Stepping Stone. Name: Date:

Similar documents
PVC Pipe Cord Reel. Description: Materials: Tools: Procedure: Name: Date:

PPC Cement TUTORIAL. how to screed a floor

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com

General Brick Installation Instructions

CRESTONE STRAIGHT FIRE PIT SKU:

28 BELGIAN WEDGE FIRE RING

FLOORING INSTALLATION INSTRUCTIONS

Installation Instructions - Dry Method

36" CRESTONE FIRE RING

Thin Architectural Splitface Block Veneer Specification Guide

Concrete Hardscape Decorating with Concrete

MOUNTAIN STONE Products

Planning and Placing Concrete

Laborers Cement Mason Concrete Placement and Finishing Tech 1 Syllabus

RUSTIC FIRE PIT SIENNA QUARRY GRAY TAN AUTUMN BLEND.

GENERAL SHALE NATURAL THIN ROCK VENEER Installation Guide. GeneralShale.com

Installation Guide Wall Panels

Application Instructions for Keystone Kool Deck on Existing Concrete

Finishes. The visual quality of your finished wall or ceiling is dependent on the quality of workmanship and quality of the materials used.

ASHWELL FIRE PIT SIENNA QUARRY GRAY TAN AUTUMN BLEND. Plan Date: June 2016

San Francisco State University School of Engineering ENGR 200, Materials of Engineering. Laboratory 3. Concrete Compression Test I.

Laborers Cement Mason Concrete Placement and Finishing Tech 2 Syllabus

How to build 4 DIY projects with. AB Courtyard

When I started tiling, we didn t do our own shower pans that BATHS

SIDER-BASE CONCENTRATE AAC/ MONOSIDERAL AAC THE ULTIMATE OLD-WORLD AERATED CONCRETE-AAC DECORATIVE STUCCO SYSTEM

Sanitation Marketing Toolkit MANUAL FOR PRODUCTION AND INSTALLATION OF POUR-FLUSH LATRINES

CONCRETE SCREEDS, INTERIOR FLOORING AND WALL COVERINGS. BME Lepel, Adrienn PhD

PART 1-SAWN THIN VENEER GENERAL

INDOOR RUBBER FLOORING INTERLOCKING INSTALLATION / MAINTENANCE GUIDELINES MARATHON SERIES. Four-Side Interlock Loose Lay Installation

Installation Instructions Tuscan Field Applied Limestone Finish

Pot and Bothered. Tools. Materials: Peat moss Sand Portland cement Water

STONEWRAP MANUFACTURED STONE VENEER - LUXURY MANUFACTURED STONE

5-Year Pothole Patch: Highway Grade Concrete (25lb 45lb Bucket Kit)

HIGUERA HARDWOODS SOLID STRAND WOVEN FLOORING PRE-INSTALLATION JOBSITE REQUIREMENTS

CAST-IN-PLACE CONCRETE SLOTTED FLOORS FOR SWINE

Con-Spec Industries Ltd.

MONOBASE AAC/ SIDER-PLAST THE ULTIMATE EXTERIOR HARD COAT STUCCO SYSTEM FOR AUTOCLAVED AERATED CONCRETE

Impression Graphic panels

ARTEX AND PLASTER. 2 - Choosing the right product

Steps in Building a Shed

1850 x 40/50mm Raised Shower Tray Kit

XTREME-BOND INSTALLATION SYSTEM

PermaBase BRAND Cement Board

HammerStone Manufactured stone veneers for commercial & residential applications

Prior to training with this module, it is recommended that the trainee shall have successfully completed Core Curriculum.

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

INSTALLATION INSTRUCTIONS

BioPrism Solid Surface

Epoxy & Pebblestone Fax: We ship all over the USA U.V.

FIRST BANK 5 1/8" W x 4 1/8" D x 4 3/4" H # Woodland Scenics P.O. Box 98, Linn Creek, MO BUILDING KIT

STORAGE AND TRANSPORTION

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

Below-grade pours (such as foundations) can be done out of the chute of the concrete truck or conveyer, however using a pump is best.

Pembroke Hopkins Park Construction Outreach Program E S. Rd., Pembroke Township, IL Tel: (815) Fax: (815)

Resin Bound Installation Guide

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

SECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements...

Product Data Sheet. Description. Uses. Suitable Surfaces. Polymer enhanced, pre-blended, bag mix, coarse float render.

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

PARKLAND BAR. Sienna: Tan: Autumn Blend: Quarry Gray:

Technical Sheet and Installation Guide. Hebel Fence Panels

Guide to Using Top-Cast Surface Retarder

STONE BAKERY 3" W x 4 5/16" D x 5 5/8" H # Woodland Scenics P.O. Box 98, Linn Creek, MO BUILDING KIT

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

OBJECTIVE SHEET HAND TOOLS: SPECIAL TOOLS

Products for the residential Market. Where. dreams. & yards meet. anchorwall.com

JOLIET FIRE TABLE SKU:

Pre-build: TOOLs & Materials

Guide to Using Top-Cast Surface Retarder

Water for the World. 7 y

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

Last Modified: Oct 9, Product Mixing & Installation Guide. Page 1 of 10

PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960

Rectangular Area: 15 x 10 = 150 sq ft Triangular Area: 15 x 5 x ½ = 38 sq ft

Form Liners. Architectural Concrete. Form Liners

Building Construction 14. Dr Nabil El-Sawalhi Associate professor Engineering Projects Management

PAVER TOP BENCH SKU: Approximate Weight: 3500 lbs Approximate Size: /2 W X 2-1/2 D X 3-3 H

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

TESTING SINGLE-COMPONENT POLYURETHANE WATERPROOFING

RUSTIC PLANTER BENCH

BioPrism Solid Surface

Appendix 4. Bills of Quantities

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

General and Installation Instructions Laminate - 2G + 2G

how to easy! TILE A BATHROOM DIY made Scan here to watch the video HOW TO TILE A BATHROOM

Hardscaping Installation Manual

Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE

Prime Shower Enclosure & Base Kit

Pro Advanced Custom MUD Tiled Shower Kit

Pry Bar or Pull bar Hammer Spacing Wedges Rubber Mallet Safety Equipment (Goggles and Mask)

MODULAR ACOUSTIC FENCING INSTALLATION GUIDE

Finish Flooring- Hard Flooring Materials

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows:

DIVISION: FINISHES SECTION: ACOUSTIC TREATMENT REPORT HOLDER: ECORE INTERNATIONAL, INC.

Korber Models LLC. Introduction. Parts list & Templates (What s in the box) Model 107 HO Scale Scale Model Railroad Structures

SecilVit Natural cork insulation For a warmer, quieter home

Easy to apply Nonflammable Low odor Castable Make excellent materials of construction

ATTENTION! READ BEFORE INSTALLING!

SECTION Fiber Reinforced Stucco 1

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

Transcription:

Stepping Stone Name: Date: Description: The project is useful for landscaping. Measurements of the right amount of Portland cement, water, sand, and course aggregates will be used to construct this project. Materials: Portland cement Sand Coarse aggregate Water Wood frame (form) (2 deep) Adhesive contact paper Colored Glass Non stick spray or diesel Newspaper Scissors Pencil Tape measure Framing Square 3 measuring pitchers (2000 ml) Safety goggles Dust mask Tools: Wheelbarrow Hammer Paint brush Mortar Hoe Concrete Float Bull Float Concrete Edger Trowel Screed board (2 ½ scrap 2x4) Procedure: 1. Measure the inside of the form and measure the adhesive paper to fit the inside of the frame. 2. Spray the inside of the frame with non stick spray or swipe with diesel using a paint brush. 3. Cut out the adhesive contact paper the size of the inside of the pan. 4. Peel the paper off of the contact paper and lay the adhesive side up. This will hold the glass pieces. 5. Make a composition using the colored glass pieces and place the glass pieces on the adhesive part of the contact paper. 6. Place the contact paper (with the glass design facing up) inside the lubricated frame. 7. Make sure you protect your work surface. Lay down some roofing felt or plastic sheeting before mixing the concrete. 8. Mix concrete 1:2:2 parts by dry volume. That is: one part Portland cement, two parts sand and two parts coarse aggregate. While mixing make sure to wear safety goggles and a dust mask, be aware of dust particles. 9. Use 1500 ml Portland cement, 3000 ml sand, 3000 ml gravel. 10. Add water CAREFULLY to the mixture, and mix with mortar hoe until an oatmeal texture is achieved. 11. Carefully pour the concrete mixture into the frame. Revised: 6/27/2011 1

12. Use a scrap of lumber to screed the form, move it back and forth in a sawing motion. Tap the form with a hammer on all sides to settle the concrete in to the form. 13. Use a wood float to settle the concrete. Do not over work. 14. Let sit until the top is dull. 15. Use the edging towel to finish the edges and a steel trowel to smooth the surface. 16. WASH ALL TOOLS THOROUGHLY. 17. Let the stepping stones dry for at least 3 days. 18. Remove from the form. Notes: Photo/Drawing: Example patterns. Revised: 6/27/2011 2

Form (frame) Concrete mix table Revised: 6/27/2011 3

Stepping Stone Worksheet Name: Date: 1. You are building a concrete structure that will be used in a swine gestation barn where each stall is 26 wide and there are two rows of 20 stalls in the barn. Assuming a 10% waste factor, how many total cubic yards of concrete will be needed?(2pts) 2. If concrete cost $96 per cubic yard delivered, what is the total amount that the concrete will cost? (2pts) 3. How much cement, sand, and gravel will be required if you mix it yourself for the above project? Use a 1:3:5 mix. (Hint: see table on the handout.) Assume that you purchase the cement in 1cu. foot sacks, sand and gravel are purchased by the cu. yard. (6pts) Cement: Sacks Sand: Yds. Gravel: Yds. Grading Rubric: CRITERIA POSSIBLE SCORE Craftsmanship 10 Overall Quality of Stepping Stone 5 Cleanup (tools) 5 Calculations (worksheet) 10 Total 30 Revised: 6/27/2011 4

Stepping Stone Teachers Notes: Agricultural Standards Met: 15.0) Students apply algebraic techniques to solve rate problems, work problems, and percent mixture problems. 6.2 Understand critical elements of health and safety practices related to storing, cleaning, and maintaining tools, equipment, and supplies. 6.5 Use tools and machines safely and appropriately. B1.2 Know the relationship between accepted shop management procedures and a safe working environment. B6.1 Understand how to accurately calculate volume, materials needed, and project costs for a concrete or masonry project. B6.2 Know proper bed preparation, concrete forms layout, and construction. B6.3 Complete a concrete or masonry project, including developing a bill of materials, assembling, mixing, placing, and finishing. Objectives: By properly completing this project, students will be able to: Properly mix concrete. Develop a stable stepping stone that will stay intact. Identify concrete tools. Alternative Tools/Methods/Materials: Aluminum backing pans can be used for forms (Dollar store) Concrete mixer can be used instead of hand mixing. Redi mix can be used in place of mixing the concrete, but then the students will not learn the skills about mixing concrete. If the students want the decorations to be on the top, finish the concrete and then press the decorations in the design they want. They will not need adhesive paper if the project is done this way. A wide variety of decorative glass, rock, etc, can be used. Be creative. Ideally you need something fairly flat. Forms: Forms are reusable. However they also make a good project. The form is constructed to be used multiple times. The frame is made of a 2 x4 or 2 x2 scraps and OSB board for the bottom. The frame is a 12 x12. The frame is held together by screws on the side and on the bottom. This way if Revised: 6/27/2011 5

the frame is not lubricated enough then the students can simply unscrew it and get the stepping stone out. Safety Review: Dust Make sure to wear safety goggles at all times during this project. Wear a dust mask when mixing the Portland cement, sand, and gravel so you don t inhale the particles. Project Time: Demonstration: Build: 30 minutes 2 hours Demonstration Notes 1. To have the students complete finishing the concrete, they will have to come back to the agriculture department 1 2 hours later. Finishing concrete takes 7 10 minutes; the students could come on their lunch break or possibly after school. 2. The wooden frame can put together with wood screws or duplex nails. The frame can easily be unscrewed or the nails and can pounded out. This way the stepping stone can easily come out of the frame if not lubricated properly. 3. If the students do not want to decorate the stepping stone they can make one without glass pieces. They are still learning the process of mixing and finishing concrete. 4. Make sure to tap the concrete into the frame, especially the corners. This way you have a solid stepping stone without holes in it. 5. A concrete mixer could be more useful when the whole class is doing to the project. This way not every student needs a wheel barrow. If you don t have a concrete mixer, put the students into groups of 4 or 5 and have the students calculate the concrete ratio and mix it together. Bill of Materials: Projects: 24 Size Description Units Qty/Project Cost/Unit Order Amount 1/2" OSB 4'x8'Sheet 0.039171 $12.83 1 $ 12.83 2x4 fir 12' board 0.053819 $3.74 2 $ 7.48 60 lb. Portland Cement bag 0.044444 $4.57 2 $ 9.14 60 lb. Gravel bag 0.044444 $ 3.73 2 $ 7.46 40 lb. Sand bag 0.05 $2.98 2 $ 5.96 #6 x 1 5/8" Bugle head wood screws 100/box 0.08 $ 3.00 2 $ 6.00 Colored glass beads or???? 0 $ TOTAL $ 48.87 Project and plan by: Niki Flosi Revised: 6/27/2011 6