ZOLL Document Number: 90F1087 Page 3 of 18 MES/ERP Nonconforming Material Transaction Instructions REV B

Similar documents
4. SPLITTING QUANITITES OF DEFECTIVE MATERIAL IN CAMSTAR

AMI AutoAGENT Shop Floor Manager

CHAPTER 12 - REMOTE TIME ENTRY ADD-ON OPTION

Working with Invoices

Record Usage Decision (QA11)

LSC Stores Ordering System User Guide (2.0) Page 1

Work Instruction PUI Supplier Request for Nonconforming Material (Rev 1)

Work Instruction PUI Supplier Request for Nonconforming Material (Rev 2)

SAP ME BObj Reporting. October 8, 2013

Quick Start Guide. Taking A Payment & Printing A Receipt

NON-CONFORMING MATERIAL

3 October 2017 Page 1 of 5 BellHawk Systems Corporation

Production Activity Control

NON-CONFORMING MATERIAL

Infor LN Quality User Guide for Non-Conforming Report & Corrective Action Plan

Shop-Trak SyteLine 9.00.XX Shop Floor Training Guide. Product Manual

How to Download PDF Invoices RR Finance Admins

Proteus MMX Enhancements (3.7)

INVENTORY & MATERIALS MANAGEMENT Course Assignment VERSION 17

Processing Department Time Entry. Human Resources

Oracle Depot Repair. Understanding Oracle Depot Repair. Oracle Depot Repair in CRM. Concepts and Procedures

Goods Receipt against an Inbound Delivery

Customer Loyalty Points Module

CHAPTER 2: ADVANCED MATERIALS MANAGEMENT

SAP QM. Prepared by Lavanya.M

AiM User Guide Work Management Module

Oracle. SCM Cloud Using Receiving. Release 13 (update 17D)

Overview. Time Entry Guide for Student Assistants. Table of Contents

QUICKBOOKS PRO 2008 WORKSHOP 5: PART A MARS COMPANY

Pre-Exercise: Logging Into Core CT

IBM Maximo Mobile Suite Version 7 Release 5.1. User Guide

Understanding the basics of client invoices

The Priority Enterprise Management System

Getting Started With SellerEngine Plus for FBA

IBM Maximo Mobile Asset Manager Version 7 Release 5. User Guide

How to Create a Non-PO Invoice in Ariba. 3) Select Non-PO Invoice from the Create drop-down menu:

Helpful Hint Users will only have access to those employees who fall within their security role.

Asset Management for Inventory Scanners. Core-CT 9.2 Finance Implementation

Understanding Manufacturing Execution Systems (MES)

Requisition Approver Quick Reference

The Requisition Approval page provides a tool for identified CSUF employees to approve requisitions

Infor LN Warehousing User Guide for Quarantine Handling

EPAF (Electronic Personnel Action Forms) TRAINING for FINANCE

Timesheets. Printing Timesheets for a Department

Receiving and Cross Docking. Release 9.0.2

Appendix C: Non Conformance Notification and Corrective Action Request

Oracle. SCM Cloud Using Quality Management. Release 13 (update 17D)

Epicor ERP Project Billing - Fixed Fee Course

Decor Fusion Inventory Handheld Gun Usage Guide Version Date [Publish Date]

FileBound AP Demo Overview

Asset Management for Asset Processors. Core-CT 9.2 Finance Implementation

Integrated Quality Systems

Revised AWMS Procurement Working Group. AWMS Procurement Working Group Return Issued Inventory Items to Stores in AWMS

FAMIS Training Manual

Acumatica Warehouse USER GUIDE FOR HANDHELD & MOBILE DEVICES V

Infor LN Warehousing User Guide for the Outbound and Shipment Goods Flows

- These instructions are for UNE Professional and ELC Casual staff who are submitting a timesheet

Manufacturing 100 USER GUIDE V SCANCO SUPPORT: FAX:

NorthClark Computing, Inc. Capacity Planning User Guide

Solar Eclipse Product Serial Numbers. Release 9.0.1

POS SETTING TASK TYPES

New Client Training. Paychex Time and Labor Online Paychex, Inc. All rights reserved. TLO

Chapter 7 Reporting System

STUDENT SUPERVISOR: TIME APPROVAL

New for 2009! Detecting and Correcting with the Client Data Review Feature

AUTOSIMPLY. Manufacturing Order. Features. About AutoSimply

Employee Process: Entering, Adjusting & Viewing Timesheets

How to Create a Non-PO Invoice in Ariba. 3) Select Non-PO Invoice from the Create drop-down menu:

Completing the Manager Evaluation

Ariba Network Supplier Guide. Get Started

Infor HR Specialized Service Provider Self-Appraisal Guide

Rev.2.0. p f W. 119th Street Chicago, IL

Eagle Business Management System - Manufacturing

Supplier Guide for Plex Online. Supplier Web Access, Review Releases, Submit ASN & Label Printing

REVERSE PAYMENTS. Note: Payments made using In-Store Credit cannot be reversed

Barcode Printing. SIMMS Inventory Management Software February 24, 2012

Updates and Program Enhancements For DBA Classic &

SCM750. Processes in SAP Manufacturing Execution COURSE OUTLINE. Course Version: 11 Course Duration:

Omnitracs Intelligent Vehicle Gateway. User Manual

MOTUS INTEGRATED TECHNOLOGIES & LEON INTERIORS INC SUPPLIER PORTAL MANUAL

UPS WorldShip TM 2010

Oracle SCM Cloud Using Quality Management. Release 13 (update 18C)

Findmyshift - Getting started with Findmyshift

Register App Training Guide

Create Physical Inventory Documents

Virtual Training Workbook

User Guide: FY16 Annual Inventory Certification Process

Contents OVERVIEW... 3

1. Once you are ready to review applicants, go to the Jobs tab and select the job you are ready to review.

Supplier Nonconformance Notification and Waiver Procedure

PAYGLOBAL EXPLORER USER GUIDE

NONCONFORMANCE MODULE PROCESS FLOW

Ariba Network Supplier Guide. Get Started

TrackITSystem. Facility Manager Documentation Installation and User Guide

Approving Online Purchase Requisitions Reference Guide

Requesting colleague input

Chapter 2.04: Deposit and Empty Container Tracking

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual

Exact Synergy Service Management. User Guide

Best Practices For Production Supervisors

Transcription:

ZOLL Document Number: 90F1087 Page 3 of 18 1. INTRODUCTION The purpose of this document is to provide instruction for when and how to perform the ERP and MES transactions required to process nonconforming material. Execution of transactions per the instructions contained in this document ensure that nonconforming material can be properly identified and quantities in the system of record are accurately maintained. All defective material shall be processed per 90F0030, flowchart 90F1087- A01 and 90E1263. 2. APPLICABLE DOCUMENTS 90F1087-A01 90E1263 90F0030 90F0072 90F0112 3. RESPONSIBILITIES MES/ERP Nonconforming Material Flowchart Camstar Visual Aid for QA Inspection Nonconforming Material Product Service Safe Handling and Cleaning Procedures for LifeVest System Hardware Responsibilities for performing transactions are identified in the bottom right hand corner of flowchart steps within flowchart 90F1087-A01. 4. DEFINITIONS Container Camstar s primary method for identifying what is being processed in the system. System generated container names may be a lot number, serial number, inspection request parent identifier, inspection request child identifier, or a rework identifier. Other manually assigned container naming conventions are identified in this document. Work In-Process(WIP) The status of material identified as the part being built on an open manufacturing order, serviced on a service order, or reworked on a rework order. Split Qty The Camstar transaction used to divide a portion of an existing container into a new identical container that is named by the user. Naming conventions are defined in the instructions in this procedure Remove The Camstar transaction used to un-issue material from the container it was issued to. By default, the material is returned to the container that it was issued from. Rework Transaction The rework transaction is the Camstar transaction used to move defective material to a predefined step that has been configured to process nonconforming material.

ZOLL Document Number: 90F1087 Page 4 of 18 5. SPLITTING QUANITITES OF DEFECTIVE MATERIAL IN CAMSTAR 5.1 Lot Controlled and Non-Serial/Non-Lot Controlled Material 4.1.1 Material Status: WIP In order to send accepted material to inventory and defective material to the MRB for disposition, the defective quantity must be split into a new container. When performing the Split QTY transaction, the UCR or II number (e.g. UC-12345, II-12345) shall be used as the container name for the defective material. If the full quantity associated with the order is defective, the container should be split to maintain naming consistency. 5.1.2 Material Status: In-Stock, Point of Use Defective lot controlled or non-serial/non-lot controlled material that is not associated with an order in Camstar shall have a rework order generated in Epicor prior to MRB processing. Any quantity specified on the rework order that is available in Camstar will be automatically split by the system into a rework container using the rework numbering rule (RWxxxxxxxx). Note: Any point of use material that has been issued to another container should be removed from that container before the rework order is generated in Epicor. 5.1.3 Multiple Dispositions for Lot Controlled Material on a Single UCR or II 5.1.3.1 Camstar requires that each disposition for lot controlled material is processed individually. When splitting material into a new container for this purpose, the following naming conventions should be used: Disposition Return to Supplier Scrap Use As Is Use For (a special purpose) Only Rework to Specification Other Multiple Container Name (UCR# or II#)_RTV (UCR# or II#)_Scrap (UCR# or II#)_UAI (UCR# or II#)_SPO (UCR# or II#)_RW (UCR# or II#)_Other (UCR# or II#)_Mult 5.1.3.2 Any single piece of material can only exist in a single MES container at once. If any single piece of lot controlled material has multiple failure modes with different dispositions for each, use the naming convention for multiple dispositions. 5.2 Serial Controlled Material Serial Controlled items shall never be split into a new container to process a nonconformance. Reference flowchart 90F1097-A01 for the appropriate transactions.

ZOLL Document Number: 90F1087 Page 5 of 18 6. REPLACEMENT OF SUBASSEMBLY COMPONENTS All components issued to subassemblies on a manufacturing order must be removed from that subassembly in order to be processed. In order to accomplish this, the subassembly must first be removed from any upper level assembly it is issued to. Once the defective component has been replaced, the subassembly must be reissued to the upper level assembly. Reference flowchart 90F1087-A01 for all required transactions. 7. EXCEPTIONS In the event that large quantities of material must be transacted, the standard process in this document may result in a significant contribution of non-value added transactional labor time that could potentially be eliminated or significantly reduced. In these situations, exceptions to the process may be made. The process used for an exception must be assessed by Quality Assurance, Manufacturing Systems, Enterprise Applications, and Finance to ensure compliance, data accuracy, and financial records are properly maintained. The process used for the exception shall be clearly documented per 95A0002.

ZOLL Document Number: 90F1087 Page 6 of 18 Appendix A Split Qty Transactions

ZOLL Document Number: 90F1087 Page 7 of 18 Instructions for Executing the Split Qty Transaction 1. Generate an Unsatisfactory Condition Report (UCR) or add a nonconformance to the Incoming Inspection (II) report per 90F0030. 2. Log into Camstar and enter the station ID. 3. Select the Split Qty transaction from the container menu. 4. Enter the name of the container being processed into the Container field. 5. In the To Container field, enter the container name using the instructions in the Splitting Defective Quantities in Camstar section of this document. 6. Enter the quantity to be split into the Quantity field. 7. Click the Split button to complete the transaction. 8. Once the container has been split, generate a container label following the instructions in Appendix C so the material can be identified. 9. For manufacturing, service, or rework order types, perform a rework transaction per Appendix B. For incoming inspection containers, process per 90E1263.

ZOLL Document Number: 90F1087 Page 8 of 18 Appendix B Rework Transactions

ZOLL Document Number: 90F1087 Page 9 of 18 Instructions for Executing a Rework Transaction 1. Create an UCR or record a nonconformance on the Service Report(SR). 2. Log into Camstar and enter the workstation. 3. Open the Rework screen. 4. Enter the name of the container identified on the container label for the defective material. 5. Select the applicable Rework Reason from the drop down. 6. Enter the UCR or SR number/sr nonconformance item number in the UCR/SR- Number field. 7. Click Rework to complete the transaction. 8. If required by 90F1087-A01, generate a reject label per Appendix C. 9. Forward the defective material to MRB for manufacturing (W) or rework (RW) order types. Forward defective material to production control for service (SW) order types.

ZOLL Document Number: 90F1087 Page 10 of 18 Appendix C Label Printing

ZOLL Document Number: 90F1087 Page 11 of 18 Instructions for Printing Labels Appendix C 1. Log into Camstar and enter the workstation ID. 2. Open the Print Container Labels menu object. 3. Enter the container name of the material being processed. 4. Select the desired label template from the Printer Label Definition dropdown menu. 5. Select the desired printer name from the Print Queue dropdown menu. 6. Enter the desired quantity of labels. 7. Click Print Label. Note: Container labels and manufacturing labels may be applied directly to a finished good. All other labels will leave a residue when removed and contact with material surfaces should be avoided. If any other label is applied to a finished good, clean the area thoroughly using a method approved in 90F0112.

ZOLL Document Number: 90F1087 Page 12 of 18 Appendix D Generating a Rework Order

ZOLL Document Number: 90F1087 Page 13 of 18 Instructions for generating a rework order in Epicor 1. Log into Epicor and open the Job Entry Screen 2. Select new job from the drop down menu. 3. Select next job. 4. Select ok.

ZOLL Document Number: 90F1087 Page 14 of 18 5. Enter part number in the field next to the Part button. 6. Select the Revision from the Rev: dropdown menu. Ensure that the revision selected matches the revision of the material to be reworked.

ZOLL Document Number: 90F1087 Page 15 of 18 WARNING: If the incorrect revision is selected the revision of the material will be changed in Camstar and when returned to inventory. This is not an approved method for converting revisions. All revision changes will take place in Camstar. 7. Select Rework Order from the Job Type: dropdown menu. 8. Enter the serial or lot number to be reworked. 9. Select today s date as the requested date. 10. Select the arrow next to the New icon. 11. Select New Demand Link from drop down. 12. Select Make to Stock. 13. Enter the quantity to be placed on the order. All serialized items must be 1. 14. Click Save. Operations and Materials will appear in Job Details window. By default, this is located on the left of the Job Entry screen.

ZOLL Document Number: 90F1087 Page 16 of 18 15. Right click on Operation and select Add Operation. 16. Select Service from the drop down menu. 17. Right click on Materials

ZOLL Document Number: 90F1087 Page 17 of 18 18. Enter part number and select revision from the dropdown menu. Ensure that the revision matches the revision of the material being reworked. WARNING: If the revision does not match the revision of the material in inventory, it will not be removed from inventory when the order is generated. 19. Check the Released box. 20. Click Save. WARNING: Clicking Save will automatically send the rework order to Camstar. Any errors identified after an order is received by Camstar shall be treated as a nonconformance and processed per 90F0030 and the rework order section of 90F1087-A01 to ensure system accuracy.

ZOLL Document Number: 90F1087 Page 18 of 18 21. Enter comments and select ok. The order will automatically be sent to Camstar at this point.