INDIA HABITAT CENTRE New Delhi

Similar documents
INDIA HABITAT CENTRE New Delhi

SECTION DUCTS PART 1 GENERAL 1.01 SUMMARY

Union County Vocational - Technical Schools Scotch Plains, New Jersey

SECTION AIR OUTLETS AND INLETS

(G) DOORS & WINDOWS LIST OF BUREAW OF INDIAN STANDARD CODE OF PRACTICE (ISI)

SECTION 1208 CHAIN LINK FENCING DESCRIPTION

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System

SMACNA-01Accepted Industry Practice for Industrial Duct Construction. A. Duct work sizes on drawings state inside clear dimensions.

SECTION MISCELLANEOUS METALS THIS SECTION TO BE INCLUDED IN SUB BID FOR SECTION MISCELLANEOUS AND ORNAMENTAL IRON

A. The work under this section consists of furnishing and installing gauge steel framing and bracing as indicated on the drawings and as specified.

BRANZ FACTS RESILIENT NON-STRUCTURAL ELEMENTS SEISMICALLY RESILIENT NON-STRUCTURAL ELEMENTS # 3. Restraint systems

CENTER OF INNOVATIVE & APPLIED BIOPROCESSING

A. This Section includes ceiling- and wall-mounted diffusers, registers, grilles and louvers.

B. Qualification Data: For installers specified in Quality Assurance article.

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

SECTION HVAC DUCTS AND CASINGS

SECTION ALUMINUM HANDRAIL SYSTEMS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

.1 American Institute of Steel Construction (AISC) Specifications for Steel Buildings AISC

SECTION METAL STAIRS

FABRICATION OF A NEW INDUCED DRAUGHT FAN DUCTING KILN 2

NOTICE INVITING QUOTATION

SECTION STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general specifications:

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

San Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES

DIVISION 15-MECHANICAL PN SECTION DUCTWORK SYSTEMS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Low, medium and high pressure ductwork.

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6

UNISTRUT CORPORATION GENERAL NOTES 1. THIS UNISTRUT SUPPORT SYSTEM IS DESIGNED TO SUPPORT A MAXIMUM UNIFORM LOAD OF PSF.

SECTION PRE-ENGINEERED METAL BUILDING

INSTITUTE OF MICROBIAL TECHNOLOGY (COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH) Sector 39-A, Chandigarh NOTICE INVITING TENDER

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION NON-STRUCTURAL METAL FRAMING

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

1. Non-load-bearing steel framing systems for interior gypsum board assemblies. 2. Suspension systems for interior gypsum ceilings and soffits.

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

A. This Section includes acoustical panel ceilings installed with exposed suspension systems.

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

HOTEL SPECIFICATION SECTION 08100

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

Technical specifications Prefab Steel Canopy

COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue

Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali

SECTION ALUMINUM GATES

installation instructions Combination Fire & Smoke Damper

SECTION METAL STAIRS

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

PREAMBLE TO BILLS OF QUANTITIES

SECTION 2 DIVISION 05 METALS

DIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING

SECTION ACCESS DOORS AND FRAMES

SECTION METAL EQUIPMENT LOCKERS

No. NIQ03/2018/IND15589/ Dated:

SECTION HVAC DUCTS AND CASINGS

INDIA HABITAT CENTRE New Delhi

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated.

A. Product Data: Submit manufacturer's descriptive literature, and recommendations and instructions for installation.

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

SECTION NON--STRUCTURAL METAL FRAMING

SECTION MISCELLANEOUS METALS

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

2.5" Min. Stud or Runner. 1.5" Mineral Fiber Blanket in Cavity, If Required. Wallboard. Retaining Angle. 1" Min. Damper Sleeve on 10" centers.

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

SECTION NON-STRUCTURAL METAL FRAMING

K. All mechanical rooms shall be designed with a minimum 3-1/2 dropped floor.

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

`AMENDMENT No. 4 TO TENDER DOCUMENTS. Tender No.: RITES/CO/B&A/EE/DTEH-Rohtak Air Cooled Chiller System of HVAC work

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL

1. ARI 410 Standard for chilled water, hot water and steam coils. 2. ARI 430 Central Station Air Handling Units

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT

Trade of Sheet Metalwork. Module 5: Ductwork Unit 3: 90 Radius Bend with Proprietary Flanges Phase 2

SECTION ORNAMENTAL ALUMINUM FENCING

SECTION STRUCTURAL METAL FRAMING

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following:

SECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

FF200, FOUR-FOLD DOORS CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

SECTION METAL DUCTS

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC.

SECTION TURBINE VENTILATORS

PRE-ENGINEERED METAL BUILDING SYSTEM

DIVISION 20 GENERAL SECTIONS FOR PLUMBING, FIRE SUPPRESSION & HVAC SECTION VIBRATION ISOLATORS

SECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION ACCORDION FOLDING PARTITIONS

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2

SECTION METAL DUCTS

SECTION HANGERS AND SUPPORTS FOR PLUMBING

Our Shop is Your Shop

Transcription:

INDIA HABITAT CENTRE New Delhi Tender For Renovation of Exhaust Air Ducting Works in Basements Date: January, 2014 Prepared by Sterling India Consulting Engineers New Delhi, India

TABLE OF CONTENTS S.No. Description Page No. 1. Notice Inviting Tender 03 04 2. 3. 4. 5. Technical Specification List of Makes Preamble Bill of Quantities 05 07 08 08 09 10 11 12 Renovation of Exhaust Air Ducting works in Basements 2 Sterling India Consulting Engineers

NOTICE INVITING TENDER Consultants: M/s Sterling India Consulting Engineers Owners: India Habitat Centre, New Delhi India Habitat Centre, New Delhi 1. Tenders are invited on behalf of the owners India Habitat Centre, New Delhi for RENOVATION OF EXHAUST AIR DUCTING IN BASEMENTS at said project. 2. The tender shall be in the prescribed form. 3. Works are required to be completed within 2 (Two) months from the date of award of work. 4. Tenderers are advised to inspect and examine the site and its surroundings and satisfy themselves before submitting their tenders as to the nature of the ground, the form and nature of the site, the means of access to the site, accommodation they may require and in general shall themselves obtain all necessary information as to risks, contingencies and other circumstances which may influence or effect their Tender. A Tenderer shall be deemed to have full knowledge of the site, whether he inspects it or not and no extra charges consequent on any misunderstanding or otherwise shall be allowed. 5. Submission of a Tender by a Tenderer implies that he has read this notice and all other Contract Documents and has made himself aware of the scope and specifications of the work to be done and conditions and rates at which stores, tools, plants, etc. will be issued to him by the Owners and local conditions and other factors having bearing on the execution of the works. 6. A Tenderer should quote in figures as well as in words rates tendered. The amount for each item should be worked out and requisite totals given. Special care shall be taken to write rates in figures as well as in words and the amounts in figures only in such a way that interpolation is not possible. The total; amount shall be written both in figures and in words. 7 All rates shall be quoted on the tender form. 8. Pre Bid meeting shall be held on 15 th Jan, 2015 in the office of the Director, India Habitat Centre, New Delhi at 4:00 pm. 9. Tenders shall be received in the office of the Director, India Habitat Centre, New Delhi on 22 nd of Jan, 2015 at 3:00 pm. 10. A tenderer shall submit the tender which satisfies each and every condition laid 0down in this notice, failing which, the tender will be liable to be rejected. 11. The Owners do not bind themselves to accept the lowest or any tender or to give any reasons for their decision. Renovation of Exhaust Air Ducting works in Basements 3 Sterling India Consulting Engineers

12. The Owners reserve to themselves the right of accepting the whole or any part of the tender and tenderer shall be bound to perform the same at his quoted rates. 13. This notice of tender shall form part of the Contract Documents. 14. The validity of the tender(s) shall be upto 30 (Thirty) days from the date of opening of tender(s). 15. The tender should be submitted in sealed envelope. 16. Terms of Payment: a) 10% as mobilization advance along with order. b) 5% against approval of shop drawings (one week s time). c) 45% against delivery of material at site. d) Balance payment shall be released after successful installation, testing, commissioning and handing over the air handling units 17. Retention Money: Retention amount of 10% of the value bill shall be retained which shall be released in two parts, 5% after six months and balance 5% after 12months from the handing over date. : 18. Defect Liability Period The defect liability period shall be 12 months from the date of handing over. The vendor shall attend to the defects which may come up during the defect liability period, repair/replace the defective components and make the system functional in perfect working order. 19. Working hours: The vendor is required to submit the working schedule in advance to enable IHC to coordinate with security/others accordingly. Working hours will be from 8:00 pm to 6:00 pm in working day and full day on Sunday/holidays. 20. Storage: The vendor shall be required to deliver and store the material in a safe custody till the same is installed, commissioned and handed over successfully. IHC, under no circumstances, shall assume the responsibility of any missing part/parts till handed over. A lockable space for storage shall be provided by IHC. Renovation of Exhaust Air Ducting works in Basements 4 Sterling India Consulting Engineers

TECHNICAL SPECIFICATION SHEET METAL DUCT WORK 1. GENERAL This section comprises of supply, fabrication, installation and testing of all sheet metal ducts and supply, installation, testing and balancing of grilles with VCD in accordance with these specifications 2. DUCT MATERIAL All ducts shall be fabricated from galvanized steel sheets of the following thickness: Gauge Thickness (mm) Round Ducts 20 1.00 Rectangular ducts up to 750mm 24 0.63 Rectangular ducts greater than 750 mm and up to 1500mm 22 0.80 Rectangular ducts greater than 1500mm and up to 2250mm 20 1.00 Renovation of Exhaust Air Ducting works in Basements 5 Sterling India Consulting Engineers

Rectangular ducts greater than 2250mm 18 1.25 3. DUCT FABRICATION All Galvanized ducts shall be site fabricated from lock form grade galvanized sheet steel zinc coated conforming with IS: 277, coating grade 120 or aluminum sheets conforming to ISS:737-1955 (wherever aluminum ducts are specified).and installed in a workman like manner. The ducts shall be fabricated at site as per ISS: 655 latest editions. Ducts shall be straight and smooth on the inside with neatly finished joints. All joints shall be made airtight by applying sealant during the assembly of the ductwork; Sealing of the seams shall be accomplished by using approved sealant. Transverse joints shall be made using sponge rubber sulphur-free foam rubber gasketing (3mm thick and 20mm wide) All exposed ducts within conditioned spaces shall have only slip joints and no flanged joints. The internal ends of slip joints shall be made in the direction of Air flow. Changes in dimensions and shape of ducts shall be gradual. Curved elbows, unless otherwise approved, shall have a center line radius equal to one and half times the width of the duct. Air turns shall be installed in all abrupt elbows and shall consist of curved metal blades or vanes, arranged to permit the air to make the turns without appreciable turbulence. All ducts shall be rigid and shall be adequately supported and braced where required with standing seams to keep the ducts true to shape and to prevent buckling, vibration or breathing. All sheet metal connections, partitions and plenums required to confine the flow of air to and through the filters and fans, shall be constructed out of 20 gauge galvanized steel sheet, thoroughly stiffened with 25mm x 25mm x 3mm angle iron braces and fitted with all necessary doors, to give access to all parts of the apparatus. Doors shall not be less than 45cm x 45cm in size. Volume control dampers wherever required shall be installed as a minimum. The final duct design may call for additional volume control dampers based on final duct configuration. 4. DUCT INSTALLATION All ducts shall be installed generally as per the drawings and in strict accordance with approved shop drawings prepared by the Contractor. The contractor shall provide and neatly erect all sheet metal work as may be required to carry out the intent of these specifications and drawings. This work shall meet with the approval of the Engineer-in-charge in all its parts and details. All necessary allowances and provisions shall be made by the contractor for beams, pipes, or other obstructions in the buildings, whether or not the same are shown on the drawings. Where it becomes necessary to avoid beams or other structural work, plumbing or other pipes, and/or conduits, the ducts shall be Renovation of Exhaust Air Ducting works in Basements 6 Sterling India Consulting Engineers

transformed, divided or curved to one side, the required area being maintained as approved or directed by the Engineer-in-charge. If a duct cannot be run as shown on the drawing, the contractor shall install the duct between the required points by any path available, subject to the approval of the Engineer-in-charge. All duct work shall be independently supported from building elements or as required by the Engineer-in-charge. All horizontal ducts shall be rigidly and securely supported, in an approved manner, within hangers formed of GI rods and GI cleats under ducts not greater than 2 meter centers. All vertical duct work shall be supported by structural members at each floor. Ducting on top of the ceiling shall be supported from the slab above, or from beams, after obtaining approval of the Engineer-in-charge. In no case shall a duct be supported from the ceiling hangers or be permitted to rest on a hung ceiling. All metal work in dead or closed down spaces shall be erected in time to occasion no delay to other contractors in the building. All ducts shall be totally free from vibration under all conditions of operations. Whenever duct work is connected to fans, that may cause vibrations in the duct, ducts shall be provided with two flexible connections located close to the unit in mutually perpendicular directions. Flexible connection shall be constructed of fire resistant flexible double canvas sleeves at least 10 cm long, secured properly and bolted at both ends. Sleeve shall be made smooth and the connecting duct work rigidly held by independent supports on both ends. The flexible connection shall be suitable for pressures at the point of installation. The two mating flanges of the ducts being joined with each other shall be made air tight by providing 3mm thick 20mm wide Sulphur-free foam rubber gasket on mating flanges. 5. SUPPLY AIR REGISTERS Supply air registers shall be of approved make and of aluminum construction with individually adjustable bars. Supply air registers shall be double deflection type, with removable key operated volume control dampers. The outer frame shall be made from drawn aluminum sections. All registers shall be selected in consultation with the Engineer.-in-charge, Different spaces shall require horizontal or vertical face bars, and different width of margin frames. All registers shall have a soft, continuous rubber gasket between the periphery of the register and the surface on which it has to be mounted. Registers shall be adjustable pattern as such grill bar shall be pivotable to provide pattern with 0 to 100 degree horizontal arc and upto 30 degree deflection up or down. Bars shall hold deflection settings under all conditions of velocity and pressure. Bars longer than 45 cm shall be reinforced by a setback vertical member. Renovation of Exhaust Air Ducting works in Basements 7 Sterling India Consulting Engineers

Registers shall be given a rust inhibiting prime coat and factory applied powder coated finish of approved colour. 6. TESTING AND BALANCING After completion of the installation of the complete air distribution system, all ducts shall be tested for air leaks. Before painting the interiors, air distribution system shall be allowed to run continuously for 48 hours for driving away any dust or foreign material lodged within ducts during installation. The entire air distribution system shall be balanced using approved anemometer. Air quantities at the fan discharge and at various outlets shall be identical to, or less than 5 percent in excess of, those specified and quoted. Leakage in each air distribution system shall be within 3 percent so that supply air volume at each fan shall be identical to, or no greater than 3 percent in excess of, the total air quantity measured at all supply outlets served by the fan. Branch duct adjustments shall be made by volume or splitter dampers. Dampers shall be permanently marked after air balance is complete so that these can be restored to their correct position if disturbed at any time. Complete air balance report shall be submitted to the Engineer.-in-charge. for scrutiny and approval, and six copies of the approved report shall be provided with completion documents. LIST OF APPROVED MAKES S.No Description MAKES The bidders shall quote with first preference of the makes. A. MECHANICAL INSTALLATION 1 G.S. Sheets : TATA/ SAIL / ESSAR 2. Grilles / Diffusers : Caryaire/ Ravistar/ Air Master 3. Grille VCD : Caryaire/ Ravistar/ Air Master 4. Steel fasteners : Fischer / Hilti Renovation of Exhaust Air Ducting works in Basements 8 Sterling India Consulting Engineers

PREAMBLE EXHAUST DUCTING SERVICES SCHEDULE OF QUANTITIES 1. All described hereafter shall be in accordance with the specifications. 2. Testing and commissioning shall include furnishing all labour, materials, equipment, instruments, and incidentals necessary for complete testing of each component as per the specifications and manufacturer's recommendations; submission of test results to the Project manager and obtaining their approval and submission of necessary documents. 3. All the ducts shall be fabricated and installed conforming to the relevant Indian standard, and the specifications. 4. Duct installation shall include fabricating and installing the duct splitter dampers, turning vanes and the distribution grids within the ducts in position and providing, installing and making air tight the joints with slips, foam rubber insertions, nuts, bolts and screws as required. In addition, multi-louvered manually adjustable dampers shall be provided in various ducts as required for proper balancing of the airflows. 5. All registers shall be provided with a soft continuous rubber gasket between their periphery and the surface on which these have to be mounted. Renovation of Exhaust Air Ducting works in Basements 9 Sterling India Consulting Engineers

6. Registers shall be given at the factory primer coat and powder coating finish of the approved color. 7. After completion of the installation, the entire air distribution system shall be tested for the air leaks by conducting smoke test and balanced in accordance with the specifications. 8. Mode of Measurement The mode of measurement for the various items, unless otherwise specified, shall be as follows: 8.1 Ducting Payment for the ducting shall be made on the basis of the external surface area of the ducting including all materials, labor, supporting arrangement etc. for the installed duct. The rate per Sq.Mtrs. of the external surface shall include flanges, gaskets for joints, bolts and nuts, duct supports and hangers, vibration isolation neoprene pads or suspenders, flexible connection, inspection doors, dampers, turning vanes, and any other item which shall be required to complete the duct installation. The external surface area shall be calculated by measuring the overall width and depth ( including corner joints) in the center of the duct section and overall length of each duct section from flange face in case of duct lengths with uniform cross section. Total area will be arrived at by adding up the area of all the duct sections. In case of the taper piece, average width and depth will be worked out as follows: W1 = Width of the small cross- section W2 = Width of the large cross-section D1 = Depth of small cross -section D2 = Depth of large cross-section Average width = (w1+w2) / 2 Average depth = (d1+d2) / 2 i. Width and depth in the case of taper piece shall be measured at the edge of the collar of the flange for duct sections fitted with angle iron flanges, otherwise at the bottom of the flange where flanges are of the duct sheet. ii. The face length for the taper piece shall be the mean of the lengths measured face to face from the center of the width and depth flanges. iiii. For the special pieces like bends, branches, tees etc., same principle of area measurement as for the linear lengths shall be adopted except for bends, elbows, the lengths of which shall be the average of the lengths of linear and outer periphery along with curvature or angle of the piece. 9. The contractor shall include charges for the following items of work: 9.1 Protecting and cleaning of equipment/materials and work in progress as per Specifications. 9.2 Comply with safety requirements including temporary partitions, "caution" signs, protection of public, maintaining protected egress and access to work at site. Renovation of Exhaust Air Ducting works in Basements 10 Sterling India Consulting Engineers

9.3 Issuing of hot permits for welding and cutting works after approval from the owners. 9.4 Submission of the detailed schedule of activities. 9.5 Removal and legal disposal of debris including compliance with local requirements. 9.6 Furnish instruments required for testing, adjusting and balancing. These shall remain the property of the contractor. BILL OF QUANTITIES S.No. DESCRIPTION OF ITEM UNIT QTY RATE AMOUNT A 1 SHEET METAL WORK Supply, Installation, Testing Balancing & Commissioning of the following items as per specifications and requirement G.S.S square/ rectangular site fabricated ducting complete with gaskets, elbows, splitters, vanes, supports etc. as per drawings and as required for air distribution. a) Square/ rectangular i 20 gauge Sqm 270 ii 22 gauge Sqm 225 2 Supply, installation, testing and balancing of Exhaust air square / rectangular Grille without volume control damper, Sqm 5 Renovation of Exhaust Air Ducting works in Basements 11 Sterling India Consulting Engineers

with frame made out of powder coated extruded aluminium sections complete with frame, gasket screws, etc. as specified. 3 4 Supply, installation, testing and balancing of Grille VCD with mil finish extruded aluminium sections complete screws, etc. as specified. Sqm 2 Supply and installation of Fire proof double layered silicon coated fabric, air tight, water proof, to with stand high temperature, non flammable type, canvass cloth connection for FAN outlet complete with drawn M S flanges on both sides for connection to FAN and duct complete with nuts, bolts etc. as per specification. Set 15 5 Supply and installation of 50mm thk wire mesh filters for following sizes: i 500x500 mm Nos. 20 Ii 600x300 mm Nos. 5 iii 500x600 mm Nos. 10 6 Dismantling of existing ducting, shifting to location as per instructions. a) Square/ rectangular i 20 gauge Sqm 270 ii 22 gauge Sqm 225 TOTAL Rs. Important Note: India Habitat centre is operational building. The work shall be carried out without disturbing the normal function. The schedule of work timing shall be as mutually agreed by the vendor and IHC. Vendors are advised to visit and make themselves familiar with site constraints, accessibility, working timings etc. Renovation of Exhaust Air Ducting works in Basements 12 Sterling India Consulting Engineers