LEVEL I PREQUALIFICATION DOCUMENTS

Similar documents
LEVEL I PREQUALIFICATION DOCUMENTS GEISEL RESTROOM RENOVATIONS

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION

LEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR

NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION

UNIVERSITY OF CALIFORNIA, SAN DIEGO

NOTICE TO PROSPECTIVE BIDDERS REGARDING PRE-QUALIFICATION FOR CONTRACTS FOR ALISAL UNION SCHOOL DISTRICT. Revised February 11, 2015

UNIVERSITY OF CALIFORNIA, SAN DIEGO

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

Bidding Conditions Attachment C

MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue

RE-ADVERTISEMENT FOR PREQUALIFICATION. Bid Package No. 28 Toilet Partitions and Accessories +Fire Extinguishers/Cabinets

ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION)

Morgan Hill Unified SCHOOL DISTRICT SEMI-ANNUAL PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

ADVERTISEMENT FOR SUBCONTRACTOR QUALIFICATION AND ADVERTISEMENT FOR PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS)

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR, 2018 I. BACKGROUND AND OVERVIEW

OAKLAND UNIFIED SCHOOL DISTRICT FOR NON-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE LEASE-LEASEBACK DEVELOPERS 2017/2018 I. BACKGROUND AND OVERVIEW

PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE

The Bid Date has changed to 03/16/2010 at 2:30 PM.

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES

January 22, Table of Contents

SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California (805)

City of Eagle Point 2017 Paving Instruction to Bidders

MARYLAND STADIUM AUTHORITY

Amity School District 4J

Albany Unified School District Contractor Prequalification

UNIVERSITY OF CALIFORNIA, LOS ANGELES REQUEST FOR PREQUALIFICATION

ADDENDUM NO. 1. Date: January 11, for. RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College. BID No.

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/BUILD TRADE PARTNERS

MARYLAND STADIUM AUTHORITY

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4

City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders

PROJECT DESCRIPTION. The project is the Spartan Complex Seismic Upgrade, San Jose, California.

UCLA LUSKIN CONFERENCE AND GUEST CENTER Project

REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS

OFFICE OF PROCUREMENT COOLING TOWER REPLACEMENT, CT BUILDING RFP NO.: RFP OPENING DATE: APRIL 16, 3:00 PM ADDENDUM #4.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

REQUEST FOR QUALIFICATIONS

ADDENDUM NO.1. Ray Stoyer Water Recycling Facility Access Road and Site Paving Repair (IN )

Refer to Section Proposal Form/All Trades (issued) a. Revised Alternate No. 2 b. Added Alternate No. 3

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE

REQUEST FOR QUALIFICATIONS

INSTRUCTIONS TO BIDDERS

Mustang Substation Bank I Replacement Project MAJ 15-SP5054

ADVERTISEMENT FOR BIDS

Invitation for Bid - Standard Office Furniture / Task Chair

Architectural Services

DOCUMENT POST BID INTERVIEW

Science Technology Engineering and Mathematics (STEM) Initiative

CHAPTER AUXILIARY SERVICES. Prequalification of Contractors for Educational Facilities Construction 8.272

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES

REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY

UCSF Precision Cancer Medicine Building January 31, th Street R&S Job No San Francisco, CA Page 1 of 1

The Home Depot U.S.A., Inc. Instructions to Bidders

Construction & Engineering 1845 East Russell Road Suite 300 Las Vegas, NV 89119

BIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION. for the COUNTY OF ORANGEBURG. Project Number: FY

EXHIBIT A - INSTRUCTIONS TO BIDDERS

REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT

NOTICE TO BIDDERS FOR

MARYLAND STADIUM AUTHORITY

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

PREQUALIFICATION OF CONSTRUCTION CONTRACTORS QUESTIONNAIRE PACKET

PREQUALIFICATION QUESTIONNAIRE

UNIVERSITY OF CALIFORNIA, RIVERSIDE BARN EXPANSION PROJECT. ADVERTISEMENT FOR PREQUALIFICATION for CONSTRUCTION MANAGER/GENERAL CONTRACTOR AT RISK

UNIVERSITY OF CALIFORNIA, SAN DIEGO

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

A D D E N D U M. REPLACE: Project Summary with attached revised Project Summary. 1 Specification Section Project Summary

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

REQUEST FOR QUALIFICATIONS FOR Design-Build Services For the HMC 2MB Cart Washers & Sterilizers Project No

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011)

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES

PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT)

***REVISED*** REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT MOORES CANCER CENTER PHARMACY UCSD MEDICAL CENTER LA JOLLA. and

General Contractor Prequalification for the Biosolids Handling Facility at the Hailey Wastewater Treatment Plant

PREQUALIFICATION OF CONTRACTORS FOR EDUCATIONAL FACILITIES CONSTRUCTION 8.502

Notice to Bidders Page 1 of 6

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) (BUILDING 590 Deep Foundations)

OSNI PONCA OFFICE REMODEL

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS

Both envelopes must have the following information in the lower left hand corner:

CITY AND COUNTY OF SAN FRANCISCO Port of San Francisco. Contract No Crane Cove Park Building 49. ADDENDUM No. 02 Issued: April 12, 2019

Construction Family of Documents

PROJECT MANUAL for Phantom Canyon Tunnel Repair Project. Location On Fremont County Road miles North of Intersection US Highway 50 with FCR 67

REQUEST FOR PRE-QUALIFICATION FROM DESIGN-BUILD ENTITIES (RFQ) ACCESS CONTROL PROJECT, PHASE 1 DESIGN-BUILD PROJECT SADDLEBACK COLLEGE

UNIVERSITY OF MASSACHUSETTS BUILDING AUTHORITY

MARYLAND STADIUM AUTHORITY

ADVERTISEMENT FOR BIDS

Transcription:

Project No. LEVEL I PREQUALIFICATION DOCUMENTS for MUIR BIOLOGY BUILDING 3RD FLOOR RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La Jolla, CA 92037 SEPTEMBER 30, 2013

TABLE OF CONTENTS PAGES TABLE OF CONTENTS 1 PART I: ADVERTISEMENT FOR LEVEL I PREQUALIFICATION OF 2 CM/CONTRACTORS PART II: GENERAL 8 1. Project Background 2. Notice To Prospective CM/Contractors 3. Prequalification of Prospective Bidders 4. License 5. General Description of Work 6. Level I Prequalification Process 7. Evaluation of Level I Prequalification Submittals and Advancement To Level II of the Prequalification Process Level I Schedules 1 PART III: LEVEL I PREQUALIFICATION QUESTIONNAIRE 30 PASS/FAIL (CM/CONTRACTORS) Level I Prequalification Page 1 of 1 Table of Contents UCSD Rev.01/01/11

PART II - GENERAL 1. PROJECT BACKGROUND The University seeks CM/Contractors with comparable previous experience. For the purposes of this Level I Prequalification Questionnaire, a comparable project is defined in Section 7, Paragraph 6. 2. NOTICE TO PROSPECTIVE CM/CONTRACTORS The University of California, San Diego, intends to award a Contract for pre-construction services with a University Option for Construction for the MUIR BIOLOGY BUILDING 3RD FLOOR RENOVATION project. The University desires to retain a contractor through competitively bidding the Project, to provide Pre- Construction Services during the Project construction document period and to act as a general contractor to construct the Project as the construction documents are completed. The Option Sum bid by the CM/Contractor shall represent all costs for CM/Contractor's Base Fee, General Conditions Work, and all other costs to construct the Project as a general contractor. The CM/Contractor, after authorization by the University, will competitively bid the various Bid Packages representing the Construction Work required to complete the Project. 3. PREQUALIFICATION OF PROSPECTIVE BIDDERS The University has determined that the CM/Contractors who submit bids to University on this Project must be prequalified. There will be a single pool of prequalified bidders who will be eligible to submit bids as described under the General Description of Work. 4. LICENSE Prequalified CM/Contractors will be required to have the following California Contractor s License: B General Building Contractor 5. GENERAL DESCRIPTION OF WORK The scope of work includes interior renovation of the existing Biology Lab. The project is approximately 8,000 GSF of the overall 14,000 GSF floor plate and its proposed scope includes complete renovation of lab spaces to provide an open lab configuration. Specific upgrades include but not limited to: fire/smoke UCSD 10/14/03 Page 1 of 8 GENERAL INFORMATION FOR

detection systems, fire rating components, fire protection systems, HVAC system renovation, fume hood replacement, plumbing systems, and upgrade of the existing electrical system including interior lighting and standby power requirements. Other upgrades include: accessibility compliance and all new interior finishes including casework and ceiling treatment. The design of the project is at 50% construction document phase. The successful CM/Contractor will be responsible for Construction Management services during the preconstruction phase. The CM/Contractor will provide pre-construction services including construction cost analysis, availability of various materials and labor, construction feasibility of various building materials, systems and equipment, construction document review and coordination, developing the scope of bid packages, constructability review and development of the construction schedule including a recommended schedule of purchase of long lead items. The CM/Contractor will develop the bid packages for subcontractors/suppliers/vendors/etc., prequalify and review subcontractor bids, procure subcontracts for the work by use of competitive bidding procedures which comply with all governmental and Regental requirements and, contract directly for all of the bid work. The University will have no direct relationship with subcontractors. Additional project information will be provided in the Level II Prequalification Documents, including instructions to bidders, contracts, general and supplemental conditions, outline specifications, soils reports, and related project information as available. Portions of this information are subject to University review and not available until release of the Level II Prequalification Document. Estimated Construction Cost: $4,000,000. 6. LEVEL I PREQUALIFICATION PROCESS On Monday, September 30, 2013, after 1:00 P.M., Level I Prequalification Questionnaires will be available to CM/Contractors wishing to be prequalified to bid on this project at: www.fdc.ucsd.edu. Select Projects and Work Available For Bid and click on this project. Scroll to the bottom of the page to access and open the Prequalification Documents. Level I Prequalification Questionnaires (hard copies only) will be received only at the following address: FACILITIES DESIGN & CONSTRUCTION Contracts Department, 10280 North Torrey Pines Road Suite 465, La Jolla, CA 92037-0916 Telephone: (858) 534-3887 www.fdc.ucsd.edu A mandatory Level I Prequalification Conference will be conducted on TUESDAY, OCTOBER 8, 2013, at 10:00 A.M., at Facilities Design and Construction, 10280 N. Torrey Pines Rd., Suite 465, La Jolla, CA 92037. Campus maps can be found at http://maps.ucsd.edu. UCSD 10/14/03 Page 2 of 8 GENERAL INFORMATION FOR

Metered parking spaces are available (for up to 2 hours) in the service yard/shuttle stop parking lot and underground parking area of Torrey Pines Center South. CM/Contractors must be present for the entire mandatory Level I Prequalification Conference. The last day prequalification questionnaires will be available will be October 16, 2013. Prospective bidders shall submit four (4) printed sets and one (1) flash drive with complete submittal of the completed Prequalification Questionnaire and required attachments at the above location. No Level I Prequalification Questionnaires will be accepted after 4:00 P.M., WEDNESDAY, OCTOBER 16, 2013. However, the University reserves the right to request, receive and evaluate supplemental information after the above time and date at its sole determination. Each prospective CM/Contractor must successfully complete the prequalification process as outlined in this document. No other prequalification process previously completed by CM/Contractors, whether for other projects or for other campuses, will meet these requirements. Statements must be submitted on the University-issued prequalification forms provided. Prospective CM/Contractors shall submit four (4) completed Level I prequalification questionnaires with required attachments both in "hard copy" format (e.g., 8 ½" x 11" paper) and one (1) flash drive. All information requested in the Level I Prequalification Questionnaire must be provided in order to be considered "responsive" to the requirements of Level I prequalification. The Level I Prequalification Questionnaire shall be submitted as one intact whole it shall not be submitted "piecemeal." Prospective CM/Contractors shall not direct other parties to separately submit documents to the University (for example, prospective CM/Contractors shall not direct insurance carriers to submit insurance certificates directly to the University, and so forth). Each prospective Subcontractor intending to sub-let more than 10% of the scope must list each 2nd tier subcontractor that could be used in the bid. Please submit a letter of explanation regarding whom you intend to use for installation. A prequalification questionnaire for each potential 2nd tier subcontractor may be required at a later time. Note that the second tier questionnaires must include all necessary addendums but will not be held to the financial requirements of the primary Subcontractor. Only those subcontractors listed will be able to provide pricing during the bid phase. All information submitted in the Level I Prequalification Questionnaire will be considered official information acquired in confidence and the University will maintain its confidentiality to the extent permitted by law. The University contact person is Ken Seuberling, Principal Architect (858) 822-4993 or Rhonda Mitchell, Contracts Manager, Facilities Design & Construction (858) 822-3126. UCSD 10/14/03 Page 3 of 8 GENERAL INFORMATION FOR

Any questions or requests for clarifications to the Level I Prequalification Questionnaire must be submitted in writing to the above address, attention Rhonda Mitchell, no later than 10:00 A.M., Wednesday, October 9, 2013. Questions received after the above-noted deadline may be answered at the discretion of the University s Representative. Questions may be faxed to (858) 534-5633. Any addenda issued will be faxed, mailed, or e-mailed to prospective CM/Contractors based on information obtained from the mandatory meeting sign-in sheet. Addenda will be issued to all firms who are known by the University to have received a set of Level I Prequalification Questionnaire and who have provided a complete and legible business address, email address, phone number, and fax number for receipt of addenda. 7. EVALUATION OF LEVEL I PREQUALIFICATION SUBMITTALS AND ADVANCEMENT TO LEVEL II OF THE PREQUALIFICATION PROCESS Level 1 Prequalification Criteria: The initial qualification of prospective CM/Contractors will be determined by the information submitted in each Level I Prequalification Questionnaire. Level I prequalification status will be granted only if the prospective CM/Contractor meets all of the following requirements: 1. Submission of properly completed and signed Declarations. 2. Attendance at the Mandatory Level I Prequalification Conference. 3. Possession of current and valid California Contractor's License, General Building "B" license; never suspended or revoked. 4. Submission of the University's form, signed by surety and notarized, confirming that: a) Surety to be used is listed in the latest published State of California Department of Insurance list of Insurance Organizations Authorized by the Insurance Commissioner to Transact Business of Insurance in the State of California. b) CM/Contractor is able to obtain bonding up to and including $4,000,000, of which not more than 50% of capacity is currently committed. c) Surety has not paid out any monies for the construction activities of the CM/Contractor whatsoever within the last ten years. d) Number of years with surety. 5. Submission of the University's form, signed by insurer and notarized, confirming that: a) Insurer to be used is listed by Best with a rating of A- or better and a financial classification of VIII or better (or an equivalent rating by Standard & Poor s or Moody's). b) CM/Contractor is able to obtain insurance at the limits required within this Level I prequalification document. c) Number of years with insurer. UCSD 10/14/03 Page 4 of 8 GENERAL INFORMATION FOR

6. Demonstration of minimum required Construction Experience: A minimum of three and maximum of five comparable projects, completed within the last 10 years with a construction value of $4,000,000 per project or a total of $12,000,000 for the projects submitted. The projects submitted must demonstrate experience with projects of this size, with preferences towards chemical and biological research laboratories, and hospital, or clinical medical facilities. A comparable project is defined as an institutional research laboratory renovation with a minimum construction amount of $4,000,000. A comparable project is further defined as one of the following: Other facilities that contain a high degree of technical/aesthetic complexity Such projects should include a minimum of the following construction challenges: Renovation of an existing research laboratory while the facility remains in full operation Renovation of a research laboratory with LEED SILVER certification or their equivalent Limited construction and staging areas Renovations/expansions requiring proactive and innovative solutions due to unknown and/or unforeseen field conditions Project complexity requiring tracking of multiple phases Project complexity requiring critical path construction scheduling to complete on time Fast-tracking submittal process for lab casework The projects submitted must demonstrate experience with projects of these types and challenges and must all have been constructed in the United States of America, one of which is constructed in the State of California. Photographs and brochures of the projects are to accompany the Project Data Sheets and are to clearly show the character of the projects. In addition, two (2) of the projects submitted must include experience as CM/Contractor providing both pre-construction services and acting as General Contractor during the construction phase on the same project. 7. (Not Used) 8. (Not Used) 9. Demonstration of minimum Field Staff Professional Capabilities: Proposed Project Manager and Proposed Project Superintendent should demonstrate experience on at least one comparable project. Proposed Project Engineer must demonstrate experience on similar projects. In addition, demonstration of professional capabilities, including demonstrated experience on a comparable project, of the proposed Pre-Construction Manager is required. UCSD 10/14/03 Page 5 of 8 GENERAL INFORMATION FOR

10. Additional CM/Contractor Requirements: submission of computer resources, project scheduling, project management, e-mail capability and web based construction management programs. 11. Submission of Construction Safety Program. 12. Submission of Quality Control/Quality Assurance Program. 13. Submission of Business Construction Revenue Data: demonstration of annual business construction revenue of at least $10,000,000 for each and every one of the last five consecutive years, 14. (Not Used) 15. (Not Used) 16. Submission of complete Disciplinary Measures History: demonstration that firm has not been disqualified from doing business with a public agency within the last 15 years. 17. Submission of Pre-Construction Services Budget Information. (See the Level I Prequalification Questionnaire of this prequalification document for the detailed and complete listing of all requirements within each category named above.) All members of a Joint Venture entity must meet all of the above requirements for Level I prequalification. Additionally, the Joint Venture entity itself must meet all of the following conditions: At the time the Level I Prequalification Questionnaire is submitted, the Joint Venture entity itself must hold a valid, current California B General Building Contractor's License. It is not sufficient that some or all of the individual members of the Joint Venture entity hold a California General Building Contractor's License. The Joint Venture entity itself must be licensed to be eligible for Level I prequalification. At the time the Level I Prequalification Questionnaire is submitted, the Joint Venture entity itself must demonstrate its ability to obtain adequate bonding and insurance. It is not sufficient that some or all of the individual members of the Joint Venture entity can obtain bonding and insurance. At the time the Level I prequalification questionnaire is submitted, the Joint Venture entity itself must demonstrate previous construction experience as set forth above. Joint Venture teams newly-formed to pursue this prequalification opportunity are not eligible for Level I prequalification. At the time the Level I Prequalification Questionnaire is submitted, the Joint Venture entity must demonstrate that each member of the Joint Venture produced annual Business UCSD 10/14/03 Page 6 of 8 GENERAL INFORMATION FOR

Construction Revenue of totaling $10,000,000 for each and every one of the last five consecutive years. Submission of an incomplete and/or unclear Level I Prequalification Questionnaire is also likely to result in the determination of the prospective CM/Contractor as NON-PREQUALIFIED for this project. After the deadline for receipt of the Level I Prequalification Questionnaires, the University will begin the review of all statements received. The University reserves the right to request, receive and evaluate supplemental information after the deadline date at its sole determination. All CM/Contractors that have submitted a Level I Prequalification Questionnaire will be notified in writing of either successfully or not successfully achieving Level I prequalification status. The decision of the University is final and not appealable within the University of California system. The University reserves the right to reject any or all responses to Prequalification Questionnaires and to waive irregularities in any response received. Level II Prequalification The above criteria has been established to determine Level I prequalification status for prospective CM/Contractors. Firms which successfully achieve Level I status will be advanced to Level II analysis. Level II Interviews This second phase of prequalification will involve submission of specific Level II submittal requirements and an interview with the principals of the CM/Contractor, and the proposed Project Team. By submittal of the Level I prequalification questionnaire, the prospective CM/Contractor commits to providing the staff named in that submittal to the project. At the time of bid, the CM/Contractor will be required to confirm the assignment of staff to the project. Substitution of project staff named in the Level I Prequalification Questionnaire may result in the bid being considered non-responsive. Only CM/Contractors which successfully achieve Level I AND Level II prequalification status will be considered fully-prequalified for successful and timely performance of the work required by this project. The contract, if awarded, will be issued to the fully-prequalified CM/Contractor submitting the lowest responsive bid for this project. The University reserves the right to terminate the Agreement for professional services of the CM/Contractor at completion of Phase 1 of the contract, Pre-Construction Services. Should the University elect to do so, the University reserves the right to publicly bid the project for a traditional lump sum contract. UCSD 10/14/03 Page 7 of 8 GENERAL INFORMATION FOR

LEVEL I PREQUALIFICATION SCHEDULE Prequalification Documents available to Bidders: Monday, September 30, 2013 at 1:00 PM Last day Prequalification Documents available: Wednesday, October 16, 2013 Mandatory Level I Prequalification Conference: Requests for clarification or interpretation of the Prequalification Documents: Submittal of all completed Prequalification Questionnaire and required attachments: CM/Contractors will be notified in writing whether they have been advanced to Level II: Tuesday, October 8, 2013 at 10:00 AM Wednesday, October 9, 2013 at 10:00 AM Wednesday, October 16, 2013 at 4:00 PM Wednesday, October 23, 2013 (Tentative) Part II Page 1 Prequalification Schedule