Developing Infrastructure in Bihar

Similar documents
POWER PLANT, BOP AND T&D CAPABILITIES

SECTOR ASSESSMENT: BIHAR POWER SECTOR

Three Tier Quality Assurance Mechanism under XII Plan RGGVY Project

BALANCE OF PLANT CAPABILITIES

REPORT CARD BIHAR STATE ELECTRICITY BOARD

Complete Power Solutions

Rajasthan Distribution Sector

TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE

Ministry of New and Renewable Energy. Raipur 13/08/2013

PROGRESS REPORT OF DEVELOPMENT WORK UNIVERSITY TOWN 1-1

RGGVY - PROGRESS UNLIMITED Decentralised Renewable Energy = Energy Equity

BANGLADESH: DISTRIBUTION SYSTEM UPGRADE AND EXPANSION PROJECT

Hon ble Prime Minister of India Inaugurated SAUNI Project

EPS. Organization Chart. Civil Sector Head. Steel Structures Dept. Manager. Supervision Dept. Manager. Concrete structures Dept.

POWER SECTOR A STUDY OF INDIA

IN THIS ISSUE SPML INFRA - RANKED 15 IN INDIA S

GAS. POWER. WATER. TELCO. A FORCE IN INFRASTRUCTURE SERVICES.

Pre-Qualification Certificate

profile adversity glares, complexity dares, time lines daunt, conditions deter, but challenges beckon. no matter what, we ll build it.

Fact Track-Power Distribution Sector in India

TENDER DOCUMENTS FOR

O&M CONFERENCE IPS 2013

UCEP Company Profile And

NEONERGY ENGINEERING PVT LTD

Role of Renewable Energy in Combating Climate Change by

Presentation on Investment Opportunities in Indian Power Sector

HARTEK POWER PVT LTD SOLAR BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd)

End-to-end electrical solutions for the biggest challenges involved with connecting wind energy to the grid. Solutions for Wind Energy Integration

ROAD MAP FOR DEVELOPMENT OF POWER SECTOR IN BIHAR

Rural Electrification Policy, 2006

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

Jhajjar Project Management An Insight. March 4, 2013

SYSTEM DEVELOPMENT EXTENSIVE RURAL ELECTRIFICATION PROGRAMS - EGYPT CASE

Power Distribution Outlook in India 2018

Modelling District Energy Distribution System For Least Load Shedding

Operational optimisation of generation, transmission and distribution Human resource development Training of utility staff and management

PRSENTATION ON Skill Development Initiatives taken by GOB BIHAR SKILL DEVELOPMENT MISSION. Department of Labour Resources Government of Bihar Patna

DISCUSSION PAPER DISTRIBUTION FRANCHISEE FRAMEWORK ASSAM ELECTRICITY REGULATORY COMMISSION

FOR TENDER PURPOSE ONLY

Electrical Network Design, Engineering & Construction

BUILDING RELATIONSHIPS

P.O.Box: 301 Riyadh Kingdom of Saudi Arabia Tel.: Fax:

Reply to Bidder s Clarifications

ADDRESS BY MINISTER FOR ENERGY, DR. JOE OTENG-ADJEI

Engineering Design & Power Training Institute

KARNATAKA ELECTRICITY REGULATORY COMMISSION. Notification no.y/01/4 dated (Notified in Karnataka Gazette on , page nos.

CORPORATE QUALITY MANUAL ISO 9001:2008 INTRODUCTION

Smart Power India Energizing rural development

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Distribution Tradesperson (Jobsplus Permit No. 706/2017)

SECTOR ASSESSMENT (SUMMARY): ENERGY

Innovative Technology Solutions for Sustainability ABENGOA MEXICO. Corporate Presentation

LOGO RUNH POWER. Sincerity Innovation Efficiency Perfection

NTPC-SAIL POWER COMPANY PRIVATE LIMITED (A Joint Venture of NTPC & SAIL)

DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)

Multi-Hazard Resistant New Construction or Reconstruction of BPL Houses in Flood Prone Alluvial Areas. (Bihar in particular and India in general)

Barilla Cogeneration Power Plant main tips

PROJECT TECHNICAL DESCRIPTION

LONDON - BASRA - ERBIL - DUBAI Engineering a world of experience.

The ambitious rural electrification programs initiated by the State are major and structuring vehicles of socioeconomic

Ex-Post Evaluation of Japanese ODA Loan West Bengal Transmission System Project (I) (II)

Japanese ODA Loan. Ex-Ante evaluation

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

REVIEW OF LAND REQUIREMENT FOR THERMAL POWER STATIONS

BLACKBIRD ENGINEERING COMPANY PROFILE

Ref:. CESU.H.Qrs./P&S/Capex-Turnkey/527/12-13/ Dt CORRIGENDUM - I

Implementation of Rural Electrification Scheme RGGVY, in Uttar Pradesh

Status - Indian Electrical Industry April to March


Saudi Aramco General Bid Slates (GBS)

Session IV: Access to Electricity Services in Rural Areas

Addendum-2

SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Performance, Problems, and Opportunities

Scenario of Rural Electrification in India- Challenges and Impact

Energy Efficiency Services Limited. Market Potential & Policy Overview of Energy Efficiency in India

estimated at INR695, nearly half of urban India's MPCE. 100% 90% 80% 70% Consumer Goods 60% 50% 40% 30% Fuel & Light Consumer Services 20% 10%

International Innovations Awards CAPAM GUJARAT STATE ELECTRICITY CORPORATION LIMITED. A new direction to green,clean and inclusive

SITE PRIORITIZATION FOR IBFI

Company Introduction and Information EPTCON LTD. 560 SHELDON DRIVE, CAMBRIDGE ONTARIO. PHONE:

Issues in. India Sri Lanka

COMPANY PROFILE INESING SPA

SECTION: 4 (Revised) SCOPE OF SUPPLY OF PLANT AND SERVICES

Case Study. KMC Construction: National Highway 47 KL-1 Project.

GALAXY ENERGY GENERAL CONTRACTING LLC COMPANY PROFILE

Administration Building Needs Assessment

Supply and Maintenance of Transformers, Switchgear, Minisubs, Oil Analysis, Oil Purification & Transformer Testing

One of SA s leading manufacturers of steel structures

Memo No. 4786/4858 /DDH-41 dated: Call for applications to associate as visiting faculty in the implementation of Training policy.

VEDANJAY POWER PRIVATE LIMITED (VPPL) COMPANY PROFILE

building solar infrastructure

Central Power Research Institute Prof Sir C V Raman Road, Sadashivnagar Post Office Post Box No: 8066, Bangalore

LAKSHYA POWERTECH PRIVATE LIMITED COMPANY PROFILE

Government of Karnataka Department of Technical Education Board of Technical Examinations, Bengaluru

INSTRUCTION TO BIDDERS

Tanahu Hydropower Limited

CONSTRUCTION OF 132/33 KV GIS SUBSTATION AT BAJKUL, DISTRICT-PURBA MEDINIPUR. (Package- 26)

15 TH ANNUAL EAST AFRICAN POWER INDUSTRY CONVENTION

INVITATION OF BID (INTERNATIONAL COMPETITIVE BIDDING)

33 KV UG Cable Laying Work & Bay Extension Electrical Works - SBI

Transcription:

Developing Infrastructure in Bihar

Vision Creating with passion and innovation, world class infrastructure to make human life comfortable. Mission Profitable growth through superior project management, innovation, quality and commitment. Philosophy To us at SPML, success is a measure of promises kept. It is the single most cherished dream in every project that we have decided to undertake. Commitment to the cause is what has driven us in the last three decades. And commitment is the key in times ahead.

SPML - Making human life comfortable with world class Infrastructure SPML Infra Limited is a leading publicly listed infrastructure developer that has managed and implemented over 600 projects across India on an EPC (Engineering, Procurement and Construction), PPP (Public Private Partnership) and BOOT (Build-Own- Operate-Transfer) basis. An ISO 9001: 2008 certified company, SPML has established proven SPML has over three decades of multidisciplinary experience in executing world class infrastructure for power transmission and distribution, water treatment and transmission, waste water treatment & recycling and solid waste management, civil infrastructure development. SPML has a special association with Bihar and have developed a number of water, power and road infrastructure for the state. Transmission and Distribution Projects SPML Infra Ltd. is one of the largest contributors to rural electrification in Bihar and has undertaken projects with establishing 33 & 11 KV sub-stations, HT & LT Cabling, Auxiliary and Distribution Transformer, DC System, Construction of new supply lines and re-conducting of existing lines etc. Over a million rural household across the state have benefited through SPML s transmission & distribution initiatives. Power SPML Infra Limited has contributed to improve the Power potentiality of Bihar. We are executing following Projects in Barh Super Thermal Power Project (3 x 660 MW) at Barh, Patna. Road Projects SPML has contributed immensely in building roads in the districts of Jamui, Madhepura, Saharsa and Supaul for better connectivity in Bihar. Water Supply Project Construction of mini water supply schemes in draught-affected districts of Bihar to cater the drinking water demands of people under Public Health Engineering Department, Patna.

Power Project Scheme: Project value: Total length of network: No. of BPL Connections: Rural Electrification Works in Patna District Bihar State Power (Holding) Company Ltd. Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY) INR 5,030 Million Design, engineering, manufacture, testing, supply of specified equipment and materials on ex work basis for execution of Rural Electrification Works in Patna District of Bihar on Turnkey basis. Scope including New 33/11KV Sub- Stations, Augmentation of 33/11KV Sub-Stations, New 33 & 11KV Line, Transformers, LT & HT Cabling, Lightning Systems, Control & Relay Panels among other associated works. 7144 Kilometers of ACSR Conductors, 5310 kilometers of LT Lines 3,83,929 in 23 Blocks In Progress

Power Project Scheme: Project value: Total length of network: No. of BPL Connections: Rural Electrification Works in Gaya District Bihar State Power (Holding) Company Ltd. Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY) INR 4,870 Million Design, engineering, manufacture, testing, supply of specified equipment and materials on ex work basis for execution of Rural Electrification Works in Gaya District of Bihar on Turnkey basis. Scope of work involves construction, erection, testing and commissioning of new 33 & 11 Kv Sub- Stations, augmentation of 33 & 11 Kv existing Sub-Stations, 6,183 kilometers long 33 Kv and 11 Kv new transmission lines, reconductoring of 57,733 kilometers of 33 kv lines, 6,058 kilometers of LT lines, and providing BPL service connections to almost 3 lac consumers. 6,058 Kilometers of ACSR Conductors, 4,918 kilometers of LT Lines 2,88,325 in 24 Blocks In Progress

Power Project Accelerated Power Development and Reforms Program (APDRP) Projects: Scheme: Project value: Total length of network: Power Supply and Transmission Project in Purnea Power Grid Corporation of India Limited Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY) INR 1,062 Million Design, engineering, manufacture, testing, supply of specified equipment and materials on ex work basis for execution of Rural Electrification Works in Purnea District of Bihar on Turnkey basis. 33 kv/11 kv Sub-station, Galvanized Structure for 33/11 Kv Switchyards, Station Lighting System, 7 Transformers of 3.15 MVA, Circuit Breakers, VCB Panels, PCC and Galvanize Poles, LT & HT Cabling, Lightning Systems, Control & Relay Panels among other associated works. 199 Kilometers of ACSR Conductors, 385 kilometers of Service Connections No. of BPL Connections: 26,000 in 583 Villages Completed

Power Project Accelerated Power Development and Reforms Program (APDRP) Projects: Scheme: Project value: No. of Villages Electrified: Power Supply and Transmission Project in Gaya Power Grid Corporation of India Limited Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY) INR 1,388 Million Design, Supply, Transportation, Erection, Testing Commissioning of New 33/11 KV Sub-Station & Renovation of Sub-station in Gaya Circle. This Project is implemented under Accelerated Power Development and Reform Program (APDRP) by Central Government of India. This Program is implemented for improving & strengthening of Existing Distribution Systems in Rural Area. The Scope also included of Construction of New Sub-Station, Augmentation of Existing Sub-station, and allied 33/11 KV Lines, Installation of New DTs etc. Under this Contract SPML have completed & Commissioned 6 Nos. New 33/11 KV Sub-Stations and 13 NOS. R & M Sub-stations. 809 Villages Completed

Power Project Accelerated Power Development and Reforms Program (APDRP) Projects: Scheme: Project value: Power Supply and Transmission Project in Patna Power Grid Corporation of India Limited Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY) INR 45 Million This Project is implemented under Accelerated Power Development and Reform Program (APDRP) by Central Government of India. This Program is implemented for improving & strengthening of existing distribution Systems in Rural Area. The Scope of work consist of Construction of New Sub-Station, Augmentation of Existing Sub-station, and allied 33/11 KV Lines, Installation of New DTs etc. Under this Contract SPML have completed & commissioned 2 Nos. New 33/11 KV Sub-stations also. Completed

Power Project Rural Electrification Projects: Scheme: Project value: Underground cabling: Power Supply Scheme in Patna Urban Areas Power Grid Corporation of India Limited Re-Accelerated Power Development and Reform Program (RAPDRP) INR 882 Million This Project is implemented under R-Accelerated Power Development and Reform Program (RAPDRP) by Central Government of India. This Program is implemented for improving & strengthening of Existing Distribution Systems in Urban Area. This Program is mainly aimed at the Towns & Cities having more than 30,000 Population. Under this Contract SPML has completed energization of 31.25 Km of 33KV underground cable work, 36.44 Km of 11KV Underground Cabling work, 40.21 Km of LT Underground Cabling Work, Commissioning of 117 Nos. DTRs & 132 RMUs and electrified 1478 Nos. house hold, dismantling of overhead lines in VIP area of Patna Town and provide the service connection by underground cable work, which avoid theft and electricity loss. 108 Kilometers No of house electrified: 1,500 Completed

Power Project Rural Electrification Projects: Scheme: Project value: No of villages electrified: Rural Electrification Works in Kaimur Power Grid Corporation of India Limited Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY) INR 325 Million This Project is implemented under RGGVY Scheme, for electrification of unelectrified, partially electrified and electrified villages and to provide electric supply to below poverty line (BPL) consumers free of cost. The Scope of work under this program was Construction of New 33KV Lines, 11 Kv Lines, LT Lines, HT Lines, Reconductoring Works, New 33/11KV Substations including Civil work and BPL Connection etc. 460 in 8 Blocks No. of BPL Connections: 15,000 Completed

Power Project Rural Electrification Projects: Scheme: Project value: No of villages electrified: Rural Electrification Works in Rohtas Power Grid Corporation of India Limited Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY) INR 372 Million Supply, Erection, Testing & Commissioning of Rural Electrification Work in Rothas District. This Project is implemented under RGGVY Scheme, for electrification of un-electrified, partially electrified and electrified villages and to provide electric supply to below poverty line (BPL) consumers free of cost. The Scope of work under this program is mainly Construction of New 33KV Lines, 11KV Lines, LT Lines, HT Lines, Reocnductoring Works, New 33/11KV Substations including Civil work and BPL Connection etc. 490 in 8 Blocks No. of BPL Connections: 18,200 Completed

Power Project Rural Electrification Projects: Scheme: Project value: No of villages electrified: Rural Electrification Works in Araria Power Grid Corporation of India Limited Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY) INR 890 Million Supply, Erection, Testing & Commissioning of Rural Electrification Work in Araria District. This Project is implemented under RGGVY Scheme, for electrification of un-electrified, partially electrified and electrified villages and to provide electric supply to below poverty line (BPL) consumers free of cost. The Scope of work under this program is mainly Construction of New 33 KV Lines, 11 KV Lines, LT Lines, HT Lines, Reocnductoring Work, New 33/11 KV Substations including Civil work and BPL Connection etc. SPML has also completed and commissioned 4 new 33/11 KV Sub-stations under this contract. 511 in 8 Blocks No. of BPL Connections: 37,500 Completed

Power Project Rural Electrification Projects: Scheme: Project value: No of villages electrified: Rural Electrification Works in Supaul Bihar State Electricity Board Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY) INR 1,250 Million Supply, Erection, Testing & Commissioning of Rural Electrification Work in Supaul District. This Project is implemented under RGGVY Scheme, for electrification of un-electrified, partially electrified and electrified villages and to provide electric supply to below poverty line (BPL) consumers free of cost. The Scope of work under this program is mainly Construction of New 33KV Lines, 11KV Lines, LT Lines, HT Lines, Reocnductoring Work, New 33/11KV Substations including Civil work and BPL Connection etc. SPML is also completed & Commissioned 5 new 33/11 KV Sub-station & augmentation of 6 existing 33/11 KV Sub-stations under this contract. 201 in 8 Blocks No. of BPL Connections: 81,000 Under Completion

Power Project Distribution Franchisee of Electricity Project: Distribution and Supply of Electricity in Bhagalpur Town and Adjoining Areas South Bihar Power Distribution Company Limited, Patna This Project is implemented for distribution of electricity in Bhagalpur Electrical Urban Division (3 Sub-divisions) and 2 Rural Electrical Subdivisions besides metering, meter-reading, billing, collection, operation and maintenance. Augmenting the transmission capacity matching with the growth in distribution network, metering of input points including calibration of meters and matters related to load dispatch and grid discipline. No. of Connections: 1,15,000 Concession Period: 15 Years In Progress

BoP Project Balance of Plant Projects: Name of Project: Project Value: Scope of Work: Offsite Area Civil Work Package for Barh Super Thermal Power Project (3x660 MW) National Thermal Power Corporation Limited, Delhi INR 1,206 Million The work mainly comprises of all Civil, Structural and Architectural works like Central workshop building, Administrative building including auditorium, Fire station building, CHP workshop cum office building, Fuel oil unloading pump house, Hydrogen generation plant building including storage of cylinder, Storm water pump station, Cooling tower switchgear building, DM plant control room building and miscellaneous civil works. Under Completion

BoP Project Balance of Plant Projects: Name of Project: Project Value: Scope of Work: Civil Works for Water Pre-Treatment and Liquid Effluent Treatment System Package for Barh Super Thermal Power Project (3x660 MW) National Thermal Power Corporation Limited, Delhi INR 150 Million The work mainly comprises of all Civil, Structural and Architectural works for structures related with Water Pre-Treatment and Liquid Effluent Treatment System. Under Completion

BoP Project Balance of Plant Projects: Name of Project: Project Value: Scope of Work: Ash Water Recirculation System for Barh Super Thermal Power Project (3x660 MW) National Thermal Power Corporation Limited, Delhi INR 153 Million Ash Water Recirculation System: The work mainly comprises of design, engineering, procurement, supply, erection & commissioning of ash water recirculation system including pump house with water intake system, four ash water re-circulation pumps of 1100 m3/hr @ 60 mwc, 8.5 km clear water pipeline of 800 mm dia and other civil and mechanical works. Under Completion

Road Project Roads & Highway Projects: Total Road Length: Scheme: Project value: Development of State Highway in Jamui 86.53 Kilometers Central Public Works Department Rashtriya Sam Vikas Yojana (RSVY) INR 1,083 Million The development of state highway into two lanes undivided carriageway with 7 meter width in respect of State Highway No. 6 and 18. The other construction included two types of pavements: Flexible Pavement and Rigid Pavement. More than 150 culverts have been constructed using 900-1200 mm dia RCC Hume Pipe. In built up /urban areas, brick masonry drain covered with RCC slab with a provision of Precast RCC cover with opening at suitable interval as per site requirement. Metal Beam Crash Barrier has been provided at high embankment and sharp curve. Kilometer Stone and 5th Kilometer stone has been put in place. Completed

Road Project Roads & Highway Projects: Total Road Length: Scheme: Project value: Development of State Highway in Dist. Saharsa, Supaul and Madhepura 84.97 Kilometers Central Public Works Department Rashtriya Sam Vikas Yojana (RSVY) INR 1,136 Million The development of state highway into two lanes undivided carriageway with 7 meter width in respect of State Highway No. 59 and 66. The other construction included two types of pavements: Flexible Pavement and Rigid Pavement. More than 200 culverts have been constructed using 900-1200 mm dia RCC Hume Pipe. In built up /urban areas, brick masonry drain covered with RCC slab with a provision of Precast RCC cover with opening at suitable interval as per site requirement. Metal Beam Crash Barrier has been provided at high embankment and sharp curve. Kilometer Stone and 5th Kilometer stone has been put in place. Completed

Quality, Health, Safety & Environment SPML strives towards excellence in all operations through compliance with worldclass quality systems in specific fields of activities, ensuring continuous improvement in our quality management system. The quality management system of SPML Infra is certified by Universal Quality Accreditation Services, UK with ISO 9001:2008. SPML recognize that the management of health, safety and environmental matters are the prime responsibility of the company and will ensure that there are adequate resources available (both human and financial) to implement the policy. The management also actively promotes and encourages the cooperation, involvement and participation of all employees, contractors, suppliers and other stake holders.

Water is the prime resource essential for survival of human life on earth. All ecosystems and habitats owe their existence to water. Fresh water is available only 2.7% though the surface of planet earth is geographically covered more than 70% with water. Sustainable water management in India is fast becoming a necessity with the looming crisis over water resources threatening the security and livelihood of the population and environment. [Managing our water resources better the only solution]

SPML Infra Limited Gurgaon: SPML House, Plot No. 65, Sector-32 Gurgaon 122001 (Haryana) Tel: 0124-3944555 Fax: 0124-3983201 Kolkata: 22, Camac Street, Block A, 3rd Floor Kolkata 7000017 Tel: 033-3944555 Fax: 033-39805303 Info@spml.co.in www.spml.co.in