Checklist in respect of selection of Design Consultancy for EER&M of Parli TPS (U-3)

Similar documents
Accord Energy Corporation India Pvt. Ltd.

RFP FOR SELECTION OF Project Management Consultant For SAP ERP incidco

DELHI METRO RAIL CORPORATION LIMITED KOCHI METRO RAIL PROJECT

KARNATAKA POWER CORPORATION LTD TENDER DOCUMENT

India : Coal Fired Generation Rehabilitation Project Bandel Thermal Power Station

DELHI METRO RAIL CORPORATION LTD. (A JOINT VENTURE OF GOVT. OF INDIA AND GOVT. OF DELHI) TENDER NO. REP/MACHINES/DMRC/MB/2018

CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED. RFP FOR SAP Module based Training and Certification of SAP cell members in CIDCO.

THE COTTON CORPORATION OF INDIA LTD. CBD BELAPUR, NAVI MUMBAI. Tender Notice

Notification pertaining to Request for Proposal (RFP) for Expansion of NPCINET.

Date: October 24, 2016

Questionnaire (Conventional Energy)

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

Jhabua Power Ltd. NOTICE INVITING BIDS

Performance enhancement of old thermal power stations using software tools

COMMUNITY OPEN HOUSE MANITOBA HYDRO BRANDON GENERATING STATION ENVIRONMENTAL LICENSE REVIEW PROCESS

Hind Energy & Coal Beneficiation (India) Ltd.

UTI INFRASTRUCTURE TECHNOLOGY AND SERVICES LIMITED. Name of the Bid: Bid for Supply of PDF Signer Certificate with Tool

Corrigendum/Addendum-1 Dated: 1 Feb 2016

NOTICE INVITING BIDS (NIB) (International Competitive Bidding)

Minutes of meeting held on 21st August 2013 between Vendor/Rep. & Rep. of CGDA

KARNATAKA POWER CORPORATION LTD TENDER DOCUMENT

ARYAN M.P. POWER GENERATION PVT. LTD.

EoI Reference No.: The last date of submission of EoI is 6/08/2018, 3:30pm through hard copy submission at the address below.

Tender No: DLI/CON/728/505 NOTICE INVITING TENDER

nat Presentation Title ( Arial, Font size 28 ) Control of Sulphur Dioxide, Oxides of Nitrogen and Mercury Date, Venue, etc..( Arial, Font size 18 )

Dheeru Powergen Private Limited.

REQUEST FOR PROPOSAL (RFP) FOR CONSULTANCY SERVICES FOR STRATEGY DEVELOPMENT & IMPLEMENTATION SUPPORT Key Information on the RFP Response Submission

THE COTTON CORPORATION OF INDIA LTD. CBD BELAPUR, NAVI MUMBAI. Tender Notice

Notice Inviting Expression of Interest

THE COTTON CORPORATION OF INDIA LTD. CBD BELAPUR, NAVI MUMBAI. Short Tender Notice

Request for Proposal for Implementation of ERP and Webbased ERP- like Solutions

Contd7. Theft of water by using pumps on water lines from dam to TPS. 8. Plant premise is not compact hence piping's are long.

RENOVATION & MODERNIZATION SERVICES & REFERENCES

National Aluminium Co. Ltd.

Preparation of Risk Register

TENDER DOCUMENT. AIR-CONDITIONING WORKS FOR CIRCLE AUDIT OFFICE 7TH FLOOR SBI KG ROAD BUILDING, BENGALURU

DETAILED NOTICE INVITING TENDER

NOTICE INVITING QUOTATION

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

2 x 300 MW (STAGE-I)

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

DELHI METRO RAIL CORPORATION LIMITED

OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM

COAL WATER SLURRY FUEL Alternate Fuel for Thailand

REQUEST FOR PROPOSAL

GUJARAT STATE ELECTRICITY CORP. LTD. WANAKBORI THERMAL POWER STATION TAL. GALTESWAR, DIST.KHEDA, TECH BID RFQ NO: NAME OF WORK:

Quaid e Azam Thermal Power (Pvt) Limited REQUEST FOR PROPOSAL (RFP)

NTPC-SAIL POWER COMPANY PRIVATE LIMITED (A Joint Venture of NTPC & SAIL)

(Last Date of Bid Submission : 09/02/ :00 Hrs)

THE COTTON CORPORATION OF INDIA LTD. BRANCH OFFICE :BATHINDA. Tender Notice

Global experience in the name of the bidder shall also be considered for calculation of bidder experience.

REQUEST FOR QUOTATION

Notice Inviting Expression of Interest

NOTIFICATION - EXPRESSION OF INTEREST CIDCO TARA

Bid Due Date / Time Marine related civil works and installation of marine gangway and cell fender assembly on jetty for LNG terminal.

BANK OF INDIA, GROUND FLOOR, GOD 45- PU-4, SCHEME NO -54, A. B. ROAD, INDORE TENDER DOCUMENT FOR

J-11011/45/2009- IA II (I)

Request for Proposal for Preparation of HR Policy for CONSULTANCY DEVELOPMENT CENTRE

REQUEST FOR PROPOSAL

Environment protection measures / technology

Training Programme on Air Quality Modelling and Management

Indian Institute of Tropical Meteorology

1 General Overall Criteria for Evaluation and Eligibility in the Schedule A

MODIFICATIONS IN COAL PULVERISERS TO INCREASE AVAILABILITY OF COAL FIRED BOILERS (3 x 35 TPH - RUSSIAN MAKE) - A Case Study

2 Name of work Construction of Neutronics Laboratory Building and allied works at Institute for Plasma Research (IPR), Bhat, Gandhinagar.

Developments in Biomass and Waste Emissions Regulation

Borregaard Case Study. Sarpsborg I & II

Request for Proposal for Implementation of SAP S/4 HANA with HER solutions

CENTRAL WAREHOUSING CORPORATION

DELHI METRO RAIL CORPORATION LTD.

REQUIREMENTS FOR AMENDMENT IN ENVIRONMENTAL CLEARANCE JUSTIFICATION FOR MODIFICATION IN THE SCHEME FOR SPENT WASH HANDLING IN THE DISTILLERY PLANT

M/s.KITCO Limited, P.B.No.1820, Ravipuram, M.G.Road, Cochin NOTICE INVITING TENDER

Response to pre-bid queries - Invitation for. expression of interest (EOI) from large. Suppliers/Vendors/Printers. For

JICA s Experiences in Renewable Energy and Energy Efficiency

Pre-Bid Queries and Responses

APPLICATION FOR PRE-QUALIFICATION OF CONTRACTORS FOR RENOVATION/ INTERIOR FURNISHING WORKS

HSSE / CSMS / /NIT Dated: 15 September, 2016

Conformity Assessment - Requirements for the Operation of Various Types of Bodies Performing Inspection

Disable friendly Washrooms at hostel blocks (A & E)

1. Date of issue of tender-form : to till 2.00 PM. 2. Last date & time of submission of Tender: up to 3.00 PM.

TENDER CONDITIONS FOR SUBMISSION OF TECHNICAL BID & PRICE BID

FACILITATING NEW ENVIRONMENT STARNDARDS FOR COAL BASED THERMAL POWER PLANT

Involvement of Expert for Technical Design of Decentralized Municipal Solid Waste Treatment Plant in Udaipur

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

I. Objectives. Public-Private Partnerships Demonstration Program to Transform Delivery of Elderly Care Services in Yichang, Hubei (RRP PRC 50201)

Government of India Ministry of Textiles, Textiles Committee P Balu Road, Prabhadevi Chowk, Prabhadevi Mumbai

TENDER DOCUMENT FOR The Renewal of Oracle ATS (CSI: ) Licenses. RFP Reference Number:REF:GICHF: /06, Dt

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION DHUVARAN TPS Telephone: FAX:

Items Local Content (%) Service Contract 20% 22% 25% Supply Contracts 20% 22% 25% EPC Contracts (Others) 30% 35% 40%

REQUEST FOR PROPOSALS FOR SUPPLY OF GOODS UNDER NATIONAL SHOPPING PROCEDURES

Energy Management System (EnMS) White Paper

DESIGN, MANUFACTURE, SUPPLY, TESTING, COMMISSIONING AND TRAINING OF 36 Nos. OF STANDARD GAUGE CARS FOR AIRPORT METRO EXPRESS PROJECT TENDER RS14

WEF Residuals and Biosolids Conference 2017

THERMAL ENGINEERING & TECHNOLOGY DEVELOPMENT DIVISION, CEA

Ref: 69/NITS/Works/CPWD/Shed-II/17-18/321 Date: CORRIGENDUM

INDUSTRIAL VISIT TATA THERMAL POWER PLANT PROJECT MANAGEMENT BATCH ( )

NTPC SAIL Power Company Private Limited

No /4/2016-Genl. Government of India Ministry of Textiles

EOI/SASAN/2017/01 Date: SASAN POWER LTD (A Wholly owned subsidiary of Reliance Power Limited) INVITATION FOR EXPRESSION OF INTEREST (EOI)

Cooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India - Reducing the water footprint in coal fired power plants -

Transcription:

Checklist in respect of selection of Design Consultancy for EER&M of Parli TPS (U-3) (a) Names of all consultants who submitted proposals; 1. M/s Tractable Engineers Pvt.Ltd New Delhi 2. M/s Evonik Energy Services (India) Pvt.Ltd.Noida 3. M/s Energo Engineering Projects Ltd.New Delhi. (b) points assigned to each consultant; Sr.No. Consultant Name Score 1 M/s Tractable Engineers Pvt.Ltd New Delhi 62.88 2 M/s Evonik Energy Services (India) Pvt.Ltd.Noida 78.76 3 M/s Energo Engineering Projects Ltd.New Delhi. 81.75 * Minimum Score required 75 Points. M/s Tractable Engineers Pvt. Ltd New Delhi scored 62.88. The technical evaluation report submitted to HO & World Bank for approval, after receipt of NOL in this connection further processing for Financial proposal carried out. (c) Evaluated prices of each consultant; Sr.No. Consultant Name Price Quoted (In Rs.) 1 M/s Evonik Energy Services (India) Pvt.Ltd.Noida 11000000.00 2 M/s Energo Engineering Projects Ltd.New Delhi. 10101833.34 (d) Final point ranking of the consultants; Sr. No. Consultants names Evaluation Financial Evaluation Combined Evaluation Scores 1 S(t) rank Financial scores 3 S(f) Financial rank Scores S(t) * T + S(f) * F Final 1 M/s Evonik 78.76 2 91.83 2 81.37 2 Energy Services (India) Pvt.Ltd.Noida 2 M/s Energo Engineering Projects Ltd.New Delhi. 81.75 1 100 1 85.40 1 T- Score Weight = 0.80 and F- Financial Score Weight = 0.20 (e) The name of the winning consultant and the price, duration and summary scope of the contract Winning Consultant: M/s Energo Engineering Projects Ltd.New Delhi. Price: Duration: Rs. 10101833.34/- +(10.3% Service Tax) (Amount in words- Rupees One Crore Ten Lakhs one Thousand Eight hundred thirty three & paise thirty four only.) 15Months 8

Summary scope of the contract: The objectives of the assignment Consultancy Services to Design Renovation & Modernisation Scheme to Improve the Energy Efficiency, Upgrade Capacity and Residual Life of Parli Thermal Power Station Unit-3 (210MW) are: To undertake Energy Audits for baseline assessments. Review of previous studies carried out on the unit, RLA of necessary components and Condition Assessment of the Unit. To assess the feasibility of up-rating the unit and provide feedback on successfully up-rated units. To address generic problems of the plant. To make market survey for latest technologies available for Thermal Power plants, feasibility of incorporating it with the advantages and cost benefit analysis studies for efficient, reliable, economical and safe performance of the unit. To prepare detailed Scope of Works with cost estimate and to assess cost effectiveness of alternative rehabilitation options. To recommend the scope of rehabilitation project of 210MW unit 3 of Parli TPS. Prepare draft of Tender specifications for bid. Assist the owner through tenderizing process by participating the pre bid meetings, technical bid opening, preparing replies to the clarifications of the technical bids. Evaluation of technical bids, post bid meeting/s, clarifications and preparing revised technical specifications if required, and price bid submission and opening. Review of Cost Benefit analysis based on actual quoted cost 9

Checklist in respect of selection of EADD Consultancy for EER&M of Parli TPS (U-3) (a) Names of all consultants who submitted proposals; 1. M/S. Ernst & Young Pvt. Ltd. Madhapur Hydrabad Andhra Pradesh, India 500081 2. TERI The Energy & Resource Institute, New Delhi 3. Enzen Global Solutions Pvt.Ltd. Bangalore -560068 4. M/S ABS Consulting Inc Plot No. 27 Sector -15 CBD Belapur Navi Mumbai (b) points assigned to each consultant; Consultants Name M/S.Ernst & Young Hydrabad TERI Delhi New Enzen. Bangalore ABS Navi Mumbai Score 78.51 82.03 84.06 71.26 * The minimum technical score required to pass is 75 points. M/S ABS Consulting Inc Plot No. 27 Sector -15 CBD Belapur, Navi Mumbai disqualified due to low score. (c) The evaluated prices of each consultant; Consultants Name M/S.Ernst & Young Hydrabad TERI New Delhi Enzen. Bangalore Price Quote (Inclusive con. service tax) in Rs. 2937501/- 6834519/- 2589541/- audited. (d) The final point ranking of the consultants ; Consultants Name Evaluation Financial Evaluation Combined Evaluation Score S(t) *factor 0.8 financial Score in Rs. Weighted score Financial Score(t)*T +S(f)*f Final M/s.Ernst & Young Hydrabad 78.51*0.8 62.81 3 2937501 100*2589541 *2 2937501 =17.63 2 80.44 2 TERI New Delhi 82.03*0.8 =65.624 2 6834519 100 *2589541*2 6834519 =7.58 3 73.20 3 Enzen. Bangalore 81.6*0.8= 67.25 1 2589541 100*2589541*2 2589541=20 1 87.25 1 factors 0.8 () & 0.2 (Financial) taken from Standard Request for Proposal Selection of Consultants The World bank Publication Washington D.C. May 2004 page -25 10

(f) Name of the winning consultant & the price, duration & summary scope of contract Winning Consultant: M/s Enzen Global Solution Pvt. Ltd., Price : Rs. 2589541/- audited. Duration : 12 weeks #90,Hosur Road, Madiwala Banglore-560068, India Award of Contract : LOA Ref.No.: C.E.(O&M) /PRL/Chem.Lab/11 th R&M-U3/ No.08807 dated 27 th Jul 2011 on ENZEN Global Solution Pvt. Ltd. #90,Hosur Road, Madiwala Banglore-560068, India Summary Scope of Contract : The detailed scope of work will include the following Parli TPS has five units in operation with an aggregated installed capacity of 1130 MW. Each unit has a separate stack for dispersing the emissions arising from combustion. Several common facilities that cater to all the units include Coal Handling Plant (CHP), Water storage and Treatment Facilities (WTP), Effluent Treatment Plant (ETP) and the Ash pond Scopes of Environmental Audit and due diligence assessment, particularly the units / facilities to be covered under each category of assessment are as follows. 1. To Study Baseline Environmental Performance Compliance Assessment The consultant shall assess the plant s compliance with the applicable regulatory boards regulations & World Bank Pollution Prevention and Abatement Handbook (PPAH) guidelines and identify the gaps. 2. Pollution Prevention & Control Assessment : Pollution prevention and control assessment shall be carried out for the entire plant and its facilities. The consultant shall analyze all the sources of pollution from the plant and. Measures / Systems to improve coal quality, burning efficiency and heat recovery. Electrostatic Precipitators/ Other particulate collection systems (collection efficiency) in different units. NOx Control systems Noise Control Systems Water Recycling Systems Effluent Treatment Systems Dust Suppression Systems Ash pond (Ash water decanting, as well as containments of ash slurry in the pond). Using the data and information collected, the consultant shall also establish the various baseline pollution parameters (with the present set of pollution control systems) such as particulate emissions (kg particulate/kwhe), SO2 emissions (kg SO2/KWhe), NOx emissions (kg NOx/KWhe), mercury emissions (g-hg/mwhe) and ash generation (kg ash/kwhe). 11

3. Resources Efficiency Assessment : A detailed resource efficiency assessment shall be carried out for Unit- 3 (210 MW set), which is being proposed for rehabilitation. Historical performance of the efficiency parameters such as Primary Fuel Use (kg-coal/kwhe), Auxiliary Fuel Use (Litre/KWhe), Unit Heat Rate (UHR), Specific Water Consumption (Litre/KWhe) in different processes such as in Steam Generation, Condenser Cooling, Ash Slurry making). Auxiliary power consumption, etc shall be determined and assessed against their respective design parameters as well as with the industry best practices for similar plant and technology. A detailed material and energy balance assessment shall be carried out for different stages of power production to identify the losses, which could be minimized. Separate study on energy audit & project design is being carried out to establish various technical and efficiency parameters of the unit being proposed for rehabilitation. In association with the client s project team, the consultant shall coordinate with the consultants carrying out the energy audit and project design to collect the relevant additional data to establish the various baseline resource efficiency parameters. 4. Occupational Health, Safety Assessment : The consultant shall review the existence and implementation of the following health and safety measures in the plant and comment upon their adequacy and effectiveness. Fire fighting systems Workers safety equipments Safety drills Periodic health check up for workers Rotation of work and minimization of exposure Emergency management plants. The consultant shall review the records, and consultation with workers and doctors, identify the prevalence of any specific occupational health concerns in the plant, review the management response to the same and assess ineffectiveness 5. Potential Liabilities /Risks The consultant shall in association with the client s project team, review relevant information available in the public domain and consult the local stakeholders particularly the plant management people being in the vicinity, project affected persons, PRIs, local NGOs, and the State Pollution Control Board in order to assess such liabilities.in light of increased attention to mercury pollution issues of thermal power plants, the consultant shall make an assessment of Hg pollution from Parli TPS. In this regard the consultant shall study the presence of Hg in coal, in stack emissions, in ash (both in dry ash and in slurry) and in the receiving water bodies. 6. Institutional Capacity Assessment The consultant shall in association with the client s project team, review the institutional set up and resources available within the plant for ensuring sound environmental performance assess their adequacy and effectiveness. suggest measures to enhance capacity. In this regard, the consultant shall review the following aspects. Institutional Set up for Environment Management Systems and Procedures & Training Mechanism for addressing public concerns 12

7. Identification of Interventions As part of the due diligence assessment specific measures / intervention would need to be identified to improve the overall environmental performance of the plants, including Measures/interventions required to ensure compliance with the applicable national and state level regulatory requirements and any specific stipulations on the plant Measures/interventions required for meeting the requirements of applicable PPAH guidelines and an assessment of their feasibility. The consultant shall clearly state whether there are such aspects, where compliance achievement is not feasible due to either technology or input constraints. The Consultant shall also suggest measures/ best practices for addressing certain concerns, where there are no stipulated and guidelines. 8. Preparation of Investment Plan: The consultant shall also estimate the additional investments required for achieving industry best practices. The plan should be presented at two levels one for the overall plant and the common facilities, and the other specific to Unit- 3. 13