Project Case Study. Al Muneera Al Raha Beach Development. Project: Al Muneera Start Date: Industry: Residential. Value: US $ 141 Million

Similar documents
Project Case Study. Park Rotana. Project: Park Rotana Start Date: 2007 Completion Date: 2010

Project Case Study. Starwood Hotel at Nile Corniche, Cairo. Project: Starwood Hotel Start Date: 2010 Completion Date: Ongoing

Project Case Study. Motor City DCP. Project: District Cooling Plant, Motor City Start Date: 2007 Completion Date: 2010

ABU DHABI A Visionary City

PROFESSIONAL SUMMARY POFESSIONAL EXPERIENCE. MUHAMED THAYYUB Abu Dhabi Phone:

Building Services / MEPF Scopes

MEP Construction Tel: Fax: Mobile: P.O. Box Ajman, UAE

Project Case Study. King Abdullah University for Science and Technology. Project: King Abdullah University. Completion Date: 2009

FROM THE CEO. Sameh Masry

RUWAIS HOUSING COMPLEX PHASE IV CIVIL & ELECTROMECHANICAL WORKS

Grand Egyptian Museum:-

The owner is Oral Roberts University, while management and leasing is handled by Trinity Corporate Real Estate Advisors, LLC.

DRAKE & SCULL CONSTRUCTION People Innovation Passion

2015 Fourth Quarter. (Base Year 2013) Detailed by: Main building materials and. services groups. Construction Cost Index

ENERGY SAVING Energy Consumption in the World

Check-List of General Building Services

Member of ETA STAR Group

Technical Specifications

ETTINGER ENGINEERING

Figure 20.x: Existing independent power and water projects (IWPPs) in Abu Dhabi. Year of Financial Close. Structure

The people behind the buildings keep the buildings working

P.O. Box Safat Kuwait Tel: Fax:

DUBAI ELECTRICITY AND WATER AUTHORITY GUIDELINES FOR NEW DEVELOPMENT PROJECTS UPDATE

productive architecture Kiss + Cathcart, Architects 44 COURT ST. TOWER C, BROOKLYN, NY t f

Enman Pty Ltd Energy Management Consultants

Waterproofing solutions. Sump and Pump Systems

THE INTEGRATED TRADE AND INDUSTRIAL HUB OF ABU DHABI

More than 135 years of delivering landmark projects around the world

MEC-G-E-1993 Project Coordinator-Consulting PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

EMIRATES INTERNATIONAL FACILITIES MANAGEMENT llc

PROJECT CLOSE-OUT SERVICES

P.O.Box: 301 Riyadh Kingdom of Saudi Arabia Tel.: Fax:

Transguard Group. Integrated Facility Services

INAMGROUP.COM

AJITH G, PMP, LEED GA, MMUP/UPDA Doha, Qatar Mob: Objective. Summary. Skills

The Successful Construction of DC Plants: Saadiyat Island Case

GOOD LIVING STARTS HERE

2016 SUSTAINABLE HOTEL AWARD WINNERS. Sustainable Project Design Sustainable Operations Sustainable Communities

Let s share a vision Schneider Electric - Industry Levente Balasa 14/10/2010 2

GULF ENGINEERING LLC COMPANY PROFILE COM PAN Y PRO FILE

Electrical and Mechanical Engineering Services. Survey Report. Sussex Lodge and Stanhope Terrace London W2 OSCAR FABER

Ehsan Soltani. Date of Birth: 1 Sep, 1980 Nationality: Iranian Marital Status: Married Mobile :(+98)

Mastering a Complex Project

THE ELEVATOR WITH A COMPACT MACHINE ROOM. KONE MiniSpace

EMergy is LIFE, Not a LIFESTYLE

PRODUCT BROCHURE. RMD Kwikform UAE. Special Formwork

THE INTEGRATED TRADE, LOGISTICS AND INDUSTRIAL HUB OF ABU DHABI

Sustainable Building Management System

Construction Management. Global Construction Management Experience

MEP Engineer MEP Engineering Of ing Of The Finest Quality The Finest Quality yal Advance Ro yal AdvanceRo

Emerald Isle by L&T Realty in POWAI

PARK PLACE CASE STUDY VANCOUVER. Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68%

P.O. Box: DUBAI, U.A.E. TEL: FAX: WEB:

Quality & Innovation. Put Together. Australian Piling Technology

Energy-Efficient Passive House using thermal mass to achieve high thermal comfort

CONSTRUCTION REQUIREMENTS

PREQUALIFICATION MULTICHOICE ELECTRO-MECHANICAL CO. Tel: (+974) Fax: (+974) P.O. Box: Doha-Qatar

FUSION MIDDLE EAST COMPANY PROFILE

Appendix J - Custom Uniformat for EDU Migration


The experience of walking through the streets of Puerto Real and talking to its residents made me realize that this project has to bring back the

Whatever your project needs, ALEMCO will ensure that it is delivered on time, within budget and to the highest standards.

JUNIPER CRESCENT AND GILBEYS YARD. 11. Mechanical and electrical services strategy

SECTION H ENERGY EFFICIENCY TABLE OF CONTENTS UNSW DESIGN & CONSTRUCTION REQUIREMENTS WEB ENTRY PAGE

Quality management system. Environmental management system. Occupational health and safety management system.

Technical Assignment #2 Electrical Systems Existing Conditions and Building Load Summary Report. Executive Summary

Energy metering is required to comply with the requirements of the Building Regulations.

Al Raha Gardens Development Control Regulations

Project : Power & Fuel consumption - an engineering initiative. VPS Rockland, Dwarka.

DESIGN BASIS FOR AIR CONDITIONING AND VENTILATION SYSTEM FOR SUBSTATION AND CONTROL BUILDING HINDUSTAN PETROLEUM CORPORATION LTD.

The ASHRAE Design Guide for Tall, Supertall and Megatall Building Systems

Smart energy grid using local energy resources

District Cooling Sustainable Design. Presented by George Berbari CEO of DC PRO Engineering

Services for Tall Buildings Cost Model For Building Magazine

R e c e n t P R O J E C T S

case study The Largest Integration Project of its kind in Libya

Company Profile LYNX TRADING & CONTRACTING W.L.L. Delivering the promise

GALAXY ENERGY GENERAL CONTRACTING LLC COMPANY PROFILE

ELMECH CONTACT DETAILS

SUMET04 Install enclosures for electrical cables, conductors and wiring systems (SQA Unit Code-H951 04)

COMPANY PROFILE HAP ENGINEERING MEP CONSULTANT

National Gymnastics Arena

Industry Sector Building Technologies Division

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Collaborative Life Sciences Building & Skourtes Tower

Medium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Germany

Al Meraikhi Precast. Established in 1975 and registered in the Emirates of Abu Dhabi and Dubai.

Director of Planning and Studies

BCM00 Introduction to Building Controls and HVAC (available on request) One day course BCIA Members VAT Non-members VAT

MANUFACTURING DIVISION

Renewable energy & energy efficiency solutions. Date: September 2017

FACILITY COMPONENTS - ELEMENTARY SCHOOL

Available online at ScienceDirect. The latest demonstrated technical innovations in Sydney CBD tall building.

our vision To become the undisputed industry leader, both regionally and globally, in the technical services segment.

ENERGY & WATER SAVING INITIATIVES

CONTENT ELECTRICAL WORKS INSTALLATION OF LOW VOLTAGE SYSTEMS VENTILATION AND AIR-CONDITIONING SYSTEMS WATER SUPPLY AND SEWERAGE FACADE WORKS

Level 1 Modules tdp-101 hvac industry overview tdp-103 concepts of air conditioning tdp-102 abcs of comfort

March BCA 2014 Section J Amendments

Contents. Introduction 01. Mission Statement 02. Services 03. Solutions 05. Client References 11. Home Solutions - Offering List 19

Element Z General Design Requirements Existing Facilities Information

Transcription:

Al Raha Beach Development Project: Start Date: 2009 Completion Date: 2012 Location: Al Raha Beach, Abu Dhabi, UAE Industry: Residential Developer: Aldar Properties Consultant/Architect: Waterman International Main Contractor: Al Futtaim Carillion Value: US $ 141 Million Drake & Scull International PJSC 01 For enquiries and other concerns, please send an email to corporate@drakescull.com

Concept & Location The project, located in the heart of the Al Raha Beach Development is a massive project in Abu Dhabi, with a total area of over 6 million m2 and 11 km of coastline, offering residents and visitors 43 km of dynamic waterfront living that includes hotels, marinas, parks, restaurants as well as leisure facilities. It consists of 11 precincts, each with their own distinct personalities and appeal. The spectacular Al Raha Beach Development provides a unique unparalleled lifestyle through its world class residential, commercial, cultural, entertainment and public facilities, which houses up to 120,000 residents in this multibillion dirham development. Located on the beach side of the main highway leading into Abu Dhabi from Dubai, the Al Raha Beach is one of the most integrated developments of its kind world-wide, with master-planned communities featuring unique residential, business, educational and entertainment facilities supported by modern infrastructure. Conceived by the finest international specialist architects, the development will be home to individual residential communities complemented by world-class amenities, a host of hotels, beaches, marinas, retailing and commercial accommodation. Al Raha Beach will also benefit from world-class education and healthcare services. At the heart of this development, the Al Dana will be home to the Aldar s new corporate headquarters within the HQ building. Al Raha Beach enjoys an exceptional location, being only 20 minutes drive from Abu Dhabi city centre and 10 minutes from the airport and the Abu Dhabi Dubai highway. The comprehensive network of marine, rail and land transportation will provide residents and visitors with hassle-free movement throughout the development as well as neighboring areas such as Abu Dhabi city centre, the airport, Yas Island & Saadiyat Island, and on to Dubai. The project is made up of two distinct areas, island and mainland, divided by a canal. The two sections have an approximate 50/50 split with respect to built area/ cost, though the island is marginally larger in size. The site area is 146,000 m2, with a total built-up area of 594,000 m2. This is divided into 254,500 m2 of residential space, plus a 106,000 m2 of basement car parking and the island s podium level will be entirely free for pedestrian usage. The bulk of the residential space is comprised of 1286 apartments spread over 16 residential towers. Right down on the beach are 11 sea-facing villas, each with five bedrooms. The development also includes 148 canal-facing, fourbedroom townhouses, and an office tower besides six tall Island Towers. Drake & Scull International PJSC 02

Scope of Work The scope of works included the installation, testing and commissioning of the following: Electrical distribution system including LV Switchgears, capacitor banks and distributions panel boards. Structured cabling and fire alarm system. Lighting control, Central battery and low current systems including CCTV, Digital Intercom, and Access control etc. Complete HVAC system including chilled water pumps, pipes, air handling units, fan coil units, ducting, fans etc. Building management systems, water supply systems including transfer and booster pumps, and above ground drainage system. Fire fighting systems including pumps and accessories, clean agent fire extinguishing system and gas distribution system. adjustments accordingly. The grand scale of the project also required a major influx of labor and equipment to carry out the MEP works. Coordination between the various teams required a lot of careful planning and constant monitoring. At peak activity levels, the manpower on site reached 3850 labor personnel and 219 office staff. A large quantity of equipment was imported from abroad, for instance, the AHUs were sourced from Italy, so the varying lead times also had to be factored in. On a somewhat ironical note, given the massive size of the project, the large number of manpower and equipment on site meant limited storage space on-site. This was a massive challenge from the logistics point of view and meant that material-supply scheduling mechanisms had to be monitored closely and tweaked to adhere to the extremely tight schedule. DSE were selected to execute the MEP requirements of this massive project, due to their strong historic experience and performance in similar landmarks around the world. The DSE team were able to demonstrate their capabilities in serving the complex requirements of this project, which posed several unique challenges to the DSE team. The Six island towers in particular, posed a specific challenge as their design was in a circular shape, which is highly unusual for projects of this nature. The MEP design and installation had to take this into account and make Drake & Scull International PJSC 03

DSI Innovation DSE were primarily involved in the basic MEP installation, but the company s involvement soon extended to interfacing the MEP systems with the modern Home Automation system. A decision was also undertaken by the client to opt for wooden flooring which proved challenging during the testing and commissioning of wet systems. However, the DSE teams were able to complete the testing of the water systems without any damage to the fragile wood paneling and flooring. In another unusual development, the townhouses were fitted with heat recovery units which is not a feature normally associated with such projects. However, the DSE teams were able to install heat recovery units, which provide fresh air and improved climate control, while also saving energy by reducing heating (and cooling) requirements, without a hitch. To speed up the work schedule, as well as improving the overall build quality, DSE s team fine-tuned a single residential tower to use as a working template for the large number of buildings required. This proved to be a masterstroke, as it helped improve the build quality and also saved many man hours. DSE also installed a world class firefighting system on site. The modern fire fighting system included ten firefighting pump sets, each comprising electric, diesel and jockey pumps, and 256 CCTV monitoring cameras together with a fire security control room. The fire-alarm system also comprised 20 MFAPs (Main Fire Alarm Panels), with two fire command centers. From an electrical viewpoint, the project was a massive undertaking due to the sheer size of the load demand. The complex electrical system installed by DSE has a total electrical load of 36,414 kw for the mainland and 30,814 kw for the island. DSI also set-up four substations with 24 nos. of LV switchgear, over 9000 m of busbar ducts in different runs and ratings, more than 2105 km of LV cables of different sizes, and 5722 sub main distribution boards, motor control centers and final distribution boards. In addition, there are also four generators of 1500 kva each, and a total of 425,000 m of cable trays, trunking and ladders, as part of the emergency backup systems. In terms of the cooling component of the project, the total cooling load on site was a significant 3650 TR and 3350 TR for the island and mainland respectively. DSE laid more than 120 km of chilled water piping all over the development. The chilling system comprises 12 chilled water pumps, 76 air-handling units (AHUs) and 5547 fan-coil units of varying sizes. DSE also installed more than 1700 fans for various daily applications ranging from stair and lift pressurization, car-park ventilation to smoke extraction. The project also required 352 sets of hydraulic pumps for domestic water transfer. DSE s careful planning and scheduling in close co-operation with the main contractor, Al Futtaim Carillion, along with stringent Safety and security management, a critical factor with such a large workforce, allowed it to be flexible enough to be able to cater to the specific needs of the entire scope of works. The project is a major feather in DSE s cap and a proud example of its outstanding planning, technical knowhow and the capabilities of the region s most skilled workforce. Drake & Scull International PJSC 04