Q

OCCUPATIONAL HEALTH & SAFETY POLICY

Conservation Education

Contents. Before you begin. Introduction: Carrying out concreting to simple forms 1. Element 1: Planning and preparing 3

Competency Standards

Arboricultural Assessment Report

OPERATION AND MAINTENANCE MANUAL

Seedling Maintenance

2010 HSC Construction Sample Answers

Competency Standards. Citrus Production (NVQF Level 1) National Vocational & Technical Training Commission March 2014


M.B. Power Services (Essex) Ltd

Code of Practice for the Sustainable Management of the Forests and Tree Resources of Tonga

This is a protocol that is designed to support the citizen

Field Guide Exercises for IPM in FRENCH BEANS (Part II)

2. PLANNING AND MAKING A SOIL SURVEY

African Organic Agriculture Manual Booklet Series No. 3 Soil and water conservation HOW DO I PROTECT THE SOIL NUTRIENTS AND WATER FROM LOSS?

Avoiding Tree Damage During Construction

Tree Preservation and Protection (Effective May 1, 2003)

TREE SERVICE STANDARD OF CARE

RISK ASSESSMENT AND SAFETY METHOD STATEMENT. for. GROUNDWORK PREPARATION AND LAYING OF YORKSTONE SEGMENTAL CIRCLE (3.6m DIAMETER)

Mechanical Blossom Thinning Using a Darwin String Thinner 2010 CTFA Annual Research Report

WATERBOXX PLANTING INSTRUCTIONS. AquaPro

March 3, To: Andrew Cohen-Cutler, Associate Planner. City of Calabasas. From: James Dean, A.S.L.A., I.S.A. City Arborist

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY NATIONAL CERTIFICATE MODULE: UNIT SPECIFICATION GENERAL INFORMATION. -Module Number Session

METHOD STATEMENT SCREEDING OF FLOOR

Electrical Shock. To share lessons learned gained from incident investigations through a small group discussion method format.

Survival of the Fittest: Pine Seedling Survival Increased by

Code of practice for the taking and use of protected plants

CW 3615 RIPRAP TABLE OF CONTENTS

Health and Safety Policy

HIGH PERFORMANCE MODULAR BIOFILTRATION SYSTEM (HPMBS) Operations & Maintenance

MANUAL. portrait set-up. landscape set-up. ClickFit Evo mounting system for sloping roofs with roof tiles for solar panels

Foresters utilize a variety of specialized tools to accomplish the following tasks:

Unit Standard 497 Demonstrate knowledge of workplace health and safety requirements Version 7 Level 1 3 Credits. Student Checklist & Instructions

Woody Vegetation (Trees) Establishment on Upland Sites

Tree Protection Policy

Save trees... by relocating them with the DAMCON tree transplanter.

OPERATOR S SAFETY MANUAL

Traditional Orchard Survey instructions

DEPARTMENT OF TRANSPORTION ENVIRONMENTAL PROTECTION AGENCY OCCUPATIONAL SAFETY AND HEALTH ACT

Operation & Maintenance (OM) Manual v01. Bioretention Systems ENGINEERED SOLUTIONS

Sustainable Forest Management

HEALTH AND SAFETY AT WORK ACT 1974 HEALTH AND SAFETY POLICY OF:

General Brick Installation Instructions

dnr.wa.gov/sflo Planting Forest Seedlings How to select, plant and care for tree seedlings WASHINGTON STATE DEPARTMENT OF Natural Resources

Operating & Maintaining a co-composting facility

How to build 4 DIY projects with. AB Courtyard

Cost-Effective Systems for Seedling Production and Tree Farm Establishment

MVDC F041 Safety Inspection Checklist

SPECIFICATION 7 P. RADIATA THIN TO WASTE CONTRACT JOB SPECIFICATIONS FOR P. RADIATA THINNING TO WASTE

REGENERATION AND SAPLING SURVEY

Outreach Program in Environmental Science

Southern Rural Fire. How To Safety Burn Stubble.

METHOD STATEMENT FOR TRENCHING/EXCAVTION FOR CONSTRUCTION OF

EFFECTS OF CONTAINER SIZE ON WHITE PINE AND DOUGLAS-FIR. SURVIVAL AND GROWTH IN NORTH IDAHO --Daniel L. Miller and Richard M.

Nancy L. Young, Forester USAID/USDA Natural Resources Conservation Service

MOUNTAIN VIEW SCHOOL DISTRICT. Forestry

Request for Proposal & Statement of Qualifications

Model # 800SM-PS3. 8/3/2016 Page 1 of 8

Land Preparation & Crop Establishment

Ecological Impacts of the Tsunami: Field observations from Sri Lanka

Job Description and Person Specification

Cedar Flooring Rounds

Mix and lay concrete tutor notes

Installing Tree Tubes

ESSENTIAL STANDARD no.1. Excavations

Signs of Disease or Damage. What it may indicate. Broken branches Water entering through old wounds and supporting wood decay by fungi

DEFINITIONS. A shallow bored hole under the derrick substructure in which the kelly is temporarily stored during tripping operations.

Level 2 NVQ Diploma in Trowel Occupations (Construction) (QCF) Qualification Specification

European Tree Technician

Operation & Maintenance (OM) Manual v01. Bioretention Systems

Silviculture Treatments for Ecosystem Management in the Sayward

Research Newsletter No. 37 Bill Miller, Cornell University

C/O.Piper Homes. 1.0 Reference No: SC17093 Insulation Underfloor Heating Pipe Screed works.

Transcription:

REHABILITATION The plant Nursery is expected to have adequate numbers and sizes of required seedlings of specified coastal indigenous plants vegetation to diversify vegetation from pioneer tree plantations to coastal indigenous forest. Substrates used at the plant nursery include overburden, river sand, and manure; Common agricultural tools are used at the Plant nursery and they include spades, trowels, jembes, wheelbarrows, secateurs, knives, bow saw, buckets, watering cans, Hose pipes, sprinklers. Our Propagules include seeds, and cuttings, Consumables: polythene planting tubing or planting bags, labels, mark pens, counter books, stationary counter books, receipt books, gate pass books. The required Infrastructure includes water supply, water tanks, store, office, seedling enclosures. Seedling preparation time from sowing to grow to planting size depends on individual species. This ranges between 6 to36 months respectively. Preparations: Seedling requirements are identified for non-standard pioneer species (1yr in advance)at the same time seedlings requirements for enrichment planting (2-3yrs in advance) Seed / propagule sourcing are also identified. Propagation trials for new species are also undertaken. List of species and specifications required each season/yr are also obtained at this stage. Planning production program and schedules are established and Propagation information through research (with other experts) or experimental trials are obtained from this point. Activity description The following is a sequence of event/tasks as carried out at the Plant nursery. First of all seeds are sourced from various places followed by treatment at the nursery. Seedbeds for the next action are carried out after which the selected and prepared seeds are sowed. After a period of 1-2 weeks seedlings are then pricked out into bags. It must be noted that Propagation through cuttings may call for a separate procedure and so the propagation through layering. Seedling care is undertaken to ensure healthy adaptation and growth. This care involves watering, root pruning, adjust light conditions among others. Finally all the above is followed by preparation for planting out (hardening to sunlight). Due to the rigorous nature of the plant preparation process, the following are used as control points for the process. 1. number of seedlings and species produced vs. i.e. production request 2. seedling height for transplanting: >0.5m 3. roots not extending out of planting bags (roots pruned regularly) 4. roots not curled in the planting bags 5. seedlings labeled (species name, seed origin, sowing date) 6. buffer stock for replacement

7. seedlings hardened 8. cost per seedling 9. reports The plant nursery section interfaces with other departments in the Lafarge Ecosystems in many ways. They include seedling requests from Tourism Department such as indigenous ornamentals and palms for replacement in the gardens, seedling requirements for butterfly food plants and many more. There are also special seedling requirements for Ecosystems Maintenance. This is in the form of fodder plants, food plant replacements, indigenous ornamentals for exhibits and landscaping works around facilities. LAND PREPARATION Ripping and Leveling As a standard practice, the quarry floor is ripped and leveled in preparation for planting pioneer trees. This process helps in softening the ground to allow root penetration for successful establishment of pioneer trees. Ripping ensures that Quarry floor has been ripped with a bulldozer or equivalent equipment, and the solid rock substrate broken to allow access for tree roots to ground water. Ripping lines are at a distance of not more than 2m distance. Ripped surface has been leveled by pulling the Cat shovel over the ripped ground, creating a level surface (level difference between extruding rocks & holes of not more than 0.3m in extreme; general level difference <0.2m). If ripping on a slope, ripping lines to follow contours. Machine models CATD7/D8/D9 are used in ripping our lands and are able to rip an average of between 8-11h/ha a day (depending on hardness of substrate). Ripping is based on sound preparations that include Planning based on annual rehabilitation. work plan (or handing-over procedure), Budgeting approval year before (if external equipment), request for equipment hire through purchasing department, site visit with the relevant Dept (or contractor) approx. 1 week prior to requested operation date confirmation of agreed operations and dates in writing, identify and chalk-mark area for ripping, instruct operator(s) and

rehabilitation. Supervisor 1 day prior to start of work, mark operations area with barrier tape if accidental intrusion is likely. Actual ripping process Actual ripping and leveling process involves Written instructions that has been signed off by relevant authority, ripping quarry floor with ripper teeth on the back of the D9.Ripping is carried out as deep as possible (approx.1m).ripping machine is turned at the end of the line (not ripping forward only and reversing), or level while reversing. Leveling is done by reversing and pushing shovel onto the ground so as to even out protruding rocks and cover holes and crevices created during ripping. Frequent supervision during operation by Land Use Planner or equivalent and relevant authority is done at least twice per day. Inspection on completion of the ripping exercise is officially signed off by Land Utilization Manager/ Land Use Planner----confirm??. Controls Ripping exercise has a number of control points that serve as our key performance indicators. First of all, the area being ripped must remain as specified in written, signed instructions agreement. Ripping depth must be maintained at +/-1m. This is enforced by site supervision during operations. The final level smooth (level variations <0.3m) must be emphasized during this operation. Finally the operation must be completed within budgeted time and -cost in case of external equipment Communication During the ripping operations, communication stands out as a vital part of the process. Work plan communication within department is carried out effectively and within specified time frame. Rehabilitation authorities instruct rehabilitation team and machine supervisor on area to be ripped and the actual operations to carry out. Emergency numbers to operator, supervisor in case of break-downs or other problems. Interfaces with other Departments To begin with, work plan communication with Mombasa Plant (Bamburi Cement) is done in early January for the year. This is followed by request for equipment allocation or even hire

through purchasing department. There is also continued work organization and coordination with Quarry teams or contractors. Information to Lafarge Ecosystems tourism and ecosystems departments is also maintained. If operations are close to tourism/ecosystems operational areas security is informed. In case of any changes to the original quarry operations program, relevant authority in the Quarry /contractor informs Land use Officer immediately. These changes could be equipment failure or breakdown, any interruption of operations for other reasons or due to site conditions among others. Land use Planner or Rehabilitation supervisor informs Land Utilization Manager or Chief operating Officer in case of changes in original program due to site conditions. Where heavy machinery and intensive works will be carried, prior arrangement are made with other departments so as to ensure harmony of operations with other departments or sections. PIONEER TREE PLANTING The expected results for Pioneer planting during rehabilitation is a well established plantations of pioneer trees Pioneer planting This process involves setting up planting plots and Planting seedlings, followed by staking, then protecting and finally replacing any mortality of the seedlings. This is in most cases on a fresh quarry land. In many instances Casuarina equisetifolia is mixed with Conocarpus lancifolius, Albizia verticolor, and other species as per specific planting plans. Expected survival rate after 1yr is 90% in low-level plantations. During Pioneer tree planting we organize our Manpower into teams of 1 team leader and 5 attendants to implement this function. Materials Substrates in the quarry floor is ripped and leveled. During this process basic tools such as planting pegs, knives and others are used for marking the sites. Individual Seedling species are prepared as per planting plans: size 0.3-0.5m and as per specifications. It takes is one year for full plantation establishment. Lafarge Eco systems standards require that quarrying is done to a level of 20-60cm above groundwater level. The rehabilitation team ensures that quarry floor is ripped and leveled, rehabilitation annual work plan is developed, seedlings are purchased or propagated and that finally that coordination with rainy season (ideally plant early in the rainy season). Actual process This process involves setting up planting plots (100x100m plots) and extend existing gridline system into new plantation (or establish new system); allow for 5m-wide grid roads at 100m distance. This is followed by marking plant locations with sisal string (and species to plant in multi-species plantations). Planting seedlings is undertaken, followed by staking, then protecting and finally replacing any mortality of the seedlings. Records of the success story of this process marks the official end of this process.

Controls In pioneer planting, it s important to establish meaningful control points, key achievements or Key performance indicators. Lafarge Ecosystems uses a number of guidelines to achieve this. First of all planting plots are set up as per work plan (annual objectives on maps). Plant locations and species are planted as per planting plan. Seedling quality as per planting are set as per specifications (as specified in 4.2. planting seedlings sub-procedure). All seedlings leaning at <45o are staked in order to enhance successful adaptation and growth. Seedlings in South Quarry are protected from browsing, while in the other quarries they are treated as the need arises. Finally survival count is conducted after 1yr to assess survival rate of the planted species and populations. MAINTAINING PIONEER TREE PLANTATIONS The Purpose and objective of this activity is to ensure Healthy and secure plantations with high visibility up to 2m above ground, and a final pioneer tree density of half the original tree density. Maintaining pioneer tree plantations is an activity that falls under rehabilitation process is a stage that specifically and critically maintains young pioneer tree plantations. This document therefore describes how young pioneer plantations are maintained for plantation health and security. General Safety Rules associated with this process. Other than the specific rules per each activity, the following general safety rules are applied in all sites of pioneer plantation maintenance activities. The team leader is responsible for assessing the risks of the job being performed. In case of thinning of trees of >2 diameter, he goes through risk assessment checklist with the team, assess and addresses risks present, or aborts operation if risks cannot be mitigated; fills checklist, signs and keeps it with him on site Entire team required to wear mandatory personal protective equipments (overalls, safety boots, helmets and hand gloves) at all times while working in the forest

All accidents requiring first aid and worse and incidents must be reported immediately by mobile phone reporting to site supervisor, Safety Environment and Health (SHE) representative, Safety and Logistics Officer or Head of Department. Inspect all tools prior to use (during issuing in the morning) to ensure no defective or blunt tools are used (see tool inspection check list) Maintain a clean work place and all tools need to be cleaned after work & checked back into the store Site to be cleaned up of debris immediately after the completion of the task and before leaving the site. Fully-stocked portable first-aid kit to be on site at all time; team leader to be in charge of first aid, or appoints first aider in charge Pruning To carry out effective pruning in the rehabilitation plantations, such requirements as manpower, suitable materials as well as safety (Personal Protective equipments) are considered. A small team comprising of 1 team leader and 5 attendants, equipped with Pruning saws, secateurs, and Pangas (machetes) carry out this function. This rehabilitation team dress in standard and approved safety gear (shoes, overall, hard hats, and hand gloves). The above team is capable of carrying out effective pruning to the speed of 12-20 man-days /ha (depending on browsing damage and excess of branching) It must be noted that before the above function is undertaken, an assessment of pruning need is conducted (Trees >2m high, person at 10-15m distance cannot be seen). Actual pruning process First pruning During the first pruning, all branches below 1.2m are cut off with panga( machete), pruning saw, secateurs. Second pruning is conducted by cutting off all branches below 2m with panga, pruning way, secateurs and leave to rot. Quality standards To ensure quality standards during the pruning process certain activities are followed strictly. First branches cut off at not more than 1cm from stem Secondly the bark should not be allowed to sheer off from the stem at pruning points (no injury to the bark below pruning point). As a standard practice, clear control points are established to provide guidelines to this process. They may be Key achievement points or performance indicators. First of all, Clear view through plantation at height below pruning height (<1.2m yr1; <2m yr2) must be enhanced. Secondly all the above preliminary quality standards are fulfilled at all levels and to acceptable details. Thinning Thinning is a rehabilitation activity that follows pruning. First thinning is done 3 years after

planting. Second thinning follows 5 years after planting (2 years after first thinning) This process involves identification of a pattern of trees to be removed. Activity Description First thinning is carried out after 3 yrs initial removal of 25% of original plantation trees is conducted (= 625 of 2500 = every 2nd tree of every second row is removed :) row 1: left intact row 2: every 2nd tree removed (= 25trees/row) row 3: left intact row 4: every 2ndtree removed others follow the same sequence No. of trees that remains: 1875/ha Second thinning is conducted 5 yrs after planting and involves removal of another 25% of initial stand (= 625 of orig. 2500), as first thinning, but the rows originally left intact row 1: remove every 2nd tree (= 25trees/row) row 2: left intact row 3: remove every 2ndtree row 4: left intact. The final number of trees remains at 1250/ha Third thinning is carried out 10 years after planting. This involves removal of another 50% of remaining stand (= 625 of1250), by removing all trees in every second row row 1: remove all remaining trees row 2: left as is row 3: remove all remaining trees row 4: left as is Final number of trees remains at 625/ha.