BIM + Technology in Large Construction Project Application. October 2017

Similar documents
Curriculum Plan for the CEPM Program of Jiangsu University (CEPM 2011 Batch and later)

Model-Based Design From Rapid Prototyping to Production

ZHANG Xin. National Center for Climate Change Strategy and International Cooperation

中国经销领域的变化 J O H N D I X O N, V I C E P R E S I D E N T, G L O B A L D I S T R I B U T I O N N O V E M B E R

THE CONSTRUCTION OF PING AN FINANCE CENTRE

Prefabricated Buildings in Europe -

Airport Digital Indoor Coverage Solution-- LampSite

JGJ Translated English of Chinese Standard: JGJ JGJ NATIONAL STANDARD OF THE

Available online at ScienceDirect. Procedia Engineering 145 (2016 )

Low-Carbon City Planning Tools. Abigail Watrous, Ph.D. Senior ORISE Fellow, EERE International

Prof. WU Siegfried Zhiqiang

Design of demand-oriented vocational education for modern structures of production and service

The Application on EPC in Project Management of Industrialized Buildings

ctbuh.org/papers Reform Measures of Korea s High-rise Buildings Construction Period Title: Ki-In Kim, Senior Manager, HanmiParsons Co., Ltd.

Shared Innovation. Christophe Bilaine, VP Preconstruction, Bouygues Batiment International

Discussion on the Application of BIM Technology in the Assembly Building

Practical application of VALMET technology on waste incineration in China

People matters How to effectively manage talents and customers? Michael Zhang Industry Principal, Financial Services

Air pollution in large cities Bjarne Sivertsen Norwegian Institute for Air Research. Sino-Norwegian cooperation, EXPO 2010

Hewlett Packard Enterprise Student and Dispatch Worker Standard for Supplier Facilities in the People s Republic of China (PRC)

inemi STUDY ON BOARD CREEP CORROSION inemi 关于电路板爬行腐蚀的研究 Project chairs: Xiaodong Jiang (Alcatel-Lucent) Mason Hu (Cisco) Simon Lee (Dow Chemical)

Application of BIM Based on Security in the Process of Engineering Construction

The Current Condition and Development Trend of the Urban Water Supply and Drainage Facilities of China

Computer Aided Drafting, Design and Manufacturing Volume 27, Number 1, March 2017, Page 63

Commissioning in a LEED & GOBAS Evaluated Green Building

BIM for Building Water Supply and Drainage Design Rong Yang, Wenwu Song

China PV Market Trends in China

Meeting Agenda. November 1, 2012

China Railway BIM and Standards. Gao Ge Tsinghua University China Railway BIM Alliance

AI Use cases and Requirements for telecom network. China Mobile

IMPACT

Application Research on Monitoring Cloud Platform of Bridge Construction Based on BIM ZHI Peng1, a, SHI Tianyun2, b, WANG Wanqi3, c, WANG Huilin4, d

2019 Beijing Forestry University

Beijing Datum Technology Development Co., Ltd. swccinfo.com

汉江雅口航运枢纽工程 ( 湖北内河航运能力提升项目 ) 采购计划 (2018) Procurement Plan of Yakou Navigation Complex(Hubei Inland Waterway Improvement.

Potential for Savings in China s Government Energy Efficiency Procurement Program: Preliminary Findings

HOW TO DEVELOP A SUCCESSFUL JOINT-VENTURE IN CHINA. is a business unit of

Delivering Remarkable Customer Experiences. Edwin Ong Director, Marketing APAC & Middle East

Regional Low-Carbon Transition & Development Planning in China: Theory and Practices

Past, Present and Future Directions with Open Demand Response Communications

Status and Trend of Waste Management in Shanghai. WANG Qiang Shanghai Solid Waste Management Center

Integrating renewable energy resources

热能与动力工程专业本科培养方案. Undergraduate Program for Specialty in Thermal Energy and Power Engineering

Guangdong Sanwood Technology Co.,Ltd

水肥一体化系统在农业生产中的应用. 北京派得伟业科技发展有限公司 Beijing PAIDE Science and Technology Development Co. Ltd. 吴建伟 WU Jianwei

Low carbon development in China

Development of an Efficient Tapered Slip-Form System Applying BIM Technology

Council on Tall Buildings and Urban Habitat

HOW TO DEVELOP A SUCCESSFUL JOINT-VENTURE IN ASIA. is a business unit of

Review and Prospect for Low Carbon Development of Chinese Steel Industry

Construction coordination

Cost Management of Mechanical and Electrical Engineering Project Based on Bim Technology

Advances in 3E of Polymer Processing and Sustainable Manufacturing. Weimin Yang

巢湖流域土地利用效益测度与综合判定 -TOPSIS - 土壤 (Soils), 2017, 49(4): DOI: /j.cnki.tr TOPSIS

Multi-dimensional (nd-)bim Applications with RFID-Enabled Real- Time Visibility and Traceability

BSCI Audit Summary Report

Oracle 的电信行业整体解决方案与策略

Effectiveness of Building Information Modeling in Value Engineering, Sequencing, & Site Logistics

PROJECT NAME. Duke University. Architect (Specify Design Vs. AOR If Multiple) Construction Manager. Civil Engineer. Structural Engineer

The construction technology of Chongqing Chaotianmen Bridge

Annual Results 2014 March 25, 2015

Carbon Mitigation Strategies in China

5D BIM Implementations in Hong Kong and Mainland China

Application of Information System in Warehouse Management

BIG DATA FOR AVIATION SAFETY

Production and Education

The ACR : Advanced Design Features for a Short Construction Schedule

Organic (VOC) Gas Absorber

WINSUN 3D Printing New Era of Green Building

自动化提高设计质量的最佳实践 The MathWorks, Inc.

CCTV HEADQUARTERS. ARCH 631 Spring 2018 Daniel Edith Mckenzie Rafael

Shaping Digitalization Industry 4.0

PROJECT MANAGEMENT PRACTICE OF TERMINAL BUILDING OF SHANGHAI PUDONG INTERNATIONAL AIRPORT

Finite element checking of flange connection in integral hoisting of flare stack

创优体系 线网建设概况 企业管理 优化管理体系, 指导企业稳步前行 ENTERPRISE MANAGEMENT OVERVIEW OF NETWORK CONSTRUCTION INNOVATIVE AND OPTIMIZED SYSTEMS 树典范, 深化改革, 从各方面为企业发展提供可靠依据

CREATIVE ITALIAN SOFAS & BEDS

2012 Results Announcement

ACCOUNTING AND ALLOWANCES: TO DEVELOP A COMPLIANCE STRATEGY 从核算与配额到企业合规战略开发

Experiencing Interoperability of BIM in a Stadium Project in China

Application of Building Information Modelling (BIM) in the Hong Kong Housing Authority s Public Housing Developments

华新水泥股份有限公司董事会审计委员会 Audit Committee of the Board of Directors of Huaxin Cement Co., Ltd 年度履职情况报告 2014 Work Report

Tianbao Plastic Regeneration Project: Development and Challenge under New Era

Smart Grid Dispatching Support System

Vegetation Management System and Safety Work Practices

Data Analytics for Business Decision Making 数据驱动下的商业决策分析

仓储优化系列之如何优化仓库空间, 提高仓储利用率?

BSCI Audit Summary Report

马林 1, 马文奇 2, 张福锁 3, 柏兆海 1 3

國立彰化師範大學 104 學年度碩士班招生考試試題

计算机化系统验证 Computerized System Validation. 陈国笋 Brant Chen 上海朗脉 Macroprocess

Product Family. Company Overview. R&D Capacity. Global Marketing

Smart phone 产业领域机器人应用解决方案

Structural Breadth Study

Updated Information of Policies on Freight Forwarding Industry in China Dr. YANG Yuntao

Section 5 - Project Logistics

Sustainability Practice of the Chinese Textile and Apparel Industry

Sweet Business - COFCO Footprint in Australia Sugar Industry

Martin Linking professional training. Shanghai, China Date: 26 th and 27 th, November, Your International Facilitator:

A Basic Study on the Improvement of Safety Education for Construction Workers Using Virtual Reality Simulation

An Introduction of Beijing s NG Outlook

Transcription:

BIM + Technology in Large Construction Project Application October 2017

Contents (1) Business Introduction (2) BIM Advancement in Construction Management (3) BIM+ Application

第一篇 企业介绍 (1) Business Introduction China Construction Bureau (Group) Co., Ltd. was established in 1953, is the new China's first building "national team", is China's construction shares of the company's core sub-enterprises. To "housing construction + infrastructure, overseas, investment," 1+3 for the industry positioning. The one and only in the Chinese construction field who won the highest prize in the Chinese government quality field - China Quality Award Award Number Award Number Luban Award 46 Project Zhan Tianyou Award National Quality Engineering Award 41 Project China Steel Gold Award 11 Project 19 Project The industry's first national scientific and technological progress won the first prize of the unit, 19 national science and technology award

第一篇 企业介绍 (1) Business Introduction Global and China s highly creators : The world 's first highest (2008) - Shanghai World Financial Center China 's first highest (2010) - Shenzhen Ping An Financial Center The world's tallest steel-concrete structure, the first highest in Europe - the Russian Federation building The Founder of Global and the Chinese : The world's largest swimming pool, the world's largest membrane structure engineering, the world's first polyhedral space steel frame structure - the National Swimming Center (Water Cube) The world's first 10.5 on behalf of the line, the largest volume of high-tech electronics factory - Hefei BOE 10.5 on behalf of the line plant China 's largest ultra - clean electronics factory - Chongqing BOE 8.5 on behalf of the line plant China 's largest single project - CCTV new site main building

Development Path : Bently MEP Monitoring Galaxy SOHO Owners lead BIM implementation Glodon Information Headquarters Start exploring BIM5D management Discussion on Special Application of BIM Medical in Beijing Tiantan Hospital The Application of Tencent Binhai Building Electromechanical Specialty Project. 2003 2005 2009 2012 2013 2014 2015 2016 China Central Television new site. Complex node deepening design Progress simulation Program simulation Finite element calculation Shenzhen Ping An Financial Center Consultant company CCDI led The process of the total package unit took over Li Xingxing project The total package unit dominates BIM implementation Changyang West Station Industrialization Project Explore BIM and the development and application of industrialization Lenovo headquarters two Project type BIM team Beijing Cultural Center Shenzhen Pingan Financial Center South Tower Project full floor, the depth of application 2017 年 : 全员参与 落地应用

综合管理组 Management Team BIM system construction: (A) organizational structure and management system 1, organizational structure The establishment of group-level BIM workstations, set up 14 professional groups, teams located in the Group Technology Center, fully hosted the work of BIM workstations. BIM BIM WorkGroup 工作站 Top Management Planning 顶层设计及策划团队 & Control Team 工程进度管理组 Progress Planning Team 工程安全管理组 Safety Planning Team 工程总平面管理组 Site Layout Planning Team 工程质量管理组 Project Quality Team 造价管理组 Project Costing Team 机电施工组 Project Costing Team 装饰设计施工一体化组 Project Collaboration Team 绿色施工组 Green Construction Team 基础设施组 Foundation Erection Team 深化设计组 Detail Design Team 钢结构施工组 Structural Steel Erection Team 拓展应用组 Simulation Team 万达工作组 Wanda Workers Team

2 Management system - implementation plan 2013 to determine the Group's eight major technical research direction, start BIM technology system construction work in 2015 to form the relevant implementation of research programs. 1, super high-rise building comprehensive construction technology 2, green building construction technology 3, foundation and underground construction technology 4, building information model (BIM) technology 5, process installation technology 6, infrastructure construction technology 7, decorative deepening design techniques 8, general contract management technology

2 management System - Issued "In The Construction Of A Group Of Subenterprises / Regional Companies BIM Workstation / Group / Center Of The Operational Certification Standards" Company BIM Centre Subsidiary BIM WorkGroup BIM Project Application Company BIM Key Projects

2 Management System - Release Group "Engineering Construction BIM Modeling Standards" Standard Catalogue: 1, general rule 2, the term 3, the basic provisions 4, the basic settings 5, model fineness and information management 6, professional model modeling process 7, model integration 8, model delivery Schedule A professional model fineness table Schedule B of the professional model information table Schedule C Navisworks support file format Schedule D single professional model transfer orders Schedule E full professional model transfer orders

2 Management System - Release Group "Construction Project Construction BIM Technology Application Guide" Guide Contents: Preface Chapter 1 BIM Application Environment Chapter 2 Project Implementation Standards Chapter 3 Project Implementation Planning Chapter 4 BIM Management Mechanisms Chapter 5 General Contracting Project Management BIM Application Chapter 6 Application of BIM for Electromechanical Construction Chapter 7 Steel Application Construction BIM Application Chapter 8 Decorative Construction BIM Application Chapter 9 Infrastructure BIM Application Chapter 10 Completion The BIM model is used for operation and maintenance management Schedule A: Each professional model information table Schedule B: Model Change Record Form Schedule C: Project BIM Technical Application Point Reference Range Table Schedule D: BIM model information audit record table Schedule E: Single Professional BIM Model Transfer Order Schedule F: Full Professional Model Transfer Order

2 Management System - Issued "In The Construction Of A Group Of Science And Technology To Promote Demonstration Project Management Approach"

2 management System - Announcement "Implementation Rules For Assessment And Evaluation Of Technical Research And Application Of Building Information Model (BIM) In China Construction Bureau (Revised Edition) Clear and subdivided the type of assessment project, according to the construction of general contracting, professional engineering and design institute design engineering three types of projects were developed assessment criteria. Detailed assessment of business types: the group within the construction class business (excluding research institutes), professional companies and design institutes, and the development of assessment standards.

For example: the construction of general contractors (Ⅰ 18, Ⅱ 27, Ⅲ 12) Application Stage Tender offer stage Project Planning Stage Key Applications BIM Bidding Standard Tender Interview Tender Cost Planning and Recommendati on BIM Actual Project Project Level BIM Standards BIM Training Priority Ⅰ Ⅰ Ⅱ Ⅰ Ⅱ Ⅰ Evaluation Standard The BIM model is inserted into the relevant sections of the "BIM Application Plan or Presentation" of the Bidding Documents to compile the technical specifications, project overview, construction deployment, construction progress schedule and guarantee measures, plan layout, BIM implementation plan and so on. Demonstration. Production of construction program animation, the tender program demonstration, defense, enhance the technical program performance. According to the tender quantity for the tender offer and cost forecasting, extract the amount of work, set the amount of the formation of cost information for the tender to provide data support. According to the "Construction BIM Model Modeling Standard", "Construction Project Construction BIM Technology Application Guide" and "in a bureau group project BIM technology implementation of standardized instruction manual", the preparation of "BIM implementation plan", including the implementation of planning and implementation standards. Approved by the company in charge of management and filing. Specification of the underlying template file selection, including the axis, elevation, wall, view settings, material, units, visibility settings and so on Specification of the underlying template file selection, including the axis, elevation, wall, view settings, material, units, visibility settings and so on

For example: the construction of general contractors (Ⅰ 18, Ⅱ 27, Ⅲ 12)-Cont d Application Stage Construction Stage Key Applications Priority Clash Detection Construction Method Visual Communication Construction Schedule Construction schedule control Detail Design Ⅰ Ⅰ Ⅰ Ⅰ Ⅱ Ⅰ Ⅰ Ⅰ Ⅰ Ⅰ Ⅰ Evaluation Standard The professional collision inspection, pipeline synthesis, net high inspection, large equipment, such as lifting routes. With the construction needs of more than three BIM-based technology / process simulation. Simulation to material, process parameters, processes and other information with words or voice to express clear. Using BIM technology for more than three three-dimensional visualization technology. Cross the screenshot to be clear, accurate information in place. Using BIM technology with two or more programming in the node analysis, calculation, checking and so on. Requirements in the temporary construction, foundation pit, mold, steel applications BIM technology. Through the actual time entry, the planned duration and actual duration comparison, tracking the actual completion of the scene, a clear schedule ahead or lagging process, to facilitate the construction process of good control and feedback; real-time through the BIM model to show the construction status of the scene, and through the model dynamics Show the completion of the previous month and next month plans and assurance measures. The use of BIM technology to deepen the decoration design, plans and so on. Using BIM technology to deepen the design of the structure, such as plans. Using BIM technology to deepen the design of drainage, such as plans. Using BIM technology for HVAC deep design, plans and so on. The use of BIM technology for electrical deepening design, plans and so on. Using BIM technology to deepen the design, plans and so on.

For example: the construction of general contractors (Ⅰ 18, Ⅱ 27, Ⅲ 12)-Cont d Application Stage Construction Stage Key Applications Quality, Safety, Management Construction Method Comparison Rebar Bending Guidelines Construction Model Document Management Steel Procurement & Installation Cladding Installations Finishing and Installations Material Resources Management Priority Ⅰ Ⅱ Ⅲ Ⅱ Ⅱ Ⅱ Ⅱ Ⅱ Ⅱ Ⅱ Evaluation Standard Collection of field data, the establishment of quality defects, security risks, civilized construction and other data, the formation of traceable records. Through the model to assist the management staff on-site quality acceptance, security management, the formation of acceptance information, information and visual records. Able to dynamically identify the scene of dangerous sources and timely warning. Using BIM technology for more than three construction programs for program selection, select the optimal construction program. To optimize the arrangement, the construction of lofting, bargaining statistics and other fine management. The use of local area network, cloud space, such as the construction version of the map management, the professional construction plans, deepening the design and other real-time dynamic update management, and timely reflect the design changes to negotiate the contents of the drawings updated. Proposed steel structure procurement plan, the components of the logistics tracking, the steel structure installation, progress and other management. The development of curtain wall installation program, the curtain wall installation, progress and other management. The development of decoration programs, decorative installation, progress and other management. According to the requirements of the preparation of the material requirements of the project, the submission of the material plan, through the model of the exact amount of work to do comparative analysis, after the audit, the limit picking control to achieve fine material management.

For example: the construction of general contractors (Ⅰ 18, Ⅱ 27, Ⅲ 12)-Cont d Application Stage Construction Stage Key Applications Priority Material Tracking Vertical Transport Mngt Subcon Mngt Engineering Data Mngt Mobile Terminal Internet of Things 3D Scanning Visualization Collaborative Management Prefabrication processing and installation Final Account Ⅱ Ⅱ Ⅱ Ⅱ Ⅱ Ⅲ Ⅲ Ⅲ Ⅱ Ⅲ Evaluation Standard Combined with two-dimensional code technology, for the real-time synchronization of off-site prefabricated components, in the model of feedback in the prefabricated components of the progress and status. Large equipment and structure of the construction simulation, calculation and analysis to ensure that the program is optimal. Subcontracting for model integration, subcontracting progress and engineering management. Collection site quality, safety, civilized construction and other data, and the model immediately related to facilitate the management to find. The use of mobile terminals on-site production, quality, safety and other construction management, visualization technology and so on. Carry out the management of steel structure, concrete and labor service personnel. The BIM technology and the three-dimensional laser scanning technology are combined to realize the comparison and analysis of the actual information of the construction drawing information and the construction site. The quality inspection, the steel structure pre-assembling and collecting the geographical image information and carrying out the reverse three-dimensional modeling. The use of VR and other software, to achieve the model lightweight, real virtual building, the project units in the VR unified platform to work together, timely record and deal with design and construction problems. For the civil, mechanical and electrical, steel structure and decorative prefabricated components, the use of BIM software to deepen the design, through the BIM software export components two-dimensional processing drawings, processing prefabricated, according to the scene assembled. To provide settlement of the amount of work, the amount of subcontracting audit and the owners of the project final accounts.

For example: the construction of general contractors (Ⅰ 18, Ⅱ 27, Ⅲ 12)-Cont d Application Stage BIM model maintenance Handing Over Completion Acceptance Key Applications Priority BIM Model Mngt Facility Management FM Mngt Software Redevelopment Ⅲ Ⅲ Ⅲ Ⅲ Ⅲ Evaluation Standard Stage integration of the various stages of the model, receive, enter and generate relevant information, update and maintain the BIM completion model Production site to complete the map, with the completion of acceptance. The completion of the completion of delivery BIM model, the maintenance of the model update. Can cooperate with the owners to model space, equipment maintenance, maintenance time and other information management. According to the project characteristics and needs, revit software for secondary development and application

2 Management System - Announcement of the Standardization Manual for the Implementation of the BIM Technology Implementation of the Group Project

3 Construction of Supporting Resources - Construction of Group BIM Resource Data Platform framework contains the professional library, BIM standard specifications, guidelines, programs, models and other large data base module, has been uploaded CI library.

Contents (1) Business Introduction (2) BIM Advancement in Construction Management (3) BIM+ Applications

Basic Characteristics Of Large - Scale Construction General Contracting Project First, the project scale, high cost, large volume Second, a wide range of engineering disciplines, complex processes Third, the high quality requirements Fourth, tight schedule Steel reinforced concrete giant column Core Tube Stretched Truss Band Truss Corner truss

Higher product quality Requirements and sustainable construction. Building VS lack of effectiveness Strict construction and construction Cost control VS frequent Missed out and Design Changes The technical means Project Complexity Increase VS 2D cannot be done, cannot do well Tech Control Benefit Globalization Increases Competition VS Unsupported Technology and Management Deprive

Higher product quality Requirements and sustainable construction. Building VS lack of effectiveness Strict construction and construction Cost control VS frequent Missed out and Design Changes The technical means Project Complexity Increase VS 2D cannot be done, cannot do well Tech Control Benefit Globalization Increases Competition VS Unsupported Technology and Management Deprive

Higher product quality Requirements and sustainable construction. Building VS lack of effectiveness Strict construction and construction Cost control VS frequent Missed out and Design Changes The technical means Project Complexity Increase VS 2D cannot be done, cannot do well Tech Control Benefit Globalization Increases Competition VS Unsupported Technology and Management

Contents (1) Business Introduction (2) BIM Advancement in Construction Management (3) BIM+ Applications

Project BIM Team Organization Lenovo Beijing Limited Project BIM Consultant Project Management BIM Centre Chief Engineer MEP Manager Steel Works Manager Commercial Manager Site Manager Technical Dpt Civil Engr BIM Engineer MEP Dpt MEP Engr BIM Engineer Steel Structure Dpt Steel Struct Eng BIM Engineer Ministry of Commerce Budget Professional BIM Engineer Engineering Department Site production BIM engineer

Project Type BIM Team Full Training Staff Training In the full participation of the BIM work mode, the project technology, engineering, business, steel, quality, safety and other departments organized 100 days, more than 30 times BIM training. Personal Participation Rate 100% Skill Test The project held BIM skills test, test the mastery of the students, the latter part of the project staff will be divided into A-B-C Level, the implementation of personalized, differentiated training. Satisfaction 95% Test Average Result 91 To achieve full "high-level can understand, the middle can use, grass-roots can do"

BIM Management Field BIM Execution Plan BIM Progress Meeting BIM Model Check & Control BIM Site Brick Layout BIM Coordination Meeting

Modeling Standard & Colour Coding Modeling Standard Colour Coding

Modeling Detail/Description Detail Specification for Each Stage

Integration of 3D & 2D Detail Design Conventional two-dimensional, three-dimensional deepening of the design work mode: 三维二维一体化工作模式 三维管线建模综合排布 2D MEP Cabling/Piping Drawing MEP Contractor BIM Consult Constructing BIM Model Based on 2D Deepening BIM model integration collision check Provide collision check report BIM Consultant 随时发现问题随时调整模型 最终达到零碰撞 导出二维管线综合排布图 Modify the integrated layout according to the collision report Cycle this process until after zero collision 图纸报审

Progress Planning, Tracking, Analysis

1 2 3 冲突 Clash Progress Control Tower crane, climbing mould, steel column between the cross conflict, restricting the progress of the entire project construction. Tower crane every 4 layers to climb once, climb once need to stop 7 days before they can adjust the construction process. Through continuous simulation, continuous adjustment, and ultimately from 7 days to 2 days. This is a total of 150 days for the total duration! Tower crane vs steel structure Tower crane support beam vs climbing mould body Climbing frame body vs steel structure

Progress Control Template layer progress simulation (secondary structure, electromechanical, fine decoration) Simulation of construction progress of steel truss Curve wall construction progress simulation Simulation of the construction progress of the first road

Quality Control Brick Laying Tiantan Hospital project in March 2015 began to enter the secondary structure of construction, BIM technical staff to introduce Guangda of 5D products in the secondary row of brick function, in the large-scale construction, the first model construction, the second masonry wall The layout of brick, issued a brick map, auxiliary block material required to use plans to guide the procurement of materials and accurate delivery, reduce material waste, to avoid secondary handling. Secondary Construction Plan 进场 1 2 3 计划 4 5 1-click layout 精确投料 砌筑完成

Quality Control Brick and Ceiling Arrangement Washroom Tiles Arrangement Room Ceiling Panel Arrangement

Quality Control Analysis of construction process simulation and quality control points

Pingan project 81-83 layer steel structure 3D Scanning Quality Control 误差着色图

Cost Management Project steel volume of 13,000 tons, the Ministry of Commerce to achieve refined steel management, control process costs, subcontracting project settlement to provide data support, the cumulative savings of more than 120 tons of steel. At the same time the use of 5D platform to achieve split water extraction material planning, follow the progress of the project dynamic generation of funds, resource consumption and other curves, real-time comparison. GGJ 模型转精细化模型 Generating a rollover bill comparison subcontract reporting plan, precision control of steel consumption

Cost Management Tender Price Budget Cost Actual Cost

Cost Management Guide the owners to report the value - analysis Require 2 or more person Conventi onal Reportin g Report by manual Using written typed text/descipti ons Manually calculate the current amount and cumulative completion Party A Party B manual verification of the amount of work Manual tracking of owners to review records Non Standard Not Visible Low Efficiency, Long Term Low Efficiency Low Efficiency BIM Reporti ng According to the schedule and the scene staff feedback double check Display 5D Report Data Based on BIM Model The system automatically calculates the amount of engineering and cumulative completion of the amount According to the BIM model for nuclear volume Standard Visible High Efficiency High Efficiency System tracking report process and approval information High Efficiency Just Using mouse In accordance with the conventional way to report, each time two business people, need 3 days In accordance with the BIM way to report, each time only need to move your fingers, the computer will calculate the amount of work Compared to the relief of a business staff, reported speed increase hundreds of times, more convenient nuclear volume, tracking with easy

Cost Management Commercial Cloud Analysis Cash Flow Analysis

Management of Sub-Contract Bill Work BIM General Contracting Management Outline BIM Technical Assistance Regular Meeting File Management Based on Network Platform

Large Tower Crane Erection at High Altitude

Thank You