TECHNICAL INFORMATION

Similar documents
Section STRAIGHT BARREL MISSION ROOFING TILE PART 1 - GENERAL 1.1 SUMMARY

M.C.A. Superior Clay Roof Tile

Verea Spanish S Roof Tile Installation Guide

Installation Guide. Mission Tile. Distributed by: BEST MATERIALS LLC, Phoenx AZ

Brava Spanish Tile. Installation Manual. Brava Roof Tile Phone: Fax:

ROOFING APPLICATION STANDARD (RAS) No. 118 INSTALLATION OF MECHANICALLY FASTENED ROOF TILE SYSTEMS Direct Deck & Counter Battens Only

SECTION CONCRETE TILE ROOFING. A. Section Includes: Concrete tile roofing as shown on Drawings and as specified.

Engineering Services Program

UFGS (June 2005) UNIFIED FACILITIES GUIDE SPECIFICATIONS

ROOF ASSEMBLIES CHAPTER 9

SLATE ROOFING INSTALLATION PROPOSAL [Last updated 10/08/2017]

Distributed by: BEST MATERIALS LLC Ph: , Fax:

SECTION Tile Roof Guideline. B. "Pan" Tile: Clay tile on the underlayment, convex in shape.

STONE COATED METAL ROOF SHINGLE

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

Installation Guide. Titan Slate. Rev102606

SECTION CONCRETE ROOF TILE

SSL-175. Specifications

ROOF ASSEMBLIES CHAPTER 9

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES CHAPTER 9

SECTION CLAY BARREL TILE ROOFING Removals Flashing and Sheet Metal.

Verea Spanish S Roof Tile Installation Guide

DL-200. Specifications

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

SECTION CLAY BARREL TILE ROOFING. A. American Society for Testing and Materials (ASTM):

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE RUBBER SHAKES REPORT HOLDER: DAVINCI ROOFSCAPES, LLC

1. Selective Demolition Section Adhered PVC Roofing System Section Sealants and Caulking Section 07920

FORTIFIED Home High Wind. Bronze New Roof Requirements

LUDOWICI. Since Installation Manual.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: FACED PANELS REPORT HOLDER: MEXALIT INDUSTRIAL, S.A. DE C.V.

SECTION ASPHALT SHINGLE ROOFING SYSTEMS. Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text".

ROOF ASSEMBLIES CHAPTER 9

ROOFING APPLICATION STANDARD (RAS) No. 120 MORTAR AND ADHESIVE SET TILE APPLICATION

CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

SECTION CONCRETE TILE ROOFING Carpentry Flashing and Sheet Metal. A. American Society for Testing and Materials (ASTM):

DIVISION 7 THERMAL & MOISTURE PROTECTION

Pacific Tile Counter Batten and Batten

Pacific Tile Counter Batten and Batten

Product Guide Specification

SECTION CONCRETE TILE ROOFING. A. American Society for Testing and Materials (ASTM):

Classic and NB Tile Counter Batten and Batten

ZARA & ASSOCIATES, INC. Peter L. Zara 8435 Sunrise Lake Blvd -# Sunrise, Florida Phone

INSTALLATION OF MECHANICALLY FASTENED ROOF TILE SYSTEMS System Two: Direct Deck & Counter Battens Only

SECTION CONCRETE ROOFING TILES ARCHITECTURAL SPECIFICATIONS VANDE HEY RALEIGH ARCHITECTURAL ROOF TILE

SECTION CONCRETE TILE ROOFING Carpentry Flashing and Sheet Metal. A. American Society for Testing and Materials (ASTM):

Engineering Services Program

REPORT HOLDER: RARE MANUFACTURING INC A AVENUE SURREY, BRITISH COLUMBIA V4N 4P2 CANADA EVALUATION SUBJECT: IRONWOOD SHAKE

SPECIFICATION GUIDELINE

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF PERMITTING, ENVIRONMENT, AND REGULATORY

Copyright 2001 and 2005 AIA MASTERSPEC Full Length 05/01 (R 05/06)

Spec Master 5/7/ For each product requiring color and texture selection, provide full size samples.

CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

57 TRI/ WSRCA. Appendix A

SPECIFICATION GUIDELINE

ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

C. Jointing of Exterior Vertical Surfaces. Section D. The Secretary of the US Department of the Interior s Standards for Rehabilitation.

Architectural Wall Products Guide Specifications

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL SHINGLES REPORT HOLDER: TEFUTE BUILDING MATERIALS COMPANY, LLC

C CALIFORNIA RESEARCH (CSI# 07320) Redland Clay Tile (800) with ASTM. fired. respectively. have widths at the large. Top and pan

Architectural Roof and Wall Products Guide Specifications

Scope. Definitions. For definitions of terms used in this application standard, refer to ASTM 1079 and the Florida Building Code, Building.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: CONCRETE ROOF TILES REPORT HOLDER: BARTILE ROOFS, INC. EVALUATION SUBJECT:

BARREL VAULT Tile Counter Batten and Batten Installation Guide

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS DAVIS, CALIFORNIA

ESR-2015P* Reissued April 2014 This report is subject to renewal April 1, 2015.

ALLMET CONTINENTAL INSTALLATION GUIDE

SECTION COPPER STANDING SEAM ROOFING

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF TILES REPORT HOLDER: GERARD ROOFING TECHNOLOGIES EVALUATION SUBJECT:

Architectural Roof and Wall Products Guide Specifications

INSTALLATION GUIDE.

SECTION COMMON WORK RESULTS FOR THERMAL AND MOISTURE PROTECTION

SECTION BATTEN SEAM COPPER ROOFING

DIVISION 07 - THERMAL & MOISTURE PROTECTION

Architectural Roof Products Guide Specifications

Stone and Masonry Veneer

Cedarlite 600/Madera 900/700

VISUM3. One tile creates the visual effect of three

VISUM3. One tile creates the visual effect of three

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

SECTION METAL ROOF AND SOFFIT PANELS

SECTION Fiber Reinforced Stucco 1

FS197 06/ , Chapter 35

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

PRODUCT EVALUATION Effective July 1, 2014 RC-28

Barrel Tile Installation Manual

City of Republic Community Development Department. Residential Roofs REVISION DATE: JANUARY 2017

1 Exam Prep Roofing Practice Exam 12

PLANUM. The essence of a traditional material for today s architectural language

Architectural Roof Products Guide Specifications

Thin Architectural Splitface Block Veneer Specification Guide

Battenless. Installation Guide BATTENLESS INSTALLATION GUIDE 1

1 Exam Prep. Roofing Practice Exam 5

SRP-AirOutshield ROOF Issued:

CS-100 Guide Specifications

1 Exam Prep. Roofing Practice Exam 9

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ROOFING FELT AND UNDERLAYMENT REPORT HOLDER: ENVIRONMENTALLY SAFE PRODUCTS, INC.

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

SECTION 7307 ASPHALT SHINGLE ROOF UNDERLAYMENT

REPORT HOLDER: FEROOF CO., LTD SEONWON LI SEONNAM MYEON SUNGJU GUN KYEONGSANGBUK DO SOUTH KOREA EVALUATION SUBJECT:

Transcription:

TECHNICAL INFORMATION SECTION 07320 TWO-PIECE TAPERED MISSION CLAY ROOFING TILE PART 1 GENERAL 1.01 SECTION INCLUDES A. Formed clay roofing tiles, complete with components and other required accessories as needed for a complete and proper installation. B. Underlayment, eave, valley, rake, and ridge protection; nailers, sheet metal flashings and tile fastening. 1.02 REFERENCES A. ICBO Report No. 3523 - Clay Roofing Tiles. B. ASTM Standard Specifications 1. C144 - Aggregate for masonry mortar. 2. C150 - Portland Cement. 3. D226 - Asphalt-saturated organic felt used in roofing and waterproofing. 4. D1002 - Silicone sealant. 5. D2626 - Asphalt-saturated and coated organic felt base used in roofing. 6. D2822 - Asphalt roof cement. 1.03 SUBMITTALS A. Submit under provisions of Section 01300. B. Shop Drawings: Submit Shop Drawings showing details on hip, ridge, valley and rake configurations, methods of fastening, and collaborated details of related work. C. Product Data: Submit manufacturer's data on tile properties, configurations and colors. D. Samples: Submit two tile Samples illustrating color, surface finish and texture, and tile configuration for Architect's approval. 1.04 QUALITY ASSURANCE A. Use adequate number of skilled workmen who are thoroughly skilled and experienced in the necessary crafts and who are completely familiar with the specified requirements and methods needed for proper performance of the Work of the Section. 1.05 DELIVERY, STORAGE, AND HANDLING A. All material shall be handled and stored in a manner which will prevent its damage. B. Materials shall be stored in original pallets and shall be clearly marked with the manufacturer's name.

PART 2 PRODUCTS 2.01 CLAY ROOFING TILE A. Where indicated on the Drawings, provide Two-Piece Tapered Mission Clay Roofing Tile as manufactured by US Tile Co., 909 Railroad St, Corona, CA 92882 (800) 252-9548, in color " " with matching hip, ridge, rakes, boosters and birdstops. 2.02 OTHER MATERIALS A. Underlayment: 1. Underlayment shall conform to one of the following: a. Roll underlayment: ASTM D226 non-perforated. b. Roll underlayment for areas of frequent ice build up or high wind areas: ASTM D2626. B. Nailers: 1. Where indicated on the Drawings or where required for proper fastening, provide: a. 2 inch by 6 inch wood nailing strips at all hips and ridges. b. 2 inch by 4 inch wood nailing strips under first row of cover tile after gable roll, with adjacent 2 inch by 2 inch wood nailing strip along rake sides. C. Flashing: 1. Valley flashing: minimum 26 gauge corrosion-resistant metal. 2. Other: lead, copper or other approved material. D. Fasteners: 1. Nails: corrosion-resistant box nails, minimum 11 gauge. 2. Other: other approved fastening systems. E. Mortar materials, plastic cement and sealant: 1. Sand: ASTM C144 2. Portland cement: ASTM C150s type 1. 3. Plastic cement: ASTM D2822. 4. Silicone sealant: ASTM D1002. PART 3 EXECUTION 3.01 EXAMINATION AND PREPARATION A. Verify that deck surfaces are clean, dry, free of ridges, warp or voids. B. Verify roof openings are correctly framed prior to installing work of this Section. Do not proceed until all unsatisfactory conditions have been corrected. 3.02 INSTALLATION

A. Underlayment: 1. For roof slopes of 3:12 to <4:12, two (2) layers of ASTM D226 Type II (No.30 Felt) are required per IBC and IRC. 2. For pitches of 4/12 and greater: Minimum one layer ASTM D226 Type II (No.30 Felt) (ASTM D4869 Type IV) head lapped 2 inches and end lapped 6 inches, or approved equal per UBC. B. Flashing: 1. Flash at valleys in strict accordance with Chapter 15 of the Uniform Building Code: a. Provide no lighter than 26 gauge corrosion resistant metal valley flashing that extends at least 11 inches each way from the center point. b. Provide a splash diverter rib not less than 1 inch high at flow line formed as a part of flashing. c. Provide end laps of not less than 6 inches. d. Longitudinal edges shall be turned in not less than 30 degrees, and shall be not less than 1/2 inch in height to prevent water overflow. e. For roof slopes of 3/12 and over, the metal valley flashing shall have a 36 inch wide underlayment directly under it consisting of a minimum of one layer of Type 15 felt running the full length of the valley, in addition to other specified underlayment. 2. At sides of dormers, chimneys and other walls, extend flashing at least 6 inches up vertical surface. a. Thoroughly counter flash. b. Extend flashing under tile at least 4 inches and turn edge up 1-1/2" inches. 3. At lower sides of dormers, chimneys and other walls, extend flashing at least 4 inches up wall and 4 inches over tile, and then thoroughly counter flash. 4. At wood saddles and returns, line with 16 oz. copper extending up roof slope not less than 14 inches, and up vertical walls not less than 6 inches, and thoroughly counter flash. 5. Make all counter flashing plugged, pointed and secure. C. Birdstops, boosters and starters: 1. Install clay birdstops along entire length of all eaves. 2. Install first course of pan tile leaving a 2 to 3 inch overhang at eave. 3. Install 3 inch booster tiles on top of birdstops. 4. Install 15 inch starter tiles on top of booster tiles along perimeter of all eaves. D. Fasteners: (Edit to avoid conflicting requirements) 1. At plywood decks, provide minimum of 11 gauge, large headed, corrosion resistant nails of sufficient length to penetrate 3/4 inches into or through the sheathing, whichever is less. 2. At nailable concrete decks, use stainless steel or silicon bronze screw shank nails of sufficient length to penetrate 1/2 to 3/4 their length into, but not through the deck. 3. Provide two fasteners per tile in snow areas.

4. In areas designated by the building officials as being subject to repeated wind velocities in excess of 80 mph, or where roof height exceeds 40 feet above grade, all tiles shall be attached as follows: a. The heads of all tiles shall be nailed. b. The noses of all eave tiles shall be fastened with approved clips. c. All rake tiles shall be nailed with two nails. d. The noses of all hip, ridge and rake tiles shall be set in a bead of approved roofer's mastic. 5. On slopes over 7/12, the nose end of all tiles shall be securely fastened with "Storm Locks" or "Wind Locks", as manufactured by The Wire Works, Inc (800)341-8828, or with other approved fastening system. 6. Provide Twisted Wire Tile-Tye, or Riness Tile-Tie system of brass, copper or galvanized wire as manufactured by The Wire works, Inc. (800)341-8828, or other approved fastening system. E. Install field tile in courses beginning at eave working up incline of roof deck. 1. Install pan tiles in vertical rows at a maximum of 11 inch centers, with cover tiles fastened over the intervening spaces, providing a maximum exposure of 15 inches for each tile. 2. As an alternate, cover tiles may be laid with random exposures from 9 to 15 inches, visually breaking all horizontal lines. 3. As an alternate, end laps of cover tile can be embedded in cement mortar for a more rustic appearance. 4. As an alternate, cover tiles can be doubled using booster tiles laid dry or laid in cement mortar. 5. Install hip and ridge tiles: a. Provide cement mortar or other approved materials at all hips and ridges to completely fill voids and to weatherproof the roof. b. All hip, ridge and first row of cover tiles after gable roll shall be set in cement mortar and fastened by non-corrosive nails. 6. All tiles in contact with cement mortar shall be immersed in water for two minutes before laying. 7. To avoid color problems on roof: a. Roof load tiles from different pallets. b. Visually inspect application from the ground level after installing 100 tiles. c. Visually verify that roof tile color is uniform and even, and verify that tile courses are straight and true. 8. Correct any color or installation problems before proceeding with the installation. 9. Complete installation to provide weather tight service. 3.03 CLEAN UP A. Clean roof to remove all pieces of debris. B. Remove and dispose of all work-related refuse and debris.

END OF SECTION Products: US Tile Authentic Clay Roof Tiles