Jemena Pipelines. NSW Pipeline Infrastructure. the current picture; future needs for future supplies; challenges & opportunities for development.

Similar documents
JOINT REPORT ON THE CASE FOR A SECOND NORTH SOUTH INTERCONNECTOR

Québec Natural Gas Market Review. Shahrzad Rahbar, PhD President

Location: Regional Development Australia Mid North Coast office located in Suites 9& William Street, Port Macquarie

General Manager Assets

Introduction. Specific Comments. Compliance Scenario. Submission RE: Low Carbon Fuels Compliance Pathway Assessment

THE U.S. COMMITMENT TO ENERGY SECURITY FOR ALL OF EUROPE

URANIUM SALE CONTRACTS UNDERPIN LANCE PROJECTS

Energy sector inquiry : market power and concentration in the EU energy markets

In recent months, customers in Wonthaggi, Inverloch and Cape Paterson may have noticed a gradual change in the taste and smell of their water.

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP

ORGANISATIONAL CONTEXT

As the electricity grid becomes more decarbonised the UK will need more energy storage.

Principles of Water and Wastewater Rate Setting

The PennEast Pipeline Project. Delaware Township, New Jersey September 29, 2014

AoC Sport membership review

NGA Regional Market Trends Forum. Steve Taake Manager - Gas Marketing May 3, 2018

Reflect Reconciliation Action Plan November November November

Tunisia Renewable energy Framework An IPP standpoint

Fact Sheet: The Global Net Zero Carbon Buildings Commitment in Australia

Brackish Groundwater Desalination Concentrate Treatment and Disposal Options

Energy Storage Ontario Submission to the Standing Committee on General Government Bill 172, Climate Change Mitigation and Low-Carbon Economy Act

Customer & Stakeholder Engagement

LONG ISLAND LONG ISLAND

Memo. Background. South Rochford Road Type recipient(s) here HDR, Inc. Roadway Options for Protection of Iron Fen Wetlands. Rochford Cemetery Fen

Chapter 1: Purchasing & Supply Management January :10 PM

Transportation and Infrastructure Working Group Meeting #3. April 28, 2016; 10:00 am 12:00 pm. Meeting Summary 1

APA DELIVERS ANOTHER YEAR OF SOLID RESULTS

Submission on Ausgrid s proposed vegetation management/tree pruning service charter

Three priority issues have been identified. They are supported by joint projects presented in more detail online at

Industry Attractiveness: Iberia case example

Time is Money Profiting from Reduced Cycle Time

KIDSTON PUMPED STORAGE HYDRO TECHNICAL FEASIBILITY STUDY OPTIMISATION

Transfers THIS PAPER EXPLORES THE CURRENT ISSUES AND PROPOSALS FOR AUTOMATION. Findel Transfers Working Group

STATEWIDE RURAL REGIONAL BUS NETWORK. Implementing the Colorado Intercity and Regional Bus Network Plan

Resource Adequacy in the Pacific Northwest: Serving Load Reliably under a Changing Resource Mix

Edexcel (A) Economics A-level

South Africa s Mobile Communications Market: Granny Smiths and Golden Delicious. Keeping Your Deal Competitive in a Rapidly Changing Market

Nuclear Power in the WAPP

YMCA South Australia is committed to community and recreation services as reflected in our positioning statement:-

Summary of Nelson City Land Demand and Capacity June 2017

Community Integrated Energy Mapping Feasibility Study in Alberta s Industrial Heartland and Strathcona Industrial Area

This document has been prepared by the RGA to assist you in preparing your submission to the 2016 Review of Rice Vesting.

March 21, Dear Brothers and Sisters:

Group C SMR Siting, Licensing and Regulatory Frameworks. Presented by: Mr. Joseph Nduma Ruwah, Kenya Nuclear Electricity Board IAEA

RENEWABLE PREFERENCE) BILL

PROPOSED PROCEDURE CHANGE (PPC) SUMMARY SECTION (For Proponent or AEMO to complete. Template focuses on solution identification)

Mr Liam Ryan Energy Savings Scheme Review 2015 Department of Trade and Investment GPO Box 7060 SYDNEY NSW 2001

POWERBUTTE WORKSHOP BOARD OF SUPERVISORS AUGUST 25, 2015 SOLAR OVERLAY ZONE

Human Resources Business Partner

cross-departmental co-ordination to join up industrial, energy, transport and agricultural policy

Initial Draft: National Water Resources Policy for the Fiji Islands

Taking Advantage of Combined Heat and Power (CHP)

Strategy 1 Strategy 2A Strategy 2B Strategy 2C Strategy 2D Strategy 3

SABAL TRAIL PROJECT. RESOURCE REPORT 12 PCB Contamination. FERC Docket No. CP

Birmingham Airport Response REDACTED (for external use)

Efficient access to offshore wind resources

Industry Engagement Program

Section 7: INTERGOVERNMENTAL COOPERATION

COMPREHENSIVE PACKAGE AGREEMENT 30 AUGUST 2017

Packaging regulations

L&D Network Meeting. 5 th September Sarah Artist, Senior Manager Innovation & Capacity

Energy Efficiency and Conservation Working Group Meeting #4. May 24, 2016; 1:00 pm 3:00 pm. Meeting Summary

Marketing Research: Process and Systems for Decision Making

PRESENTATION Lower Churchill Project Joint Review Panel Public Hearing March 3, 2011

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report

Canada s Energy Future 2017: Energy Supply and Demand Projections to 2040 Mike Johnson Technical Leader, Energy Supply Team

Treatment Operations Engineer. Service Delivery for Customers. Environmental Operations. Manager Wastewater Treatment Operations

DEUTSCHE BANK LEVERAGED FINANCE CONFERENCE

CalDesal Conference Desalination Today for Water Tomorrow

Renewable Portfolio Standards: Costs and Benefits

Energy Savings A District Perspective

Ministere des Transports

Joint response of the Murray Valley Horticultural Alliance to the Proposed Basin Plan

4. Powerco has also seen the Electricity Networks Association feedback, and supports its content.

The Peel Watershed Assessing the Complexities of a Land Use Issue

Company Update. November 2018

Curdridge Reading Room Invitation to tender for renewable energy feasibility study

In 1961 a new Lift Station was constructed, the trickling filter was repaired and some minor modifications were made to the treatment plant.

UPC Internal Scan Subcommittee Summary of findings and conclusions

Guidelines. Multi Industry School Based and Pre Apprenticeship Support Pilot Project. Grant Background

BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA

Operating Year(s):

PROTON ENERGY LIMITED HEALTH, SAFETY & ENVIRONMENT POLICY

BETTER BUYING POWER (BBP) 2.0 SUMMARY

Communications Manager

2018 FEC Energy. Woodco. 25 th September 2018

FORM 3 SUBMISSION ON PROPOSAL CONCERNING NATIONAL POLICY STATEMENT ON URBAN DEVELPOMENT CAPACITY. Clause 3 of Schedule 1, Resource Management Act 1991

Neil Savery. National President Planning Institute of Australia

Special Report. Debunking. the Top. Eight Myths. in Your DSD Mobile. Security Strategy. Surrounding Small-Business. Warehouse Management Systems

Nuclear Energy and Renewables: System Effects in Low-Carbon Electricity Systems

Ireland s Competitiveness Performance & Challenges Ahead & Future Skills Needs for the Hospitality Sector

Encouraging Green Market Development

Company Update. November 2017

Water Regulation through to 2021 and beyond

Energy Market Reform Efforts in the US

PUBLIC INFORMATION CENTRE May 29, 2017 MUNICIPALITY OF BRIGHTON

World Green Building Council

ESO Summary of Recommendations

Transcription:

Jemena Pipelines NSW Pipeline Infrastructure the current picture; future needs fr future supplies; challenges & pprtunities fr develpment. AIE half-day Frum - 24 June 2013 NSW Lming Gas Shrtage: Fact r Fictin?

2 Jemena s Gas Assets Eastern Gas Pipeline Links Gippsland in Victria t markets in NSW Queensland Gas Pipeline Links Wallumbilla t Gladstne and Rckhamptn VicHub Intercnnect Facility Intercnnect facility between the EGP and the Victrian gas transmissin system Clngra Gas Transmissin & Strage Pipeline 9km gas transmissin and strage pipeline delivering gas t Delta Electricity s gas turbine facility Jemena Gas Netwrk Since its beginnings in 1837 the Jemena Gas Netwrk¹ in New Suth Wales has grwn t service ver 1 millin custmers acrss its 23,800 km length

3 Eastern Gas Pipeline: Asset Overview Descriptin 797km pipeline between Lngfrd & Sydney Supplies 50% f NSW & ACT Gas Netwrk with gas frm Gippsland Services several significant reginal centres en rute, including Canberra & Wllngng Primary demand frm industrial custmers, pwer generatrs and retailers Asset Lcatin Key Metrics Current capacity: 106 PJ pa Cnstructed in 2000 Key Shippers/ End Users include:

4 East Cast Infrastructure Rckhamptn Mmba Cper SWQP Surat & Bwen s Gladstne Brisbane Gunnedah Clarence Mrtn Glucester Adelaide Sydney Sydney Otway Melburne Bass Gippsland Legend Tasmania Cnventinal Gas SPIAA pipelines CSG Hbart VicHub Clngra

ynamic Change in the Eastern Australian Gas Market arge Scale LNG Exprt Prjects c.38,000 PJ and cunting Eastern Australian Gas Markets / Reserves hanging Dmestic Market Dynamics Eastern Australian Gas Flws Changing Cper gas being drawn nrth Uncnventinal gas increasing Dmestic Demand Impacted Frecast f higher prices Reductin in GFG Shrter term cntracts Surce: 2P reserves and 2015 Gas Demand frm AEMO Gas Statement f Opprtunities 2012.

6 Outlk fr NSW? LNG Prjects will have a Prfund Impact n Pipeline flws: Expected Gas Flws in Eastern Australia Dmestic demand is cmpeting with LNG exprts at a time when dmestic cntracts are up fr renewal. Significant reductins in gas flwing frm Cper t NSW Cmmunity cncern t CSG is impacting develpment f new surces f supply 95% f NSW gas is imprted Is NSW CSG the Silver Bullet? NSW CSG was expected t replace sme Cper vlume nce infrastructure cnstructed Technical, envirnment & regulatry issues mean timing and vlume cming nline is uncertain Adelaide Legend Cnventinal Gas CSG Mmba Cper Otway SWQP Melburne Bass Hbart Surat & Bwen s Gunnedah Sydney Gippsland Tasmania Rckhamptn Gladstne Clarence Mrtn Sydney Glucester Brisbane SPIAA pipelines VicHub Clngra

EGP Capacity Expansin Opprtunities EGP is planning expansin frm a capacity f 106PJ p.a. t 130PJ p.a. : T secure gas supply t NSW that has histrically been surced frm Cper Tw additinal cmpressr statin n EGP at Orbst & Michelag The FEED study is being reviewed and finalised When?? Time is running ut t get additinal capacity fr Winter 2015 A clear picture f demand is difficult as participants adjust t the new market Discussins under way t finalise custmer requirements Mila Orbst Michelag FEED Study Bard Apprval (FID) Cnstructin Cmmissined Current Status Q3 2013 Winter 2014 Winter 2015 Expansin case midline cmpressrs sites 7

What abut NSW native natural gas? NSW has abundant uncnventinal gas reserves Pipelines shuld nt be seen as the cnstraint Jemena has histrically delivered pipeline slutins t meet custmer demand Jemena is in psitin t build pipelines t facilitate flw f gas t demand centres But significant infrastructure like this requires cntracts nt just STTMs The limitatin will be the apprvals prcess n the gas develpments There is an pprtunity t intrduce greater cmpetitin t the transmissin market n the East Cast An intercnnected East Cast t prvide supply slutins that t help manage current and future market changes 8

Thughts n the Grattan reprt The EGP is expected t be expanded as a key part f the slutin t the NSW shrtfall We agree general prtectinism isn t the answer althugh plicy t manage transitin impacts culd be cnsidered In ur experience capacity is traded between existing pipeline shippers supprted by ur cntracts Jemena believes that any new measures t imprve market transparency and cmpetitiveness shuld be subject t rigrus cst benefit analysis All regulatin impses a cst burden Expect limited actual gas trading STTM price signals will nt drive investment in new capacity 9

10 In Cnclusin The gas market is changing and new infrastructure is required t meet the new demands Pipeline capacity will be built t meet custmer need There is sufficient time t build pipelines But shrt term markets wn t deliver lng term utcmes