UBA builds answers Positive energy building in Dessau

Similar documents
nzeb Germany - Strategy to improve energy efficiency in the German building sector and the leading role of public buildings Dr.-Ing.

Bruck an der Mur. Project summary. Energy concept: Background for the renovation reasons

Guidelines. Checklist for Building Approval. 1. The Site

The Embassy of the Kingdom of the Netherlands, Amman - Jordan

Energy Efficient Building Envelope Kiev,

made in paris presents a modest rebirth of the established textile factory. It integrates itself into the existing environmental

ASC New Building 400 Masthead Street Albuquerque, NM

SOLAR XXI: A Portuguese Office Building towards Net Zero-Energy Building

Verified net Zero Energy Building with air source heat pumps for SME

The Elithis Tower is an experimental and demonstration. Elithis Tower in Dijon, France. nzeb case studies

CHIANG MAI HEALTH CARE CENTER Energy Efficiency Study, Chiang Mai, January 19, 2017

Financing Energy Efficiency in Malta and Italy

The Centre for Sustainable Building (ZUB) * A Case Study

Stadtwerke Konstanz Customer Centre, Constance

TRANSSOLAR. 6 th Canadian German Conference on Energy Efficiency Retrofits in Buildings. September 22, 2015 Toronto

Press Release. Zero Energy Building for Seoul. Fraunhofer ISE Leads Interdisciplinary Team and Develops Energy Concept

Thermal Comfort Measurements in a Hybrid Ventilated Office Room

Exhibition sectors at BAU

BRF Kredit headquarters

ESyCool green ESyCool classic. Sustainable energy systems for food retailing. Heating systems Industrial systems Refrigeration systems MF/1

FEBRUARY 22, GREEN BUILDING: Past, Present and Future

Energy Efficient Buildings in Germany An Introduction

The Hive Sustainability Trail - Supporting Notes

Design specifications for the Future Creating a masterpiece

Eco-Building, Sustainability, & LEED Green Associate Training

siting, building and design guidelines April 2017 Newgate, Tarneit Design Guidelines

INTEGRAL BUILDING AND ENERGY DESIGN OF AN OFFICE BUILDING COMPARISON OF INITIAL DESIGN IDEAS WITH MONITORED RESULTS

Chapter 10 - Energy Conservation

BRE Energy Efficient Office of the Future

Improving the Energy Performance of Museum Buildings Development and Evaluation of Sustainable Refurbishment Strategies

SUSTAINABLE BUILDING TODAY - ENERGY EFFICIENCY THROUGH GREEN CONSTRUCTION

36 BTrd / DP Architects ArchDaily

Project Summary. Sustainability Facts. LEED for New Construction Rating (out of 69 possible points) Total Score 40 Sustainable Sites 7

Environmental & Sustainability Policy Statement

Building Typology Draft Metrics

EcoCommercial Building Program of Bayer Material Science

ENERGY SAVING INNOVATION IN CHINESE TRADITIONAL BUILDINGS. L. Zhu Nanjing University of Technology China

Thermally Active Building Systems. Heating and cooling for offices and commercial buildings, cost- and energy-efficient

HELLA Sonnen - und Wetterschutztechnik GmbH. Contribution within the framework of BREEAM certification. Management. Date:

ARCHITECTURAL QUALITY AND SUSTAINABILITY

Thermal comfort in a 21st century climate

the Dutch way Building sustainable school The Christiaan Huygens College, currently under construction n Cover Story: Educational Facilities

Creating a Better Tomorrow. Sustainable initiatives for better healing and better living

Background information

Low energy co-office building BMEEPTCEP01

New Generation Office Building

CB04. Outback House. Case Study. Creative Spaces Australia. by Casey Brown Architecture

Evaluating the Building Performance of the Center for Promotion of Science in Block 39 in Belgrade, Serbia

2012 Green Homes Tour

OKO House by YOUMEHESHE architects

Green Star Design & As Built Summary of Credit Changes. By Rachael Lindup

SOPHARMA AND LITEX TOWERS Hi-tech intelligent building where light, architecture and sustainability meet business

CREATIVE SPACES INFORMATION PACK THREE SUSTAINABLE DESIGN

CREATIVE SPACES 2013 INFORMATION PACK THREE SUSTAINABLE DESIGN

INTEGRATED APPROACH TO ENERGY EFFICIENCY IN CULTURAL HERITAGE BUILDINGS

Winner of CIBSE Building Performance Award Project of the Year (Public use) 2017 Keynsham Civic Centre

A first look at the affect of outdoor planting on the indoor environment of St. Loyes Residence. David Coley. March 2011 Internal Document 776

Tohu: Chapiteau des Arts

CIBSE LOW CARBON CONSULTANTS REGISTER SESSION 10 ENERGY EFFICIENCY IN BUILDINGS. I Prophets energy services

Solar active school in Lajen (Italy) EURAC research - Institute for Renewable Energy Alexandra Troi

Energy Efficiency & Sustainable Building Design

Responsive Building Elements Actual Development and Trends Within IEA

Efficiency house. Building description

546: High Altitude Design, Optimising Residential Architecture in the Alborz Mountains, Iran

Compactness ratio : 1.2. Openings ratio : 26% (thermic envelope / inhabitable area) Smaller is better 1.9 = bad < 0.8 = good

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles

Leeds Metropolitan University Portland Gate Development - Phase 1 Building Building Sustainability Design Statement

Laurel School Upper Campus Building Features

FORMULATING A BUILDING CLIMATE CLASSIFICATION METHOD

ENERGY EFFICIENT TECHNIQUES AND SIMULATION OF ENERGY CONSUMPTION FOR THE SHANGHAI ECOLOGICAL BUILDING

171: An urban office designed for the southern Brazilian climate

NRGY 62. Innovative curtain walling. Sapa Building System

CAMBRIDGE PUBLIC LIBRARY

Sustainability - incorporated in lightweight construction. Aarhus School of Architecture 15. november 2011

Compliance to the IgCC. September 29, 2011

Passive House Project documentation

Denmarks first public CO 2 -neutral building

SHIMOGA KARNATAKA INDIA 1000 Person Naturally Ventilated Office

BALCONY & FAÇADE DESIGN

Ecole Connaught Community School Welcomes. CaGBC Sask Chapter Members & Colleagues

GLADYS VALLEY HALL. Materials & Resources Innovation & Design Process

ZEM ds : Case studies

10 tips from your Architect

Chapter 4 - Energy Conservation

Impact of Cooling Strategies on Energy Reduction

LEED LEED LEED. Earth Tech, Inc. Earth Tech, Inc. A Firm With Experience. A Firm With Experience. Operational Efficiencies & Resources Preservation

CASE STUDIES - CENTRE FOR SUSTAINABLE BUILDING (ZUB) KASSEL, GERMANY

Minimum Energy Consumption 84% energy heating savings*

Analysis of Heating Energy of Ventilation Systems in Non- Residental Passive Houses in Estonia

TAP-YTL 2010: Sustainable Architecture & Urban Planning

The Renner Residence 2009 Mike and Elida Renner

Varennes Net-Zero Library City of Varennes

Falcon Energy Worldwide Inc. 2 Robert Speck Parkway, 7 th Floor. Mississauga, Ontario. L4Z 1H8 Phone Toll Free Fax 905

SOLAR PHOTOVOLTAIC ENERGY

POLYCITY Innovation Energy and environmental concepts of the POLYCITY project in Cerdanyola del Vallès CONCERTO POLYCITY

SOUTH LANARKSHIRE COLLEGE LOW CARBON TEACHING BUILDING TECHNICAL CASE STUDY

Project Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb

Colorado Mountain College: Sustainable Design Standards

Double layer glass façade in the refurbishment and architectural renewal of existing buildings in Italy

Monitoring of Advanced Facades and Environmental Systems

Transcription:

EXTENSION IN DESSAU UBA builds answers Positive energy building in Dessau

Sustainable construction Environmental qualities are paramount The holistic assessment system for sustainable construction was used for quality assurance. This ensures a comprehensive consideration of the entire life cycle of the building in a transparent and comprehensible form, including the environmental, economic and socio-cultural quality, as well as the technical procedural aspects. The five sub-aspects are each separately assessed under their key criteria groups, comprising about 45 bullet points which are then aggregated by a predetermined weighting into an overall mark. This provides the opportunity of also separately presenting outstanding qualities in one or more subsections. As user of the building, the main focus in the project implementation for the Environment Agency lay in the environmental qualities. The aim is to achieve gold certification, which represents the highest rating.

Landscaping and Percent for Art Continuation of existing features The design concept picks up and develops the features of the existing landscaping on the site. So for example, there was a continuation of the extensive planting of herbaceous perennials and wild herb meadows in addition to indigenous trees and shrubs. The park-like character of the site is reflected in the layout of the paths and the selection of the planting. The rainwater infiltration takes place entirely within the site. Only 13 % of the surface of the external works is fully sealed with a further 16 % partially sealed. The ecological value of the design is evident from the careful selection of planting, hard surfaces and site furniture and fittings. In addition to those already existing on the site, employees and visitors have at their disposal 73 cycle stands, 67 of which are in a pavilion, plus a further 32 car parking spaces. The artworks: Kohlfelsen [Coal Rocks] by Cornelia Buchheim are being installed in the grounds, they will enclose the building s two ventilation pipes. The design is distinguished by its contextual, associative references to the location. These are primarily based on the impression made by the charred timber surface. Inside, Michael Sailstorfer has created an artwork called Sonne [Sun]. The sun consists of a disc composed of several imprints of honeycombs.

Construction materials and components Environmental protection and resource preservation combined with healthy room air About 1,650 m³ of recycled concrete was used, representing approximately 60 % of the total shell works. Hemp insulation is built into the internal walls. The composite timber windows have an aluminium skin on the weather side and triple glazing to Passivhaus standards. The floor finish consists of solid oak parquet that guarantees a long service life. The selection of low-emission and non-toxic building products (e. g. wall paints) supports the objective of achieving a very high indoor air quality in the building. The high quality of the air with regard to volatile organic compounds was verified by the accompanying ambient air measurements. The naturally occurring refrigerant, propane, is used to operate the heat pump. An extensive green roof system has been installed underneath the photovoltaic modules. LED lighting contributes to the reduction in energy demand. No expanding building foam was used on the dust-free and low-noise construction site, which operated on green power.

Key project data Brief project description User: German Environment Agency (UBA) Landlord: Institute for Federal Real Estate Building authority: Construction and Property Management Saxony-Anhalt, Ministry of Finances Saxony Anhalt Architect: Anderhalten Architekten Building services engineers: WINTER beratende Ingenieure für Gebäudetechnik GmbH Landscape design: ST raum a. Monitoring: Federal Institute for Research on Building, Urban Affairs Spatial Research Construction start: April 2016 Completion: March 2018 Total cost: EUR 14 M (approx.) Usable area: 2,247 m² Gross floor area: 4,780 m² Workplaces: 111

Architectural concept Amorphous building form and eye-catching facade design The design makes a convincing statement as a compact free-standing building that not only fits into the existing urban design concept as a natural component of the entire property, but also effortlessly and self-confidently asserts its own independent architectural expression. An intelligently designed folded facade, in which photovoltaic elements alternate with windows, increases the surface area. The photovoltaic elements are set at 75º to the ground and create a unique pattern of light and shade over the facade of the positive energy building. The 111 workplaces are predominantly accommodated in one and two-person individual offices, while modern forms of office organisation are managed in two open-plan office areas. In the ground floor conference area there are two conference rooms, one of which can be subdivided into two rooms, each for 40 60 people.

Energy concept Renewable energy meets the demand With an output of 74.7 kwp, the facade is the power station of the building. Together with the photovoltaic system on the roof (57.4 kwp), they provide electricity for operating the building from a total area of 826 m². When there is excess production, the renewable power is used on the rest of the site. As a means of exploiting the geothermal potential, a 54 kw heat pump with 32 probes uses building component activation to heat the floors in winter. In summer conference rooms can be cooled directly from the earth probes via this building component activation. The offices are naturally cooled in summer using free night-time ventilation with the help of motorised pivoting windows. The offices are not air-conditioned. In the transitional seasons the offices are ventilated via the windows. In winter and summer efficient heat exchangers minimise energy losses due to heating or cooling. To ensure fire protection, the entire building is equipped with a sprinkler system. Solar shading, window opening, room temperature and ventilation are each controlled from a control panel in each room. The lighting system is fitted with daylight and presence controls. In the two atria, the stack effect is used to naturally ventilate the spaces via vents on the ground floor and in the roof. Air temperature, operative temperature, relative humidity and CO2 content are measured in 15 reference rooms, the data being used, among other things, to control the building via the BMS. The adjustment of the building s technical systems through a monitoring period extending over several years is an essential element in operating the building with minimal energy over the long term. The primary energy demand of the building has been shown to be 32.8 kwh/(m² a), a value that is 76 % below the required energy standard set in the EnEv 2009 regulations.

The implementation objective The object of the project is a positive energy building that is not only able to provide all of its own annual energy needs, but also produces a surplus for the rest of the site. Data from approximately 340 data points is collected and evaluated by the BMS as part of a comprehensive monitoring programme.

Visitors have access to the Forum (foyer) and to the exhibitions in the Forum during the opening hours of the existing building. Mon Fri Sat Sundays / Public holidays 6 am 10 pm 6 am 4 pm 8.30 am 4 pm German Environment Agency (UBA) Wörlitzer Platz 1 06844 Dessau-Roßlau Postf. 1406 06813 Dessau-Roßlau Tel.: (0340) 21 03 0 www.umweltbundesamt.de The visitors room (information material) and the library in the Forum of the existing building are open: Mon Wed 9 am 3.30 pm Thu 9 am 5 pm Fri 9 am 2 pm Visitors who would like to find out more about the architectural and ecological design concept and to visit the atrium can join one of the guided group tours. Further details can be found in our visitor centre or on our website. Related link: https://www.umweltbundesamt.de/node/14168 Picture credit: qatsi.tv GmbH & Co.KG, 3D animation:anderhalten Architekten, Text:Umweltbundesamt Z5, BBSR