SECTION FACILITY SANITARY SEWERS

A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water (30 kpa).

SECTION SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS

A. This Section includes gravity-flow, nonpressure storm drainage outside the building, with the following components:

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

SECTION FACILITY SANITARY SEWERS

Facility Sanitary Sewers

SECTION SANITARY SEWER SYSTEM

A. Gravity-Flow, Nonpressure, Drainage-Piping Pressure Rating: 10-foot head of water.

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated.

SECTION STORM DRAINAGE. A. This Section includes gravity-flow, nonpressure storm drainage (REMOVED), with the following components:

SUNY Genesee Community College JMZ Project No Implementation of Master Plan Projects - Phase 1 Site Improvements

A. This Section includes gravity-flow, nonpressure and force-main, pressure sanitary sewerage outside the building, with the following components:

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION SANITARY SEWER SYSTEM

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SANITARY WASTE AND VENT PIPING

Daytona Beach Pier Building Renovation Jun 2010

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

DESIGN GUIDELINES AND TECHNICAL STANDARDS

SDR26 material is to be used as a minimum on all U-M projects.

C. Provide construction staking in accordance with generally accepted practice for layout of underground utilities.

1. C-478 Specification for Precast Reinforced Manhole Sections. 2. D-3034 Specification for Polyvinyl Chloride (PVC) Pipe.

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS

SECTION FACILITY STORM DRAINAGE PIPING

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

SECTION (15150) - SANITARY WASTE AND VENT PIPING

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

TABLE OF CONTENTS

SECTION FACILITY STORM DRAINAGE PIPING

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated.

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following storm drainage piping inside the building.

SPECIAL SPECIFICATION 3504 Septic Tank System

SECTION WATER SERVICE PIPING

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1

Storm Drainage

SECTION FACILITY SANITARY SEWERS PART 1 - GE:\"ERAL

CHAPTER 6 - SANITARY SEWER

SECTION STORM UTILITY DRAINAGE PIPING

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION VI SANITARY SEWERS

SECTION STORM DRAINAGE

SECTION SANITARY UTILITY SEWERAGE PIPING

SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete.

Section 4 Service Lines

Wastewater Capital Projects Management Standard Construction Specification

SECTION

FOX METRO WATER RECLAMATION DISTRICT MANHOLE / SEWER PIPE MATERIALS AND INSTALLATION SPECIFICATIONS MATERIALS 1. PIPE & FITTINGS

PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

1. Division 01 Section General Requirements - Temporary Facilities and Controls. 2. Division 31 Section Earthwork.

SECTION STORM SEWER COLLECTION SYSTEM

SECTION 39 - MANHOLES TABLE OF CONTENTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.

SECTION FOUNDATION DRAINAGE

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

1 Revised: 2019 Edition

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM NO SLIPLINING SANITARY SEWERS

A. Piping materials shall bear label, stamp, or other markings of specified testing agency.

***************************************************************************************************************

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

***************************************************************************************************************

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS DAVIS, CALIFORNIA

SPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings

ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

***************************************************************************************************************

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

1.02 RELATED WORK: Refer to the following sections for related work:

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

San Antonio Water System Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

January 2015 Town of Surf City Standard Specifications

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

B. Fiberglass for construction in back lot easements placed on cast-in-place base.

SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

SECTION LAYING AND JOINTING BURIED PIPELINES

Changes for the. TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

SECTION GRAVITY WASTEWATER LINES

CITY OF ODESSA SPECIAL SPECIFICATIONS ITEM 1000 GLASS-FIBER REINFORCED POLYESTER (FRP) REHAB/REPLACEMENT MANHOLE

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

Specifications Standards for University of Washington Section Job Order Contracting SUBDRAINAGE ZGF Partnership Page 1 of 10

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section DUCTILE IRON PIPE AND FITTINGS

D. Removal of existing storm sewerage pipe and drainage structures.

ITEM 432 TUNNEL CONSTRUCTION

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION POLYETHYLENE PRESSURE PIPE

TECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID:

Transcription:

SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes gravity-flow, non-pressure sanitary sewerage outside the building, with the following components: 1. Special fittings for expansion and deflection. 2. Cleanouts. 3. Precast concrete manholes. B. All work performed in the City of Salisbury s right of way or easements shall be performed by a contractor approved by the city and to the standards and specifications issued by the City. 1.3 SUBMITTALS A. Product Data: For the following: 1. Special pipe fittings. B. Shop Drawings: For the following: 1. Manholes: Include plans, elevations, sections, details, and frames and covers. C. Field quality-control test reports. 1.4 QUALITY ASSURANCE A. Environmental Compliance: Comply with applicable portions of local environmental agency regulations pertaining to sanitary sewerage systems. B. Utility Compliance: Comply with local utility regulations and standards pertaining to sanitary sewer systems. 1.5 DELIVERY, STORAGE, AND HANDLING A. Do not store plastic manholes, pipe, and fittings in direct sunlight. B. Protect pipe, pipe fittings, and seals from dirt and damage. C. Handle manholes according to manufacturer's written rigging instructions. 1.6 PROJECT CONDITIONS FACILITY SANITARY SEWERS 221313-1

A. Interruption of Existing Sanitary Sewerage Service: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary service according to requirements indicated: 1. Notify Construction Manager & Owner no fewer than five (5) days in advance of proposed interruption of service. 2. Do not proceed with interruption of service without Construction Manager's written permission. B. Site Information: Perform site survey, research public utility records, and verify existing utility locations. Verify that storm sewerage system piping may be installed in compliance with original design and referenced standards. 1. Locate existing sanitary sewerage system piping and structures that are to be abandoned and closed. PART 2 - PRODUCTS 2.1 PIPING MATERIALS A. Refer to Part 3 "Piping Applications" Article for applications of pipe, fitting, and joining materials. 2.2 HUB-AND-SPIGOT, CAST-IRON SOIL PIPE AND FITTINGS A. Pipe and Fittings: ASTM A 74, Extra-Heavy class. B. Gaskets: ASTM C 564, rubber. C. Calking Materials: ASTM B 29, pure lead and oakum or hemp fiber. 2.3 PVC PIPE AND FITTINGS A. General: Provide pipe and pipe fitting materials compatible with each other. Where more than one type of materials or products is indicated, selection is Installer's option. Piping in paragraph below is available in 4 SDRs and in NPS 4 to NPS 15 (DN 100 to DN 375). Joints are solventcemented and gasket types. B. Gravity 1. PVC Sewer Pipe and Fittings, NPS 15 and Smaller: ASTM D 3034, SDR 35, with belland-spigot ends for gasketed joints with ASTM F 477, elastomeric seals. 2. Piping in paragraph below is available in 2 thicknesses and in NPS 18 to NPS 36 (DN 450 to DN 900). Joints are gasket type. 3. Corrugated PVC Sewer Pipe and Fittings, NPS 18 and Larger: ASTM F 949-93a, with bell-and-spigot ends for gasketed joints with ASTM F 477, elastomeric seals. 4. Couplings: Rubber or elastomeric sleeve and stainless steel band assembly fabricated to match outside diameters of pipes to be joined. FACILITY SANITARY SEWERS 221313-2

a. Sleeves: ASTM C 564, rubber for cast-iron soil pipe; and ASTM F 477, elastomeric seal for plastic pipe. Sleeves for dissimilar or other pipe materials shall be compatible with pipe materials being joined. b. Bands: Stainless steel, one at each pipe insert. C. PVC Pressure Piping: 1. Pipe: ASTM D 1785, Schedule 40 PVC, with plain ends for solvent-cemented joints. 2. Fittings: ASTM D 2466, Schedule 40 PVC, socket type. 2.4 CLEANOUTS A. General: Provide cast-iron ferrule and countersunk brass cleanout plug, with round cast-iron access frame and heavy-duty, secured, cast-iron cover. 2.5 CONCRETE A. General: Cast-in-place concrete according to ACI 318/318R, ACI 350R, and the following: 1. Cement: ASTM C 150, Type II. 2. Fine Aggregate: ASTM C 33, sand. 3. Coarse Aggregate: ASTM C 33, crushed gravel. 4. Water: Potable. B. Portland Cement Design Mix: 4000 psi minimum, with 0.45 maximum water/cementitious materials ratio. 1. Reinforcement Fabric: ASTM A 185, steel, welded wire fabric, plain. 2. Reinforcement Bars: ASTM A 615/A 615M, Grade 60, deformed steel. C. Manhole Channels and Benches: Factory or field formed from concrete. Portland cement design mix, 4000 psi minimum, with 0.45 maximum water/cementitious materials ratio. Include channels and benches in manholes. 1. Channels: Concrete invert, formed to same width as connected piping, with height of vertical sides to three-fourths of pipe diameter. Form curved channels with smooth, uniform radius and slope. a. Invert Slope: Match pipe slope through manhole. 2. Benches: Concrete, sloped to drain into channel. a. Slope: 4 percent. 2.6 IDENTIFICATION A. Metallic-Lined Plastic Underground Warning Tapes: Polyethylene plastic tape with metallic core, 6 inches wide by 4 mils thick, solid green in color with continuously printed caption in black letters "CAUTION - SEWER LINE BURIED BELOW." FACILITY SANITARY SEWERS 221313-3

2.7 WET-WELL, PACKAGED SEWAGE PUMPING STATION WITH SUBMERSIBLE GRINDER SEWAGE PUMPS: 1. Basis-of-Design Product: Subject to compliance with requirements, provide the product indicated on Drawings or a comparable product of approved equal construction. a. Environment One Corporation. b. Model DH 1152-93 1) 240V, 60 hz, 1 phase 2) Duplex alternating panel 2-260 PART 3 - EXECUTION 3.1 PREPARATION OF FOUNDATION FOR BURIED SANITARY SEWERAGE SYSTEMS A. Grade trench bottom to provide a smooth, firm, stable, and rock-free foundation, throughout the length of the pipe. B. Remove unstable, soft, and unsuitable materials at the surface upon which pipes are to be laid, and backfill with clean sand or pea gravel to indicated level. C. Shape bottom of trench to fit bottom of pipe. Fill unevenness with tamped sand backfill. Dig bell holes at each pipe joint to relieve the bells of all loads and to ensure continuous bearing of the pipe barrel on the foundation. 3.2 PIPE APPLICATIONS FOR UNDERGROUND SANITARY SEWERS A. Pipe Sizes 2 to 6 Inches: Extra-heavy-class hub and spigot cast-iron soil pipe and fittings. B. Pipe Sizes 6 to 15 Inches and Smaller: PVC gasket joint sewer pipe and fittings. C. Pipe Sizes 18 Inches and Greater: Corrugated PVC gasket joint sewer pipe and fittings. 3.3 INSTALLATION, GENERAL A. General Locations and Arrangements: Drawings (plans and details) indicate the general location and arrangement of the underground sanitary sewerage system piping. Location and arrangement of piping layout take into account many design considerations. Install the piping as indicated, to the extent practical. B. Install piping beginning at low point of systems, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and couplings in accordance with manufacturer's recommendations for use of lubricants, cements, and other installation requirements. Maintain swab or drag in line and pull past each joint as it is completed. C. Use manholes for changes in direction, except where a fitting is indicated. Use fittings for branch connections, except where direct tap into existing sewer is indicated. FACILITY SANITARY SEWERS 221313-4

D. Use proper size increasers, reducers, and couplings, where different size or material of pipes and fittings are connected. Reduction of the size of piping in the direction of flow is prohibited. E. Install piping pitched down in direction of flow, at minimum slope of 2 percent, except where indicated otherwise. F. Extend sanitary sewerage system piping to connect to building sanitary drains, of sizes and in locations indicated. G. Install 1-inch-thick extruded polystyrene over underground building drain piping not under building. Width of insulation shall extend minimum of 12 inches beyond each side of pipe. Install directly over and center on pipe center line. H. Tunneling: Install pipe under streets or other obstructions that cannot be disturbed, by tunneling, jacking, or a combination of both. I. Install force-main, pressure piping according to the following: 1. Install piping with restrained joints at tee fittings and at horizontal and vertical changes in direction. Use corrosion-resistant rods, pipe or fitting manufacturer's proprietary restraint system, or cast-in-place-concrete supports or anchors. 2. Install piping with 42-inch minimum cover. 3. Install schedule 40 PVC piping according to ASTM D 2774 and ASTM F 1668 and local plumbing and health department codes. 3.4 PIPE JOINT CONSTRUCTION AND INSTALLATION A. Join and install hub and spigot cast-iron soil pipe and fittings with compression gaskets in accordance with CISPI "Cast Iron Soil Pipe and Fittings Handbook, Volume I." Use "Extra Heavy" class gaskets to match class of pipe and fittings. B. Join and install gravity PVC pipe as follows: 1. Pipe and gasketed fittings, joining with elastomeric seals in accordance with ASTM D 3212. Bell and spigot pipe. 2. Installation in accordance with ASTM D 2321. C. Join different types of pipe with standard manufactured couplings and fittings intended for that purpose. D. Join force-main, pressure piping according to the following: 1. Join schedule 40 PVC piping according to ASTM D 2855. 2. Join dissimilar pipe materials with pressure-type couplings. 3.5 INSTALLATION OF PUMP STATION A. Install packaged sewage pumping station components where indicated, according to specific equipment and piping arrangement indicated. B. Follow manufacturer s instructions including ballast requirements, controls and backfill. FACILITY SANITARY SEWERS 221313-5

3.6 CLEANOUTS A. Install cleanouts and extension from sewer pipe to cleanout at grade as indicated. Set cleanout frame and cover in concrete block 18 by 18 by 12 inches deep, except where location is in concrete paving. Set top of cleanout 1 inch above surrounding earth grade or flush with grade when installed in paving. 3.7 TAP CONNECTIONS A. Make connections to existing piping and underground structures so that finished work will conform as nearly as practicable to the requirements specified for new work. B. Use commercially manufactured wye fittings for piping branch connections. Remove section of existing pipe, install wye fitting into existing piping, and encase entire wye fitting plus 6-inch overlap, with not less than 6 inches of 3000-psi 28-day compressive-strength concrete. C. Make branch connections from side into existing 4- to 21-inch piping by removing section of existing pipe and installing wye fitting, into existing piping. Encase entire wye with not less than 6 inches of 3000-psi 28-day compressive-strength concrete. D. Make branch connections from side into existing 24-inch or larger piping or to underground structures by cutting opening into existing unit sufficiently large to allow 3 inches of concrete to be packed around entering connection. Cut end of connection pipe passing through pipe or structure wall to conform to shape of and be flush with inside wall, unless otherwise indicated. On outside of pipe or structure wall, encase entering connection in 6 inches of concrete for minimum length of 12 inches to provide additional support of collar from connection to undisturbed ground. 1. Provide concrete that will attain minimum 28-day compressive strength of 3000 psi, unless otherwise indicated. 2. Use epoxy bonding compound as interface between new and existing concrete and piping materials. E. Protect existing piping and structures to prevent concrete or debris from entering while making tap connections. Remove debris, concrete, or other extraneous material that may accumulate. 3.8 CLOSING ABANDONED SANITARY SEWERAGE SYSTEM A. Abandoned Piping: Close open ends of abandoned underground piping that is indicated to remain in place. Provide sufficiently strong closures to withstand hydrostatic or earth pressure that may result after ends of abandoned utilities have been closed. 1. Close open ends of concrete or masonry utilities with not less than 8-inch-thick brick masonry bulkheads. 2. Close open ends of piping with threaded metal caps, plastic plugs, or other acceptable methods suitable for size and type of material being closed. Wood plugs are not acceptable. B. Abandoned Structures: Remove structure and close open ends of the remaining piping, or remove top of structure down to not less than 3 feet below final grade; fill structure with stone, FACILITY SANITARY SEWERS 221313-6

rubble, gravel, or compacted dirt, to within 1 foot of top of structure remaining, and fill with concrete. 3.9 INSTALLATION OF IDENTIFICATION A. Install continuous plastic underground warning tape during back-filling of trench for underground Sewerage piping. Locate 6 to 8 inches below finished grade, directly over piping. 3.10 FIELD QUALITY CONTROL A. Clear interior of piping and structures of dirt and superfluous material as work progresses. Maintain swab or drag in piping, and pull past each joint as it is completed. 1. Flush piping between manholes and other structures to remove collected debris. 2. Place plug in end of incomplete piping at end of day and when work stops. B. Inspect interior of piping to determine whether line displacement or other damage has occurred. Inspect after approximately 24 inches of backfill is in place, and again at completion of Project. 1. Submit separate report for each system inspection. 2. Defects requiring correction include the following: a. Alignment: Less than full diameter of inside of pipe is visible between structures. b. Deflection: Flexible piping with deflection that prevents passage of ball or cylinder of size not less than 92.5 percent of piping diameter. c. Crushed, broken, cracked, or otherwise damaged piping. d. Infiltration: Water leakage into piping. e. Exfiltration: Water leakage from or around piping. 3. Replace defective piping using new materials, and repeat inspections until defects are within allowances specified. 4. Reinspect and repeat procedure until results are satisfactory. C. Test new piping systems, and parts of existing systems that have been altered, extended, or repaired, for leaks and defects. 1. Do not enclose, cover, or put into service before inspection and approval. 2. Schedule tests and inspections by authorities having jurisdiction with at least 24 hours advance notice. 3. Submit separate report for each test. 4. Sanitary Sewerage: Perform air test according to UNI-B-6. 5. Leaks and loss in test pressure constitute defects that must be repaired. Replace leaking piping using new materials, and repeat testing until leakage is within allowances specified. END OF SECTION 221313 FACILITY SANITARY SEWERS 221313-7