INSTALLATION GUIDELINES The following instructions shall be reviewed prior to installation. Shaw will not be responsible for improper installation.

Similar documents
INSTALLATION GUIDELINES - ECOWORX PERFORMANCE BROADLOOM

be installed while the adhesive is wet for better pattern matching capabilities. Concrete floors must be sealed if dusting or powdering exists. The fo

The following instructions should be reviewed prior to installation. Shaw Industries will not be responsible for improper installation.

StrataWorx Tile. Installation Guidelines 1. CONDITION YOUR SITE AND TEST 2. PREPARE THE FLOOR

Installation ECOWORX / ECOLOGIX INSTALLATION 1. CONDITION YOUR SITE AND TEST 2. PREPARE THE FLOOR

Moisture Requirements Moisture testing must be performed. Patcraft requires the use of the following test methods:

Recommended Trowel Size and Notch Coverage

Tufted and Woven Goods Direct Glue-Down

Tufted and Woven Goods Double-Stick

Modular Carpet Tile Installation Instructions

IVC US. Light Commercial Installation Guide - Sheet Vinyl. Leading the Way

Specification and Installation

Installation Guide LVP Glue Down

Modular Carpet. Installation Instructions. Ecoflex AIR Cushion Back Ecoflex ICT Vinyl Back Ecoflex NXT PVC Free Back

Installation Instructions for Hercules Rib 52

Installation Procedures Broadloom Carpet with

Carpet Tile & Plank Direct Glue Down

INSTALLATION BASICS FOR TUFTED BROADLOOM BACKING

ELECTROSTATIC FLOORING Installation Instructions

INSTALLATION BASICS FOR TUFTED BROADLOOM BACKING

Installation Instructions

LVP GLUE DOWN INSTALLATION GUIDE PAGE 1 of 6

Installation Instructions. Distributed by:

FlexLok Adhesive Tabs for Carpet Tile

Specification and Installation

LOOSE LAY INSTALLATION GUIDE PAGE 1 of 6

Contract Installation Instructions

Student Services & Classroom Addition

CONTRACT PAGE 1 OF 5

SECTION TILE CARPETING

American Guild Vinyl Flooring - Steadcrest Collection Installation Instructions

EXPANKO RESILIENT FLOORING PRE-INSTALLATION GUIDELINES

ALETTE GLUE DOWN INSTALLATION INSTRUCTIONS

INSTALLATION MANUAL FULLY ADHERED INSTALLATIONS

Infinity Modular/Infinity Modular RE Carpet Tile Installation Guidelines

Product Size Thickness Installation direction Seams treatment

End of Addendum No. 3

Moisture barrier for protection of flooring assemblies up to 99.5% relative humidity

BENTLEY ELEMENTS COLLECTION LVT

Text applicable to Parterre luxury vinyl tile, plank and resilient sheet flooring unless otherwise evident.

IVC US. Commercial Installation Guide - Sheet Vinyl. Leading the Way

Technical Specifications

SECTION BROADLOOM CARPET

Rubber Flooring Installation Guidelines

SECTION RESILIENT TILE FLOORING. A. Section includes vinyl composition floor tile and accessories indicated and as specified.

Moisture barrier for protection of flooring assemblies up to 99.5% relative humidity

Installation Instructions for Broadloom Carpet

MARATHON & MARATHON PLUS RUBBER TILE

Commercial Resilient Sheet Flooring

CONTRACT PAGE 1 OF 5

Section STATIC DISSIPATIVE RESILIENT FLOORING

INSTALLATION PROCEDURES FOR RUBBER FLOORING

Technical Service. INSTALLATION INSTRUCTIONS FOR TARAFLEX SPORT PRODUCTS over Gypsum base Products. This document refers to the following products:

Features. Specifications. VersaShield MBX slashes up to half the total cost with a quick and effective concrete moisture mitigation up to 99.5% RH.

Wood Floor Bonding Systems

Signature Sports Flooring Installation Instructions. For SignaDeck Premium Rubber Tiles

IVC US Residential Installation Guide - LVT. Leading the Way

VINYL COMPOSITION TILE

Section RESILIENT TILE FLOORING INCLUDING VINYL COMPOSITION TILE

MONDO MP 1000 ACRYLIC ADHESIVE DISCLAIMER: Refer to page 5 of this document.

Infinity RE / Infinity Cushion / Infinity Modular Carpet Tile Installation Guidelines

Product Width Thickness Installation direction Seam treatment. Taraflex Sport M Comfort Approximately mm + 5mm Same Heat Welded

Installation Instructions for Vinyl Back Ipocork Glued Down HPS Finish Cork Tiles

Machine Tufted Broadloom Carpet Installation Procedures

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

INSTALLATION INSTRUCTIONS FOR TARAFLEX SPORT PRODUCTS. Product Width Thickness Installation direction Seam treatment

A. Drawings and general provisions of the Contract apply to this Section including all documentation provided in RFP#

Installation Instructions for CushionBac Renew Tiles

RESILIENT FLOORING: Hot and Heavy - Secoya

SPECIFICATIONS - CARPET TILE 09681

Union County Vocational - Technical Schools Scotch Plains, New Jersey

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOCKING FLOORING

Technical Services. Product MM INCH Installation direction Seam treatment GTI CONTROL (welded) 625 X 625 mm 24.5 x 24.

Infinity Modular, Infinity 2 & Infinity Cushion Carpet Tile Installation Guidelines

VESDURA ENGINEERED VINYL PLANK INSTALLATION GUIDE

SECTION SUBSURFACE PREPARATION FOR FLOOR FINISHES

INSTALLATION Instructions EcoFitness Interlocking Tile

Wood Floor Bonding Systems

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR DRYBACK FLOORING

Tarkett Carpet Tile Installation Guide

INSTALLATION INSTRUCTIONS

SECTION WOOD STRIP FLOORING

RESILIENT FLOORING: Select Step Wood

MANAAKI GUIDELINES. Creating amazing spaces

INSTALLATION BASICS FOR AFFIXX Tile TModula

B. Samples: For each exposed product and for each color and pattern specified.

ComforTech Cushioned Rubber Sheet Flooring

Suggested Specification for Tri-Patch Versatile Concrete Patching Compound

PARKAY LAMINATE FLOORING (UNILIN DROP) Installation Instructions

CONTRACT PAGE 1 OF 6

SECTION RESINOUS FLOORING

CONTRACT PAGE 1 OF 6

Replay Rubber Multi-functional and Sports Flooring

LVT over EcoSilence Installation and Warranty

UNDERLAYMENT INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR GERFLOR MIPOLAM BIOCONTROL. These instructions are specifically written for the installation of the following product:

B. Store products in dry spaces protected from the weather, with ambient temperatures maintained between 50 and 90 deg F (10 and 32 deg C).

Installation Instructions for GlasBac /GlasBacRE Tiles

CONDUCTIVE RESILIENT FLOORING

MILLIKEN SHALL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF THE USE OF ANY OF ITS GUIDE SPECIFICATIONS.

Transcription:

TECHNICAL SERVICES DEPARTMENT Installation of EcoWorx Broadloom and EcoWorx Performance Broadloom NOTICE: Failure to follow these guidelines can result in voiding the carpet warranty. LOOK BEFORE YOU CUT.. Contact your Sales Representative or the Financial Services Department if a visible manufacturing defect exists. If such a defect is installed, Shaw is not liable for the installation. INSTALLATION GUIDELINES The following instructions shall be reviewed prior to installation. Shaw will not be responsible for improper installation. SITE TESTING AND CONDITIONING Maintain the temperature of the installation site, carpet, adhesive and seam sealer between 65 F and 95 F for 24 hours before installation. Do not begin the installation if the room or subfloor temperature is below 65 F. The adhesive and seam sealer will not function properly when applied over an extremely cold surface. The ambient Relative Humidity should not exceed 65%. These conditions must be maintained for 24 hours prior to, during and permanently afterwards. Test the concrete slab for alkalinity prior to beginning the installation. Check the concrete for surface ph at several locations. A reading below 5.0 or above 9.0 requires corrective measures. Specific information on the correct method of neutralizing extremely low or high ph is available from the Shaw Field Technical Services Department. Test the concrete slab for moisture prior to beginning the installation using the anhydrous calcium chloride or (ASTM 1869) test method. The moisture transmission rate of the concrete slab must not exceed 5.0 lbs. per 1000 sq. ft. per 24 hours. When testing the concrete slab for Relative Humidity (RH) prior to beginning the installation using the Relative Humidity or (ASTM F-2170) test method. The Relative Humidity of the concrete slab should be less than 85%. NOTE: When performing both tests, the Relative Humidity RH test results will be the qualifying standard. Other moisture testing methods are not as reliable. If the moisture in the concrete slab exceeds these requirements, contact the general contractor or building owner for a decision on whether to begin. Shaw is not responsible for any moisture related installation failures if these guidelines are not strictly followed. The subfloor must be structurally sound, clean, level and dry. Remove all foreign substances such as wax, grease, dirt and any substance or chemical that would interfere with a good bond. Do not use sweeping compounds as they may leave an oily residue that can prevent adhesive from bonding to the sub floor. Depressions and cracks must be filled with a liquid latex additive patching compound and all protrusions leveled. NOTE: Do not sand or scrape Vinyl-asbestos tile (VAT) without proper attention to asbestos abatement procedures and precautions in accordance with all state and local codes. FLOOR POROSITY Determine subfloor porosity by applying a droplet of water the size of a dime to the subfloor. The water should dissipate within 30 seconds. Please be aware that due to the high solids content of Shaw s recommended adhesives, porous floors will have a reduced adhesive set up time while non-porous floors will experience an increased adhesive set up time. SHAW ACCEPTS NO RESPONSIBILITY IF LOOSE ASBESTOS CONTAINING FLOORINGS ARE AFFECTED UPON REMOVAL OF CARPETING.

Concrete floors must be sealed if dusting or powdering exists. The following floor sealers are suggested for concrete: Shaw Contract 9050 Floor Sealer and Shaw 8550 Level Primer. ADHESIVES Shaw recommends the use of Shaw 3500. Shaw 3600 is recommended when a specification requires Antimicrobial coverage meeting AATCC 174 requirements. Contact Shaw for approved equivalent adhesives, which have been formulated with higher solids content, that will perform adequately with Ecoworx Broadloom Backings. Use of other adhesive could result in an installation failure. Any claims resulting from installation failures due to non approved adhesives should be directed to the applicable adhesive manufacturer. For information regarding equivalent adhesives, please see Shaw s contact numbers listed below. Recommended Application for Pattern Products - 1/8 x 1/8 x 1/8 U notch trowel providing a coverage rate of 5-7 yds. /gal with a container size 4 gallons, depending on the porosity of the substrate. Recommended Application for Non Pattern Products 3/32 x 3/32 x 3/32 U notch trowel or equivalent that will provide a coverage rate of 8 9 yds./gal. with a container size 4 gallons, depending on the porosity of the substrate. On extremely porous or floors with residual multi-purpose adhesive, more glue will be needed. Coverage rates should be closely monitored. Excessive rates may indicate a worn or improperly notched trowel. Adhesive open time will vary depending on the temperature and humidity at the job site. The adhesive is ready for carpet installation when the entire ridge of glue becomes tacky. This can be checked by firmly placing a finger into the ridge of adhesive and pressing to the floor. Lift slowly and the adhesive should stick to the floor and your finger and have leg or strings for one to two inches. Fans or air movers blowing across not on the adhesive will greatly reduce required open time. Inadequate adhesive application or set up time may result in bubbles and/or peaked seams and repair will require more time and effort than proper initial installation. JOB LAYOUT Dry lay the entire area to be carpeted. Implement roll sequencing prior to cutting any textured, graphic product. Dry laying will minimize the normal variations encountered when pattern matching and reveal any bow or skew within the roll. Follow the roll numbers sequentially. If the roll information has been removed prior to the carpet arriving on the job site, the date and time is backstamped (in military time) on the carpet to assist in sequencing. ROLLING This backing should be rolled both width-wise, and length-wise with a 75 100 lb. roller to assure transfer of the adhesive between floor and carpet backing and to eliminate any trapped air. Failure to perform this could result in bubbling or unwanted air pockets. CUTTING AND SEAMING Seam edges shall be trimmed using tools and techniques best suited for the carpet. Trim edges far enough into the material, normally about 8-10 rows, to maintain the structural integrity of the carpet. The cutting technique for this backing system is row cut both edges. Correct pattern matching, gaps and overlaid areas with use of a knee kicker, power stretcher, mini stretcher or deadman. Patterned carpets must be cut by the row cut/row cut method and dry laid to ensure pattern match, also check for sidematch and any visual defects. Use a screwdriver to separate rows of yarn and cut with a cushion back or loop pile cutter. After the adhesive has become tacky, place the first drop into the adhesive and apply seam sealer, following with the second breadth pattern matching if necessary. Use of a power stretcher, mini

stretcher or deadman to obtain proper match. Cross seams can be made the same as side seams if the rows can be run across the width. If not, cut both sides of the carpeting on pattern and continue to pattern match the seam. SEAM SEALING All commercial broadloom products require the use of a latex seam sealer such as Shaw 4000 or a polymer sealer such as Shaw 8300 (providing a moisture impervious seam). Seam sealer must be applied to the edges trimmed for seaming, and cover the thickness of both the primary and secondary backing without contaminating the face yarn. CAUTION: Seam edges must be sealed to prevent edge ravel, tuft loss, and delamination of the secondary backing in the seamed area. STEAMING In order to alleviate bubbles, creases, pile distortion and crushing, it is advised to steam the carpet. Shaw recommends the use of a wallpaper steamer that has a 12 plastic head. Wallpaper steamers can be obtained through any local hardware store and can also be rented for a minimal charge. A white cotton cloth should be placed under the head of the steamer to protect the carpet fiber. Placing the steamer on the affected area for approximately 45 sec. 1 min. will allow the carpet backing to become pliable and reactivate the adhesive in order to assist in removal of the bubbles, creases or pile distortion. When the carpet is properly steamed, the affected area should be rolled with a carpet tractor to create a bond between the carpet backing and adhesive. It may be necessary to repeat this process in order to alleviate an area displaying bubbles. Note If the steamer is left for a prolonged period of time on the carpeting, it could potentially cause the carpet fiber to appear darker. As the carpeting dries and the moisture dissipates, the carpet will regain its original color. TRANSITIONS Where carpet meets other floor coverings, the edges must be adequately protected with an appropriate transition molding or strip that covers the carpet edge at least ½. POST INSTALLATION CARE AND PROTECTION 1. Use plywood over the carpet when heavy objects are moved within 24 hours after installation. 2. Protective chair mats under chairs with casters are recommended. This will prevent excessive wear to the face of the carpeting. 3. A non-staining building material paper must be placed over the carpet to protect it when additional construction activity is to take place that could soil or stain it. Do not use plastic sheeting as it could trap moisture. The self sticking type can transfer adhesive residue to the carpet that will attract t soil. These installation procedures are intended to assist in the installation and care of Shaw carpet under most job conditions. Specific questions regarding installation and maintenance not covered must be referred to the Shaw Technical Services Department at 1-800-471-7429. Any variance from these procedures will become the responsibility of the installer and not Shaw Inc Shaw Technical Bulletins are updated as new information becomes available. To determine if this represents the most current information, call 1-800-471-7429 and ask for the current bulletin number and date. SPD02-01/26/10. If steaming does not correct the bubbled areas, then an application of adhesive to the affected area may be necessary. Allowing adequate adhesive tack time will insure proper adhesion.

TECHNICAL SERVICES PHONE NUMBER - 1 800 471-7429 WEB SITES Shaw Contract 1.877.502.7429 www.shawcontractgroup.com Patcraft Designweave 1.800241.4101 www.patcraftdesignweave.com Philadelphia Queen Commercial 1.800.441.7429 www.shawfloors.com

BOW, SKEW, and PATTERN ELONGATION Q: How do you install a patterned carpet if it has bow, skew, or pattern elongation that is within the set tolerances of 1½ for bow in 12, 1½ for skew in 12, and 1½ for pattern elongation in 12? A: First, dry lay all the carpet according to roll or pattern sequence. The sequence number on the roll tag determines installation sequence if a pattern sequence is not provided. Dry stretch the carpet to minimize alignment difficulties. For bow or skew, select the most prominent width wall, cut the carpet exactly on pattern across the width, then position the carpet along the wall. If cut and positioned correctly, either the bowed or skewed edge(s) will be running up the wall. Fold the carpet back and spread the recommended adhesive using the proper trowel size. Allow the adhesive to properly tack to develop good adhesive legs. Using the mini stretcher, pull the skewed or bowed edge down off the wall. Align the pattern along the wall. This will form a bubble that will need to be moved to the opposite end of the seam. A bowed carpet will form a bubble on both edges, a skew will bubble only on one side. Align the pattern as the bubble is moved down the seam. It may be necessary to over stretch the carpet pattern with the mini stretcher and allow it to slide back to achieve proper alignment. Use a power stretcher and deadman to properly align the pattern along the opposite wall. A deadman is constructed by nailing tack strip completely on one side of a 2 x12 x 4 long piece of lumber. If necessary, stay nails can be used to hold the pattern in place. Remove the nails after adhesive has set. For pattern elongation, start at the center of the drop and match the pattern at the seam. Then, working both ways from the center out toward the opposite walls, use the mini stretcher or power stretcher to stretch and align pattern working towards each wall.