Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway

Similar documents
Louisiana Transportation Conference February 17-20, 2013

Long-Term Settlement Performance Monitoring, I-15 Reconstruction Project, Salt Lake City, UT. Steven Bartlett, University of Utah

Performance of Mechanically Stabilized Earth walls over compressible soils

CHAPTER 11: WALLS.

MECHANICALLY STABILIZED EARTH (MSE) WALL SYSTEMS

FLORIDA DEPARTMENT OF TRANSPORTATION

Best Practices for Design and Construction of MSE Walls

ODOT Design & Construction Requirements for MSE Walls

JOB BB0414 PORTER RD. HWY. 112/71B WIDENING & INTCHNG. IMPVTS. (S) AUGUST 10, 2016

or (800)

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

Construction and Long Term Performance of Transportation Infrastructure Constructed Using EPS Geofoam on Soft Soil Sites in Salt Lake Valley, Utah

PROPOSED SEGMENTAL RETAINING WALLS ARGONAUT RETAIL VILLAGE - PHASE I PENSACOLA, FLORIDA

MagnumStone Specifications Gravity

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

Earth Retaining System

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL

Notes for Erection of Evergreen Maxi Wall Retaining Walls

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

MSE WALLS CASE STUDIES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

Behavior of Reinforced Embankment on Soft Ground with and without Jet Grouted Soil-Cement Piles

MECHANICALLY STABILIZED EARTH (MSE) WALLS

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM

C-R-S: PID: Reviewer: Date:

ENGINEERING DIRECTIVE

Chapter 18 EARTH RETAINING STRUCTURES

Save time. Save money. Specify a fast, economical Vist-A-Wall MSE. fast and easy to install. They adapt well to curves, angles and

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 867 TEMPORARY WIRE FACED MECHANICALLY STABILIZED EARTH WALL.

FOUNDATIONS. Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1

MOA Project # Golden View Drive Intersection & Safety Upgrades

Geotechnical Solutions for High Speed Track Embankment A Brief Overview

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

SEISMIC SOIL-STRUCTURE INTERACTION IN FULLY INTEGRAL ABUTMENT BRIDGES WITH HP STEEL PILES

INSPECTION GUIDE FOR SEGMENTAL RETAINING WALLS TEK 18-11B

GEOTECHNICAL INVESTIGATION I-15 MILE POST CL 120 INTERCHANGE MESQUITE, NEVADA PREPARED FOR:

Ground improvement support using Confined aggregate piers in soft soil. Brian Metcalfe, P.E. Director of Engineering Geopier Foundation Company

HIGH STRENGTH GEOGRIDS FOR BASAL REINFORCEMENT. 49th Annual Southeastern Transportation Geotechnical Engineering Conference - (STGEC)

Case History: Value Engineering of Driven H-Piles for Slope Stability on the Missouri River

Earth Retaining Structures and Systems Submittal Checklist. Part One: Materials and Material Properties

Modeling and Design of Bridge Super Structure and Sub Structure

GeoTechTools Your Decision Making Solution

DESIGN OF TEMPLETON OVERPASS FOR THE CANADA LINE. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng.,P.Eng., SNC-Lavain Inc.

Anchorplex retaining wall construction guide

CONCRETE SEGMENTAL RETAINING WALLS

Installation guide WALLS

ADDRESS: 122 LIPSCOMBE ROAD, DECEPTION BAY, QLD,

Installation guide WALLS

Table 1. Typical Soil Parameters Description Bulk Density, kn/m 3 Liquid Limit, % Plastic limit, % Natural Moisture Content, % Cohesion, kn/m 2 Compre

Precast Panel Walls Wire Walls. Introducing the Grid-Strip TM Soil Reinforcement System. ail.ca. Saves time and money

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY

This paper describes the salient features of a

INDOT Wall System Approval Criteria and Design Review

ESCS LIGHTWEIGHT AGGREGATE GEOTECHNICAL FILL. Jody Wall, P.E Reid Castrodale, PhD, P.E. Carolina Stalite Company

Maine Turnpike Authority

Bureau of Materials Materials Approval Procedures

GEOTECHNICAL RESISTANCE FACTORS

Installation guide WALLS

Seismic Considerations and Design Methodology for Lightweight Cellular Concrete Embankments and Backfill

SPECIFICATION FOR MAGNUMSTONE GEOGRID REINFORCED Mechanically Stabilized Earth (MSE) SYSTEM

ICBO Evaluation Service, Inc Workman Mill Road, Whittier, California

RETAINING WALL SYSTEM. ViaWall. ViaWall A. ViaWall B. ViaBlock

Numerical Modeling of Dynamic Soil-Structure Interaction in Bridges with HP Driven Piles

Installation guide WALLS

Geoguide 6 The New Guide to Reinforced Fill Structure and Slope Design in Hong Kong

Long-Term Instrumentation Program to Monitor Various Geo-Technologies Used on the I-15 Reconstruction Project, Salt Lake City, Utah

5 ¼" (H) x 6 ¾" (W) x 9" (D) minimum. 5 ¼" (H) x 10 ½" (W) x 9" (D) minimum. 5 ¼" (H) x 13 ¾" (W) x 9" (D) minimum

Upon speaking with the representatives with Technical Foundations as well as Walder Foundations, it was determined that:

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

Accelerated Bridge Construction in USA

Table of Contents 5.1 GENERAL Overview Investigation and Engineering Information

Chapter 3 - Excavation

Earth Retention Systems

SECTION SPECIFICATION FOR MECHANICALLY STABILIZED EARTH TWO STAGE WALL SYSTEM

Table of Contents 18.1 GENERAL Overview Responsibilities References

This supplemental technical specification replaces Section 713 of the 2007 Standard Specifications for Highway Construction.


SECTION Segmental Concrete Unit Masonry Retaining Wall Height Over 5-0 High

Ground Improvement Using Steel Reinforcing Strips

FACING OPTIONS FOR REINFORCED STEEPED SLOPES

Design and monitoring of EPS embankment on D1 near Ivanovice in the Czech Republic

SECTION SEGMENTAL CONCRETE UNIT MASONRY RETAINING WALL MAXIMUM HEIGHT OF 5-0 HIGH

Reinforced Soil Slopes (RSS)

Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By:

OVERALL STRUCTURAL SYSTEM

ANALYSIS & DESIGN OF 44 METER M.S.E. (MECHANICALLY STABILIZED EARTH) WALL BY USING PLAXIS 8.2

SECTION MECHANICALLY STABILIZED EARTH 1.01 SUMMARY

FACSIMILE/ MAIL TRANSMISSION. Date: December 2, 2011 File:

GEOTECHNICAL ENGINEERING CHALLENGES ON SOFT GROUND. For Myanmar Engineering Society 2012 CONTENTS

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe

twenty six concrete construction: foundation design ELEMENTS OF ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SPRING 2013

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

EFFECT OF REINFORCEMENT, BACKFILL AND SURCHARGE ON THE PERFORMANCE OF REINFORCED EARTH RETAINING WALL

T-WALL.

Date: December 7, 2017 Project No.:

SECTION TRENCHING

B209 - EMBANKMENTS OVER SWAMPS AND COMPRESSIBLE SOILS - OPSS 209. Excavation method means to remove the swamp material mechanically.

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) ,

Transcription:

Grade separated interchange at the intersection of U.S. Hwy 17 Bypass and Farrow Parkway Jeff Sizemore, P.E. Geotechnical Design Support Engineer SCDOT Ed Tavera, P.E. Principal Geotechnical Engineer Geoengineers

Need for Project: The purpose of the project is to improve traffic flow, increase intersection capacity, and improve safety within the intersection and along US 17. The US 17 and SC 707/ Farrow Parkway intersection is currently experiencing substantial congestion during peak morning and afternoon travel periods.

Project Site Enlarged Map Zone Project Site

Existing US 17 Bypass US17 BP East

Proposed US17 Bypass US 17 BP

Project Layout Ramp C Backgate Bridge Ramp D Ramp A End Bent 1 End Bent 7 Ramp B South Bridge Approach North Bridge Approach

South Subsurface Profile

North Subsurface Profile

Project Design Constraints Project Geometry and Layout Project Constructed on Existing Alignment Complex Traffic Control Staging Plan (Geotechnical Designs Constructed in Stages 2, 3, and 4) Total Project Construction Time Requirements Approx. 3.5 years High Traffic Volume Combined with Limited Construction Staging Areas

Geotechnical Key Issues Consolidation Settlement Seismic Slope Stability (Liquefaction) Bridge Abutment Foundation Performance Extreme Event I and II

Settlement At Bridge Abutments (Normal Weight Fill)

Longitudinal Seismic Slope Instability

Transverse Seismic Slope Instability

Stiff Clay (Pee Dee Formation) 66 - HP14X117 X 100 ft long Bridge Abutment Unimproved Foundation Performance Axial Load Bridge Lateral Load Extreme Event II Extreme Event I Excessive Sand Medium Clay 40 feet 90 feet Row 3 2 1 End Bent 7 (North Abutment)

Ground Improvement Methods Lightweight Aggregate Borrow Material Reduce Magnitude of Settlement Prefabricated Vertical Drain (PVD) / Granular Surcharges Increased Rate of Settlement during Construction Deep Soil Mixing Seismic Slope Stability and Bridge Abutment Foundation Improved Performance Mechanically Stabilized Earth (MSE) Walls Permanent and Temporary Retaining Walls

Lightweight Aggregate (Rotary Kilin Produced) Required Properties: Internal Friction Angle 40 degrees Unit Weight: 60 pcf minimum (Long-term 70 pcf maximum) MSE Wall Reinforced Backfill Properties

Settlement South Bridge Abutment (End Bent 1)

Settlement North Bridge Abutment (End Bent 7)

Prefabricated Vertical Drains (PVD)

PVD Installation S PVD PVD Triangular Installation Pattern PVD 2 Drainage Sand Layer Geotextile Separator Fabric

Granular Surcharges Required Properties: Internal Friction Angle 32 degrees Unit Weight: 120 pcf Granular Surcharge Lightweight Aggregate Borrow Material

Seismic Slope Stability Improved Deep Soil Mixing

Stage 4 Ground Improvement North/South Abutment (Typical)

Deep Soil Mixing Lime-Cement Columns Block Type Pattern - Overlapping (Dry Mix Method) Seismic Slope Stabilization Shear Key Improved Performance of Bridge Abutment Foundations

10 Feet Min. DSM-LCC Test Sections 10 Feet Min. 1 2 Test Pile 1 (HP 14x117) 4 3 Test LCC No. 1 2 3 4 DSM-LCC Test Section 1 (Block Type Pattern) Test LCC Sampling Quadrants DSM-LCC Test Section 2 (Single Line Pattern) Legend Test Lime-Cement Columns (Test LCC)

Bridge Abutment Improved Foundation Performance End Bent 7 (North Abutment) Extreme Event I < ¼ End Bent 7 (North Abutment) Extreme Event II (Case 3) < 1/8

Geotechnical Instrumentation Settlement Monitoring 12 VW Settlement Sensors (SS) 15 VW Piezometers (P) 2 VW Data Collection Centers 10 Settlement Plates (SP) 2 Magnetic Extensometer (ME) Slope Stability 6 Slope Indicator

Traffic Control Stage 2 Ramp A Ramp B

Traffic Stage 2 Ground Improvement Ramp A Ramp B MSE Walls Lightweight Aggregate Borrow Material 2, and 3 Granular Surcharge (Normal Weight) 3 and 4 Triangular Spacing PVD Geotechnical Instrumentation

Traffic Control Stage 3 Ramp C Ramp D

Traffic Stage 3 -Ground Improvement Ramp B Ramp C MSE Walls Lightweight Aggregate Borrow Material 1, 2, and 4 Granular Surcharge (Normal Weight) 3 and 4 Triangular Spacing PVD Geotechnical Instrumentation

Traffic Control Stage 4 Backgate Bridge South Bridge Approach North Bridge Approach

Traffic Stage 4 -Ground Improvement South Bridge Approach Bridge South Bridge Approach MSE Walls Lightweight Aggregate Borrow Material 1, 2, and 3 Granular Surcharge (Normal Weight) 3 Triangular Spacing PVD Geotechnical Instrumentation Bridge Abutment DSM-LCC (South 30 x 133 x 50 deep North 30 x 141 x 70 deep ) Longitudinal DSM-LCC (South 5 Wide / North 8 Wide)

X- Section End Bent 7 (250+26)

X- Section End Bent 7 (252+00)

Initial MSE Wall Construction (2 & 3 Stage Wall Construction) Drainage Pipe Flexible Wire Facing B Req MSE Wall Soil Reinforcement Light Weight Aggregate Geotextile Separator Fabric

2-Stage MSE Wall Construction (Stage 1 of 2) Sand Surcharge Sand Surcharge Flexible Wire Facing Light Weight Aggregate Borrow Material

Permanent Precast Concrete Segmental Panel Flexible Wire Facing Fill Void w/light Weight Fill Precast Concrete Segmental Panel Lightweight Aggregate Precast Concrete Panel Connector 1 Minimum 2 Maximum

Permanent Full Height Concrete Panel (Pre-Cast or Cast-In-Place) Fill Void w/lightweight Aggregate Deadman Anchor Flexible Wire Facing Precast or Cast-In-Place Full Height Concrete Panel Facing Lightweight Aggregate 6 Maximum Void

MSE Walls Permanent MSE Walls Two-Stage Construction Three-Stage Construction (w/drainage Structures) Temporary MSE Walls (Welded Wire Mesh Facing)

3-Stage MSE Wall Construction With Drainage Structure (Stage 1 of 3) Flexible Wire Facing Sand Surcharge Sand Surcharge Drainage Structure Blockout Area Light Weight Fill

3-Stage MSE Wall Construction With Drainage Pipe (Stage 2 of 3) Flexible Wire Facing Drainage Pipe Lightweight Aggregate

3-Stage MSE Wall Construction With Drainage Structure (Stage 2 of 3) Flexible Wire Facing Structural Frame Lightweight Aggregate

3-Stage MSE Wall Construction With Drainage Structure (Stage 2 of 3) Flexible Wire Facing Light Weight Fill

Lightweight Aggregate Borrow Material 4 Feet Long Biaxial Geogrids Placed on 2 Feet Vertical Spacing 2 Feet Thick Cover of Borrow Silty or Clayey Soil Materials Minimum 2 Feet Drainage Layer

Project Construction Phase (North Abutment Sta. 252+00) Ramp D Stage 3 Bridge Approach Embankment Stage 4 Ramp B Stage 2

Bridge Abutment Construction (North Abutment End Bent 7)

US 17- Bypass Over SC707/Farrow Parkway (Backgate Bridge) Myrtle Beach, SC Horry County Thank You Any Questions?