COMPARING RAYTEQ PARALLEL HEATING ELEMENT WIRING WITH SERIES ELEMENT WIRING

Similar documents
Lecture 26 Chapter 23 Circuits Chapter 24 Magnetism

Delaware Electric Cooperative Generator Interconnection Application Long Form (For Use with Generators Greater than 100 kw)

Single Pulse Resistance Welder Instruction Pamphlet CD125SP High Accuracy CD Welder

Please or Fax orders to Gulf Coast Event Services. FAX

Maintenance Bypass Breaker Cabinet Series Configuration 5. Installation and Operation Manual

Name: New Document 1. Class: Date: 87 minutes. Time: 87 marks. Marks: Comments:

Lesson 7: Watt s in a Name(plate)?

Maintenance Bypass Breaker Cabinet Series Configuration 2. Installation and Operation Manual

Thermoelectric Coolers. All Models INSTRUCTION MANUAL. Rev. G 2016 Pentair Equipment Protection P/N

Commercial Lighting Renovation Guide

Form B GENERATION INTERCONNECTION APPLICATION (Non-Inverter Based Generation and Inverter Based Generation > 25 kw)

Thermoelectric Cooler

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form)

GEOS / ENST / ENSC Problem set #8 Due: Tues. Apr. 25

Interconnection Application

Electrical Systems: Theory and Operation

Energy is involved in everything that happens. We are aware

ThermMAT. Please read these instructions in conjunction with the Guarantee Card enclosed with your ThermFloor heating system.

Gerber Scientific Products

W = ItV P = IV. P = W t FXA Candidates should be able to :

K-12 Environmental Education

The first law of thermodynamics can be stated in terms of the heat energy transferred into the system,

7 STEPS TO SUCCESSFUL RETENTION AUTOMATION YOUR GUIDE TO MAXIMIZING REVENUE FROM YOUR CUSTOMER DATA

7 STEPS TO SUCCESSFUL RETENTION AUTOMATION YOUR GUIDE TO MAXIMIZING REVENUE FROM YOUR CUSTOMER DATA

Information Guide for Troubleman Knowledge Test - Verbal

Exterior Concrete Embedded Snow and Ice Melting System. For Concrete Walkways, Driveways and Paver Systems

Opinions about Climate Change

Hydrocar Earth Sci. Lab

Installation and Operation Manual

Ecologix Environmental Systems, LLC

Gerber. Scientific Products. Dear Gerber Sabre Customer:

ELECTRICAL RESISTIVITY AS A FUNCTION OF TEMPERATURE

Accent Floor Heating. Tmat System Installation Manual. Floor heating system

Solar Electric Systems Safety for Firefighters

INSTRUCTION MANUAL PHANTOM LOAD MODEL PA For SERIAL NO.

Choosing the correct fuse. The three main sizes of fuse are 3 amps, 5 amps and 13 amps. You must use the correct fuse for your appliance.

INSTALLATION MANUAL. Cable and mains connection junction boxes are not provided by us and should be obtained from your installing electrician.

NEBB-ASHRAE elearning Course Descriptions for Technical Training E-Learning Courses

AA2-M CONTROLLER IMPORTANT!!!!

Arc Damage Modeling Tool (ADMT) Simplifying EWIS Failure Severity Assessments

Field Economy Unit Instruction Manual

Single-Phase Meter Installation

PACIFIC POWER PARTNERS

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Digital Loop Carrier System

GEOS / ENST Problem set #Grid Due: Tues. May 18

WHAT DO THE LIGHT BULBS DO?

PDM16 & PDM32 User Manual

TUNNELWORKS KS4 SCIENCE LESSON 2 (ESSENTIALS) TEACHERS NOTES

Dated: April 16, 2002

LIFETIME WARRANTY INSTALLATION MANUAL. Ultra thin cable. Easy to install. Fully compliant to latest regulations CE approved INSTALLATION MANUAL

WHY PRICING DOES NOT EQUAL REVENUE MANAGEMENT FOR HOTELS

1993 Specifications CSJ , etc. SPECIAL SPECIFICATION ITEM Digital Loop Carrier System

Experts speak on UPS output Watt, VA, and Power Factor ratings.

An Inexpensive Diffusion Furnace

The Fundamentals of Refractory Inspection with Infrared Thermography

SECTION 16080P - ELECTRICAL TESTING

Glowing Aluminum Disinformation?

VAV WITH ELECTRIC HEATER

ACTIVITY 6: Series and Parallel Wiring

SWITCH GEAR SERVICE AND MAINTAINNANCE SAFETY MEASURES AND REQUIREMENTS

Grade 9 Lab Notebook Science in Action 9 Index of Investigations, Challenges and Activities Electrical Principles and Technologies

Q1. The diagrams show what happens to each 100 joules of energy from burning coal on an open fire and in a stove.

Ethanol Combustion C 2 H 5

10810 W. LITTLE YORK RD. #130 - HOUSTON, TX VOICE (713) FAX (713) web: IMPORTANT!!!

The sensitivity of today's state of the art, class zero electronic devices is forcing companies to take a closer look at their ESD programs.

GARKANE ENERGY COOPERATIVE SMALL GENERATOR QUALIFIED FACILITY INTERCONNECTION APPLICATION

Temperature Measurement and Control

Model: LoLander Series Truck Scale Model: LL FT Model: LL FT Installation, Set-Up and Operation Manual

GRADE 9: Physical processes 2. UNIT 9P.2 12 hours. Electricity and energy. Resources. About this unit. Previous learning.

Chapter 21 Electric Current & DC Circuits

Vertical Axis Wind Turbines

Customer Responsibilities

Avoiding the Pitfalls of Generators and Large Motors

Chapter 6. The Second Law of Thermodynamics. by Asst. Prof. Dr.Woranee Paengjuntuek and Asst. Prof. Dr.Worarattana Pattaraprakorn

Sag Fighter Case Study

HT829 Humidity Transmitter HT839 Humidity and Temperature Transmitter Installation and Operating Instructions

Technical Guide to Solar Thermal. Better World Energy. How to harness the sun s energy and create hot water with a Solar Thermal System

UPS installation safety requirements

Choosing Wrong: Consider The Reason You Want a Spa - Therapy vs Relaxation vs Entertainment

Wallbox Adapter. For Rowe CD51 and CD100 jukeboxes

Pay Per Call Arbitrage Case Studies

Lightning Conduction Ground Rods: Configurations & Testing For Tree Protection

RGBW (Red, Green, Blue, White) LED Swivel Light With TOUCH Sensing Control

Commercial Energy Savings Guide

Secure Attachment in Pulsed Power Applications

Reference Information:

XBDM-HW63. 63A Model. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved.

Lightning Protection and Trees

ATS Inspect. Product Features

Introduction to E-Business I (E-Bay)

PID275 Feasibility Study Report 9.33 MW Distribution Inter-Connection Valentine Substation

The Ex Ante Calculations match the claimed savings in the project tracking system.

Cornerstone Electronics Technology and Robotics I Week 11 Other Sources of Electrical Energy and Photoresistors Administration: o Prayer o Turn in

SUBCOURSE EDITION EN UTILITIES II

GMAW (MIG) / FCAW / MCAW

5 Ways to Increase CSD Production

From Research to Manufacturing

Inspection of Steam Reformers and Catalyst Tubes with Infrared Thermography

Card payment processing for your business

Instruction Notes for LimiTrol 104A PC512 & 104A PC524

Transcription:

COMPARING RAYTEQ PARALLEL HEATING ELEMENT WIRING WITH SERIES ELEMENT WIRING SERIES-WIRED FURNACES Many electric resistance melting furnaces are equipped with series-wired heating elements that are usually connected in a three-phase configuration. But like inexpensive Christmas tree lights, all elements wired in series will stop operating when a single element in the group fails. This places the crucible in great thermal stress, risking catastrophic failure, as it faces blazing heat on one side and cold, dark heating elements on the failed side. Worse yet, one third to one half of the furnace input power will be lost as a result of a single element failure, depending on whether the furnace is delta or wye connected. And when the second element fails two thirds to 100% of all furnace power will be lost! Obviously, the failure of a single element requires an immediate production stoppage so the furnace can be shut down for repairs. Series connections are popular with some furnace manufacturers because they reduce manufacturing expense: there is no need for electrical wiring harnesses, junction terminals, fuse blocks, fuses or connection strips which have high labor content and are required for parallel-wired furnaces. An example of a series-wired electric resistance melting furnace is shown in Photo 1 below. PHOTO 1 EXAMPLE OF SERIES ELEMENT WIRING

Manufacturers of electric resistance furnaces equipped with larger diameter heater wire nearly always connect their heating elements in series groups. They do this because heating elements made from larger diameter wire have a very low electrical resistance which requires low voltage. Series connections offer an inexpensive way to reduce the voltage across each element. The alternative is to use a large, expensive step-down transformer which would raise the manufacturing cost appreciably. It is well known that when one element in a series group fails, all other elements in that group stop operating. But it is less well known that the loss of a single element in a series connected, three phase floating wye configuration will immediately cut the input power to the furnace in half and that the loss of a second element will cut the furnace input power to zero! To determine what happens when heating elements fail in a series connected furnace, it is useful to examine a particular example. Let's say we have a series-wired furnace with a power input rating of 75 kw (75,000 watts) which has twelve heating elements connected in a threephase floating wye configuration. These elements would be wired per the diagram shown in Figure 1 below: The Figure 1 wiring diagram can be simplified and redrawn for clarification as shown in the schematic representation labeled Figure 2 next to Figure 1. With an input voltage of 480 volts in any 3-phase, wye configuration, the voltage across each series group or "leg" will be 480/ 3 = 277 volts. The voltage across each of the four heating elements in the three series groups shown in Figure 2 will thus be 277 divided by 4 = 69.25 volts. To determine the power rating of each individual heating element, we divide the total furnace power rating of 75,000 watts by 12 elements = 6,250 watts per element. -2-

To calculate the resistance of each element, Ohm's Law tells us that R = V 2 /W where R is the element resistance in ohms, V is the voltage across the element and W is the individual element power rating in watts. In this example, R = (69.25) 2 /6,250 = 0.768 ohms. Again, according to Ohm's Law, the current in amps (represented by I) flowing in each heating element will be I = W/V. For this particular example I = 6,250/69.25 = 90 amps. (This is a large current which can easily overheat the series connection junctions. The typical current in a Rayteq heating element is a much lower 15 amps.) Now, when an element burns out in one leg, the diagram looks like Figure 3 below. Instead of the original three phase circuit, the burnout has left the remaining eight heating elements in series across a single 480 volt phase. The other four elements are completely out of the circuit because of the burnout and none are operating. The voltage across each of the eight remaining elements will now be 480 divided by 8 = 60 volts instead of 69 volts as before. This voltage drop will reduce the power dissipated in each element. To determine what this reduced power will be, we again look to Ohm's Law which states that W = V 2 /R. Now, at the reduced voltage caused by the burnout, the power dissipated by each element is W = (60) 2 /0.768 = 4,688 watts. Thus, the total power dissipated in this furnace after a single element burnout is now 8 times 4,688 watts = 37,500 watts which is exactly half the original input power of 75,000 watts! No wonder the furnace must be immediately shut down and repaired! What happens when a second element burns out? The entire remaining series group of eight elements go out of operation and the total furnace power dissipation is zero! RAYTEQ MELTING FURNACE WITH PARALLEL-WIRED HEATING ELEMENTS -3-

PARALLEL-WIRED FURNACES In a Rayteq parallel-connected furnace with independently wired heating elements, all other heating elements will keep working if one element should go out of service. A furnace with 24 heating elements will lose just 1/24th of its melting rate with the loss of a single element and production can continue without a shutdown. This makes the extra investment for the parallel wiring very cost effective since it pays for itself in uninterrupted production after the first element goes out of service. The interior of a Rayteq parallel-wired furnace is shown in Photo 2 above. A simple example of Rayteq s parallel heating element wiring is shown in Figure 4. Note that the A, B, and C phases rotate from one element to the next so that the failure of one phase will not result in a huge cold spot on one side of the crucible. A schematic representation of Figure 4 is shown in Figure 5. If one element goes out of service for any reason, we have the situation shown in Figure 6. Most importantly, with parallel wiring the loss of any element never affects any other elements as is the case with series wiring. -4-

-5-

For a useful comparison, Rayteq's Model R-475 melting furnace has eighteen heating elements wired in parallel and a total power input of 81 kw. If one heating element goes out of service, all other elements remain in full operation and the furnace loses just 1/18 of the input power or 4½ kw. If a second heating element goes out of service, the furnace loses 2/18 of the input power or just 9 kw. Thus, with two elements out the furnace is still at 89% power and the reduction in melt rate can hardly be noticed. This is quite a contrast to the series connected example above where the furnace drops to half power when one element burns out, then to zero power when two elements burn out. This example should help clarify why Rayteq furnaces are wired with 100% parallel heating element connections for maximum up-time reliability. CHECKING FOR SERIES OR PARALLEL WIRING The prospective buyer should carefully check and verify whether the furnace being considered is parallel or serieswired. Most manufacturers will immediately confirm which type of wiring they are offering. Sometimes confusion arises if a manufacturer claims its furnaces are parallel-wired or series/parallel wired when, in fact, they are 100% series connected. In advance of purchase, to insure he gets 100% parallel wiring, the prudent buyer should (a) request a detailed wiring diagram which shows the wiring of every element in the furnace to ascertain that the furnace is truly parallelwired and, if necessary, obtain the services of a skilled electrician (or Rayteq) to confirm it; and (b) receive a written pledge from the manufacturer that the furnace can be returned for a full refund if it should arrive with series wiring. P.O. Box 1343 Healdsburg, California 95448 Phone (510) 638-2000 E-mail: Information@Rayteq.com Web Page: www.rayteq.com -6-