Minutes of Meeting ( )

Similar documents
Township Thazi Village Pyi Nyaung. 2. Present findings of the draft Supplemental ESIA

(7) Good Practices. <Myanmar> Good Practice 1: EIA Consultant Registration System in Environmental Impact Assessment Procedure

ROADS: OPERATION AND MAINTENANCE

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

IN THE KYRGYZ REPUBLIC

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ROUNDTABLE MEETING ON SUSTAINABLE PALM OIL. RSPO Guidance for the Management and rehabilitation of Riparian Reserves Holly Barclay

ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

Source of requirement EBRD. - Each six months during construction - Annually during operation. Best practice EBRD PR 1

Environment Management Plan

RECLAMATION PLAN FOR. (name of Mine) MINING OPERATION

Water Pollution Control for Work in Sensitive Areas

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

Cement Manufacturing Company Ltd. Page 1

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT INDUCTION. Section 5

Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores

BACKGROUND INFORMATION DOCUMENT

left over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or

E. STORMWATER MANAGEMENT

MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING PERIOD VILLAGE OF PLAINFIELD, ILLINOIS

SALVEASERRA. Concordia Mountain Environment Protection Group, NGO

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

WORK PROGRAMME FORM QUARRY RESOURCE CONSENT

WI-ENV-PER-0013 GROUND DISTURBANCE PERMIT

Borrow Pit and Quarry Management Procedure Environmental

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

SANDCRETE ENGINEERING NIG. LTD. Background Information Document (BID)

Erosion Control Inspection Form

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

The Project will be undertaken in line with a number of national laws and standards. Key local laws relating to ESIA include:

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives

E671 vol. 5. Lesson 11. Environmental Impact of Small-Scale Infrastructure Projects. November L&-~~A>f. Technical Support Staff Basic Training

Hardrock Mining POTENTIAL IMPACTS TO WATER, WILDLIFE, AIR AND LAND. BY BONNIE GESTRING

GEORGIA URBAN ENERGY LTD

Storm Water Pollution Prevention Plan (SWP3) Checklist

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

CORPORATE SOCIAL RESPONSIBILITY POLICY

Annex F Scoping Checklist

NDDOT Erosion & Sediment Control Construction Course

Environmental and Social Impact Assessment for Guinea Bauxite Mining, West Africa

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT

Chapter 13 Management and Implementation

Building Better Storm Water Quality

TERMS OF REFERENCE. Notes for NEPA for Generic Terms of Reference

Washington Dulles International Airport EXECUTIVE SUMMARY

A tank filtration and settling system set up to dewater groundwater for excavation work near the Upper Truckee River.

Provisional Myanmar National Building Code and Guidelines for High-rise Buildings

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

Agricultural Re-Use of Treatment Wastewater

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

SECTION TEMPORARY ENVIRONMENTAL CONTROLS

Public Notice.

Hay Bale Barriers are prohibited

1.2 REGULATORY REQUIREMENTS

Chapter 13 Management and Monitoring

PART II - SURVEYING AND GRADING CRITERIA

VETIVER FOR REHABILITATION OF PADAENG ZINC MINE, MAE SOT DISTRICT, TAK PROVINCE, THAILAND

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

(1) Prime Minister Senior General Than Shwe meets LPDR Prime Minister Mr Khamtay Siphandone

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Improving the Management of Waste and Generating Revenue. Aravind Eye Care Hospitals, Pondicherry

Mining Environmental Impact Assessment Guidelines. May 2018

Environmental Impact Assessment (EIA)

The Role and Opportunities Of Water Environment in the. Republic of the Union of Myanmar

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

SECTION STORMWATER POLLUTION PREVENTION

Works, services and infrastructure code

CERTIFICATE OF APPROVED REGISTRATION J. T. BAKER CHEMICAL COMPANY. Sanitary Landfill. Harmony Township. Warren 2110B

J.K. Cement WORKS, NIMBAHERA (RAJ)

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT

Operating and Reclamation Plan

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

Combined Safeguards and Sub- on ERDD-plus, Singapore, March Daw Le Le Thein, U Than Naing

Summary of Preparatory Study

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE

LEBANON WATER SUPPLY AUGMENTATION PROJECT ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT

GRADING, EROSION AND SEDIMENTATION CONTROL

METHOD STATEMENT. MVV O&M GmBH, South West Devon Waste Partnership & Kier Construction Limited. Document No: CMS/ E0788 /003 FOR

Permeable Pavement. Pavements constructed with these units create joints that are filled with permeable

13 Land Use Activities and Indigenous Biological Diversity

Reservoir age, increasing human population,

ROUND 2 OPEN HOUSE. Keeyask Transmission Project EA Report Appendix D: Public Involvement Materials D-81

COWLITZ COUNTY DEPARTMENT OF BUILDING AND PLANNING

Air, Materials and Chemicals, 3days

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Appendix 4. Soil Management Plan

Re: Erosion Control Report and Drawings Requirements Accompanying Document

July Cleaning Up Abandoned Mine Drainage. in the West Branch Susquehanna Watershed

Part B Assessment of Environmental Effects. Earthworks (Minor Effects) Consent No.:... Earthworks (Minor Effects) AEE 6

Petra Diamonds (Finsch) Storm Water Management Plan Update. Project No: PET-FIN Shangoni Management Services (Pty) Ltd

Introducing Act 64 - the Vermont Clean Water Act - and Vermont s Clean Water Goals

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

Transcription:

Minutes of Meeting (5.9.2017) Meeting Details Project Supplementary ESIA for Shwe Taung Cement () Cement Plant & Associated Facilities in Myanmar Office/ Department/ Organization Kalewa GAD office Region/ State Sagaing Township Kalewa Village - Objectives Township Level Meeting to: 1. Share information about the Project Expansion of a Cement Plant & Associated Facilities by the Shwe Taung Cement () Company in Myanmar. 2. Present findings of the draft Supplemental ESIA 3. Exchange views with interested and affected parties which will be taken into account for finalization of the Environmental and Social Impact Assessment (ESIA) Report for the Project. Date 5 September 2017 (Tuesday) Time 09:45 to 12:15 Attendees List Government Org. (59) Public (38) NGOs, CSOs (21) Media (3) Agenda 1) Introduction of the Shwe Taung Group (STG) by U Aung Khaing Nyi, STG 09:45 10:00 2) Explanation of public relationship by Daw Aye Mon Thu, STG 10:00 10:10 3) Presentation of Project Details by U Ze Lum, 10:10 11:05 4) Presentation of draft ESIA findings by Daw Myat Mon Swe, ERM 11:05 11:45 5) Question and Answer Session (see below on detailed notes of discussion) 11:45 12:15. 1

Q-1: Chairman (Kyaw Zin Group of Kalewa, Socio-economic Development Group) i. Our organization is involved in forest conservation and palm cultivation in Kalewa area since 2016. I would like to know the area of forest that will be impacted by Project. How do you manage the replantation programme at the coal mine at the coal mine and how many acres of area are already replanted? A-1: i. According to the contract commitment with Mining Department and Forest Department, impacts on forest by mining activities have to be minimized. Environmental Conservation Department also frequently examines any environmental impacts of our coal mine. Our coal concession area is greater than 3,000 acres, around 9 miles long and 6-7 furlongs wide. i The replantation area will be 20 % of our coal concession area. Replantation will not only be started following completion of production. Different plant species will be replanted in mine area during the process of coal extraction in the area. The top soil from coal extraction will be reused as the finishing layer of replantation. According to the mine rehabilitation plan and mine closure plan and mine closure plan as our commitment with Forest Department, we plan to replant teak and hedge. The biodiversity impact assessment was already done by ERM as part of the ESIA Study. FFI (Flora and Fauna International) was commissioned to undertake the biodiversity surveys. The biodiversity survey data and impact assessment are disclosed in the draft ESIA Report. Biodiversity as well as other potential environmental impact will be mitigated as appropriate to address stakeholders concerns. Q-2: Upper Chindwin Youth Network i. What are the job opportunities from the Project for local people living in the eight (8) villages around the coal mine area and from Kalewa? The opportunities should not only be non-technical labour but also for technical staff with permanent position at coal mine which is really important. i We also consider that pollution of the Chindwin River by coal and wastewater discharge from the coal storage area and unplanned accident during coal transportation along the river should be properly managed. Impacts from the Project to the forest and resources and associated resources should also be assessed. 2

A-2: i. Technical staffs are required for our mining activities. offers job opportunities to local people living around the mine according to their interest, and vocational training is provided to train them as technical staff. Four (4) technical staffs from Kalewa are working for the coal mine now. Five (5) non-technical staffs from Kalewa are working now as excavator driver and their salaries are up to 300,000 kyat, from 60,000 kyat when they are first hired. In Pyin Naung, vocational training center will be set up in next year. i iv. To improve the living standards of local people, education is really important. We try to provide assistance to villages around the Project area to improve education level and health condition of the villagers. We provide scholarship for students who passed matriculation so that they can continue to higher education level. We take the responsibilities and accountabilities for environmental and social impacts caused by the Project. Training is being provided to our staffs for health and safety and environmental conservation. Coal transportation by barges along the Chindwin River is being managed systematically. For example, the coal is covered by sheet during transportation. Our coal storage areas have drainage system and wastewater is discharged to the settling ponds first to prevent coal sedimentation in the river. v. Soil erosion caused by mining or natural process may lead to river pollution. To prevent soil erosion from topsoil where vegetation is removed for the purpose of mining, we installed drainage system to divert the surface runoff to reduce erosion. vi. To prevent soil contamination in coal storage area, we will pave the area with concrete in next five years. v To prevent contamination of river water, there is drainage with engineering design to discharge natural rain water to the river directly, bypassing the coal storage area. Drains are constructed around the coal storage area which is connected with a settling pond to reduce sediment level before discharged. We will test the collected water and treat them as necessary before discharge to the river. To prevent impacts to the streams by access road construction, we will design and construct appropriate crossings across streams. vi We spray water on our road to control dust emissions. In rainy season, we will maintain the access roads and conduct planting around the coal mine area with teak and other plant species. ix. As part of our CSR programme, we constructed access roads and provide donation for schools and health assistance. 110 million kyat was used for CSR. x. For job opportunities, many of our staffs are form Thit Chauk village. We have 77 employees in 2012-2013 and 150 employees in 2017. Total payment for salary is 18.2 million kyat. 3

A-2: ERM i. In our ESIA Report, we have proposed mitigation measures to manage potential water quality impacts from the coal mining activities. Apart from the mitigation measures that just mentioned, there will also be Emergency Response Plan prepared for the Project which will be implemented in case of emergency, including accidental loss of coal during transportation by barges. In terms of biodiversity impact of the Project, we have engaged experts from FFI to undertake biodiversity survey in January to March 2017 for the Project and in September 2017 ERM survey Bio specifics at the Limestone Mountain including the coal mine and the cement plant areas. In addition, a wet season survey was conducted in September 2017 at the limestone habitat within and in the vicinity of the limestone quarry of the cement plant. Critical habitat is identified which may be affected by the Project and mitigation measures are proposed in the ESIA Report, including biodiversity offset, to manage potential biodiversity impacts according to IFC PS. As part of our recommendation, we will assist to develop the biodiversity action plan and actions will be undertaken accordingly to mitigate biodiversity impacts. Q-3: President of National Unity Party i. We expect that there will be more job opportunities to local people rather than people from outside the local area. i iv. More health care facilities and staffs are required for the coal mine to respond to accidents and emergency cases. On biodiversity, the Paluzawa stream as well as the nearby south and north streams are main fishing ground, however, there are less fish due to electrofishing. Barking deer are now rare in the area due to hunting by traps. So are there measures to prevent the above? On replantation, we cultivated a teak nursery (120 x 45 feet) and planted 12 acres when I worked at Kokant Golden Dragon Kokant Golden Dragon in Chaungzon for about 10 months in 2013-2014. However, these are now destructed. I would like to request to to maintain this teak area. v. I would like to visit to the site with other NGOs, political parties and government departments. vi. Please provide us information on the location of the second line of the cement plant and its capacity. 4

A-3: i. welcomes and expects more job applications from local peoples living around the mine area. i iv. There is a clinic with a mid-wife in Ywerthar village group and one staff who worked for Kalewa Hospital before is now hired by us to manage the health care of our staffs. We provide healthcare assistance to the local people once a week. We help to send patient with emergency to the Kalewa Hospital. Also we provide test kit for malaria and all patients have to be sent to Kale or Kalewa Hospital for treatment. We will try to supply more healthcare facilities in the future. It is difficult for to control illegal fishing such as by electrofishing. We can help to put up signboard to remind the public of prohibition of such illegal activities. We will restrict access of non-project related trucks on our access road to prevent illegal logging and hunting. We will try to maintain the teak plot of Kokant Golden Dragon and Mandalay Golden Friend Kokant Golden Dragon and Mandalay Golden FriendCompany. v. We will plan for a site visit for NGOs, CSOs and other communities to our coal area and we welcome any advice, suggestion and comments on our activities. vi. The second line of the cement plant will be constructed in the existing cement plant area and its production is 4,000 tons of clinker and 5,500 tons of cement per day. The engineering procurement and foundation work and foundation work has started and construction will be completed by the end of 2018. Q-4: Chindwin Myittha Resources Watch Group i. How do you manage water quality impacts to the Chindwin River due to coal storage near the river bank with other companies? Some coal mining projects by other companies are not being managed properly. We don t want to see any pollution in Chindwin River because it is the only water resources for us. A-4: i. An environmental conservation committee is formed with all mining companies in Paluzawa which also include village leaders, officers from General Administration Department and Education Department as well as the public. To solve this problem, all companies need to participate and comply with the related regulation. We also invited all mining companies working in Paluzawa area to attend this public consultation meeting to discuss how to solve this problem together so that we can find the best way to control this impact together. 5

Q-5: Upper Chindwin Youth Network i. Please disclose the production period of coal mine in Paluzawa. A-5: There is 18 million tons of coal in our concession and we will mine down to 250 meters (above sea level) using the open pit method. After that underground mining will be employed for coal extraction. We will use underground mining method to reduce health and safety risk of our operation. Total coal production will depend on coal availability and method of mining. Our production period will be 30 years. Q-6: Chindwin-Myitthar Development i. Firstly, I like to say thank you to on behalf of local people of Kale and Kalewa and we hope can continue supporting the community in the future. I have visited the Project area under invitation. During the visit, I observed the health and safety practice, staff facilities, road construction and nursery for the replantation programme. When I accessed STG website, I found that STG has already donated 92 schools in Myanmar and try to support the facilities for students. Also local people can raise their living standard due to job opportunities provided by the Project. i I would like to know risk of auto-ignition of coal during transportation by barge and truck and how to manage that. A-6: i. Risk of auto-ignition of coal can be reduced by controlling the height of coal stockpiles. At the coal storage area, we compact the coal with roller layer by layer to prevent autoignition. We equipped our coal truck with fire extinguisher, which is checked regularly, to respond to auto-ignition of coal. Coal is also covered by sheet to prevent oxidation oxidation. On the barge, carbon dioxide fire extinguisher is used. Up to now, there is not any fire case on coal barge and there is only one case of capsize of coal barge which happened long time ago (not related to coal mine). Q-7: U San Hla Tun (Public) i. We welcome the cement plant expansion project which will provide more job opportunities. There is a historical milestone which is about 2 miles from Paluzawa. The milestone is broken and we would like to request to help repairing it. A-7: 1) We noted and will follow-up accordingly. 6

Photos 7

Photos 8

Photos 9