The essential guide to the mandatory knowledge, skills and competencies required for personnel designing for or working in hazardous areas

Similar documents
The Responsible Person AKA Technical Person with Executive Functions

Hazardous. Scheme. the power behind your business

Quick Guide: Field Labelling, Limited Product Certifications and Special Inspections for USA & Canada

General Accreditation Criteria Equipment assurance, in-house calibration and equipment verification

EEMUA CompEx - the world s pre-eminent IEC Ex scheme for personnel competency development and certification

IECEx 03 Service Facilities Program. John Allen Dowding & Mills

Safety Manual. SEMS Program

NON BINDING GUIDANCE TO ENSURE A MINIMUM

UKAS Supplement for the Accreditation of Environmental Verifiers for EMAS (the EU Eco Management and Audit Scheme Regulation 1221/2009)

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality?

IECEx OPERATIONAL DOCUMENT

Cenelec Standards Inspections Course Guide

Document 2007 Rev 0 December 2005 Page 1 of 8

IECEx OPERATIONAL DOCUMENT

WELMEC European cooperation in legal metrology

IECQ PUBLICATION IECQ IEC Quality Assessment System for Electronic Components (IECQ System)

Preventing Disasters Through Intrinsic Safety The essentials behind an essential practice

Principles of the Railway Industry Supplier Qualification Scheme

The Top 5 Mistakes in Making a Declaration of Conformity for CE Marking

BAFE SP203-1 Assessment Check List

EX SCHEME IMPLEMENTATION - PETRONAS EXPERIENCE

Everything You Ever Needed To Know About...

REQUIREMENTS FOR SAFETY RELATED (ASME AND NON-ASME) ITEMS OR SERVICES

Phoenix Energy Holdings Gas Ltd Health & Safety Policy

ASI National Structural Steelwork Compliance Scheme. A Guide for Clients, Builders and Prime Contractors

REPORT FROM THE COMMISSION

Asbestos Management Policy

QUALITY REQUIREMENTS

Compiled by: Figure 2: Fire triangle. Successfully suppressing or separating one or more of these three components can avoid a fire or explosion.

MASS MANAGEMENT ACCREDITATION STANDARDS

Quality, Health Safety & Environment Code: 2013

Australian/New Zealand Standard

IECEx OPERATIONAL DOCUMENT

SAFETY THROUGH COMPETENCY STATEMENT OF CAPABILITIES

Auckland Transport HS07-01 Competency and Training

Page 1 / 11. Version 0 June 2014

ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) VERIFICATION DOSSIER STANDARD

MCS 025. Installer Certification Scheme Competency Criteria Guidance. Issue 1.1

Australian/New Zealand Standard

EPS AUSTRALIA SERVICES HAZARDOUS AREA CAPABILITY

ILAC-P10:2002. ILAC Policy on Traceability of Measurement Results

ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE

Technical excellence: delivered. Forms Part of. Alderley. Services. 360 support to optimise performance throughout the life of your assets

Jussi Rautee Vice President Chemical, Oil and Gas Market Automation Products Division ABB

EAST SUSSEX FIRE AUTHORITY Job Description

Recycling Best Management Practice (BMP) for Management of Used Aircraft Parts and Assemblies. Aircraft Fleet Recycling Association. Revision 4.

Air Quality Monitoring PE Terminals

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR WOOD WALL PANELS AC196. April 2017 (Effective June 1, 2017) PREFACE

CDM FAQ Sheet

RSPH Level 4 Certificate in Asbestos Laboratory and Project Management

Student Services & Classroom Addition

Calibrations. Air-Met Scientific. with

Managing Asbestos in Premises, the Duty Holder Requirements Qualification Specification

WELMEC Application of module D Quality assurance Under directive 2014/32/EU (MID) or directive 2014/31/EU (NAWID)

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

~ Safety Our Priority ~

WHS Management Plans

ExTAG Training Workshop Application ISO/IEC :2018

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) COMPETENCY STANDARD

Review of Victoria s Electricity and Gas Network Safety Framework- Supplementary Issues Paper APA VTS Operations (Australia) Pty Ltd Submission

Band Systems Ltd. Construction Phase Plan CDM POLICY STATEMENT

Standards and accreditation. Tools for delivering better regulation

Industry Minimum Requirements (IMR Condensed - 5 Star Qualified Organisations).

ISO INTERNATIONAL STANDARD. Quality requirements for fusion welding of metallic materials Part 3: Standard quality requirements

Ex Competent Person Training and Certification Program Hazardous Areas Classification

Health and Safety Policy Standard

Occupational Health and Safety. Improvement Standard

QSS 0 Products and Services without Bespoke Contracts.

Technical Guideline for. Section 8. Inspection and Approval of Construction

CONTROLLING CONTRACTORS (Completely Rewritten)

Professional Engineers Using Software-Based Engineering Tools

IEC Scheme for Certification to Standards relating to Equipment for use in Explosive Atmospheres

CONTRACTOR WHS SYSTEM STANDARD RISK MANAGEMENT EXTERNAL USE ONLY

Equipment In-house Calibration Requirements and use of Non-Accredited Calibration Service Providers

THE REQUIREMENTS FOR SCAFFOLDING IN NSW POLICY STATEMENT 1. INTRODUCTION

NQA-1 Graded Approach, 55-Gallon Drum Summary

Centre guide for Learning and Development Awards

Regulatory Guide 2.19

WAMITAB Level 4 High Risk Operator Competence for Managing Thermal Treatment of Hazardous Waste

IEC System for Certification to Standards relating to Equipment for use in Explosive Atmospheres (IECEx System)

What to You Need to Know When Limited Production Certification is Your Hazardous Locations Compliance Strategy

Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome

PROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015

REGULATION REGARDING EQUIPMENT PROCUREMENT PROCESS AND APPROVAL OF MANUFACTURERS FOR NUCLEAR FACILITIES

Establish health and safety requirements

SOUTH AFRICAN QUALIFICATIONS AUTHORITY REGISTERED UNIT STANDARD: Inspect and test a single phase domestic installation UNIT STANDARD TITLE

Quality system implementation from a manufacturers viewpoint

GUIDANCE ON THE APPLICATION OF THE IRSE LICENSING SCHEME. July 2015

QUALITY ASSUARENCE IN THE FOOD CONTROL LABORATORIES

Green Product Mark Certification Scheme

Training and Competency

External Supplier Control Obligations

Brochure. Asset integrity solutions Improve integrity and reduce costs through more effective asset management

Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Principle Compliance Verification Engineer TWI Certification Ltd. BS EN ISO 3834

Guidelines on the Competence of Personnel Undertaking Engineering Inspections

Guidelines on the Competence of Personnel Undertaking Engineering Inspections

Energy Efficiency System:2014 (EES + )

USER INSTRUCTIONS. Installation Operation Maintenance. Valtek Mark 3 Sealed Metallic Pumps

A2LA. R104 - General Requirements - ISO-IEC Accreditation of Field Testing and Field Calibration Laboratories

Transcription:

The essential guide to the mandatory knowledge, skills and competencies required for personnel designing for or working in hazardous areas Based on IEC 60079-14 and IEC 60079-17 2 nd Edition, April 2013 Intertek Deeside Lane, Chester, CH1 6DD UK hazloc@intertek.com +44 1244 882590 www.intertek.com/hazloc

Contents Contents... 1 Introduction... 1 About the Standards IEC 60079-14 and 60079-17... 2 Enforcement... 2 Mandated knowledge and skill requirements... 3 General... 3 Responsible Persons... 3 Operatives... 4 Electrical Designers/Engineers... 5 Assessment of competencecy... 6 How can Intertek help?... 7 Mobile CompEx... 7 Introduction The question is often asked What is meant by competence? Competence is commonly regarded to be the ability to perform the activities within an occupation or function to the standards expected in employment. This definition makes reference to Standards. Thus, competence is equated to an ability to perform to the expected Standard. Hence, competence assessment entails measuring a person s performance against a Standard. Reference UK Health & Safety Executive Research Report 086: Competence assessment for the hazardous industries Electrical installations in hazardous areas possess features (protection concepts) specifically designed to render them suitable for operations in such atmospheres. These protective measures aim to reduce to an acceptable level the likelihood that the electrical equipment or installation could become a source of ignition. In order for these protective measures to be effective electrical apparatus must be correctly designed, installed, tested, maintained and used in accordance with its specified characteristics in addition to any relevant harmonised or national Standards imposed. The need for verifiable training and competence in the field of explosion protection and mitigation has been highlighted by the ATEX Directives for the Protection of Workers in Potentially Explosive Atmospheres. www.intertek.com 1

About the Standards IEC 60079-14 and IEC 60079-17 IEC 60079-14 and IEC 60079-17 specify in some detail the requirements for people involved in application design as well as the selection and installation of equipment or plant used in hazardous (potentially explosive) atmospheres. Great emphasis is put on the necessity to verify the knowledge and skills of people who may have an effect on the integrity of an installation which is re-enforced with a general drive for verifiable competence in the field of explosive atmospheres. It should be noted that installation requirements are equally applicable to many manufacturers who assemble certified equipment to form an assembly as it is to companies installing apparatus into a plant. The IEC 60079-14 and IEC 60079-17 Standards identify the various roles that require training and the level of training required. Historically, it has predominantly been the hands on installers/ technician who were directed to receive appropriate training and competency validation, but the requirements as detailed in the Standards now consider all of the people who have an influence in the final integrity of the assembly or plant installation including responsible persons or those with a pure executive function, the designer/ engineer as well as the installers/ technician (referred to as operative) Enforcement The Standards provide detailed guidance on the knowledge and skills required for particular tasks and it is likely that the competence levels defined in these Standards will be written into many companies specifications or contracts. Evidence of competence (and/or training/ experience) could be requested (by an end client or by the regulatory authorities) for the designers of assemblies, the people who build the assembly and the people involved in the management process. Companies including contractors who are involved with hazardous area plant may already posses suitable evidence of competency (frequently CompEx) for their electrical installers/ technicians, but now - in addition they may be asked for evidence of their Designers/ Engineers and Managers (Responsible People) training and competency records too. www.intertek.com 2

Mandated knowledge and skill requirements General Competencies shall apply to each of the explosion protection techniques for which the person is involved. For example, it is possible for a person to be competent in the field of selection and erection of Ex i equipment only and not be fully competent in the selection and erection of Ex d switchgear or Ex e motors. In such cases, the person's management shall define this in their documentation system. As detailed in the Standards: Responsible Persons Responsible persons and technical persons with executive function who are responsible for the processes involved in the inspection, maintenance, design, selection and erection of explosion protected equipment shall possess, at least, the following: a) General understanding of relevant electrical engineering; b) Understanding and ability to read and assess engineering drawings; c) Practical understanding of explosion protection principles and techniques; d) Working knowledge and understanding of relevant Standards in explosion protection particularly IEC 60079-10-1 & 2, IEC 60079-14, IEC 62141-14 and IEC 60079-19; e) Basic knowledge of quality assurance, including the principles of auditing, documentation, traceability of measurement and instrument calibration. Such persons must confine their involvement to the management of skilled personnel competent Operatives conducting inspection, maintenance, selection and erection duties and not engage themselves directly in the work without ensuring their practical skills at least meet the requirements. Responsible Persons are required to be able to demonstrate their competency and provide evidence of attaining the knowledge and skill requirements specified above, relevant to the types of protection and/or types of equipment involved. Typical staff that may require this training include Plant Engineers (those with an executive function), Project Managers, Maintenance Managers, Procurement Managers, Quality Assurance and Contract Managers. www.intertek.com 3

Operatives Operatives (practitioners) are considered to be people who are involved in the selection, installation and inspection of equipment. Operatives required training under the old Standard/system for installation, but the new Standard greatly emphases the need for an assessment of the persons skills. This necessitates practical training and evaluations such as the CompEx scheme where trainees are expected to assemble equipment (for example glands) that will then be taken apart and examined by assessors. Operatives shall possess, to the extent necessary to perform their tasks, the following: a) Understanding of the general principles of explosion protection; b) Understanding of the general principles of types of protection and marking; c) Understanding of those aspects of equipment design which affect the protection concept; d) Understanding of content of certificates and relevant parts of IEC 60079-14; e) General understanding of inspection and maintenance requirements of IEC 60079-17; f) Familiarity with the particular techniques to be employed in the selection and erection of equipment referred to in IEC 60079-14 and the inspection and maintenance of equipment referred to in IEC 60079-17; g) Understanding of the additional importance of permit to work systems and safe isolation in relation to explosion protection; h) Comprehensive understanding of the selection and erection requirements of IEC 60079-14 and IEC 61241-14; i) General understanding of the repair and reclamation requirements of IEC 60079-19. Operatives shall be able to demonstrate their competency and provide evidence of attaining the knowledge and skill requirements specified as above relevant to the types of protection and/or types of equipment involved. They shall also be able to demonstrate their competency with documentary evidence in the: Use and availability of documentation; Production of job reports to the user; Practical skills necessary for the preparation and installation of relevant concepts of protection; Use and production of installation records. www.intertek.com 4

Electrical Designers/ Engineers The requirements for personnel involved in the process of designing plant or equipment for use in potentially explosive atmospheres (including equipment that may be located in the safe area but have functionality involved in the safe explosion prevention or mitigation) are new and should be given serious consideration. The requirements will obviously be applicable to companies who design plant (new plant or modifications) but are equally applicable to project engineering companies or manufacturers who may provide rigs, skids or assemblies that may or may not utilise certified hazardous area equipment. Designers shall possess, to the extent necessary to perform their tasks, the following: a) Detailed knowledge of the general principles of explosion protection; b) Detailed knowledge of the general principles of types of protection and marking; c) Detailed knowledge of those aspects of equipment design which affect the protection concept; d) Detailed knowledge of content of certificates and relevant parts of IEC 60079-14; e) Understanding of practical skills for the preparation and installation of relevant concepts of protection; f) Detailed knowledge of the additional importance of Permit to Work systems and safe isolation in relation to Explosion Protection; g) Detailed knowledge of the particular techniques to be employed in the selection and erection of equipment referred to in IEC 60079-14; h) A general understanding of Inspection and Maintenance requirements of IEC 60079-17. Designers shall be able to demonstrate their competency and provide evidence of attaining the knowledge and skill requirements specified above, relevant to the types of protection and/or types of equipment involved. They shall also be able to demonstrate their competency with documentary evidence in the: Production of documentation; Production of Designers certificates to the user; Practical skills necessary for the preparation and compilation of relevant design details for the concepts of protection and systems involved; Update and production of installation records as specified in IEC 60079-14. www.intertek.com 5

Assessment of competency IEC 60079-14 and IEC 60079-17 state that the competency of Responsible Persons, Technical Persons with executive function, Operatives and Designers shall be verified and attributed, at intervals relevant to national regulations or Standards or user requirements, on the basis of sufficient evidence that the person: a) Has the necessary skills required for the scope of work (including practical skills where approropraite); b) Can act competently across the specified range of activities; and c) Has the relevant knowledge and understanding underpinning competency. IEC 60079-17 goes further and states that the verification process should not exceed 5 years. Verifiable competency translates to having records for all staff that demonstrate that a person s knowledge, skills and experience meet the requirements against their specific role or roles and responsibilities. Commonly, these records will include CompEx validation of some kind. CompEx is the foremost internationally recognised personnel competency validation scheme for operatives in hazardous areas with over 36,000 certificates issued to date. CompEx requires re-validation of competency within a maximum 5 year period (as detailed in IEC/EN 60079-17). Intertek s CompEx centres operate under licence through JT Limited, who are accredited by UKAS to provide certification of persons who work in explosive atmospheres. Overall governance of the scheme is provided by a pan industry group that includes the Engineering Equipment and Material Users association (EEMUA), the Association for Petroleum and Explosive Administration (APEA), Electrical Contractors Association (ECA) and the UK s Health and Safety Executive (HSE). Intertek s CompEx trainers and assessors operate under a separate licence following a rigorous qualification process that ensures verifiable experience, qualifications and technical ability. Individual companies should be aware of the changes to legislation and Standards that are applicable to them and should determine if additional training and validation of competency is required. The company s quality system should address this, together with the management and verification of training/ competency records and a mechanism to ensure that only competent people are allocated tasks that may www.intertek.com 6

impact on a hazardous area installation. There have been many significant changes over the last few years that are relevant to installation that introduce new protection concepts, new equipment selection methodologies and new equipment groupings (for example IIIA, IIIB and IIIC for dust). It is important to ensure that courses are supplemented with a mechanism for updating the people involved where such changes occur, or having more frequent refresher training and re-validation of competency. How can Intertek help? Intertek is an ATEX Notified Body, DSEAR/ ATEX implementation specialist with dedicated Hazardous Locations Training Centres. We have dedicated CompEx licensed facilities in the UK as well as the capabilities to offer training and competency assessment globally. We offer both open and bespoke training, and through our unique systems can tie in with a company s management systems to ensure that all staff are verified and attributed as competent and remain competent through regular updates and refresher training. Mobile CompEx Designed for use outside of the United Kingdom, Intertek is the first CompEx centre to offer the scheme to a global market through their mobile CompEx Assessment Rigs. Based closely on our principal centres in the UK our mobile rigs are transported via bespoke flight cases and assembled at a suitable location on or near your site. For more information on Intertek s training services for hazardous location staff, or to begin your project right away, Call: +44 (0)1244 882590 Email: training.uk@intertek.com or visit: www.intertek.com/hazloc This publication is copyright Intertek and may not be reproduced or transmitted in any form in whole or in part without the prior written permission of Intertek. While due care has been taken during the preparation of this document, Intertek cannot be held responsible for the accuracy of the information herein or for any consequence arising from it. Clients are encouraged to seek Intertek s current advice on their specific needs before acting upon any of the content. www.intertek.com 7