USE OF DIPP PILES FOR A NEW SUP BRIDGE IN WEST MELBOURNE

Similar documents
Ductile Iron Systems trm.at

Pile foundations Introduction

STATIC ALTERNATING CYCLIC HORIZONTAL LOAD TESTS ON DRIVEN

Foundation Innovations Ensure Successful Bridge Replacement

CHAPTER 11 SUMMARY AND CONCLUSIONS

Sabah Shawkat Cabinet of Structural Engineering 2017

Pile Design to BS EN :2004 (EC7) and the National Annex

Northport Berth 3 design and construction monitoring

Repute benchmarks. 4 x 4 pile group in firm to stiff clay. Results from Repute. Comparison with benchmark. Comments. Reference.

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch

SETTLEMENTS DUE TO TUNNEL CONSTRUCTION

Modelling of Piled Raft Foundation on Soft Clay

NPTEL Course GROUND IMPROVEMENT USING MICROPILES

PILED RAFT DESIGN PROCESS FOR A HIGH-RISE BUILDING ON THE GOLD COAST, AUSTRALIA

Evaluation of negative skin friction on sheet pile walls at the Rio Grande dry dock, Brazil

Numerical Analysis for High-rise Building Foundation and Further Investigations on Piled Raft Design

Better ZSOIL, Better Geotechnical Analysis

Combined Pile Foundation System for a Residential Complex

GEOTECHNICAL DESIGN AND CONSTRUCTION METHODOLOGY OF A DEEP BASEMENT CUT NEXT TO SENSITIVE BUILDINGS

Ching Guan Kee ABSTRACT

The Innovative Design of Piled Through Mass Gravity Stone Strong Wall Homestead Gully Bridge Rehabiliation

Large-scale dynamic high-strain load testing of a bridge pier foundations

Lateral Loads on Micropiles. Thomas Richards Nicholson Construction Company

Council on Tall Buildings

Experimental study on axial and lateral bearing capacities of nonwelded composite piles based on pile load test results

twenty six concrete construction: foundation design ELEMENTS OF ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SPRING 2013

EFFICIENCY OF MICROPILE FOR SEISMIC RETROFIT OF FOUNDATION SYSTEM

Modelling issues for numerical analysis of deep excavations

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS

twenty four foundations and retaining walls Foundation Structural vs. Foundation Design Structural vs. Foundation Design

twenty seven concrete construction: foundation design Foundation Structural vs. Foundation Design Structural vs. Foundation Design

Modelling of a pile row in a 2D plane strain FE-analysis

Ground Improvement Using Steel Reinforcing Strips

ICC-ES Evaluation Report Issued February 1, 2011 This report is subject to re-examination in one year.

Field Static Load Testing of Concrete Free Reticulated Micropiles System

Performance of Reinforced Earth Retaining Wall with Fly Ash under Static and Dynamic Loading

SOIL PRESSURE IN EMBANKMENT STABILIZATIONS

APPENDIX B ABC STRUCTURES DESIGN GUIDE

Innovation in Instrumented Test Piles in Malaysia: Application of Global Strain Extensometer (GloStrExt) Method for Bored Piles

RESEARCH AND PRACTICE IN ENGINEERING The Rion-Antirion Bridge foundation design

A brilliantly simple Foundation Method

The World s First RPC Road Bridge at Shepherds Gully Creek, NSW

SEISMIC SOIL-PILE GROUP INTERACTION ANALYSIS OF A BATTERED PILE GROUP

COLUMNS 1- Definition: The Egyptian code defines columns as : 2- Types of concrete columns

Effect of Seismic Reinforcement of Sheet Pile Quay Wall Using Ground Anchor

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: GEOTECH ENTERPRISES, INC.

GeoEng2000 An International Conference on Geotechnical & Geological Engineering

Downloaded from Downloaded from /1

Reinforced Soil wall and approach embankment for Cliff Street Overpass constructed on stabilised foundations

The design of soil nailed structures to AS4678

Safe, fast and simple: the DUKTUS pile is loadtested in South Africa

COURSE ON COMPUTATIONAL GEOTECHNICS A Geotechnical Design Tool. Faculty of Civil Engineering UiTM, Malaysia

Austral Deck Design for Construction Loading. Permanent formwork and Span capability

SEISMIC SOIL-STRUCTURE INTERACTION IN FULLY INTEGRAL ABUTMENT BRIDGES WITH HP STEEL PILES

Behavior of pile due to combined loading with lateral soil movement

Seismic Performance of Piled Raft Subjected to Unsymmetrical Earth Pressure Based on Seismic Observation Records

DIVISION: EARTHWORK SECTION: BORED PILES REPORT HOLDER: HELICAL ANCHORS, INC BOONE AVENUE, NORTH MINNEAPOLIS, MINNESOTA 55428

Code No: R Set No. 1

ST7008 PRESTRESSED CONCRETE

PILE RAFT FOUNDATION BEHAVIOR WITH DIFFERENT PILE DIAMETERS


Performance of high capacity jack-in pile for high-rise building with preboring in weathered sedimentary rock formation

Seismic Analysis of Truss Bridges with Tall Piers

On-site determination of pile capacity Distribution of pile load between the shaft and tip, and Detection of possible pile.

STATNAMIC LOAD TESTING OF HIGH CAPACITY MARINE FOUNDATIONS

Modeling and Design of Bridge Super Structure and Sub Structure

Analysis of Buried Arch Structures; Performance Versus Prediction

PILE SETTLEMENT ZONES ABOVE AND AROUND TUNNELLING OPERATIONS

Bridge Approach Embankments on Rigid Inclusions

Geoguide 6 The New Guide to Reinforced Fill Structure and Slope Design in Hong Kong

Passage under Lövstavägen at Bypass Stockholm From Design to Realization

Design of Soil Nailed Walls According to AS

ABSTRACT. KEY WORDS: Tubular piles; composite behavior; offshore structures; push-out strength; bond strength; slip.

FE Review Mechanics of Materials

Bi-Directional Static Load Testing of Driven Piles

Earthquake Design of Flexible Soil Retaining Structures

Level 6 Graduate Diploma in Engineering Structural analysis

Direct Drilled New Micropile TITAN 127/111 for Underpinning Roman Bullring in Barcelona, Spain

BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY

Comparison of the results of load test done on stone columns and rammed aggregate piers using numerical modeling

Modeling and monitoring of an excavation support using CSM

HIGH CAPACITY MICROPILES IN WEAK DOLOMITIC LIMESTONE FOR CRANE FOUNDATION SUPPORT

Experimental study on axial and lateral bearing capacities of nonwelded composite piles based on pile load test results

Finite Element Analysis of Flexible Anchored Sheet Pile Walls: Effect of Mode of Construction and Dewatering Naveen Kumar 1, Arindam Dey 2*

DESIGN OF WALLS FOR SHEAR

Geotechnical Engineering Software GEO5

Behaviour of Strip Footing on Geogrid Reinforced Slope subjected to Eccentric Load

Seismic Design of a Railway Viaduct in a High Seismic Zone

Design Specifications- Micropile Foundation System. Geopier Calculations

Lecture Retaining Wall Week 12

IOP Conference Series: Materials Science and Engineering. Related content PAPER OPEN ACCESS

Figure 1 Swing Span Supported by Center Pivot Pier and Two Rest Piers

NPTEL Course. GROUND IMPROVEMENT Factors affecting the behaviour and performance of reinforced soil

Offshore pile acceptance using dynamic pile monitoring

SECTION DUCTILE IRON PILES

The bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge.

Jet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay

Modular System Advantages

SEISMIC RESPONSE OF AN ISOLATION METHOD FOR CUT AND COVER TUNNEL USING POLYMER MATERIAL

Subject with Code: Strength of Materials(16CE104) Course& Branch: B. Tech - CE Year &Sem : II-B. Tech &I-Sem Regulation: R16

Transcription:

USE OF DIPP PILES FOR A NEW SUP BRIDGE IN WEST MELBOURNE If you want to put a photo on the title slide use this layout with colour photos (delete this box) Michael Wei, Jawad Zeerak & David Barton 8 th Australian Small Bridges Conference: Gold Coast, Australia 1

EIC ACTIVITIES PTY LTD EIC Activities is CIMIC Group's engineering and technical services business. The EIC name stands for Engineering, Innovation and Capability. EIC Activities provides engineering and technical services to the following CIMIC companies 2

Contents of the presentation 1.0 PROJECT OVERVIEW 2.0 GEOTECHNICAL CONDITIONS 3.0 DUCTILE IRON PIPE PILES 4.0 PILE DESIGN 5.1 PIGLET 5.2 PLAXIS 3D 5.0 PILE LOAD TESTS 6.0 ACKNOWLEDGMENT 3

1.0 PROJECT OVERVIEW 4

Project Location The project is located approx. 5km to the west of Melbourne CBD The new SUP Bridge is constructed over the Maribyrnong River 5

Project Overview The new SUP Bridge was constructed over the Maribyrnong River to improve the amenity for cyclists It replaces the existing SUP on the adjacent Shepherd s Bridge Existing SUP on the Shepherd Bridge was removed, Shepherded Bridge was widened and strengthened to support the increased freight movement to the port of Melbourne as part of West Gate Distributor Stage 1 project. The river crossing is one of the busiest cycle routes around the Melbourne 6

The New SUP Bridge The bridge is 3 span, 190m long and 4.5m wide Supported on two abutments (east & west) and two piers (east & west) 7

2.0 GEOTECHNICAL CONDITIONS 8

Geotechnical Conditions The bridge is located in the Yarra Delta region of Melbourne The major geological units included; - Fill - Coode Island Silt (CIS) - Fishermens Bend Silt (FBS) - Newer Volcanics Basalt 9

Geotechnical Conditions cont d The bridge is 3 span, 190m long and 4.5m wide Supported on two abutments (east & west) and two piers (east & west) 10

3.0 DUCTILE IRON PIPE PILES (DIPPS) 11

Ductile Iron Pipe Piles (DIPPs) During the tender & preliminary design stages CFA piles were proposed to support the new SUP Bridge During later stages of the design DIPPs were adopted as alternative foundation piles for the following reasons; - Limited rig capacity to install over 30m long CFA piles - Site constraints (existing bridge) including presence of services - Light weight and more mobile installation equipment & less vibration DIPPs were for the first time used on a VicRoads project 12

DIPPs Cont d DIPPs are circular tube piles made of ductile cast iron 170mm dia piles with 9mm wall thickness 5m long sections installed using plug & drive 900MPa compressive strength and 420MPa tensile strength Load of up to 2400kN The piles are filled with 50MPa concrete 5m long 100 UC sections inserted for the top section High corrosion resistant than steel Low vibration (<= 2mm/sec) Can be installed 400mm from existing buildings Driven using standard 25-30t excavator mounted with hydraulic hammer 13

DIPPs Cont d 2 14

Pile driving video 15

DIPPs Cont d 2 16

4.0 PILE DESIGN & PILE GROUP ANALYSIS 17

Foundation Layout The DIPPs were arranged in the following groups; Abutments - 8 piles (two groups of 4) East Pier - 12 Piles (Two rows of 5 piles with an additional two piles) West Pier - 19 Piles - Due to presence of services & eccentric loading, west pier was arranged in the above manner. 18

Foundation layout 19

Pile Group Analysis Original design proposed 900dia CFA piles, Detailed design adopted 170mm dia DIPPs DIPPs are long and slender Concerns associated with lateral capacity of DIPPs The lateral loads were mainly due to wind and earthquake It was crucial that an accurate assessment of the lateral loads was undertaken Pile groups were analysed using the following two methods; - PIGLET - PLAXIS 3D 20

Pile Loads Two load cases were analysed Load Case Vertical Load (kn) Horizontal Load (kn) Moment (kn-m) 1 8390 0 0 2 6015 500 4100 Case 1 governed vertical load case while case 2 governed lateral load cases 21

PIGLET PIGLET is a spreadsheet based program Relatively easy to use and quick answer Limitation of PIGLET e.g. one single soil layer, soil strength cannot be modelled Due to ease of use and quick results, PIGLET is still commonly used The following soil parameters were used in the PIGLET analysis Soil Parameters Pile Properties Shear Modulus (kpa) Shear Modulus Gradient (kpa/m) Shear Modulus Below Base (kpa) Poisson s Ratio Pile Diameter (mm) Yung s Modulus (kpa) 2,310 500 38,000 0.3 170 5.1x10 7 22

PLAXIS 3D PLAXIS 3D is a 3D FEA package Used for deformation and stability analysis In PLAXIS 3D, the 170 dia DIPP piles were modelled as embedded beam elements Pile cap was modelled as linear elastic plate element The following geotechnical parameters were adopted in the analysis Material/Layer γ (kn/m3) Cu (kpa) C (kpa) Φ (degree) E (kpa) ν' Ult. Skin Friction (kpa) Fill 18 75 5 25 25,000 0.35 40 CIS 17 25 2 25 2,500 0.35 - FBS Upper, stiff silty clay 18 75 5 26 25,000 0.35 40 FBS silty/clayey sand 19-3 28 30,000 0.3 50 FBS lower, very stiff silty clay 19 100 10 26 30,000 0.35 50 Basalt 26-50 33 100,000 0.2 600 23

PLAXIS 3D Cont d To following stages were included in the PLAXIS 3D analysis to simulate the construction sequence on site; - Generate initial stresses - Install piles - Excavate to the base of pile cap - Construct Pile cap - Apply bridge load 24

Pile Group Analyses Results (east pier) Pile No Axial Force (kn/pile) Max Bending Moment (kn-m) Pile Head Settlement (mm) PIGLET PLAXIS 3D PIGLET PLAXIS 3D PIGLET PLAXIS 3D 1 385 347 32 31 13 11 2 312 340 29 25 13 11 3 293 338 28 27 13 11 4 312 341 29 27 13 11 5 385 351 33 30 13 11 6 734 668 33 35 18 25 7 614 665 29 30 18 25 8 583 655 28 31 18 25 9 614 655 29 32 18 25 10 734 668 33 33 18 25 11 524 520 31 34 15 18 12 524 520 31 32 15 18 Calculated pile actions and pile settlements from PIGLET & PLAXIS are generally in the similar range Pile head settlements under serviceability load conditions were well below the acceptance criteria 25

Pile deflection & moment PLAXIS 3D Calculated bending moments were generally in the top 4m and dropped to virtually nothing at depth of approx. 4m Based on this top 5m of the DIPPs were reinforced with UC section 26

Settlement contours PLAXIS 3D As shown pile toe movement is negligible, indicating that the pile head settlement were predominantly due to elastic shortening of the piles 27

Geotechnical capacity PLAXIS 3D The pile geotechnical capacity was mainly derived from shaft resistance As shown, mobilised toe resistance from PLAXIS 3D were very small The pile end bearing is not fully mobilised (small movements shown before) 28

5.0 PILE LOAD TESTING 29

Pile Tests & Results Six piles were tested using dynamic load testing with PDA & CAPWAP analysis; - 1 at each abutment - 2 at each piers Pile Test results are presented below Test Pile ID Pile Length (m) Ultimate Geotechnical Strength (kn) Test Load from PDA (kn) Test Load from CAPWAP (kn) Total Shaft Resistance (kn) Mobilised Toe Resistanc e ( kn) Pile Head Settlement at design Load (mm) 2EA 29.5 430 1242 1224 1183 41 3 1EP 29.9 1340 1703 1850 1698 152 13 2EP 29.8 1340 1857 2076 1850 226 13 7WP 11.5 1380 2063 2180 2010 170 7 8WP 7.6 1380 1538 1568 1286 282 8 3WA 11.3 740 1528 1584 803 780 4 All tested piles exceeded the required geotechnical capacity 30

Pile Load Testing During the design stage, refusal in basalt was assumed at 60mm/ 30sec of driving (contractor s experience) Based on actual pile driving records refusal was achieved at less than12mm/ 30sec Test results indicated significantly higher shaft resistance than expected, particularly at the west abutment (up to 300-600kPa) The above could be attributed to presence XW-HW basalt which may have been penetrated through during the driving process All tested piles exceeded the required ultimate geotechnical capacity Settlements under serviceability loads were well below the criteria With the above DIPP piles were successfully used for the first time on a VicRoads Project. 31

Construction Photos 32

Lifting in place of the superstructure 33

Acknowledgments 34