Oil and Gas Energy. Transforming Ideas for the Energy We Use. gaiconsultants.com/energy

Similar documents
Transforming Ideas for the Energy We Use. gaiconsultants.com/energy. Energy

Oil & Gas. Capabilities & Qualifications. Part of a diversified family of services. www. jmt.com. An Employee Owned Company

R.F. MITALL & ASSOCIATES, INC. Consulting Engineers and Surveyors 117 Sagamore Hill Road Pittsburgh, PA 15239

STATEMENT OF QUALIFICATIONS

ENVIRONMENTAL & NATURAL RESOURCES Part of a diversified family of solutions. jmt.com

leinfelder Fauna Spotter Catcher Architects. Engineers. Scientists

STATEMENT OF QUALIFICATIONS

2.1.1 Traffic Noise Analysis

PEAK DEMANDS. Civil & Environmental Consultants, Inc. PEAK DEMANDS. balancing utility reliability with regulatory change

Three copies (one original and two copies) of your completed NOI should be submitted to:

The Caltrans Contract Manager will assign specific projects to the Consultant through the issuance of Task Orders.

INTEGRATED RESOURCE PLANNING SITING ENVIRONMENTAL CONSIDERATIONS

Work Breakdown Structure Element Dictionary Preliminary Engineering

MWS Project Number: 11-SC-0116 Last Updated: January 19, 2016

Environmental. US Army Corps of Engineers BUILDING STRONG

jmt.com WATER RESOURCES MANAGEMENT Part of a diversified family of solutions

ATTACHMENT C MEASURES TO MINIMIZE HARM

Guidance on Repairs to Interstate Natural Gas Pipelines Pursuant to FERC Regulations (July 2005)

FERC PDF (Unofficial) 10/08/2014. Environmental Impact Statement ES-1 Corpus Christi LNG

The compliance monitors are responsible for reviewing NEXUS s construction and documenting compliance with the FERC Certificate.

General Construction Permit (GCP) Storm Water Inspections. Scott Bulgrin Pueblo of Sandia

Utilities and Environmental Permitting

A DYNAMIC PERSPECTIVE SINCE 1978.

Areas of expertise include:

Bridge Design, Rehabilitation, and Management

Environmental Information Worksheet

ENVIRONMENTAL PERFORMANCE PROGRAM

equity environmental engineering 500 International Drive, Suite 150, Mount Olive, NJ (973)

Plan of Development. Energy Gateway South Transmission Project. Volume I PREPARED BY:

Appendix M Framework Stormwater Pollution Prevention Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

Natural Gas Transport and Storage

Built & Natural Environment

Monthly Progress Report. June 2017

Good Housekeeping. Phones Weather related emergencies Breaks and facilities. Introductions

Request for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019

INTRODUCTION AND BACKGROUND

ENDANGERED SPECIES ACT, WETLANDS, STORMWATER & FLOODPLAIN REGULATORY COMPLIANCE FOR ENERGY AND UTILITIES

June 6, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

BL ENGLAND & RELIABILITY PIPELINE PROJECT. September 27, 2013

IN PROGRESS PARTNERS IN PROGRESS IN PROGRESS. your conduit for delivering confidence

Wetlands. DuPage County Stormwater Ordinance Update- Wetlands and Buffers. Is a Stormwater Permit Required? 7/13/2012

Appendix C2 Stormwater Pollution Prevention Plan Framework

Making our client s vision a reality.

Construction Management Transportation

Table Table 7.2 Potential Environmental Impacts and Mitigation Measures

CESAM-RD-N May 29, 2014 PUBLIC NOTICE NO. SAM JSC

By Mark Gallagher Princeton Hydro LLC. From FERC Leidy Line EA

Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA

Existing Conditions and Environmental Consequences

Environmental Considerations: Renewable and Conventional Power Plant Siting

Exploration & Production Site Development Requirements. Oil & Gas Environmental Conference Dallas, TX

Monthly Progress Report. January 2018

City of Grand Junction Illicit Discharge Detection and Elimination Manual

Project Delivery. TTAP Project Delivery Class Descriptions

The Beckett s Run Experience. Fort Wayne, Indiana

CONSTRUCTION ENGINEERING SERVICES

Freeport LNG Liquefaction Project

NDDOT Erosion & Sediment Control Construction Course

ENDANGERED SPECIES ACT, WETLANDS, STORMWATER & FLOODPLAIN REGULATORY COMPLIANCE FOR ENERGY AND UTILITIES

Items in this checklist identify the base requirements that are to be provided by the design professional.

An Overview and Comparison of the Tennessee Department of Transportation s Environmental Evaluation Process

ENDANGERED SPECIES ACT, WETLANDS, STORMWATER & FLOODPLAIN REGULATORY COMPLIANCE FOR ENERGY AND UTILITIES

In all our projects, we seek to provide fresh inspiration and practical solutions that have a positive impact.

S.O.P. No. HMD

Services to the Nuclear Power Sector

Middle Tennessee State University (MTSU) Stormwater Plan Review Checklist

Spire STL Pipeline Project

Brandon Wood, P.E., P.S. Engineering And Surveying

Regulation Of Oil And Natural Gas Pipelines: A Legal Primer For The Layman

PILLAR PAGE 3

Environmental Requirements and Enhancement Projects. Chip Ray VDOT Environmental Quality Division

UNDERSTANDING THE LAW. In Pennsylvania, both state and federal law govern water pollution caused by stormwater. We briefly examine both.

PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF ENGINEERS PROJECT PURSUANT TO 33 U.S.C. SECTION 408

SCOPE 1.0 General Requirements

Washington Dulles International Airport EXECUTIVE SUMMARY

Construct and Operate a Rail Line Between North Pole, Alaska and Delta Junction, Alaska

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

PERP Program LNG Receiving Terminals New Report Alert

October 25, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

PRESENTERS. Contact Information: RW Armstrong Union Station, 300 S. Meridian St. Indianapolis, IN

DRAFT SCOPE 1.0 General Requirements

WRECO LOGO CMYK. Civil Engineering Water Resources Environmental Compliance Geotechnical Engineering

Matrix of Major Environmental Laws and Regulations Provisions Related to Components of an Indirect and Cumulative Impact Analysis 1 2

GOVERNORS POLICY FORUM ON SHALE ENERGY DEVELOPMENT

Public Meeting for SH-85A Horse Creek Bernice, OK. SH-85A bridge located 3.5 miles east of SH-85, including west and east approaches

APPENDIX A. Agency Consultation Meeting Notes

4.1.1 Best Practices for Agency Coordination

POWERFUL SOLUTIONS FOR THE NATURAL GAS INDUSTRY. With services from wellhead to burner tip

THE MMC ADVANTAGE: DELIVERING VALUE FOR THE ENERGY SECTOR. Strategic Solutions Group

CONNECTING. Big Chino Valley Pumped Storage Project. Energy Infrastructure

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

Environmental Due Diligence for New Oil and Gas Pipelines

Stormwater Management Practices and Design Manual. Clemson University

METROPOLITAN PLANNING ORGANIZATION MEMORANDUM

Chapter 3 FEDERAL POLICIES SOUTH DAKOTA DRAINAGE MANUAL

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

Module 1: Construction Site Erosion Control

Transcription:

Oil and Gas Energy Transforming Ideas for the Energy We Use gaiconsultants.com/energy

Oil and Gas Focused on Your Goals World energy markets are rapidly expanding with the United States poised to be a major player in oil and gas production and export. This expansion presents boundless opportunities for energy companies to capitalize in this competitive market where speed and reliability are key success factors. When these opportunities become projects, GAI responds quickly and efficiently to assist our energy clients in making their projects successful. We understand how our services fit into the larger project life cycle, how each element early feasibility studies, land acquisition, survey, permitting, civil/site engineering, construction, operation and end of asset life interact and impact the others. Our clients have come to rely on GAI s comprehensive knowledge of the standards and permits required to meet fast-paced upstream, midstream, transmission, LNG, and natural gas liquids (NGLs) project schedules. Our managers understand the owner s perspective, and adopts your goals as their own. Strategic Partnerships For holistic support of clients goals. GAI engages select strategic partners for pipeline design, maintenance, and rehabilitation; compressor station design; and other services. We find complete solutions. Your goals are important. And if it s important to you, it s important to us.

We believe our clients have important goals and we make those goals our own. What Distinguishes GAI Experienced team with insightful knowledge of the permitting protocols required to get upstream, midstream, transmission, Liquefied Natural Gas (LNG) and Natural Gas Liquids (NGLs) projects to market Comprehensive survey, environmental, and civil/site engineering in one company, a strong base for understanding how each element impacts the overall project In-house expertise in rare, threatened, and endangered species, wetlands, and cultural resources Understanding the competitive nature of the oil and gas market and importance of managing both cost and schedule

Oil and Gas Services Routing Pipeline desktop studies to identify sensitive resources early on in planning phases of the project Pipeline constructability surveys performed by site civil, cultural, and environmental to minimize issues during construction and develop a route minimizing environmental impacts Surveying GIS services Center line staking Construction stake-out As-built surveys Topographic and Bathometric surveys Construction alignment sheets Property Exhibits/Plats FERC Environmental report preparation for 7c and Blanket Prior Notice (BPN) filings Third party and applicant NEPA document preparation Assistance with 2.55b, Blanket Automatic Authorization (BAA), and BPN projects Environmental Assessment, Permitting, and Planning Permitting strategy development and project timeline roadmapping Wetland and stream delineation Permittee Responsible stream and wetland mitigation design Erosion and Sedimentation Control Plans and permitting Dredge material management National Pollutant Discharge Elimination System (NPDES) permitting Clean Water Act 404/401 permitting and Section 10 consultation Floodplain studies and permitting Rare, threatened, and endangered species consultation and surveys Assistance with USEPA compliance orders, USACE cease and desist orders, and Notices of Violation (NOVs) Assistance with Habitat Conservation Plans and Incidental Take Permits Phase I, II, and III Environmental Site Assessments (ESAs) and due diligence for mergers, acquisitions and divestments Sound monitoring and modeling required to be in compliance with local, state, or federal permitting Air permitting

Cultural Resources Due diligence evaluations SHPO and tribal consultations Archaeological predictive modeling Phase I, II, and III archaeology studies Historic architectural surveys and evaluations Agreement documents Treatment Plans and Mitigation Civil Engineering Services Compressor and meter station site layout Well pad design Roadway design and permitting (i.e. road bonding, Highway Occupancy Permits (HOP s), and driveway permits) Geotechnical services Stormwater Pollution Prevention Plans (SWPPP) Spill Prevention Control and Countermeasure (SPCC) Plans Program Management GAI can act as the overall Program Manager for your project. With survey, environmental, and civil/site engineering in one company, we have the ability to see the many risks that could impact your project and we mitigate those risks. GAI oversees land activities, easement acquisition, deed research, and civil/site engineering. We also provide oversight of operational compliance programs for facilities. Construction Support Environmental Inspection and compliance Pre and post construction water source sampling and structure condition surveys Assistance with Notice of Terminations (NOT s)

Connect with Our Experts R. Scott Burnsworth Vice President, Natural Gas Market Sector / Environmental Technical Services Energy Business Unit T 681.245.8853 s.burnsworth@gaiconsultants.com About GAI Consultants, Inc. Transforming ideas into reality since 1958, GAI is an employee-owned engineering, planning, and environmental consulting firm providing local expertise to worldwide clients in the energy, transportation, development, government, and industrial markets. gaiconsultants.com