Elizabeth River Tunnels Project. ASHE October Technical Meeting ERT Project Overview October 8, 2015

Similar documents
Elizabeth River Crossings OpCo, LLC Elizabeth River Tunnels Project Monthly Report Owners and Holders Pursuant to Continuing Disclosure Agreement

Hampton Roads Bridge Tunnel Expansion: Overview of Tunnel Construction Methods

Peninsula Widening. Project Description. Overview of Project Status. Estimated Total Project Cost $4.7 - $7.3 Billion

Hampton Roads Bridge-Tunnel

Immersed Tunnels. Richard Lunniss and Jonathan Baber. CRC Press. Taylor & Francis Group. Taylor & Francis Group, A SPON BOOK

Gilmerton Bridge Replacement Project Virginia Society of Professional Engineers (VSPE) March 27, 2013

Challenges in Urban Tunneling

Downtown Tunnel/Midtown Tunnel/MLK Extension Project

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today!

PPTA Project Pipeline

Transportation Update

Pushing the Envelope For 100 Years

IMPROVING I 81 IN MARYLAND

ECONOMIC DEVELOPMENT FULLY FUNDED PROJECTS Capital Improvement Program FY FY 2016

Purpose Today: Review information to assist with Prioritization

Exposition Light Rail Transit Project

INDEPENDENT REVIEW PANEL MEETING VDOT'S TECHNICAL FINDINGS PRESENTATION DOWNTOWN TUNNEL/MIDTOWN TUNNEL/ MARTIN LUTHER KING FREEWAY EXTENSION

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

Maritime Work Plan for the High Rise Bridge Construction

VDOT Major Projects Update

NORFOLK STREET BRIDGE

ITS Multimodal Initiatives in Virginia HRTO Subcommittee Meeting Hampton, VA, June 11, 2013

DECOU ROAD BRIDGE. Municipal Structure Inspection Form NORFOLK COUNTY. Site Number DECOU ROAD, SIMCOE. 1.Okm E of Willow Drive

Exposition Light Rail Transit Project

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013

Lesner Bridge Replacement

9 Conclusion. 9.1 Introduction

Exposition Light Rail Transit Project

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Lesner Bridge Replacement

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

Independent Technical Review of the George Massey Crossing. December, 2018

HUNT STREET BRIDGE. Site Number HUNT STREET, SIMCOE. 0.2 km North of Highway 3

Learning Legacy Document Duration of data recorded (approx.) 1

WHERE GREEN JOBS GROW ON LAND AND WATER THE PORT OF COEYMANS P&M BRICK LLC

Zinc Rich Paint in a Pigeon Rich Environment

Congress Parkway over South Branch of the Chicago River

Walt Whitman Bridge Redecking Fact Sheet

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction

Ironton Russell Bridge Project

Hampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations

Kevin Abt Chief Engineer Virginia Port Authority

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6

Final Report 6/19/2013. Sponsored by:

Second Avenue Subway

NSBA. Prize Bridge. Awards

DRAFT Noise Analysis Technical Report

Benjamin G. Perez, AICP Parsons Brinckerhoff. TRB Conference on Surface Transportation Financing

Agenda Item 6a. TO: BATA Oversight Committee DATE: November 7, FR: Executive Director W. I. 1252

Presentation Outline. Need for Creative Solutions in Technical Construction Problems. creativity, imagination, and innovative skills.

The government of the SOCIALIST REPUBLIC OF VIETNAM HO CHI MINH CITY PEOPLE S S COMMITTEE TUNNEL JAPAN. Official Development Assistance

Aviation Capital Construction Program Update

I-64 Capacity Improvements Segment I Financial Plan Annual Update

Highway Construction Program

HEAD STREET BRIDGE (SIMCOE)

VENISON CREEK BRIDGE

POSTER PAPER PROCEEDINGS

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

DESIGN OF TEMPLETON OVERPASS FOR THE CANADA LINE. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng.,P.Eng., SNC-Lavain Inc.

AGENDA ITEM #17: VIRGINIA S 2025 TRANSPORTATION NEEDS ASSESSMENT AND HB2: OIPI CONSULTANT

Sullivan Lake Cold Water Intake. Pend Oreille PUD No. 1 of Pend Oreille County, WA

RENTON CONCESSION CULVERT. Site Number COUNTY ROAD 5, WOODHOUSE. 0.4 km S of Highway #3

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.

I-65/I-70 North Split Project

2-2 ALTERNATIVES CONSIDERED AND ELIMINATED

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

William R. Bennett Bridge. W.R. Bennett Bridge, Kelowna, B.C. Canada. July 2005 to December 2008

Implementing Asset Management: WSDOT s Experience

TABLE OF CONTENTS 3.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant

NORWICH ROAD BRIDGE. Site Number D00016 NORWICH ROAD, DELHI. 1.0 km N of King Street Delhi

Ironton Russell Bridge Project

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

RESILIENT INFRASTRUCTURE June 1 4, 2016

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

COMMUNITY BOARD EIGHT

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa

Ironton Russell Bridge Project

Rehabilitation of East Lynn Lake Bridge Steel Pile Bents With Composites

ITA Working Group 11 for Immersed and Floating Tunnels

2. ALTERNATIVES. Draft Supplemental Environmental Impact Statement Chapter 2: Alternatives 2.1 INTRODUCTION

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.

I-70 East PACT DRAFT EVALUATION DATA

Ironton Russell Bridge Project

Design Challenges and Construction Benefits of Precast Segmental Rail Bridges

Jane Addams Memorial Tollway (I 90) Fox River Bridge Traffic Needs Drive Innovative Solutions

Westside Purple Line Extension Section 1 Project Overview

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

SEAUPG ANNUAL MEETING NOVEMBER 13, 2013

I-4 Ultimate Social Media

TALBOT STREET BRIDGE

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4372 TUNNEL SECTION REMOVAL

DESIGN OF THE MAIN SPANS OF THE CHONGQING CAIYUANBA BRIDGE

Nancy Daubenberger, MnDOT Assistant Commissioner Engineering Services

SENIOR THESIS FINAL PROPOSAL

Future Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes)

Transcription:

Elizabeth River Tunnels Project ASHE October Technical Meeting ERT Project Overview October 8, 2015

Project Location: Hampton Roads, VA

ERT Project Scope New, two-lane, WB tunnel Rehab and lifesafety improvements of existing MTT Brambleton Ave. / Hampton Blvd. interchange modifications Extending MLK to I-264, High St. interchange Rehab and lifesafety improvements of existing DTT (EB & WB tubes) Norfolk Portsmouth 3

ERT Project Schedule Project Completion Date Refurbishment of Existing Downtown Tunnels August 2016 New MLK Freeway Extension December 2016 New Midtown Tunnel December 2016 Refurbishment of Existing Midtown Tunnel May 2018

Value to the Hampton Roads Region Reduces congestion and travel time Reduces idle time saving fuel and reducing emissions Creates seamless connection to I 264 Extends useful life of existing tunnels Ends bi directional traffic in Midtown Tunnel Improves reliability and connectivity Enhanced public transportation services made available through partnership with HRT

ERT Project Team Owner Equity / Sponsors Developer Lenders Bank/Bond/TIFIA Design-Build Contractor Operations & Maintenance Tolling Contractor 3M Designers

Organizational Responsibility OTP3 VDOT Central Office Pre- Comprehensive Agreement Development OPCO VDOT Hampton Roads District Post Comprehensive Agreement Project Delivery

The Design-Build Team Design-Build Joint Venture: - Skanska USA Civil SE - Kiewit Infrastructure Company - Weeks Marine Design Team: - Parsons Brinckerhoff Immersed Tube Tunnel (ITT) Experience: - Since 1964, installed 74% of the ITT s in the USA - Installed 52,500 feet of ITT in the USA - 19,700 feet of ITT in the Norfolk Area - Volkert & Associates

ERT Project Funding

Project Funding

Financing Cash Flow No equity repayment until 2021 at earliest (assuming available funds) Any revenue shared w VDOT must be used to benefit users of Project

Construction Overview & Update

ERT Project Schedule Project Completion Date Refurbishment of Existing Downtown Tunnels August 2016 New MLK Freeway Extension December 2016 New Midtown Tunnel December 2016 Refurbishment of Existing Midtown Tunnel May 2018

ERT Project Component 1: Existing Tunnel Rehabilitation

Tunnel Rehabilitation Project Scope Rehabilitation Projects Existing WB Downtown Tunnel Existing EB Downtown Tunnel Existing (EB) Midtown Tunnel Rehabilitation Activities Removal of suspended ceilings Replace existing transverse with longitudinal ventilation Fire-life safety upgrades to 100 mega watt Concrete repairs (spalls and cracks) Electrical rehabilitation and upgrades Misc. signage, painting and repairs

DTT Rehabilitation: Ceiling Removal

DTT Rehabilitation: Barrier Repair

DTT Rehabilitation: Fire Protection & Ventilation Upgrades installation of fire protection board installation of longitudinal ventilation system

DTT-WB Lighting Before and After

ERT Project Component 2: MLK Freeway Extension

MLK Freeway Extension I-264 MLK Extension High St. London Blvd. Architectural Rendering

MLK Extension: Pile Driving

MLK Extension: Ped Bridge Cap Pour

MLK Extension: Structural Steel Erection

MLK Extension: Aerial 26

MLK Extension: Aesthetic Treatments High Street Gateway Turnpike Road Plaza

ERT Project Component 3: New Midtown Tunnel Approaches

New MTT: Portsmouth Approach Existing MTT Approach New MTT Approach Aerial View

New MTT: Portsmouth Approach

New MTT: Norfolk Approach Existing MTT Approach New MTT Approach 31

New MTT: Norfolk Approach Surface View

ERT Project Component 4: New Midtown Tunnel

New MTT: Tunnel Element Fabrication

New MTT: Floating Tubes

New MTT: Element Tow Down

New MTT: Element Tow Down

New MTT: Elements Moored in Portsmouth

New MTT: Screed Barge

New MTT: Final Concept Concrete shell, Immerse Tube Tunnel (ITT) Westbound tube connecting Norfolk to Portsmouth Two vehicular lanes and an egress corridor Utility Corridor Deluge System Jet Fans Egress Corridor Promat

New MTT: Plan & Profile

New MTT: Offset Alignment New Midtown Tunnel Existing Midtown Tunnel

New MTT: Ballast Concrete Placement

New MTT: Lay Barge

New MTT: Elements Docked 45

New MTT: Element Seals Seals between Elements - Gina Joint (gasket type) - Omega Seal (inner connection) Elements to connect to Cast in Place Approach work

New MTT: Element Placement

New MTT: Portsmouth Slot

New MTT: Immersion of Element in Slot

New MTT: Backfill of Element in Slot

New MTT: Immersion of the Final Element 51

Questions?