Expert Reference Series of White Papers. The Triple Constraint Model Is It Time To Upgrade?

Similar documents
Expert Reference Series of White Papers. Managing Risk An Integrated Approach

PROJECT MANAGEMENT OVERVIEW

Expert Reference Series of White Papers. Changes to the. PMBOK Guide, 4th Edition, and What You Should Know

RGF Webinars Series WEB01-WEB

Chapter One PROJECT MANAGEMENT OVERVIEW

For the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.

Defining Project Scope

Legal Project Management 101 November 1st, 2010

Project Management Professional Training

Guten Tag. (good day)

Project Time Management

Expert Reference Series of White Papers. ITIL Implementation: Where to Begin

Is this a project? Do I really have to plan?

Kathy Schwalbe, Ph.D., PMP

Project Management CTC-ITC 310 Fall 2018 Howard Rosenthal

The Agile PMP Teaching an Old Dog New Tricks

Using PRINCE2 To Enhance Your PMBOK Guide Experience and Knowledge Base

PROJECT SCOPE MANAGEMENT

Applied Project Management

Project Management Process Groups. PMP Study Group Based on the PMBOK Guide 4 th Edition

Agile Project Management. Finding the Optimal Approach

Creating opportunities. Changing lives.

Managing Multiple Projects

MGT/437. Project Management. Session #2 University of Phoenix 02/12/2004 Brian Smithson. 02/12/2004 MGT/437 #2 -- Brian Smithson 1

CSU Project Management Certificate Program. Project Scope Management

Project Management For The Client. Dick Talley, PE, PMP Oregon Area Manager

Information Technology. Project Management, Seventh Edition

CRASH COURSE IN PROJECT MANAGEMENT. Jon Hicks, MBA, PMP Scaling Value

Project Management Professional (PMP) Boot Camp

PMBOK Guide Fifth Edition Pre Release Version October 10, 2012

Embracing Change Through Simple Change Control

Successful Project Management. Overview Houston Community College Fall, 2017

The Project Management Discipline: An Introduction. JoAnn W. Klinedinst CPHIMS, FHIMSS, PMP Director, Healthcare Information Systems HIMSS

Content Break-up & Methodology for awarding Contact Hours / PDUs

Sales Enablement 1. Onboard Smarter, Not Harder

Project Management Professional (PMP) Exam Prep Course 3 - The Basics of Project Management - Part 1

Project Management Training Brochure

Project Scope Management

Managing Projects at Your Workplace

Document Review Part 1

PMI Scheduling Professional (PMI-SP)

SYSTEM MODERNIZATION BEST PRACTICES

In this issue: 1. The Project Constraints

Project Management Professional (PMP) Exam Prep Course 00 PMP Application & Exam

PMP MOCK EXAMS BASED ON PMBOK 5TH EDITION


Errata 1 st Printing. Errata 2 nd Printing

The good news is that with some planning and the right partnership, IT leaders and their teams can achieve incredible success.

Project Management Proposal

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition, and ISO 21500

4. Which of the following statements are true regarding The Project Scope Statement based on the PMBOK 5h Edition?

Ninth Edition. Rita Mulcahy, PMP, etai. Rita Mulcahy s. Inside this book:

The Project Charter. January 14, Presented by Mark Spain, PMP

The Basics of Schedule Planning It s About Communication

Define and Initiate SubPhase

Continuous Process Improvement Organizational Implementation Planning Framework

White Paper. Project Management: Not Just For Project Managers. Add PM Skills to Corporate Training & Boost Business Goal Achievement

GUIDE TO THE CHANGES IN PMP simpl learn i

THE PMP EXAM PREP COURSE

State of Florida Department of Financial Services. Invitation to Negotiate DFS RM ITN 13/14-07 For Insurance Management System

Does This Come With Instructions?

Professional Training Services

Information Technology. Project Management, Sixth Edition

Project Management. Week 2. Core Issues in Rapid Development. Lecture Overview. Does One Size Fit All?

Project Management Professional

Project Integration Management

Basics of Project Management. Nadia Circelli June 1, 2016

PROJECT MANAGEMENT PLAN INTRODUCTION. 1 Powered by POeT Solvers Limited

The Project Planning Process Group

Managing Projects (Course Code: 5927A) Course length: 3 days

NEW! What to Expect for the Needs Assessment, Planning, Analysis, Traceability and Monitoring, and Evaluation Domains

Microsoft Project 2010 Core Essentials

SCSD2613 System Analysis and Design. PART II: Project Planning Process

Understanding Agile from a PMP s Perspective! Exploding the myth that Agile is not in the PMBOK

PMP Exam Preparation Course Project Time Management

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500

W. R. Long, P. Eng., PMP May, 2015

PMP PMBOK 5 th Edition Course Agenda

Course Outline. Project Management Concepts Course PM12: 3 days Instructor Led


PROJECT SCHEDULING & CONTROL

Project Management Professional (PMP) Exam Prep Course 1 - Application and the PMP Exam

Introduction to IT Project Management

PMP Exam Preparation Workshop. Chapter # 5 Project Scope Management

Managing Information Technology Projects, Sixth Edition

How to Effectively Build a Project Schedule in MS-Project

Chapter- 1: Introduction

Agenda. PMBOK Guide Third Edition. PMI Standards Background. PMI Life Cycle Plan for Standards. Presented by Kevin Chui, PMP. How Did We Get Here?

What is ISO/IEC 20000?

pm4dev, 2016 management for development series Project Scope Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

CIPRIANI COLLEGE OF LABOUR & CO-OPERATIVE STUDIES BSC IN PROJECT MANAGEMENT PRM 135: PROPOSAL DEVELOPMENT & COSTING WEEK 8

Instructor: Roger Beauman, PMP. Cell Phone: (618)

Instructor: Roger Beauman, PMP. Cell Phone: (618)

Project Management Basics

Performance Management Readiness

Project Management Professional(PMP ) Course

The Planning Process Group

Project Management Professional (PMP) Exam Prep Course 2 - Types of Exam Questions

Achieving Benefits in Project and in Program Management Guidelines for Success. Here Is What We Will Cover

Through Collaboration with the Business Analyst & Project Manager. Hosted by Michael Kennedy Senior Consultant, DevelopMentor

Transcription:

Expert Reference Series of White Papers The Triple Constraint Model Is It Time To Upgrade? 1-800-COURSES www.globalknowledge.com

The Triple Constraint Model Is It Time To Upgrade? Darrell G. Stiffler, Global Knowledge Instructor, PMP Introduction In the past, one of the key processes for a successful project was the solicitation of the customer and other stakeholder s flexibility of constraints in regards to project deliverables. Identifying the flexibility of the constraints associated with each deliverable was at least as important as identifying the deliverable. There appears to be a shift in this perspective with the release of A Guide to the Project Management Body of Knowledge (PMBOK Guide ) 4th Edition, which I will discuss later in this paper. Over the years, we have seen different models for managing stakeholder s preference in flexibility in regards to constraints. The PMBOK Guide historical models have been the Three Card Model and the Triple Constraint Model, which I discuss later in this paper. With the release of PMBOK Guide 4 th Edition, the two historical models are not mentioned. In the absence of a constraint model in the PMBOK Guide, I am proposing a new model based on other content from PMBOK Guide 4th Edition, which I have named the Stiffler Hexagon Constraint Model. A constraint as described by PMBOK Guide 4th Edition: The state, quality or sense of being restricted to a given course of action or inaction. An applicable restriction or limitation, either internal or external to a project, which will affect the performance of the project or a process. For example, a schedule constraint is any limitation or restraint placed on the project schedule that affects when a schedule activity can be scheduled and is usually in the form of fixed imposed dates. The Three-Card Model In the earlier days of project management, the project manager would sit down with a stakeholder and say, in regards to the project or deliverable, I have three cards Better, Faster, and Cheaper pick two. (Figure 1.) Better Faster Cheaper The purpose of this exercise was to help the stakeholder understand that it is not possible to deliver a project or deliverable with all three constraints remaining equal, and, therefore, choices have to be made. You can only have Figure 1. You can only have two cards. Copyright 2010 Global Knowledge Training LLC. All rights reserved. 2

If the stakeholder wants a deliverable to be Better and Faster, they want all the features and functions of the deliverable quickly completed. This means the project requires additional resources and extended working hours, and therefore, the deliverable cannot be considered Cheap. If the stakeholder wants the deliverable to be Better and Cheaper, no overtime or additional resources can be used, but the same amount of effort is required. The deliverable would take longer to reach completion and thus would not be Faster. If the stakeholder wants the project deliverable to be Cheaper and Faster, they will likely not get all the features and functions originally identified in the scope. Therefore, the project deliverable is not Better. The Triple Constraint Model: The 2000 edition of the PMBOK Guide states, Many project management practitioners refer to the project triple constraint as a framework for evaluating competing demands. The project triple constraint is often depicted as a triangle where each leg represents one of the constraints being managed by the project team. (See Figure 2.) It seemed odd that the Triple Constraint Model included four items, with, Time, and Cost () as the legs of the triangle and as the center of the triangle. The idea was to have the project manager sit down with the stakeholder and explain how the Triple Constraint Model affected the project or the deliverables and in some cases both. The message to the stakeholder was: if one of the three legs (, Time, Cost) of the model is changed (added to, or subtracted from), it would probably impact the other two legs and the central theme of. : If were added to or subtracted from, meaning if features and functions were added or reduced, it would either lengthen or shorten the Time needed to produce the project deliverable and increase or decrease Cost. It would probably affect in that if were increased and Time allotted remained the same, could possibly diminish because resources were stretched too thin to correctly complete all necessary tasks. Likewise, if were added to and Cost were not increased, there would not be sufficient money to pay for the resource s time. If were decreased and Time and Cost remained the same, there would be more than sufficient resources to pay attention to the deliverables, and could possibly be elevated. Time: If the Time allotted to produce the project or deliverable(s) were shortened or lengthened, Cost would increase or decrease. (features, functions or results) could possibly be reduced, removed, or added to, depending on the manipulation of Time. would be affected in that if Time were reduced and Cost remained the same, there would not be sufficient Time nor the necessary extra resources to focus on. If Time were lengthened and Cost remained the same, there would be more Time to focus on, which could then be elevated. Cost: If Cost were changed by an increase or decrease, the Time allowed to produce the project deliverable would probably shortened or lengthen. would probably decrease if Cost were decreased, and would probably be affected as suggested in previous paragraphs. Copyright 2010 Global Knowledge Training LLC. All rights reserved. 3

Figure 2 The Triple Constraint Model has served project managers well, and I suspect it will not disappear completely. However, as of the PMBOK Guide 4th Edition, the Triple Constraint Model is no longer referenced. On page 6 of the PMBOK Guide, it states: 1.3 What is Project Management?. Managing a project typically includes: Identifying requirements, Addressing various needs, concerns, and expectations of the stakeholders as the project is planned and carried out Balancing the competing project constraints including, but not limited to: Risk I must admit that I like the change; I have felt the triple constraint model to be woefully inadequate when discussing constraints with stakeholders. I have taken the new references to constraints in the PMBOK Guide and developed a new constraint model that consists of a hexagon node (see Figure 3) with each leg representing one of the six constraints named in the PMBOK Guide. The PMBOK Guide does not mention whether the order of the 6 constraints is significant; however, I believe the constraints should be listed in a specific order with equal consideration given to each one. The order should be,,,, Risk, and Copyright 2010 Global Knowledge Training LLC. All rights reserved. 4

. I have labeled the legs in priority order following a standard clockwise direction. In addition to labeling the legs of the hexagon, I added the words Customer Satisfaction to reinforce the idea that the setting of priorities of the constraints must be with the customer s approval and to their satisfaction. Figure 3 I have further illustrated the concept of the constraint model by creating a Work Breakdown Structure (WBS) using the new model (see Figure 4). I believe this illustrates a real life scenario of how a WBS works. From the Project and Phase level of a project, the Stiffler Hexagon Constraint Model WBS illustrates that key stakeholders must consider the impact of the six constraints. It further shows that on the deliverable level, should one of six constraints change and the other constraints not be reevaluated or one constraint be given more consideration, not only does the change affect the deliverable directly, but it affects the Phase as a whole. Therefore, it is imperative to give equal consideration to all six of the stated constraints. The elasticity of the triple constraint is still reflected in the new model. The PMBOK Guide states, The relationship among these factors is such that if any one factor changes, at least one other factor is likely to be affected. However, the PMBOK Guide is very specific in that the constraints should be balanced, not subjected to a either/or choices as reflected in the Three Card Model. Copyright 2010 Global Knowledge Training LLC. All rights reserved. 5

The model in Figure 4 illustrates how an equally balanced Stiffler Hexagon Constraint Model Work Breakdown Structure would appear. The beauty of the hexagon is that when all sides are equal the module fits nicely together, demonstrating a flawless solid cohesive model. Figure 4 The model in Figure 5 illustrates how the effect of not balancing the constraints would appear. Darrell G. Stiffler, PMP 10/16/09 Stiffler Hexagon Constraint Model Applied to a Work Breakdown Structure Project Project and s are subject to Customer Satisfaction Phase 1 Phase 2 Phase 3 Figure 5 Let s take a look at each of these constraints on an individual basis. Copyright 2010 Global Knowledge Training LLC. All rights reserved. 6

1. : It is my belief that should be the first constraint considered after the high-level description of the deliverable (product, service, or results) has been established. I have experienced situations where is almost an afterthought in project management, but I think most of us agree that should be the predominant consideration. It seems odd that a Project Manager s (PM) performance is measured by and compliance, when level of, as defined by the customer, is the primary concern of the customer. What good is a deliverable if it is not usable or durable? This is not to say that every deliverable has to be of the highest, but it must be at a level that is acceptable to the customer (meets or exceeds the customer requirement or specification). Not only should the of the deliverable be defined but also the of the resources to be used in the delivery of the deliverables. For example, the project may require equipment that can deliver a product with the ability to provide more accurate tolerance than equipment currently in use. 2. : Now that the of the deliverable has been established, the PM must define the deliverables and sub- deliverables necessary to produce the project deliverable. Not only must the required process to create the deliverable be defined, the activities necessary to produce the deliverables must also be addressed. Additionally, the competencies of the human needed to produce the deliverables at the level of desired must be defined. 3. : Building on the previous constraints, we have established the need and competencies of the to produce the deliverable. If exceptional for the project deliverables is required, using the standard model for budgeting may not be sufficient. For example, if it is standard practice for the performing organization to use the top-down methods in estimating, other methods may need to be considered. It may be necessary to use the Wideband Program Evaluation Review Technique (PERT) for greater accuracy. Because this project s expected exceeds normal, the Wideband PERT estimate will be a superior estimating tool. This constraint is only as good as the information and experience used to craft the document. 4. Resource: Resource refers to both human and capital. Close attention must be paid to the competencies of in-house. If a standard exceeds normal standards, the in-house may not be adequate and might require additional training or augmentation by outside. Similarly, capital assets must be scrutinized and evaluated to confirm that they have the capability to produce the level that is expected. The ability to garner the required within the budgetary constraints is generally one of the biggest challenges faced by the PM and other key stakeholders. It is at this point that there is usually a revisit to the level of,, and that was established. There will probably be compromises at this point, but don t forget to keep the constraints balanced. 5. : Assessment of must be made based upon the intended enforcement of all six of the defined constraints. Risk is based upon assumptions that constraint limitations have been accurately assessed. The PM, as well as other stakeholders, must identify possible Risk events associated with not only the 6 constraints in this model, but other possible constraints that may be identified due to the project s uniqueness. Probability and impact should be assessed on each identified, possible Risk. Once the probability and impact have been assessed and entered into the Risk Register, possible Triggers should be identified and a Risk response strategy crafted. Typically, the greatest are not outside the control of the PM. It is generally accepted that 85% to 90% of to a project can be identified prior to or during the planning stage of a project. Copyright 2010 Global Knowledge Training LLC. All rights reserved. 7

6. : Another big challenge for the PM is controlling the dealing with human nature and Mother Nature. This challenge is especially great when there is an elevation to the quality expectations of a unique project. The communicating of the expectations and crafting of the metrics ( must adhere to expectations and be measured by metrics) can be a daunting task. Adherence to is always complicated by the ability of human to focus on the task at hand. Duration estimates of activities use a complicated formula based on the resources competencies, availability, focus and, most importantly, attitude. The ability to predict a stakeholder s attitude and mental state in the future, however, is nearly impossible. The journey to emphasize and illustrate the importance of constraints identification in regard to a project deliverable continues. The more effectively and efficiently the PM and key stakeholders are able to balance the identified constraints, the better the chances the PM will be able to deliver a successful project. Past models have served our industry well. As we follow the path of progressive elaboration in the project management industry, we will discover or create more innovative means and tools to accomplish our goals. It is my hope that the Stiffler Hexagon Constraint Model will help students and practitioners of project management see the value of balancing all of the constraints on a project and execute better planning techniques. Please share your thoughts. You can find my e-mail address in my author bio. Learn More Learn more about how you can improve productivity, enhance efficiency, and sharpen your competitive edge. Check out the following Global Knowledge courses: Risk Management (PM04) and Cost Control (PM03) for Project Managers (PM06) For more information or to register, visit www.globalknowledge.com or call 1-866-925-7765 to speak with a sales representative. Our courses offer practical skills, exercises, and tips that you can immediately put to use. Our expert instructors draw upon their experiences to help you understand key concepts and how to apply them to your specific work situation. Choose from our more than 1,200 courses, delivered through Classrooms, e-learning, and On-site sessions, to meet your IT, project management, and professional skills training needs. About the Author Darrell G. Stiffler, PMP, has been a member of PMI since 1998 and received his PMP designation in September of 1999, a time when there were only 12,000 PMPs in the world. He is also certified in ITIL Foundations v2 & v3. He has over 20 years of project management experience in various industries with the preponderance of his experience in IT-related projects. He has consulted with both large and small organizations: General Motors; Xerox; Exel Logistic; VisionTek; Wellington Management; Boeing; General Dynamics. He has a military background and currently applies his years of experience to train and consult others in project management and ITIL professional development. He can be reached at DGStiffler@Verizon.net. Copyright 2010 Global Knowledge Training LLC. All rights reserved. 8