IEA IEA--GHG Risk Assessment Network Meeting GHG Risk Assessment Melbourne - Melbourne April 16th- April 16th 17th

Similar documents
IEA-GHG Summer School Svalbard Aug 2010

Site selection: Technical site selection criteria and information needs

CO 2 Sequestration Market Development

The EU CCS Directive and guidance documents Dr Raphael Sauter European Commission, DG Climate Action

North America Business Manager

Siting and Monitoring CO 2 Storage Projects Sally M. Benson Lawrence Berkeley National Laboratory Berkeley, CA 94720

Proposed Study for Capturing and Storing CO 2 from Power Generation Activity in Egypt in Conjunction with Enhanced Oil Recovery in Stranded Oil Wells

DET NORSKE VERITAS CO2WELLS. Guideline for the risk management of existing wells at CO 2 geological storage sites. DNV Report No.

Managing guncertainty in Geologic Storage. Dwight Peters Schlumberger Carbon Services

CO 2 Geological storage - TOTAL Approach. SCA 2003 Symposium 14/12/2003

Safety and Monitoring of CO 2 Storage Projects

Assessing technical risks in the geological storage of CO 2

Monitoring and Verification of CO 2 Geological Storage sites

IEAGHG Summer School Environmental Impacts of Geological Storage of CO 2. Jen Roberts, University of Strathclyde

Storage 1- Site Selection: Capacity and Injectivity

Geological carbon sequestration: prediction and verification

Framework Convention on Climate Change

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection

Liability Issues Related to Geological Storage of CO 2

Geological Storage - Risk Assessment & Monitoring

Carbon Dioxide Capture and Storage in Deep Geological Formations. Carbon Dioxide Capture and Geologic Storage

Schlumberger WATER SERVICES. Schlumberger Water Services. Solutions for Water Exploration and Sustainable Supply

Systematic Assessment of Wellbore Integrity for CO 2 Geosequestration in the Midwestern U.S.

CO 2 Storage in Geological Media

Petrotechnical Expert Services. Multidisciplinary expertise, technology integration, and collaboration to improve operations

The Jänschwalde CCS Demo project

Carbon Dioxide Capture and Sequestration in Deep Geological Formations

Oxy CO 2 EOR Project Discussion Draft MRV Plan

Modelling geological storage

European legislation on CO 2 Geological Storage. Sergio Persoglia. ! OGS Board of Directors! CO2GeoNet Secretary General

Engineered Water Solutions. Aquifer Storage and Recovery

Decarbonisation of the use of fossil fuels

The CO2WELLS Joint Industry Project

Monitoring Carbon Dioxide Sequestration in Deep Geological Formations for Inventory Verification and Carbon Credits

OVERVIEW OF MITIGATION AND REMEDIATION OPTIONS FOR GEOLOGICAL STORAGE OF CO2

New Developments: Solved and Unsolved Questions Regarding Geologic Sequestration of CO 2 as a Greenhouse Gas Reduction Method

Use of models in site selection and exploitation

State of the Art of Monitoring Methods to evaluate CO2 Storage Site Performance

Available online at Energy Procedia 1 (2009) (2008) GHGT-9

CCS-CDM: Methodology proposal

E N O S Enabling Onshore Storage in Europe

Carbon Capture & Storage (CCS)

The site monitoring of the Lacq industrial CCS project. CSLF Storage and Monitoring Projects Workshop. Marc LESCANNE - R&D CCS

Potential Impacts of CO 2 Storage on Groundwater Resources

Is CCS (Geological Storage) Ready for Prime Time?

Carbon Capture and Storage Regulatory Policy

CSA Z Geological storage of carbon dioxide

CCS Technological Achievements and Political Challenges

CSLF Projects: Interactive Workshop. CO 2 Storage at In Salah JIP Phase 1: Storage Capacity Assessment. March 1 st 2011: Al Khobar KSA Iain Wright

FINAL REPORT. Stratigraphic Forward Modelling Comparison with Eclipse for SW Hub

Geological sequestration. or storage of CO 2

RISK ASSESSMENT FOR CO2 SEQUESTRATION

ROAD P MONITORING PLAN. Vincent Vandeweijer, Filip Neele

CO 2 Geological Storage In Salah Algeria Sustainable Development Project

The Jänschwalde CCS Demo Project in Germany

FACTSHEET FOR PARTNERSHIP FIELD VALIDATION TEST (Rev )

Review of Existing Injection Well Permit Regulations and Expectations of Future Geologic Sequestration CO 2 Regulations with Monitoring Conditions

National Risk Assessment Partnership (NRAP): Updates on Carbon Storage Risk Management

Fundamentals of modelling CO2 movement underground

Risk Assessment Case Study: Mountaineer CO 2 Sequestration Site

Geological Storage of CO 2. Tor Fjaeran President Director, Statoil Indonesia

Managing Climate Change and Securing a Future for the Midwest s Industrial Base. MRCSP, Michigan Basin Field Demonstration Briefing, March 2007

RP 65 and other API Activities on Carbon Capture and Storage

CO 2 Geological Storage: Research, Development and Deployment (RD&D) Issues

Methodological developments to define safety criteria

6 Risk assessment methodology

Regulatory Guidelines for Monitoring, Evaluation, Reporting and Verification

CO 2 Sequestration in Deep Aquifers

Summary of Field Test Site and Operations

Permanence and detection of physical seepage addressing CDM - Meth panel monitoring concerns

Overview of CA Gas Storage, Aliso Canyon Blowout Root Cause Analysis and Timeline

RISK ASSESSMENT? IEA JOINT NETWORKS WORKSHOP June, 2008, New York

CCS Strategy & Activities

Quantification Protocols and GHG Monitoring for CO 2 -EOR Operations

Available online at

E N O S Enabling Onshore Storage in Europe

Water Management for Mines. Solutions and Technology

Geologic Sequestration Rules: A Multi-Stakeholder Perspective

FCCC/SBSTA/2011/INF.14

Well-Based Monitoring

IPCC Guidance on Developing and Applying CCS Emission Estimation Methodologies in National Inventories of GHGs

Fossil Fuels and the environment

CMYK. Pantone. Westbay System. Greyscale. Black on White. White on Black. Multi-level Technology for Subsurface Characterization and Monitoring

Deep Well Injection for Concentrate Disposal. Why use injection wells for concentrate disposal?

Management of Water from CCS Project Number 49607

PHMSA Requirements for Underground Storage of Natural Gas

Iran-Austria Joint Scientific Conference in Higher Education

Safe and successful CO 2 injection operation and post-injection monitoring closing the life cycle of the Ketzin pilot site

Australia 10 years of achievement and the view to 10 more. Tania Constable Chief Executive Officer

Groundwater Monitoring Protocols for Seawater Intrusion Example of Challenges and Experiences in a Coastal Groundwater Basin

Role of Enhanced Oil Recovery in Carbon Sequestration The Weyburn Monitoring Project, a case study

Some geomechanical aspects of well integrity

Capturing and storing CO 2. The hard facts behind CCS

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

AUSTRALIA. Submission under the Cancun Agreements February 2011

Geologic Sequestration of Carbon Dioxide under the Safe Drinking Water Act s Underground Injection Control Program

PHASES OF GEOTHERMAL DEVELOPMENT

Westbay System. Multilevel Technology for Subsurface Characterization and Monitoring

An Update on the Saskatchewan CO2 Floods (Weyburn+Midale) and Storage Monitoring Activities

DEVEX 2016 Smart EOR Screening Workflow connecting Analytical and Numerical Evaluations

Transcription:

IEA-GHG Risk Assessment Network Meeting Melbourne - April 16th-17th, 17th, 2009 Vattenfall Demo Projects in Germany Risk Management Approach Joint Presentation given by Claudia Vivalda - Schlumberger

Outline 2 Background Risk Management Approach The Jänschwalde CCS Demo Project Risk Management Initial Steps

Background 3 Vattenfall screen sites in Germany for injection of carbon dioxide produced in their power plants. Presentation focus: Jänschwalde CCS Demo project (well suited to become one of the 12 EU Flagship projects) A robust Risk Management Approach put in place to ensure that the CCS sites are selected and then managed without harm to the population and the environment while insuring the asset integrity DNV contracted to initiate the process of risk assessment for the geological storage A first Workshop organized in January 2009 involving main industrial/research/academic stakeholders and relevant authorities Outcomes of the workshop recorded and elaborated for further investigations and actions

Risk Management Approach 4 All the threaths and opportunities of the Jänschwalde CCS Demo project are identified, analyzed and managed all along the project life cycle by taking into account the methodologies and practices in development in the CCS community E.g. The initial context for the preliminary risk assessment of the geological storage was set according to the draft Guideline for Carbon Storage site qualification (under development in the JIP CO2QUALSTORE - leaded by DNV, with Vattenfall and SLB sponsors) The Project Team will integrate the outcome of the preliminary risk assessment for the geological storage with the other elements analyzed/under analysis, such as the pipeline transportation system and the power plant

Vattenfall CCS Pilot & Demonstration Projects 5

The Jänschwalde CCS Demo project 6 Jänschwalde Power Plant

Roadmap to realisation: Project and forecast for scale-up 7 Commercial concept: ~ 1000 MW th Test rig: 0.1 0.5 MW th < 3 million Pilot plant: 30 MW th 70 million Demonstration plant: 300 700 MW th ~ 600 million Conceptual investigations 2001 2004 2008 2013 2015 2020 Theoretical studies Research Basic principles Combustion characteristics Demonstration of the process chain Interaction of components Validation of basic principles i and scale-up criteria Long term characteristics Non-commercial Verification and optimization of the component choice, the process and reduction of risks ik Must be commercially viable incl. subsidies Competitive in the market at that time No subsidies

Risk Management - Initial Steps 8 * The first steps of risk management are usually qualitative / semi-quantitative For the geological storage DNV suggested the use of: Structured What-IF checklist (SWIFT) to identify the hazards Screening and Ranking Framework (SFR) to assess the containment integrity SWIFT Analysis Rapid Risk Ranking Safeguards & Uncertainty Reducing Measures *Hazard:a source of potential harm or a situation with a potential to cause adverse effect **Risk: chance of something happening that will have an impact CCS CCS System definition Hazard Identification Risk Assessment Likelihood/Probability Risk calculation Risk Risk Mitigation Actions Severity Cost Cost effectiveness assessment Risk Risk Management g

Qualitative Risk Assessment approach 9 Structured What IF checklist a group-based approach to identifying hazards. Identifies hazards* and evaluates risks** in a qualitative sense, and recommend appropriate additional safeguards. Top-down perspective starting with systems or operations, rather than individual equipment, tasks or failure modes. The foundation of a successful SWIFT is a good team that consist of several specialists in different aspects of the subject. What-ifs..? questions to identify situations or issues or threats with a potential for causing harm. To complement issues raised by the group, the SWIFT process may consult FEP (Features, Events and Processes) databases for completeness. lt Define characterization basis Develop characterization plan EP Acquire data, test, analyse Exploration Permit Identify and rank uncertainties and risks Evaluate state of knowledge sufficient or not? No Yes Statement of Storage 2 Site Endorsement Decision of DG3 continuation

Rapid Risk Ranking 10 Level Level name Description H High High risk, not acceptable. Further analysis should be performed to give a better estimate of the risk. Risk reducing measures must be implemented to decrease risk. M Medium. The risk may be acceptable but further analysis should be performed to decrease the uncertainty in the analysis. Risk reducing measures should be implemented if reasonably practical. When assessing the need of remedial actions, the number of FEPs of this risk level l should be taken into consideration. L Low The risk is low and further assessment or risk reducing measures are not necessary Risk categories Identification and assessment of safeguards PROBABILITY EXAMPLES FOR RAPID RISK RANKING No. Name Description Event ( E ) Frequency Feature (F) / Process (P) Probability 1 Very Low 2 Low Improbable, Very unlikely to occur during About 1 per 10000 Disregarded Less or equal 1% negligible the next 5000 years years or less Remotely probable, hardly likely 3 Medium Occasional, likely Very unlikely to occur during injection operations Likely to occur during injection operations About 1 per 1000 years About 1 per 100 years May occur several times About 1 per 10 4 High Probable, bl very likely l during injection operations year 5 Very high Frequent, to be expected Will occur several times during injection operations About 1 per year or more. Not expected Less or equal 10% 50/50 chance Less or equal 50% Expected Less or equal 90% Sure Less or equal 99% Probability and consequence classes CONSEQUENCE EXAMPLES FOR RAPID RISK RANKING No. Name Impact on Injectivity Impact on Capacity 1 Very Low 2 Low 3 Medium 4 High 5 Very high Small temporary reduction. No interruption of injection Small reduction, minor interruption to injection (hours) Significant temporary reduction, interruption to injection for days Significant permanent reduction, new injectors needed Significant permanent reduction, no fix available Small chance of reduced capacity in the future Minor reduction in capacity, does impact project viability Significant reduction in capacity, fixable without new wells Impact on Storage Integrity None Unexpected migration of CO2 inside the defined storage complex Unexpected migration of CO2 outside the defined storage complex Impact on Local environment Minor environmental damage Local environmental damage of short duration Time for restitution of ecological resource < 2 years % CO2 leaked after 5000 yrs Impact on Reputation Consequence for Permit to operate 0,0001 Slight or no impact None 0,001 Limited impact Small fine 0,01 Considerable impact Large fine Significant reduction Leakage to vadose in capacity, fixable zone over small area Time for restitution of ecological 0,1 National impact with new wells (<100m2) resource 2-5 years Significant reduction in capacity, no fix available Leakage to vadose zone over large area (>100m2) Time for restitution of ecological resource such as marine bio-systems, ground water >5 1 International impact Temporary withdrawal of permit Permanent loss of permit

Risk Workshop on Geological Storage Sites 11 Risk Workshop SWIFT Analysis 2 potential sites assessed: Birkholz site used as reference and Neutrebbin site compared for differences Duration: 2 days Participants: selected experts from main companies and institutions (25 + 5 facilitators) Competencies: Regional geology, Drilling and completion, Basin modelling, Wellbore integrity, Stratigraphy, Engineering geology, Geochemistry, e Hydrogeology, ogy, Geostatistics, s Geophysics, Reservoir engineering, Ecology and terrestrial environment, Reservoir modelling, Risk assessment

Category Specific Keyword Checklists used in SWIFT Analysis Hazard category FEP keywords Reservoir Spatial domain of interest CO2 quantities, injection rate Overpressuring CO2 composition Reversibility Remedial actions CO2 properties CO2 phase behaviour CO2 solubility and aqueous speciation CO2 interactions Displacement of saline formation fluids Induced seismicity Thermal effects on the injection point Heavy metal release Mineral dissolution and precipitation Reservoir geometry Pore architecture Heterogeneities Stress and mechanical properties p Seal Effects of pressurisation of reservoir on cap rock Drilling activities Desiccation of clay Additional seals Lithology Lithification/diagenesis Overburden Buoyancy driven flow Co migration of other gases Unconformities Heterogeneities Undetected features Vertical geothermal gradient Modified hydrology and hydrogeology Microbial processes Vadose zone Near surface aquifers and surface water bodies Water management Soils and sediments Hydrological regime and water balance Surface Impacts on humans Land and water use Buildings Terrestrial environment Terrestrial ecological systems Sinkhole formation Diet and food processing Community characteristics Asphyxiation effects Ecotoxicology of contaminants Modification of microbiological systems Future human actions Sea level change Periglacial effects Subsidence or uplift Wells Borehole seals and abandonment Drilling and completion Formation damage Well lining and completion Workover Monitoring wells Well records Closure and sealing of boreholes Seal failure Blowouts Soil creep around boreholes Fault zones Fractures and faults Transmissive faults Fault Valving 12

Example of log-sheet 13 CCS CCS System definition SWIFT Analysis Hazard Identification Rapid Risk Ranking Risk Assessment Risk calculation Likelihood/Probability Severity Keyword Checklists Reservoir What If Pressure pulses in system give undesired effects Causes Emergency shut down Consequences (1) Cement sheath cyclically loaded and damaged d( (cracked) (2) Mobilize fines that plug the formation P C Safeguards Notes Safeguards & Uncertainty Reducing Measures Risk Risk Mitigation Actions Cost Cost effectiveness assessment Risk Risk Management Fault zones Unidentified fractures related to faults Insufficient data (resolution or coverage) and understanding and characterization (1) Leakage through fault zone out of permit area of either CO2 or brine (2) Reduced storage capacity relative to initial expectation

Risk Workshop Follow-up 14 Follow-up 1:Results elaboration to create risk database Creation of Risk database from the list of Hazards, the Rapid Risk Ranking and the identified Safeguards Follow-up 2: Screening and Ranking Framework Questionnaire i sent out to individual id experts Recording individuals understanding of containment features: weight property relevance and assign goodness and certainty values Answers collected and elaborated to derive Integrity Attributes Measuring the degree of consensus amongst individual experts Generating graphical display to present range and spread of assessments and certainties Ref. C. Oldenburg at LBNL

Way forward 15 Integration of the outcome of the preliminary risk assessment for the geological l storage with the other elements analyzed/under analysis, such as pipeline transportation t ti and power plant to: dig further the potential risks identified; implement preventive and corrective measures to mitigate them; and take the risks under control all along the project development.