SYSCOM-SPECIFIC Award Structures and Requirements

Similar documents
SYSCOM-SPECIFIC Award Structures and Requirements

Delivering Innovation Dept. of the Navy (DON) Small Business Innovation Research & Small Business Technology Transfer Program

Navy CPP the Details. Miss Lee Ann Boyer DoN CPP Manager August 23, 2007

SBIR Commercialization Pilot Program (CPP)

PEO Land Systems Small Business Strategy Addendum

SeaPort-e to SeaPort-NxG Susan W. Tomaiko SeaPort Program Manager Naval Sea Systems Command

Department of the Navy. Office of Small Business Programs. Speaker: Ms. Emily Harman Director, Department of the Navy

Department of Navy (DON)

John Williams and Bob Smith. Fall National SBIR/STTR Conference November 13, 2014

Addressing the Barriers to Agile Development in DoD

DoD SBIR/STTR Training

SBIR/STTR PHASE III CONTRACTING - WHAT YOU NEED TO KNOW

Department of the Navy Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) Phase III Guidebook

Management Consulting and Auditing Services Pre-Response Conference. ITN No A August 23, :00 AM

Best Technology Transition Practices: The Navy Small Business Innovation Research Program

TARDEC Small Business Innovation Research (SBIR) Overview George Pappageorge TARDEC External Business office

Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Acquisition Strategy

NAVAIR SOURCE SELECTION PROCESS OVERVIEW

DoD Mid-Atlantic Regional Council

a message from... AIR-6.0

Department of the Navy. Department of the Navy

National Defense Industrial Association (NDIA) Small Business Conference

GSA Update for HAMA. Eddie Mills 12 May 2017

"The Price is Right!" Commercial Item/GSA Schedule Contracting Jack G. Horan Phillip R. Seckman

Document Synopses by Series

Obtaining Greater Efficiency and Productivity in Defense Spending

Office Of Small Business Programs

Section 26.45: Overall DBE Three-Year Project Goal Methodology. Name of Recipient: The City of Driggs, ID owner of the Driggs-Reed Memorial Airport

MAFBE Participation in Professional and Artistic Services at the University of Illinois. Presented to the Board of Trustees November 18, 2010

SPAWAR Industry Roundtable June 9, 2016

NUWC Industry Day Corporate Operations

Natural Rubber Production

For. Planning and Research Related to Procurement of a Systems Integration, Enhancements to a MMIS, New Fiscal Agent, and a Replacement DSS

PUBLIC NOTICE REQUEST FOR QUALIFICATIONS SUBMISSION

SAM Supplement Representations, Certifications and Other Statements of Offerors for Government Related Orders

AFCEA. San Diego Chapter SPAWAR CONTRACTS DIRECTORATE. 16 October Presented by: Nancy Gunderson, Director of Contracts

Statement of Work For PMA-205 TRAINING SYSTEMS Training Ranges Integrated Product Team. 9 July 2009

2016 NAVSUP STRATEGY (in process of update)

Contracting and Acquisition Department, (Code 02)

TxDOT Internal Audit Travel Division Operations Audit (1405-1) Department-wide Report

08/09 RIGHT OF WAY AND UTILITIES DIVISION PROCEDURES FOR THE PROCUREMENT OF RIGHT OF WAY ACQUISITION CONSULTANTS

Principles of Contract Pricing

METHODS OF CONTRACTING

Code 40 Tomahawk Information System (TOMIS) Software Engineering Support Services Pre-Solicitation Conference

REQUEST FOR QUOTATION ACQ RFQ. For. IBM Mainframe Storage Equipment Maintenance and Support. Response Due Date: January 6, :00 PM

Maintenance, Repair, and Operations JOC Program

Aeronautical Systems Center

Contractor Purchasing Systems Reviews (CPSR) The Current CPSR Environment. Bryan Felber, Director of Purchasing & Compliance

Direct Reporting Program Manager Positioning, Navigation, and Timing

L.20; L.25; L.9; L.12;M.1; K; A]...

APPLYING FOR ARCHITECT-ENGINEERING (A-E) CONTRACTS AT NAVFAC PACIFIC. Department of the Navy NAVFAC Pacific A-E Contracts II Branch

PURCHASE ORDER ATTACHMENT Q-201 SOFTWARE QUALITY SUBCONTRACTOR REQUIREMENTS TASK DESCRIPTIONS - PURCHASE CATEGORY "A"

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 4, Lesson 1 Differences between Cost & Price Analysis

STUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 4, Lesson 1 Differences between Cost & Price Analysis

How to Prepare a DCAA Compliant Cost or Price Proposal. Bag Lunch Webinar November 17, 2016

Small Business Successes & Opportunities

NUWC Industry Day Corporate Operations

HEAD OF CONTRACTING ACTIVITY (HCA) & PROGRAM EXECUTIVE OFFICE (PEO) SMALL BUSINESS STRATEGY FY19 & FY20

Performance Assessments and Root Cause Analyses

USAF CAD/PAD Program Overview CAD/PAD Industrial Summit

Section M: Evaluation Factors for Award HQ R LRDR Section M: Evaluation Factors for Award For HQ R-0002

DEPARTMENT OF THE NAVY OFFICE OF THE SECRETARY 1000 NAVY PENTAGON WASHINGTON DC

Department of the Navy Mentor Protégé Program

REQUEST FOR PROPOSALS. (Safety Management Database) BID NO: Addendum 1

Department of the Navy Earned Value Management Quarterly Newsletter. Deputy Assistant Secretary of the Navy (Management and Budget) (DASN (M&B))

Call for Proposals 007 Proposal Submission Form Standard Component

DEPARTMENT OF THE NAVY OFFICE OF THE ASSISTANT SECRETARY RESEARCH, DEVELOPMENT AND ACQUISITION 1000 NAVY PENTAGON WASHINGTON DC

DATE: 02/05/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/002 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

Request for Proposals for Enterprise Resource Planning System Replacement Consultants Mariposa County, CA

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Naval Postgraduate School

NATIONAL ECONOMIC IMPACT of the DEPT. of the NAVY SBIR/STTR PROGRAM. Fiscal Years

Warner Robins Air Logistics Complex

TM ACQUISITION AND POLICY

SPAWAR Paperless Initiatives Partnering for Success

Systems Engineering and the Navy s Next Generation Integrated Power System IEEE Region 1 Northeast Industry Day September 24, 2010 Portsmouth, NH

SUBPART ACQUISITION PLANS (Revised January 10, 2008)

Naval Surface Warfare Center Industry Day Contracts

A Primer on. Software Licensing. Charlene Gross Software Engineering Institute. Do You Own It or Not? Charlene Gross, April 19-23, 2010

SBIR/STTR Workshop Provided by: Ripple Technology (previously Ripple Management)

DoD DMSMS Conference: Lifecycle Management Panel

Kirk W Buffington, CPFIM, CPPO, C.P.M.,

DATE: 05/03/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

Acquisition of ERP. December 4, 2007

Earned Value Management on Firm Fixed Price Contracts: The DoD Perspective

Vincent M. LeMond Project Management & Construction Services University of TexasatAustin

Sensor Package Integration for the X-65B Experimental Unmanned Combat Air Vehicle -- Navy (UCAV-N) Statement of Work.

Procurement Requirements under the Uniform Administrative Guidance

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Selection of Contractor Step 5. June 2013

Preparing for a CPSR Audit

Coaching, Conflict Resolution, Consulting and/or Training Services RFP Questions & Responses to RFP: P.M.

Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Small Business Set-Aside RFP. Pre-Proposal Conference

Agenda. Current Acquisition Environment-Strategic Sourcing. Types of Contract Vehicles. Specific Contract Vehicles for Navy-wide Use DOD EMALL

Atmospheric Plasma Depainting. Peter Yancey Atmospheric Plasma Solutions, Inc.

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

SC111 Umoja Procurement Overview. Umoja Procurement Overview Version 11 Last Modified : 14-Aug-13 Copyright United Nations

SUBRECIPIENT MONITORING GUIDE

Breakout Session #: A14 Presented by: Bridget Gauer. Date: July 24, 2017 Time: 11:15AM-12:30PM

Strategic Plan Accomplishments

Transcription:

SYSCOM-SPECIFIC Award Structures and Requirements

NAVSEA Predecisional Working Papers 2

NAVSEA SBIR/STTR Phases & CRP Req ts Topic Generation & Approval Concept Development & Feasibility Technology Development Technology Demonstration, Validation, Test, Evaluation & Systems Integration Navy Use Topic Generated by PEO/DIRs Base Opt Base Opt 1 $125K 6 mos Phase I $100K 6 mos Successful Ph I Proposal Selected for Ph II award to exercise Ph I Option NAVSEA SBIR/STTR Technology Managers, Program Offices, and TPOCs nominate projects for the Commercialization Readiness Program $500K 12 mos $1.0M 24 mos $500K 12 mos Successful Ph II Initial Proposal Opt 2 Base Opt 1 Phase II $500K 12 mos $500K 12 mos Sufficient Ph II Full Proposal meeting target Program Office requirements CRP $1.5M SBIR Funds 24 mos Non-SBIR/STTR Matching Funds Signed and Approved TTA 1 for 1 Non-SBIR/STTR Program Office Matching funds 24 Month Execution Second Ph II Contracts are CRP Projects Ph III Non-SBIR Funds Direct Contract Subcontract to Prime License to third party producer Procurement via QPL Etc TRL Contract 1-3 3-6 CRP 5-6 Ph III 6-9 FFP Contract CPFF Contract CPFF Contract Any Rev 1 Aug 2016 1

NAVSEA Funding & Documentation Requirements Strategy Duration SBIR Max DoD Non-SBIR Funding Reqmnts Documentation Reqmnts Exit TRL Approval By Option 6 mos $250K None Unsigned TTA for CD, Ph III Initial Contracting Docs (e.g. RFP, TI) for AT or Ph III, or Enhancement application All SBIR funds go on original Phase II or on a 2 nd Phase II contract Any NAVSEA SBIR CPM Enhancement 12 mos $625K 1:1 Concurrent SBIR & Navy program funds to SBC (matching funds available at contract modification) Enhancement application Any NAVSEA SBIR CPM Continuing Development (CD) 24 mos $750K None TTA signed by TPOC, target Navy transition program, Navy program providing transition funds, PEO Sponsor, & NAVSEA SBIR CPM before end of option. TTA must show planned transition funds. TTA updated with change in cost, schedule, participants, transition, or insufficient risk retirement. ~5-6 NAVSEA SBIR CPM Accelerated Transition (AT) 24 mos $1.5M Concurrent 1:1 SBIR to Navy program match at time of Ph II contract modification Initial Ph III contracting documents (e.g.; RFP, TI) at time of Ph II contract modification > 6 NAVSEA SBIR CPM For SBIR Investment >$2.5M (Phase II + II.5) Navy Director approval and 1:1concurrent funds to SBC required NAVSEA s Ph II awards in excess of $2.5M shall be 10% of NAVSEA Phase II projects Non-SBIR funds should be applied to a Ph III TTA Updated & re-signed annually per signature requirements above FOUO 4

ONR

ONR SBIR/STTR Program Award Structure Feasibility Study Technology Development and Prototype Demonstration Prototype Testing & Evaluation Technology Demo & Validation Commercialization Transition Phase I Phase II Subsequent Phase II Phase III Phase I Base 6 Months (SBIR) 7 Months (STTR) $80K FFP Contract NTE $150K Phase I Option 6 Months $70K Phase II Base 18 Months Phase II Option 1 9 Months TTP required SBIR PM/PO review for Option 2 at exit CPFF Contract NTE $1.125M SBIR/STTR Funding Phase II Option 2 ~12-18 Months total 1:1 cost match Signed TTA required TRL 4 at exit Contingent upon having a successful project with a committed Transition Sponsor/Path Up to 24 months 1:1 cost match Signed TTA required Minimum TRL 4 at entry CPFF Contract NTE $1.5M SBIR/STTR Funding NOTE: A Subsequent Phase II is a Requirements Driven process; i.e., based upon Acquisition program needs. Transition to Acquisition Program Non-SBIR/STTR $ (Private sector or Non-SBIR Gov. $) Unlimited POP SBC Extension of Data Rights and Sole Source Designation Contract Type Varies Phase III contracts may be awarded without competition after Phase I/II No limit on funding (Just Non-SBIR/STTR) NTE $2.775M Total SBIR /STTR Funding Phase III can occur anytime after Phase I and is funded with non-sbir/sttr$ TRL: 0-2 - 5 4-7 6-9 TTP: Technology Transition Plan TTA: Technology Transition Agreement Updated June 6, 2013

NAVAIR

NAVAIR SBIR Award Structure ACTIVITY - Feasibility NAVAIR SBIR Phasing Strategy Technology Development and Prototype Demo. Prototype Testing & Evaluation Technology Demonstration & Validation Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Strategies Enhancement* 12 18 mo. $ 750k SBIR *Requires 1:1 PMA Funding Commitment Phase I 6 mo. Option 6 mo. Phase II variable $80k $70k Base $750K Total with option $1M Phase I Option is invoked when draft Total POP ~24 mo. Phase II proposal is received Option variable Cont. Dev. 12 18 mo. $ 750k SBIR TTP Required AT 12 24 mo. Total CD+AT $1.5M SBIR TTA Required Accelerated Transition (AT) 24 mo. $1.5M SBIR TTA Required Phase III Non-SBIR $ Variable SBIR FUNDS - NTE $150K NTE $1M NTE $1.5M NTE $2.65M CONTRACT FFP Typically CPFF Typically CPFF Any TYPE - Typical TRL Level ~0-3 ~2-5 ~4-7 ~6-9 NAVAIR Public Release 10-1441 Distribution Statement A Approved for public release; distribution unlimited.

Strategy Duration SBIR Funding Maximum NAVAIR Non-SBIR Funding Requirements TTA Requirements Exit TRL Approval By All SBIR funds go on original Phase II or on a 2 nd Phase II contract Enhancement Typically 12 to 18 mo. $750K 1:1 Concurrent SBIR & NAVAIR program funds to SBC (matching funds available at contract modification) None Any NAVAIR SBIR PM must verify & approve non- SBIR DOD match ratio and funding source Continued Development (CD) Typically 12 to 18 mo. $750K NAVAIR Acquisition Program funds or prime investment desired but not required Technology Transition Plan (TTP) developed by TPOC and PMA TTP endorsed by PMA, PEO SBIR Technology Manager, and CTO Typically ~5-6 SYSCOM SBIR PM or DPM Accelerated Transition (AT) 24 mo. $1.5M Transition funding must be detailed in TTA Technology Transition Agreement (TTA) developed by TPOC and PMA TTA approved by PMA and PEO SBIR Technology Manager Phase III out year funds identified in TTA > 6 SYSCOM SBIR PM or DPM For SBIR Investment >$2.5M (Phase II + II.5): Navy Director approval and 1:1 concurrent funds to SBC required # NAVAIR SBIR Phase II awards in excess of $2.5M will be 10% of NAVAIR SBIR Phase II projects Non-SBIR funds should be applied to a Ph III TTA reviewed annually

SPAWAR

SPAWAR SBIR/STTR Award Structure Feasibility Study Technology Development and Prototype Demonstration Prototype Testing & Evaluation Technology Demo & Validation Commercialization Transition Phase I Phase II Phase III Phase I Base Phase I Option 6 Months $80K (SBIR) 7 Months $80K (STTR) 6 Months $70K FFP Contract NTE $150K Phase II Base 12 Months $500K (SBIR) 18 Months $500K (STTR) Phase II Option I 12 Months $500K (SBIR) 9 Months $250K TTP required (STTR) Phase II Option 2 ~12 18 Months 750K total 1:1 cost match $375K $375K Signed TTP required TRL 4 at exit (STTR only) CPFF Contract NTE $1M SBIR Funding NTE $1.125M STTR Funding Contingent upon having a successful project with a committed Transition Sponsor/Path Continued Development (CD) Signed TTP required 18 months $750K Accelerated Transition (AT) 24 months NOTE: $1.5M A '' is a Requirements 1:1 cost match Driven (SBIR process; to non SBIR); i.e., based upon 2:1 cost Acq. Program match if needs transitioning from CD CPFF Contract NTE $1.5M SBIR/STTR Funding Phase III can occur anytime after Phase I and is funded with non-sbir/sttr $ TRL: 0-3 2-5 4-7 6-9 Distribution Statement A Transition to Acquisition Program Non SBIR/STTR $ (Private sector or Non SBIR Gov.$) Unlimited POP SBC Extension of Data Rights and Sole Source Designation Contract Type Varies Phase III contracts may be awarded without competition after Phase I/II No limit on funding (Just Non SBIR/STTR) 1

SPAWAR Ph II.5 Funding & Documentation Requirements Strategy Duration Ph II.5 SBIR Funding Maximum Total Phase II + II.5 SBIR Funding Maximum DoD Non-SBIR Funding Requirements Documentation Required (in Addition to PR Package Requirements) Approval By All SBIR funds go on original Phase II or on a 2nd Phase II contract Continued Development (CD) 18 mo. $750k $1.75M None TTP signed by: TPOC, PEO SBIR TD, Navy Program that will be providing transition funds, SPAWAR SBIR PM PEO SBIR TM/TD, SPAWAR SBIR PM Accelerated Transition (AT) 24 mo. $1.5M $2.5M 1:1 Match of SBIR to Non-SBIR Funds; 1:2 Match if CD Transitioning to AT None TPOC, PEO TM/TD, SPAWAR SBIR PM New Definitions: : Any phase II in which the total phase II investment, for a specific topic to an SBC, exceeds $1M Matching funds: Any concurrent non-sbir funds from the government put on the phase II contract or funding from a prime contractor, to an SBC, that logically extends the effort from the SBIR contract Notes: Per solicitation guidelines: phase II base cannot exceed $750k and option cannot exceed $250k Phase II Option requires PEO TM approval and Phase II Option Request Form Any contracting action request sent to SBIR PO prior to 19 JAN 11 is exempt from new documentation requirements and limits Topics designated as Naval Provider Enterprise (NPE) are exempt from TTP requirement Maximum non-sbir funds on phase II.5 is $1.5M Documentation required for matching funds from a prime contractor includes: copy of contract between prime contractor and SBIR SBC; TPOC review and certification that prime/sbc contract logically extends from R&D in phase II SBIR

MARCOR

Topic Generation & Approval Concept Development & Feasibility MARCOR SBIR Phasing Strategy Technology Development Technology Demonstration, Validation, Test, Evaluation & Systems Integration MARCOR Use PH PH I OPTION PH II OPTION PH III - Transition Funding & Duration $80K $70K $750K $250K 6 mo. 6 mo. 18-24 mo. 6 mo. Direct Contract Subcontract to Prime Requirement Ph I proposal nominated for award. Successful Ph I Invited to submit a Phase II proposal Exercise Ph II Option Phase II Enhancement Up to $500K available with negotiated matching funding < 18 mo. Continued Development (CD) < 2 years Maximum of $1.5M of SBIR funds with negotiated matching funds Non-SBIR Funds TRL Contract 1-3 2-6 Ph II.5 4-7 Ph III 4-8 8-9 FFP Contract CPFF Contract Modification to existing Ph II Any

MARCOR SBIR Post Phase II Funding & Documentation Requirements Program Option Duration SBIR Max DoD Non-SBIR Funding Requirements Documentation Requirement Exit TRL Approval By All SBIR funds go on original Phase II or on a 2 nd Phase II contract Option 6 mo. $250K None TTA Any PEO-LS or PGD, IPM, SBIR PM Enhancement 18 mo. $500K Up to $500K SBIR funding with negotiated matching funds TTA Any PEO-LS or PGD, IPM, SBIR PM Continued Development (CD) 24 mo. $1.5M Up to $1.5M SBIR funding with negotiated matching funds TTA ~5-6 PEO-LS or PGD, IPM, SBIR PM

STTR

ACTIVITY - NAVY (non NAVAIR) STTR Award Structure and Transition Strategies Technology Prototype Testing & Evaluation Feasibility Development and Prototype Demo. Technology Demonstration & Validation Year 1 Year 2 Year 3 Year 4 Year 5 TTA Required (All) Year 6 Phase 1 7 mo. Option 5 mo. Phase 2 18 mo. $80k $70k Base $500K TTP Required Opt. ~ 9 mo. Option 1 $250K CD (Continued Development 18 mo. Built into Phase II Contract $ 750K (50% STTR) AT (Accelerated Transition)* 2 yr. Phase III Non-STTR $ variable New Contract $ 1.50M (50% STTR) STTR FUNDS - CONTRACT TYPE - NTE $150K NTE $1M NTE $1.125M NTE $2.275M FFP Contract CPFF or FFP Contract CPFF or FFP Contract TRL - 0-3 2-5 4 7 6-9 * Requires Non-STTR Funding Commitment Any

NAVY (non-navair) STTR Award Structure and Transition Strategies Strategy Duration STTR Funding Maximum DoD Non-STTR Funding Requirements All SBIR funds go on original Phase II or on a 2 nd Phase II contract TTA Requirements Exit TRL Approval By Option ~9 mo. $250K None TTP Required Any Commitment from PEO, Transition Target, or SYSCOM PM Continuing Development (CD) ~18 mo. $750K (50% STTR) Built into contract. 50% Non-STTR funding share required. TTA signed by PM or R&D lead and matching funds source. Approved by STTR PM. ~4-6 SYSCOM STTR PM Accelerated Transition (AT) 24 mo. $1.5M (50% STTR) New contract. 50% Non-STTR funding share required. TTA signed by PM or R&D lead and Matching Funds Source. Approved by CTO or PEO and SYSCOM SBIR PM & STTR PM. Phase III out year funds identified in TTA. TTA in PM Database 6 SYSCOM STTR PM Cases where >$2.5M SBIR Investment (Phase II + II.5) require Navy Director approval, and 1:1concurrent funds to SBC. No more than 10% of SYSCOMs Phase II funding can b e used on $2.5M plus awards. Non-SBIR funds should be applied to a phase III. TTA Updated & re-signed annually by non-sbir funding source and SYSCOM SBIR Office.

ACTIVITY - NAVAIR STTR Award Structure effective FY11 Technology Prototype Testing & Evaluation Feasibility Development and Prototype Demo. Technology Demonstration & Validation Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Phase I 7 mo. Option 6 mo. Phase II variable Option variable Enhancement* 12 18 mo. $ 500k STTR *Requires 1:1 PMA Funding Commitment STTR FUNDS - CONTRACT TYPE - $80k $70k Base $500K Total with option $1M Phase I Option is invoked when draft Phase II proposal is received Total POP ~24 mo. Phase II Option requires PMA endorsement NTE $150K NTE $1M NTE $1M NTE $2.15M Cont. Dev. 12 18 mo. $ 500k STTR TTP Required AT 12 24 mo. Total CD+AT $1M STTR TTA Required Accelerated Transition (AT) 24 mo. $1M STTR TTA Required Phase III Non STTR $ FFP Typically CPFF CPFF or FFP Contract Any variable TRL - ~0-3 ~2-5 ~4-7 ~6-9